CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla, Associate

Upload: others

Post on 02-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

CPUC Avoided Cost DRAFT Results

CEWG Workshop May 31, 2016

Brian Horii, Senior PartnerSnuller Price, Senior PartnerZach Ming, ConsultantKiran Chawla, Associate

Page 2: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Outline

Overview of Model Changes

• Data Updates

• Methodology Enhancements

Results

Appendix

2

Page 3: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

OVERVIEW OF MODEL CHANGES

3

Page 4: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Simple Data Updates

All scenario assumptions consistent with LTPP “Default – AAEE Sensitivity Scenario”

• Assumes 1x AAEE to account for effects such as electrification

Generation capacity costs

• From CEC Cost of Generation Report March 2015

Ancillary service costs

• 0.7% of energy value

T&D marginal capacity costs

• See appendix

Carbon price forecast

• Mid-IEPR price forecast

Avoided marginal RPS costs

• From RPS Calculator version 6.2

4

Page 5: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

$0

$2

$4

$6

$8

$10

$12

$14

2016 2020 2024 2028 2032 2036 2040

$/M

MBt

u no

min

alOld

EIA

IEPR

MPR

Natural Gas Price Forecast

Natural gas price forecast calculated using MPR methodology

• NYMEX prices used through 2021 for PG&E CityGate and SoCalBorder

• After 2021, prices are escalated proportionally to the EIA AEO Henry Hub forecast

5

• Transportation rates, franchise fee surcharges, and hedging transaction costs added to NYMEX commodity prices

• Model uses average of SoCal, PG&E BB, and PG&E LT

Page 6: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Methodology Enhancements

Resource balance year for capacity set to today (2016)

Carbon price and variable O&M now included in dispatch logic for calculating net cost of new entry (net-CONE)

Hourly capacity allocation value are based on expected unserved energy (EUE) outputs from E3 RECAP model

T&D allocation factors now based on actual utility loads instead of temperature

6

Page 7: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

-

20

40

60

80

100

120

140

160

Annu

al A

vera

ge En

ergy

Avo

ided

Co

st ($

/MW

h)

Northern CASouthern CALong-RunOld

Annual Energy Price Forecast

Currently, forecasted average annual energy prices are based on a combination of

• Market price forwards

• Transition to annual average price that can support a fully capitalized CCGT

7

Short run market prices

Transition to long-run prices

Page 8: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Hourly Market Price Profiles

The model uses 2015 CAISO hourly prices as the basis for all future hourly prices profiles

For years 2016 through 2020, the model uses the RPS Calculator to adjust the 2015 hourly heat rate profile

Hourly price profile is held constant beyond 2020 due to large uncertainty about renewable integration scenarios

8

00.20.40.60.8

11.21.41.61.8

0 2 4 6 8 10 12 14 16 18 20 22

Norm

alize

d He

at R

ate

Hour

20162017201820192020

Page 9: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

RESULTS

Page 10: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Energy Prices

2017 Energy Price Duration Curve

• Does not include carbon

10

Page 11: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Capacity Prices

Temperature adjusted capacity value forecast

11

Page 12: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Capacity Allocation Factors

12

Month/hour/day-type capacity

allocation factors from RECAP

(expected unserved energy)

RECAP month/hour/day

-type factors allocated to 8760 using

2015 temperatures

Page 13: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Renewable Premium

Renewable Premium = (Renewable Cost –Energy Value) * RPS %

13

Page 14: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Changes from 2011 Avoided Cost Calculator

Overall, avoided cost values shift

• Down in magnitude

• Later in the day (afternoon to evening)

• Later in the year (summer to summer/fall)

14

Page 15: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

CZ 6: Changes from 2011 Avoided Cost Calculator

15

$0

$50

$100

$150

$200

$250

$300Ja

nFe

bM

arAp

rM

ay Jun Jul

Aug

Sep

Oct

Nov

Dec

$/M

Wh

T&D

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy

Series8$0

$50

$100

$150

$200

$250

$300

Jan

Feb

Mar

Apr

May Jun Jul

Aug

Sep

Oct

Nov

Dec

$/M

Wh

Distribution

Transmission

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy

Old

$0

$50

$100

$150

$200

$250

$300

1 3 5 7 9 11 13 15 17 19 21 23

$/M

Wh

T&D

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy

Series8$0

$50

$100

$150

$200

$250

$300

1 3 5 7 9 11 13 15 17 19 21 23

$/M

Wh

Distribution

Transmission

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy

Old

CZ 6, 2020

Page 16: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

CZ 13: Changes from 2011 Avoided Cost Calculator

16

$0

$50

$100

$150

$200

$250

$300

Jan

Feb

Mar

Apr

May Jun Jul

Aug

Sep

Oct

Nov

Dec

$/M

Wh

T&D

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy$0

$50

$100

$150

$200

$250

$300

Jan

Feb

Mar

Apr

May Jun Jul

Aug

Sep

Oct

Nov

Dec

$/M

Wh

Distribution

Transmission

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy

Old

$0

$50

$100

$150

$200

$250

$300

$350

$400

$450

1 3 5 7 9 11 13 15 17 19 21 23

$/M

Wh

T&D

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy

$0

$50

$100

$150

$200

$250

$300

$350

$400

$450

1 3 5 7 9 11 13 15 17 19 21 23

$/M

Wh

Distribution

Transmission

Capacity

Avoided RPS

Emissions

Ancillary Services

Losses

Energy

Old

CZ 13, 2020

Page 17: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Energy Efficiency Avoided CostsPG&E 2020

17

Page 18: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Energy Efficiency Avoided CostsSCE 2020

18

Page 19: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Energy Efficiency Avoided CostsSDG&E 2020

19

Page 20: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

APPENDIX

20

Page 21: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Combustion Turbine Costs

Advanced Combustion TurbineOld Assumptions Updated Assumptions

Operating DataHeat rate (Btu/kWh) 9300 9880

Lifetime (yrs) 20 20Scheduled Outage Factor 3% 3.18%

Forced Outage Rate 4% 4.13%Plant Costs

Installed Cost ($/kW) $1,230 $1,069Fixed O&M ($/kW-yr) $17 $23.87

Variable O&M ($/MWh) $4 $0Plant Cost Escalation Rate 2% 2%

Cost Basis Year for Plant Costs 2009 2013Financing

Debt-to-Equity 60% 67%Debt Cost 8% 4.52%

Equity Cost 12% 13.25%

Source: ESTIMATED COST OF NEW RENEWABLE AND FOSSIL GENERATION IN CALIFORNIA, March 2015 (http://www.energy.ca.gov/2014publications/CEC-200-2014-003/CEC-200-2014-003-SF.pdf)

Note: Administrative costs such as labor1 and overhead2 are included in the CT cost estimates.

21

Page 22: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

T&D Capacity Costs

2020 $/kW-yr (adjusted for losses to the meter)

IOU Old T&D Capacity Cost Updated T&D Capacity Cost

PG&E* $92.17 $137.99SCE $66.23 $147.57

SDG&E $92.08 $112.91

*For PG&E, system average is shown. Actual update will use values that vary by zone

In addition, the model will have the optionality of letting the user override the T&D capacity costs and the corresponding allocation shapes

Reporting of sub-transmission and distribution avoided costs can be separated

• Would need corresponding allocation factors

• Bulk system transmission costs assumed to be embedded in the market energy price forecasts

22

Page 23: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

RPS Calculator Energy Price Profile Adjustment

Start with 2015 hourly day-ahead and real-time CAISO market prices

Calculate market prices using RPS Calculator for 2015-2020

• RPS Calculator produces 12 month x 24 hour price profiles

• Each year calculated using different RPS % but same gas price

Adjustment process

• Take the % difference between the 2015 RPS Calculator profile and the 2016-2020 RPS calculator profiles for each 12x24 value

• Add the 12x24 % difference from step 1 to the corresponding hour in the normalized day ahead shape

• Re-normalize the adjusted shapes to average 1.0

23

Page 24: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Price Forecasts

24

$-

$20

$40

$60

$80

$100

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

$/to

n no

min

al

Carbon Price Forecast

Old (Synapse) Updated (IEPR Mid)

-

20

40

60

80

100

120

140

160

Annu

al A

vera

ge En

ergy

Avo

ided

Co

st ($

/MW

h)

Northern CASouthern CALong-RunOld

Short run market prices

Transition to long-run prices

Page 25: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Avoided RPS Costs

Avoided RPS costs now based on 50% RPS and latest data from RPS calculator

Marginal RPS resource is assumed to be energy-only, solar PV –tracking, >20 MW

• $75/MWh (2015 dollars)

• Energy-only means no incremental transmission cost applied to PPA price and no capacity value given in calculating avoided RPS cost

RPS calculator used to estimate marginal RPS resource cost: http://www.cpuc.ca.gov/WorkArea/DownloadAsset.aspx?id=10347

25

Page 26: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Resource Balance Year

If the model were to continue to use a resource balance year for capacity, the system would reach resource balance in 2027

• This does not include any future EE or DR

26

30,000

35,000

40,000

45,000

50,000

55,000

60,000

65,000

70,000

75,000

80,000

2015 2020 2025 2030 2035 2040

MW

Resources

2027

Page 27: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Capacity Value Methodology Change

Net cost of new entry (CONE) now includes a carbon price when dispatching the CT for energy market revenues as well as variable O&M

CO2 emission rate calculated based on implied hourly market heat rate

• Will be capped at a maximum of 12,500 Btu/kWh

• When implied heat rate drops below 6900, marginal emission rate will drop be based on a plant heat rate of 6900

• If implied heat rate drops below zero (i.e. negative pricing), marginal emission rate will be set to zero to signify renewable curtailment hour

Resource balance year will now be set to present (2016) based on CPUC proposed decision (May 2016)

27

Page 28: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Generation Capacity Allocation

2010 Weekday Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec1 0 0 0 0 0 0 0 0 0 0 0 02 0 0 0 0 0 0 0 0 0 0 0 03 0 0 0 0 0 0 0 0 0 0 0 04 0 0 0 0 0 0 0 0 0 0 0 05 0 0 0 0 0 0 0 0 0 0 0 06 0 0 0 0 0 0 0 0 0 0 0 07 0 0 0 0 0 0 0 0 0 0 0 08 0 0 0 0 0 0 0.0026966 0.0029112 0 0 0 09 0 0 0 0 0 0 0.0065215 0.0098603 0.0027316 0 0 0

10 0 0 0 0 0 0 0.0157723 0.0176726 0.0087897 0 0 011 0 0 0 0 0 0.0038537 0.0185558 0.029874 0.0140379 0 0 012 0 0 0 0 0 0.0048778 0.0251853 0.0414074 0.0245794 0 0 013 0 0 0 0 0.0088 0.0129475 0.0347823 0.05318 0.0308885 0.0059507 0 014 0 0 0 0 0 0.0173719 0.0406409 0.058978 0.0370498 0 0 015 0 0 0 0 0 0.0133788 0.0387546 0.0569903 0.0355128 0 0 016 0 0 0 0 0 0.0048417 0.0286004 0.0437687 0.0236727 0 0 017 0 0 0 0 0 0.0041508 0.0192022 0.0306525 0.0191233 0 0 018 0 0 0 0 0 0 0.0156842 0.0293617 0.0205981 0 0 019 0 0 0 0 0 0 0.0131517 0.0232846 0.0064984 0 0 020 0 0 0 0 0 0 0.0080857 0.006075 0 0 0 021 0 0 0 0 0 0 0 0 0 0 0 022 0 0 0 0 0 0 0 0 0 0 0 023 0 0 0 0 0 0 0 0 0 0 0 024 0 0 0 0 0 0 0 0 0 0 0 0

2020 Weekday Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec1 0 0 0 0 0 0 0 0 0 0 0 02 0 0 0 0 0 0 0 0 0 0 0 03 0 0 0 0 0 0 0 0 0 0 0 04 0 0 0 0 0 0 0 0 0 0 0 05 0 0 0 0 0 0 0 0 0 0 0 06 0 0 0 0 0 0 0 0 0 0 0 07 0 0 0 0 0 0 0 0 0 0 0 08 0 0 0 0 0 0 2.788E-15 0 3.062E-17 0 0 09 0 0 0 0 0 0 3.896E-13 0 1.194E-13 0 0 0

10 0 0 0 0 0 0 7.567E-12 1.683E-15 1.492E-13 0 0 011 0 0 0 0 0 0 2.291E-10 1.587E-13 1.368E-10 0 0 012 0 0 0 0 0 5.15E-16 1.153E-07 5.919E-11 1.149E-08 0 0 013 0 0 0 0 0 5.781E-14 1.05E-06 2.133E-07 3.925E-07 0 0 014 0 0 0 0 0 2.444E-11 6.157E-06 1.25E-05 1.129E-05 1.413E-17 0 015 0 0 0 0 4E-15 1.787E-09 6.876E-05 0.0003697 0.0002303 4.638E-12 0 016 0 0 0 0 1E-13 9.485E-08 0.0002481 0.0009546 0.0007069 1.167E-09 0 017 0 0 0 0 1E-10 1.833E-07 0.0003291 0.0010551 0.0008316 1.124E-05 0 018 3.046E-14 0 0 0 8E-11 2.678E-06 0.0004791 0.0016849 0.004977 9.048E-06 1E-13 5E-0919 0 0 0 0 2E-08 4.774E-05 0.0016626 0.0047013 0.0048272 2.428E-05 0 2E-1120 0 0 0 0 1E-07 4.272E-05 0.001757 0.0033027 0.0015178 1.003E-07 0 6E-1221 0 0 0 0 7E-12 3.342E-08 5.955E-05 7.973E-05 2.259E-05 0 0 1E-1822 0 0 0 0 0 0 5.126E-10 1.428E-10 2.579E-09 0 0 023 0 0 0 0 0 0 0 0 0 0 0 024 0 0 0 0 0 0 0 0 0 0 0 0

2030 Weekday Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov D1 0 0 0 0 0 0 0 0 0 0 02 0 0 0 0 0 0 0 0 0 0 03 0 0 0 0 0 0 0 0 0 0 04 0 0 0 0 0 0 0 0 0 0 05 0 0 0 0 0 0 0 0 0 0 06 0 0 0 0 0 0 0 0 0 0 07 0 0 0 0 0 0 0 0 0 0 08 0 0 0 0 0 0 1.569E-18 0 0 0 09 0 0 0 0 0 0 3.05E-18 0 1.14E-17 0 0

10 0 0 0 0 0 0 4.209E-17 0 1.258E-18 0 011 0 0 0 0 0 0 5.872E-16 0 1.08E-14 0 012 0 0 0 0 0 0 9.383E-12 0 2.106E-12 0 013 0 0 0 0 0 0 4.499E-11 1.496E-15 9.715E-11 0 014 0 0 0 0 0 0 1.171E-09 2.035E-11 3.138E-08 0 015 0 0 0 0 0 3.419E-18 1.127E-07 6.943E-07 7.781E-06 0 016 0 0 0 0 5.385E-19 1.235E-12 2.319E-06 1.676E-05 5.674E-05 8E-14 017 0 0 0 0 1.829E-13 3.496E-11 1.918E-05 5.501E-05 0.0001153 1E-05 0 7E18 5.168E-13 0 0 0 1.169E-12 8.677E-08 0.0001148 0.0005932 0.0052906 3E-05 2E-12 2E19 0 0 0 0 4.699E-08 6.765E-05 0.0018974 0.0048548 0.0071231 8E-05 1E-13 8E20 0 0 0 6.173E-14 5.011E-07 8.349E-05 0.0023575 0.0037861 0.0024356 5E-07 3E-14 3E21 0 0 0 0 4.899E-11 9.027E-08 0.000112 0.0001341 5.765E-05 0 0 6E22 0 0 0 0 0 3.203E-14 2.472E-09 4.026E-10 1.391E-08 0 023 0 0 0 0 0 0 0 0 0 0 024 0 0 0 0 0 0 0 0 0 0 0

Updated 2020

Capacity Allocation

Updated 2030

Capacity Allocation

Old Capacity Allocation

Hou

r

Month

Capacity allocation will use E3 RECAP model

• Hourly expected unserved energy (EUE) probability model

• Uses 63 years of historical weather, historical renewable profiles, hydro flows and generation forced outage rates

Model will also allow user-override of capacity allocation

28

Page 29: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

00.0050.010.0150.020.0250.03

020406080

100120

125

951

777

510

3312

9115

4918

0720

6523

2325

8128

3930

9733

5536

1338

7141

2943

8746

4549

0351

6154

1956

7759

3561

9364

5167

0969

6772

2574

8377

4179

9982

5785

15

Capa

city

Allo

cato

rs

Tem

pera

ture

(°F

)Creating 8760 Hourly Allocators

Once a month/hour/day-type table of EUE has been created using RECAP for each year, these values are allocated to an 8760 using a given temperature year

Days with load-weighted temperature averages greater than 90° F are assigned EUE capacity allocators

2030 Weekday Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec1 0 0 0 0 0 0 0 0 0 0 0 02 0 0 0 0 0 0 0 0 0 0 0 03 0 0 0 0 0 0 0 0 0 0 0 04 0 0 0 0 0 0 0 0 0 0 0 05 0 0 0 0 0 0 0 0 0 0 0 06 0 0 0 0 0 0 0 0 0 0 0 07 0 0 0 0 0 0 0 0 0 0 0 08 0 0 0 0 0 0 1.569E-18 0 0 0 0 09 0 0 0 0 0 0 3.05E-18 0 1.14E-17 0 0 0

10 0 0 0 0 0 0 4.209E-17 0 1.258E-18 0 0 011 0 0 0 0 0 0 5.872E-16 0 1.08E-14 0 0 012 0 0 0 0 0 0 9.383E-12 0 2.106E-12 0 0 013 0 0 0 0 0 0 4.499E-11 1.496E-15 9.715E-11 0 0 014 0 0 0 0 0 0 1.171E-09 2.035E-11 3.138E-08 0 0 015 0 0 0 0 0 3.419E-18 1.127E-07 6.943E-07 7.781E-06 0 0 016 0 0 0 0 5.385E-19 1.235E-12 2.319E-06 1.676E-05 5.674E-05 8E-14 0 017 0 0 0 0 1.829E-13 3.496E-11 1.918E-05 5.501E-05 0.0001153 1E-05 0 7E-1718 5.168E-13 0 0 0 1.169E-12 8.677E-08 0.0001148 0.0005932 0.0052906 3E-05 2E-12 2E-0819 0 0 0 0 4.699E-08 6.765E-05 0.0018974 0.0048548 0.0071231 8E-05 1E-13 8E-1120 0 0 0 6.173E-14 5.011E-07 8.349E-05 0.0023575 0.0037861 0.0024356 5E-07 3E-14 3E-1121 0 0 0 0 4.899E-11 9.027E-08 0.000112 0.0001341 5.765E-05 0 0 6E-1422 0 0 0 0 0 3.203E-14 2.472E-09 4.026E-10 1.391E-08 0 0 023 0 0 0 0 0 0 0 0 0 0 0 024 0 0 0 0 0 0 0 0 0 0 0 0

Date Avg Daily Temp (F)

Hour LOLP

Sep 5 87° F 17 0

Sep 5 87° F 18 0

Sep 5 87° F 19 0

… … … …

Sep 6 93° F 17 0.0001

Sep 6 93° F 18 0.005

Sep 6 93° F 19 0.007

Temp

Allocators

15% Burbank19% Fresno25% Longbeach19% Riverside

5% Sacramento1% San Francisco

12% San Jose3% Ukiah

Temperature Load Weights

Page 30: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Climate Zone 2

Marin

Page 31: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Climate Zone 3

Alameda

Page 32: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Climate Zone 4

San Luis Obispo

Page 33: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Climate Zone 12

Pleasanton

Page 34: CPUC Avoided Cost DRAFT Results · 2019-09-12 · CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016. Brian Horii, Senior Partner. ... Jan Feb Mar Apr May Jun Jul Aug Sep

Climate Zone 13

Fresno