city of brantford 2014 master servicing plan (msp) for water, … · 2019. 2. 10. · city of...
TRANSCRIPT
City of Brantford
2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services
Volume III - Water Master Plan
Final Report
July, 2014
Prepared by:
In Association With:
City of Brantford
2014 Master Servicing Plan (MSP) for Water, Sanitary and Stormwater Services
Volume III
July, 2014
Page i
Table of Contents – Volume III - Water Master Servicing Plan page
1 Introduction and Background....................................................................................... 1
1.1 Background .................................................................................................................... 1 1.2 Master Servicing Plan Objectives .................................................................................... 2 1.3 Master Servicing Plan Documentation Layout ................................................................. 3 1.4 Master Servicing Plan Report Volume III ......................................................................... 5
2 Water System Policy and Criteria ................................................................................. 6
2.1 Design Criteria................................................................................................................ 6 2.1.1 Water Treatment Plant ....................................................................................... 6 2.1.2 Watermains........................................................................................................ 7 2.1.3 Water Pumping Stations ..................................................................................... 7 2.1.4 Water Storage Facilities ..................................................................................... 8
2.2 Service Levels ................................................................................................................ 8 2.2.1 Customer Level of Service ................................................................................. 8 2.2.2 Technical Level of Service.................................................................................. 8
2.3 Costing Methodology ...................................................................................................... 8 2.3.1 Unit Rates .......................................................................................................... 8 2.3.2 Operation and Maintenance Costs ..................................................................... 9 2.3.3 Final Project Costs ............................................................................................. 9
3 Existing Water Distribution System ........................................................................... 10
3.1 Existing Water Infrastructure ......................................................................................... 10 3.1.1 Water Treatment Plant ..................................................................................... 10 3.1.2 Water Pumping Stations and Storage Facilities ................................................ 12
3.2 Hydraulic Water Model ................................................................................................. 12
4 Assessment of the Existing and Future Water Infrastructure .................................. 14
4.1 Opportunities and Constraints ....................................................................................... 14 4.1.1 Water Distribution System ................................................................................ 14
4.2 Hydraulic Analysis ........................................................................................................ 16 4.2.1 Water Treatment Plant ..................................................................................... 19 4.2.2 Trunk Watermains ............................................................................................ 20 4.2.3 Water Pumping Stations ................................................................................... 20 4.2.4 Water Storage .................................................................................................. 21
5 Evaluation of Strategies .............................................................................................. 22
5.1 Objectives .................................................................................................................... 22 5.2 Description of the Evaluation Process ........................................................................... 22 5.3 Evaluation Criteria ........................................................................................................ 24 5.4 Servicing Concepts ....................................................................................................... 26
5.4.1 Servicing Concept Evaluation ........................................................................... 26 5.5 Servicing Strategies ...................................................................................................... 27
5.5.1 Servicing Strategy Evaluation ........................................................................... 33
City of Brantford
2014 Master Servicing Plan (MSP) for Water, Sanitary and Stormwater Services
Volume III
July, 2014
Page ii
6 Preferred Water Servicing Strategy............................................................................ 34
6.1 Preferred Servicing Strategy ......................................................................................... 34 6.2 Capital Program for the Preferred Water Servicing Strategy .......................................... 36 6.3 Implementation & Class EA Requirements .................................................................... 38
7 Post-2031 Vision .......................................................................................................... 41
City of Brantford
2014 Master Servicing Plan (MSP) for Water, Sanitary and Stormwater Services
Volume III
July, 2014
Page iii
List of Figures
Figure 3.1 – Master Servicing Plan Document Layout .............................................................................. 3
Figure 3.2 – Existing Water Distribution System ..................................................................................... 11
Figure 3.3 – Opportunities and Constraints ............................................................................................ 15
Figure 3.4 – Traffic Zones ...................................................................................................................... 17
Figure 3.5 – Intensification Zones .......................................................................................................... 18
Figure 3.6 – Projected Holmedale Water Treatment Plant Demands ...................................................... 19
Figure 3.7 – Servicing Option Evaluation Flow Diagram ......................................................................... 23
Figure 3.8 – Servicing Strategy 1: Optimize Pumping to Upper Zones and Add New Elevated Storage .. 29
Figure 3.9 – Servicing Strategy 2: Optimize Pumping to Upper Zones and Downtown South Pressure
Zone Re-Alignment ............................................................................................................. 30
Figure 3.10 –Strategy 3: Eliminate Albion PS Feed, New/Modified Northwest Feed & Optimize Storage 31
Figure 3.11 – Strategy 4: Prioritize Albion PS Feed & Optimize Storage ................................................. 32
Figure 3.12 – Preferred Water Servicing Strategy .................................................................................. 35
Figure 3.13 – Potential Post Period Considerations................................................................................ 42
List of Tables
Table 3.1 – Water Design Criteria ............................................................................................................ 6
Table 3.2 – Pumping Station and Storage Facility Summary .................................................................. 12
Table 3.3 – Maximum Day Demand Projections ..................................................................................... 16
Table 3.4 – Water Pumping Requirements ............................................................................................. 20
Table 3.5 – Future Water Storage Needs ............................................................................................... 21
Table 3.6 – Evaluation Criteria ............................................................................................................... 24
Table 3.7 – Servicing Strategy Evaluation .............................................................................................. 33
Table 3.8 – Preferred Water Servicing Strategy Capital Program ........................................................... 37
Table 3.9 – Capital Program Scheduling and Implementation................................................................. 40
Appendices
Appendix 3A – Water Demand Projections
Appendix 3B – Historical Water Demands
Appendix 3C – Water Evaluation Tables
Appendix 3D – Unit Costs
Appendix 3E – Preliminary Water Model Results
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 1
1 Introduction and Background
1.1 Background
The City of Brantford is located in southwest Ontario along the banks of the Grand River, and is within
close proximity to the City of Hamilton and the County of Brant. The City of Brantford is responsible for:
water treatment, trunk and distribution mains, storage facilities and pumping stations; wastewater
treatment, sewers, forcemains and sewage pumping stations; as well as, stormwater sewers, drainage
ditches, culverts, and stormwater management ponds.
The City of Brantford owns and operate its water system, which draws water from the Grand River and
distributes treated water to its residents. The City employs the Ontario Clean Water Agency (OCWA) to
operate, maintain and manage the Brantford Water Pollution Control Plant and nine sewage pump
stations. The entirety of the City is located within the Grand River Watershed. The majority of the City
drains directly to the Grand River or Grand River tributaries, Mohawk Lake and D’Aubigny Creek, via City
owned stormwater infrastructure; however, a significant portion of the northeastern segment of the City
discharges to local creeks along the City’s north and east boundaries.
The City of Brantford is part of the Greater Golden Horseshoe (GGH) area situated on the Grand River in
the heart of Southern Ontario. The Government of Ontario’s legislative growth plan, Places to Grow Act,
2005, and its Amendment 2, 2013, identifies substantial population and employment growth for the City to
2031.
Readily available and accessible public infrastructure is essential to the viability of existing and growing
communities. Infrastructure planning, land use planning and infrastructure investment require close
integration to ensure efficient, safe and economically achievable solutions to provide the required water,
wastewater and stormwater infrastructure.
To balance the needs of growth with the protection and preservation of natural, environmental and
heritage resources, the City of Brantford initiated the preparation of a Master Servicing Plan for water,
wastewater and stormwater services under the Municipal Engineers Association (MEA) Master Plan
Class Environmental Assessment process.
As the study proponent, the City of Brantford retained BluePlan Engineering Limited as lead consultant, in
association with Associated Engineering, GeoAdvice, Watson & Associates and McLeod Wood, to
complete the Master Plan through an integrated process with City Staff, stakeholders and the public.
The 2014 Master Servicing Plan provides a review, evaluation and development of water, wastewater and
stormwater servicing strategies to support existing needs and projected growth within the City. The
Master Plan uses updated population and employment growth forecasts based on a 2031 planning
horizon.
The 2014 Master Servicing Plan is being completed concurrently with the City’s Transportation Master
Plan Update to enable, where advantageous, alignment of recommended work or capital projects,
minimizing potential impacts and disruptions to the public. The 2014 Master Servicing Plan is a critical
component of the City’s planning for growth and will provide the framework and vision for the
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 2
management, expansion and funding of the water, sanitary and storm systems for the entire City to 2031
and beyond.
1.2 Master Servicing Plan Objectives
The Master Servicing Plan for Water, Sanitary and Stormwater Services comprehensively documents the
development, evaluation and selection of the preferred water, wastewater and stormwater servicing
strategies to meet the servicing needs of existing and future development to 2031.
The 2014 Master Servicing Plan evaluates the ability of existing and planned water, wastewater and
stormwater infrastructure in the City of Brantford to efficiently and effectively service the City’s existing
and anticipated growth, and to evaluate and develop recommended servicing strategies.
The key objectives of the 2014 Master Servicing Plan are as follows:
Review planning forecasts to 2031 and determine the impacts on servicing needs for the City’s
water, wastewater and stormwater infrastructure;
Consider and incorporate proposed water, wastewater and stormwater infrastructure needs
beyond 2031;
Undertake a comprehensive review and analysis for the water, wastewater and stormwater
servicing requirements;
Complete the Master Servicing Plan in accordance with the MEA Class EA process (further
described in Volume II)
Address key servicing considerations as part of the development and evaluation of servicing
strategies including:
o Level of service to existing users and approved growth
o Operational flexibility and security of supply
o Mitigation of impacts to natural, social and economic environments
o Opportunity to meet policy, policy statements, regulations and technical criteria
o Opportunity to optimize existing infrastructure and servicing strategies
o Ensuring the strategies are cost effective
Consider and develop sustainable servicing solutions;
Utilize updated industry trends and more detailed information from relevant City studies and
projects to provide better capital cost estimates;
Utilize recently completed and on-going projects to update infrastructure status, capacity and cost
estimates;
Utilize the updated water, wastewater and stormwater hydraulic models for the analysis of
servicing alternatives;
Establish a complete and implementable water, wastewater and stormwater capital program; and
Extensive consultation with the public and stakeholders.
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 3
1.3 Master Servicing Plan Documentation Layout
The 2014 Master Servicing Plan Report, including all supporting volumes, is the documentation placed on
public record for the prescribed review period. The documentation, in its entirety, describes all required
phases of the planning process and incorporates the procedure considered essential for compliance with
the Environmental Assessment Act.
The Master Servicing Plan Report is organized into six volumes as illustrated in Figure 3.1 and as
described below:
Figure 3.1 – Master Servicing Plan Document Layout
Volume I – Executive Summary
Volume I provides a brief overview of the 2014 Master Servicing Plan. It summarizes the information
contained in Volumes II, III, IV, V and VI, including problem statement, purpose of the study, significant
planning, environmental and technical considerations, description of the analysis performed and final
solutions and recommendations.
Volume II – Background and Planning Context
Volume II details the master planning process including the Master Plan Class EA process, related
studies, legislative and policy planning context, water, wastewater and stormwater servicing principles
and policies, population and employment growth forecasts, existing environmental and servicing
conditions and future considerations. This volume also introduces the existing infrastructure conditions for
the water, wastewater and stormwater systems. The appendices in this volume contain relevant baseline
and planning information including:
Appendix 2A – Water and Wastewater Servicing Principles and Policies Paper
Appendix 2B – Planning Data and Memo
Appendix 2C – Environmental Mapping
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 4
Volume III – Water Master Plan
Volume III consists of the principal document summarizing the study objectives, approach,
methodologies, technical analyses, evaluation and selection of the preferred water servicing strategy.
This volume outlines the water policies, design criteria and level of service needed to be achieved by the
water network. In addition, Volume III identifies the existing water network and describes the hydraulic
modelling tool used for the analysis. Further in Volume III is the detailed evaluation and decision-making
as well as the preferred servicing strategy and associated capital program.
A significant amount of technical background information has been compiled, which is critical to the
development of the Water Master Servicing Plan. This information is included as appendices of Volume
III. The technical appendices contain relevant project, implementation and technical analysis information,
including:
Appendix 3A – Water Demand Projections
Appendix 3B – Historical Water Demand
Appendix 3C – Water Evaluation Tables
Appendix 3D – Unit Costs
Appendix 3E – Preliminary Water Model Results
Volume IV – Wastewater Master Plan
Volume IV consists of the principal document summarizing the study objectives, approach,
methodologies, technical analyses, and evaluation and selection of the preferred wastewater servicing
strategy. This volume outlines the wastewater policies, design criteria and level of service needed to be
achieved by the wastewater network. In addition, Volume IV identifies the existing wastewater network
and describes the hydraulic modelling tool used for the analysis. Further in Volume IV is the detailed
evaluation and decision-making as well as the preferred servicing strategy and associated capital
program.
A significant amount of technical background information has been compiled, which is critical to the
development of the Wastewater Master Servicing Plan. This information is included as appendices of
Volume IV. The technical appendices contain relevant project, implementation and technical analysis
information, including:
Appendix 4A – Wastewater Flow Projections
Appendix 4B – Historical Wastewater Flows
Appendix 4C – Wastewater Evaluation Tables
Appendix 4D – Unit Costs
Appendix 4E – Preliminary Wastewater Model Results
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 5
Volume V – Stormwater Master Plan
Volume V consists of the principal document summarizing the study objectives, approach, methodologies,
technical analyses, evaluation and selection of the preferred stormwater servicing strategy. This volume
outlines the stormwater policies, design criteria and level of service needed to be achieved by the
stormwater network. In addition, Volume V identifies the existing stormwater network and describes the
hydraulic modelling tool used for the analysis. Further in Volume V is the detailed evaluation and
decision-making as well as the preferred servicing strategy and associated capital program.
Background information is included as appendices of Volume V. The technical appendices contain
relevant project, implementation and technical analysis information, including:
Appendix 5A – Introduction to Stormwater Management
Appendix 5B - Stormwater Evaluation Tables
Appendix 5C – Unit Costs
Volume VI – Public and Agency Consultation
Volume VI contains all relevant documentation of the public consultation process including notices,
comments and responses, and distribution information. Presentation material from all Public Information
Centres (PICs) held during the process is included. Other presentation material and discussion
information from workshops held with relevant agencies, approval bodies and other stakeholders are also
included.
1.4 Master Servicing Plan Report Volume III
This current volume provides the analysis and summary of the preferred 2031 water servicing strategy for
the City of Brantford. It also provides the background support for satisfying Phase I and II of the Class EA
process.
Volume III is organized into the following sections:
1. Introduction
2. Water System Policy and Criteria
3. Existing Water Distribution System
4. Assessment of Existing and Future Water Infrastructure
5. Evaluation of Strategies
6. Preferred Water Servicing Strategies
7. Post 2031 Vision
Volume III is one of six volumes that make up the complete Master Servicing Plan Class EA Study Report and should be read in conjunction with the other volumes.
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 6
2 Water System Policy and Criteria
2.1 Design Criteria
A guiding principle for the design criteria is to ensure that demand projections are accurately predicted
with an appropriate level of safety and risk management. This overall principle also ensures that
infrastructure has sufficient capacity to meet the growing needs of the City and does not impede the
approved/planned growth.
The design criteria was reviewed as part of this Master Servicing Plan to ensure water demands are
accurate and will support sizing and timing of future infrastructure such as pipes and facilities.
The development of design criteria utilized historical billing data in combination with Ontario Ministry of
Environment (MOE) Design Standards and Guidelines. Level of service and water policies were
discussed and established at the outset of the project.
Table 3.1 summarizes the City of Brantford water design criteria used at a Master Servicing Planning
level.
Table 3.1 – Water Design Criteria
Type of Development Average Day Demand Maximum Day Factor Peak Hour Factor
Residential 300 L/person/day 2.0 3.0
Employment 300 L/employee/day 2.0 3.0
The water billing analysis indicated that an average day demand of 300 L/cap/d is considered reasonable
for residential development. Employment demands were based on an equivalent population and
300 Lpcd. A minimum of 28 m3/ha/d was assumed as the minimum demand requirement for employment
in accordance with MOE Guidelines.
The rated capacity of a water treatment plant is defined as the maximum daily flow that the works is
approved to treat. Water treatment capacity is based on meeting maximum day water demand
requirements with an additional factor for in-facility uses such as filter backwashing.
Existing water demands were established based on water billing records. The approach for projecting
future growth demands was based on planning data for residential and non-residential users provided in
small geographic units (SGU) and applying the design criteria outlined in Table 3.1.
2.1.1 Water Treatment Plant
Under this Master Servicing Plan, the future maximum day demands were estimated based on historical
review of the production data at the Holmedale Water Treatment Plant (WTP). The approach for
projecting the future City-wide demands was carried out using a starting point methodology.
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 7
Under this approach, the equivalent per capita consumption was calculated for the Holmedale WTP for
each of the last five years and averaged to establish an appropriate historical per capita consumption.
This rolling average of the per capita consumption was then used with the 2011 population and
employment to obtain the 2011 starting point. In order to project future demands from the 2011 starting
point, the design criteria listed in the previous section was applied to the population and employment
growth and added to the starting point.
This approach provided an assessment of the existing capacity at the Holmedale WTP and was used to
determine future servicing needs. The starting point developed using this approach may be updated over
time as a rolling average, thereby incorporating future consumption trends. The calculated 2011
maximum day demand starting point used under this Master Servicing Plan is 53 ML/d and the current
Holmedale WTP rated capacity is 100 ML/d.
2.1.2 Watermains
Theoretical transmission capacities were estimated using capacity calculations with a reasonable
allowable head loss. For larger watermains, a factor of 1.5 m/km of head loss was typically used.
The City of Brantford full pipe hydraulic model was used to assess the ability of the water distribution
network to deliver adequate flows and pressures throughout the City of Brantford as well as to further
refine watermain capacities. Four hydraulic modelling scenarios (minimum hour, maximum day, peak
hour and maximum day plus fire) were evaluated to confirm watermain requirements.
Additional criteria considered typical of best practices were also referenced to establish existing and
future watermain capacities. These criteria are as follows:
Watermains that are part of the local distribution system are sized for the greater of maximum day
demand plus fire or peak hour demand
Watermain sizing is based on flow demands and pressure requirements which include
maintaining pressures in the distribution system between 40 and 100 psi.
Velocities within trunk watermains should be maintained below 2.0 m/s.
Trunk watermain capacity expansions are based on service level (e.g., pressure, velocity, head
loss). Oversizing was considered in areas where future potential growth and build out is
expected to occur.
2.1.3 Water Pumping Stations
Water pumping stations (PS) are rated based on their firm capacity, which is defined as the capacity of
the pumping station with the largest pump out of service. For each pressure zone, the pumping stations
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 8
should be able to provide peak hour demands in the immediate serviced pressure zone and have
sufficient capacity to transfer maximum day demands to the upper serviced pressure zones.
Capacity expansions are triggered once the pumping station’s firm capacity reaches the required
maximum day demand or peak hour demand, depending on high-lift or low-lift requirement.
2.1.4 Water Storage Facilities
The quantity of required storage within a given water pressure zone is dictated by the ability to provide
the required equalization storage, fire storage, and emergency supply to maintain a satisfactory level of
service. Reservoir storage capacity at each pumping station is based on typical MOE criteria:
Equalization storage – 25% of the maximum day demand for serviced pressure zone
Fire storage – minimum 250 L/s for 4 hours depending on Equivalent Population within each
pressure zone
Emergency storage – 25% of the equalization plus fire storage for the lower pressure zone at the
reservoir’s HGL.
2.2 Service Levels
Guiding policies and principles for the design and operation of the City’s water distribution system were
established at the outset of the Master Servicing Plan. These policies and principles are presented in the
following sections.
2.2.1 Customer Level of Service
Customer levels of service are in place to ensure that pressures to end users are adequate, water supply
is reliable, and water quality meets local and agency regulatory guidelines. Furthermore, the City of
Brantford endeavours to minimize service interruptions whenever possible.
2.2.2 Technical Level of Service
Technical levels of service specify the actual operating ranges under which the water distribution system
is expected to perform. A minimum operating pressure of 40 psi (275 kPa) and a maximum operating
pressure of 100 psi (690 kPa) shall be maintained within the distribution system under maximum day
demand and a minimum operating pressure of 40 psi shall be maintained under peak hour demand.
Under fire flow conditions, it is allowable for pressures to drop to a minimum of 20 psi (140 kPa).
2.3 Costing Methodology
2.3.1 Unit Rates
Unit cost rates were used as a baseline approach in determining estimated linear project costs. The
linear unit rates used for this Master Servicing Plan are based in 2014 dollars and take into consideration
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 9
southern Ontario prices of labour and availability of materials. The unit rates are the result of preparing
multiple Master Planning Studies and have undergone independent peer reviews in order to further refine
and ensure overall accuracy of the cost estimates. Estimates were favorably compared to costs of recent
capital projects within Brantford, the GTA and southern Ontario to support validation of the unit rates. A
summary of the linear unit water costs for the Master Servicing Plan is provided in Appendix 3D.
2.3.2 Operation and Maintenance Costs
Operation and Maintenance Costs (O & M) have been qualitatively considered during the evaluation of
servicing alternatives. The development of alternatives has strived to reduce O & M costs wherever
possible. For example, the ongoing operation and maintenance costs of a pumping station or storage
facility will have a larger financial impact on a servicing strategy than one that does not include such a
facility.
2.3.3 Final Project Costs
The 2014 Master Servicing Plan includes the calculation of capital costs for all proposed projects. These
costs were calculated using a combination of methods. For the majority of the water projects, a base
construction cost was obtained using either unit rate construction cost based on pipe diameter or unique
project analysis. The base construction cost considers several factors unique to each project such as
approximate depth of installation, creek, railway and highway crossings, tunneling requirements,
Greenfield versus urban construction and various other construction challenges. Design, administration,
contingency and non-recoverable HST costs were added to arrive at a final project cost. Detailed costing
sheets were developed to support the financial evaluation for each linear and facility projects. The final
project costs are shown in the Capital Program within Section 6.2.
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 10
3 Existing Water Distribution System
3.1 Existing Water Infrastructure
The City of Brantford’s water system consists of three pressure zones: Zone 1, Zone 2/3, and Zone 4.
Water supply originates from the Grand River, and is treated at the Holmedale Water Treatment Plant
(WTP). The Holmedale high lift pump station delivers water to Zone 1, while secondary pump stations
deliver water from Zone 1 to Zone 2/3 and Zone 4. The boundaries along the pressure zones consist of a
series of closed valves and pipes, and pressure regulating valve (PRV) stations to decrease the pressure
to an acceptance range of level of service. Water storage for emergency, fire and flow equalization is
achieved at a series of in-ground reservoirs located at the Pumping Stations as well as a single elevated
storage tank.
The water system consists of one (1) water treatment plant, four (4) pumping stations, five (5) storage
reservoirs, and one (1) elevated storage tank. There are approximately 126 km of trunk watermains and
354 km of distribution watermains.
Pressure Zone 1 generally consists of the lower elevation areas within south Brantford, along the Grand
River. This is a large pressure zone that includes the residential Greenfield growth area in southwest
Brantford along Shellard Lane as well as the downtown Brantford Urban Growth Centre. Pressure Zone
1 is fed directly from the Holmedale WTP site via feedermains ranging in diameter from 500 mm to 750
mm.
Pressure Zone 2/3 is a large, combined pressure zone that comprises the residential and commercial
areas in north Brantford, Industrial area in east Brantford and small Greenfield growth area in east
Brantford. In addition, the intensification growth areas along King George Road, Wayne Gretzky Parkway,
West St and Lynden Rd also lie within Pressure Zone 2/3. Water is pumped into the zone from the
Holmedale WTP via several pumping stations and storage facilities. Storage and pumping for Pressure
Zone 2/3 comes from the Tollgate Road Reservoir (Res) and Pumping Station (PS), Wayne Gretzky
Parkway Res and PS, Albion St PS and King George Road Elevated Tank.
Pressure Zone 4 comprises an industrial area serviced by Northwest Pumping Station and Reservoir.
The Northwest Pumping Station and Reservoir services Pressure Zone 4 and is fed by a 900 mm
diameter watermain from the WTP High Lift PS. The feed from the North West PS into Zone 4 is 750
mm. An overview of the existing water distribution system is provided in Figure 3.2.
3.1.1 Water Treatment Plant
The Holmedale Water Treatment Plant is located at 324 Grand River Avenue, drawing water from
Holmedale Canal in the Grand River, 1.5 km upstream of the Water Treatment Plant. The water facility
has a treatment capacity of 100 ML/d and was recently upgraded with a new Peroxone Treatment System
and a new filtration/administration facility.
Figure 3.2 - Existing Water Distribution System
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 12
3.1.2 Water Pumping Stations and Storage Facilities
There are currently four (4) pumping stations, four (4) reservoirs, and one (1) elevated tank in the City of
Brantford water distribution system. Table 3.2 summarizes the pumping and storage facilities and their
capacities.
Table 3.2 – Pumping Station and Storage Facility Summary
Facility Pressure
Zone No. of Pumps
Installed Capacity (L/s)
Firm Capacity (L/s)
Reservoir Capacity (m3)
Holmedale WTP 1 10 1,060 920 4,500 &
18,250
Tollgate Road Res & PS 2/3 4 1,080 810 11,365
Wayne Gretzky Res & PS 2/3 5 259 (Low Lift)
786 (High Lift) 783 11,365
Albion Street PS 2/3 2 530 265 N/A
North West Res & PS 4 6 550 420 12,500
King George Road
Elevated Tank 2/3 N/A N/A N/A 2,770
The existing water pumping and storage facilities are highlighted in Figure 3.2.
3.2 Hydraulic Water Model
Analysis of the current and future water distribution system was undertaken using a hydraulic simulation
model. The City of Brantford water model used for the 2014 Master Servicing Plan was updated based
on the GIS data received in May 2013. The City’s existing water model consists of an all-pipe model in
InfoWater (Innovyze), which includes all distribution and trunk watermains. The existing model includes
approximately:
3,900 pipes
2,900 nodes
5 storage reservoirs
1 elevated tank
4 pumping stations
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 13
The model used for this Master Servicing Plan consists of a steady state model with the following
modelling scenarios:
Existing System
o Average Day Demand
o Max Day Demand
o Peak Hour Demand
2031 System
o Average Day Demand
o Max Day Demand
o Peak Hour Demand
Subsequent to the update of the hydraulic model, the model was calibrated to confirm the hydraulic model
accuracy. Hydraulic model calibration is the process of testing and adjusting the model to ensure that
model results bear reasonable close comparison to actual performance of the water distribution system
over a range of operating conditions. Calibration is mandatory prior to use of the model for any capital
works decision-making analysis, as well as further applications of the model such as water quality,
operations or energy management modelling. The benefits of calibration include discovering and correcting
discrepancies in the model data and, occasionally, identification of problems in the field.
Model calibration essentially encompasses all aspects of the model development and field data collection
process. The process makes extensive use of the City’s meter and plant records. This calibrated model
was used as part of the 2014 Master Servicing Plan analysis.
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 14
4 Assessment of the Existing and Future Water Infrastructure
The first step in the detailed analysis of the Master Servicing Plan is assessment of the existing
infrastructure capacity and conditions. Establishing accurate existing conditions will ensure further
accuracy of the future recommendations. Once the existing system conditions are established, the
impacts of future growth demands on the water distribution system were analyzed to develop and
evaluate servicing alternatives.
The following sections describe the current infrastructure constraints, as well as opportunities for
developing and expanding the water system to meet growing demands to the 2031 planning horizon.
4.1 Opportunities and Constraints
Existing Opportunities and Constraints were identified through preliminary infrastructure review and
discussions with City staff. In addition, the opportunities and constraints were further validated through
preliminary modelling results, which can be found in Appendix 3E. The opportunities and constraints are
shown in Figure 3.3 and are further outlined in the following sections.
4.1.1 Water Distribution System
In general, the water distribution has adequate capacity to deliver water at acceptable service levels,
though there are some areas at the higher or lower end of the acceptable pressure range. The hydraulic
water model as well as input from City staff was used to identify these areas. The following Opportunities
and Constraints for the City of Brantford water distribution system were identified:
General
Future intensification within downtown core requires accommodating growth while maintaining
level of service
Holmedale WTP has sufficient capacity to support growth to 2031
Growth in southwest Zone 1 Brantford along Shellard Lane and in Northwest Zone 4
Sufficient pumping capacity in Northwest Brantford to support growth
Several environmentally sensitive areas within Brantford
Operation
Operational issues in North West Brantford Zone 4
Low Pressures in Strawberry Hill / Hillcrest area
High Pressures within Downtown South
Surplus pumping capacity to upper Pressure Zone 2/3 and Zone 4
High headlosses through existing local, small diameter watermains
Several environmental constraints and
environmentally sensitive areas
throughout Brantford.
Environmental
Low pressures experienced within areas
of higher elevation.
Potentially high pressures within areas
of lower elevation.
Pressure
Servicing the downtown core will require
integration with rehabilitation programs
for old assets as well as complementing
the Transportation Master Plan.
Downtown Core
Sufficient treatment capacity at the
Holmedale WTP.
Treatment Plant
Exploring ways to minimize new
infrastructure needs in busy urban areas
whilst maintaining levels of service will
be a focus for intensification areas.
Intensification Areas
North West PS has ample pumping
capacity, however operational issues
exist.
Multiple Pressure Zone 2/3 PS with
spare capacity; provides operational
flexibility.
Pumping Stations
Increased velocities and headlosses in
watermains could potentially impact
pressure in the system.
Operational Issues
Intensification growth within corridors may
result in capacity deficiencies/ reduced
level of service.
Intensification Areas
Growth in Southwest and Northwest
Brantford requires extension and looping
of existing network.
Growth
The growth to the University campus
has been included to ensure that the
final servicing strategy is
comprehensive.
University
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 16
4.2 Hydraulic Analysis
Analysis and water demand from existing and future population and employment growth is based on the
City’s Traffic Zones. These Traffic Zone polygons containing growth data were supplied by the City as
shown in Figure 3.4.
Within areas of expected intensification, such as within the intensification corridors or within the
downtown core and the Traffic Zones were more narrowly defined as Intensification Zones. The
Intensification Zones are shown in Figure 3.5.
Once the population had been calculated for each Traffic Zone and Intensification Zone, an average daily
water demand was calculated using the design criteria methodology described in Section 2.1. This
average day water demand criteria is 300 L/person/day and 300 L/employee/day with maximum day
factor of 2.0. The maximum day demand is the primary infrastructure planning criteria used for evaluating
the capacity of the system.
Water demand requirements were developed for each system to identify existing and potential future
supply deficiencies. Based on the planning projections, maximum day demand projections for the City
are summarized in Table 3.3.
Table 3.3 – Maximum Day Demand Projections
Pressure Zone 2011 MDD (L/s)
2016 MDD (L/s)
2021 MDD (L/s)
2026 MDD (L/s)
2031 MDD (L/s)
1 236 265 315 360 408
2 255 261 272 180 284
3 96 104 123 134 142
Zone 2/3 Subtotal 351 365 395 314 426
4 30 31 33 52 64
Total 617 660 743 825 897
1
10
11
12
13
14
15
1617
17
18
19
2
20
21
22 23
24
25 26 2727
2829
3
30
31
32
33
34
35
36
37
39
39
45
4647
48
49
5
5
6
8
9RailRoadsMunicipal BoundaryRiversSix Nations of the Grand River Territory
´City of Brantford2014 Master Servicing Plan (MSP)for Water, Sanitary and Stormwater Services
4 Figure 3.4 - Traffic Zones
June 20141:44,000 | UTM83-17n
21 Traffic Zone
GROWTH AREASGreenfield AreaIntensification AreaUnder OMB ReviewUrban Growth CentreRailRoadsMunicipal BoundaryRiversSix Nations of the Grand River Territory
´City of Brantford2014 Master Servicing Plan (MSP)for Water, Sanitary and Stormwater Services
Figure 3.5 - Intensification Zones
June 20141:44,000 | UTM83-17n
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 19
4.2.1 Water Treatment Plant
The 2014 Master Servicing Plan analyzed the projected growth demand within the Holmedale Water
Treatment Plant (WTP) service area to ensure that the facility had adequate capacity within the 2031
growth horizon.
The starting point methodology previously identified in Section 2.1.1 was used to calculate the projected
demands for the Holmedale WTP shown in Figure 3.6. The current plant capacity of 100 ML/d is also
represented. There is sufficient total treatment capacity to service the City’s needs to 2031. However,
should historical peak instantaneous flows at the WTP be projected to 2031, the Holmedale WTP is seen
to be approaching approximately 95 per cent of its current plant capacity.
Figure 3.6 – Projected Holmedale Water Treatment Plant Demands
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 20
4.2.2 Trunk Watermains
The City’s hydraulic water model was used to support the assessment of the water system’s watermain
capacity. Based on the hydraulic modelling results, the existing trunk watermains generally have
sufficient capacity to move water to the next pumping station under maximum day conditions.
However, modelling results have shown capacity deficiencies and reduction in level of service along King
George Rd, north of Fairview Dr. High head losses under model runs along this future intensification
corridor will result in the need for a transmission capacity upgrade. Servicing Strategies and Concepts
are further described in Section 5
4.2.3 Water Pumping Stations
Assessment of pumping capacity was based on the ability of the pumping stations to provide firm capacity
to meet the required demands in the system on a zone by zone basis. Table 3.4 demonstrates the
pumping station requirements within the Brantford Pressure Zones to 2031.
Table 3.4 – Water Pumping Requirements
Pumping / Reservoir Facility Firm
Capacity (L/s)
Historical Max Day Demand: 2012
Starting Point (L/s)
Water Demand Increase: 2011-
2031 (L/s)
Projected Max Day Demand:
2031 (L/s) Pressure Zone 1
(Including transfer to upper
pressure zones) 1,115 617 281 897
Pressure Zone 2/3 - Tollgate Rd PS and Res - Wayne Gretzky PS and
Res LL - Wayne Gretzky PS and
Res HL - Albion St PS
1,176 351 74 425
Pressure Zone 4 - North West PS and Res 290 30 34 73
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 21
4.2.4 Water Storage
Water storage is provided throughout the City of Brantford at several facilities. Capacities for these
facilities were previously identified in Table 3.2. Storage demands increase with increased growth, in
accordance to MOE guidelines and City of Brantford Design Criteria. Table 3.5 summarizes existing
storage volumes by pressure zone, 2031 maximum day demands (MDD), and projected 2031 storage
requirements by pressure zone.
Table 3.5 – Future Water Storage Needs
Pressure Zone
Total Volume
(m3)
2031 MDD
(m3/d)
2031 Storage Requirement (m3)
Surplus / (Deficit)
(m3)
Equalization Fire Emergency Total
Zone 1
-WTP 22,750 35,231
Determined through Class EA Feasibility
of Water Storage Facility Study
Zone 2/3
- King George
-Tollgate
-Wayne Gretzky
25,500 36,800 9,200 8,100 4,300 22,000 3,500
Zone 4
-North West 12,500 5,500 1,400 3,600 1,200 6,200 6,300
There is currently no floating storage provided in Zone 1. However, the calculated storage need within
Zone 1 based on the 2031 MDD and MOE design criteria, is being achieved at the existing Holmedale
WTP Reservoir. However, low pressures are experienced at the top end of Pressure Zone 1, particularly
within the Strawberry Hill/Hillcrest area. Implementation of an elevated storage facility presents an
opportunity to address these pressure issues and adds additional floating storage redundancy and
reduces dependency on pumped storage capacity.
A sensitivity analysis for storage requirements in Zone 1 was carried out, to consider higher demands
based on peak instantaneous historical flows and greater fire flow requirements. Coordination with the
ongoing Class EA Feasibility of Water Storage Facility Study was undertaken and included in the
sensitivity analysis to determine Zone 1 water storage requirements and confirm sizing of the elevated
storage tank. Through discussions with the City, it was agreed that the size of the proposed elevated
tank in the MSP would be based on the recommendations of the Class EA Feasibility Study.
The Class EA Feasibility Study identified a 2031 storage requirement of approximately 4.9 ML. As such,
a 5.0 ML elevated tank has been carried in the Water Capital Program, presented in Section 6.2.
Servicing Strategies and Concepts related to storage needs are further described within Section 5.
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 22
5 Evaluation of Strategies
The identification and evaluation of servicing options is a critical component of the Master Servicing
Planning process because it enables a comprehensive review of a reasonable range of alternatives while
documenting the process in a transparent manner. The evaluation process that has been undertaken is
described in the following sections.
5.1 Objectives
The identification and evaluation of servicing options is the comprehensive review of a reasonable range
of alternatives while documenting the process in a transparent manner.
The 2014 Master Servicing Plan sets out to meet the Approach 2 requirements under the Municipal
Engineers Association (MEA) Class EA process. Under Approach 2, a Master Servicing Plan Report is
prepared at the conclusion of Phases 1 and 2 of the Class EA process. This approach allows for all
Schedule A, A+ and select Schedule B projects identified in the Master Servicing Plan to move forward to
implementation. To achieve this objective, systematic evaluation and documentation is required to
support the Schedule B Class EA requirements along with any applicable review agency commitments
prior to implementation. Any Schedule C projects identified will also require supporting information and
decision making to proceed onto separate studies and continue to Phases 3 and 4 of the Class EA
process.
The evaluation approach has been designed to ensure a logical and transparent process that can
document the evaluation and decision making that will ultimately develop a capital program that is
defensible. Sustainability principles will also be considered in the development of the 2014 Master
Servicing Plan, and will be integrated within the five-point evaluation, such as:
making best use of existing infrastructure;
minimizing the cost of new infrastructure;
considering operation and maintenance costs to ensure financial sustainability and;
ensuring the long term reliability and security of the water, wastewater and stormwater systems.
5.2 Description of the Evaluation Process
The Evaluation Process undertaken for the development and selection of a preferred servicing strategy is
described in this section and is graphically depicted in Figure 3.7
A broad range of water serving concepts were established based on high level feasibility to meet the
servicing requirements for the growth within the City of Brantford. These high level concepts included but
were not limited to: Expand the Existing Network, Inter-Regional/County Agreements, Optimized Storage
and Zone Boundary Re-Alignments. These concepts also included Do Nothing and Limit Growth as
required for the Class EA Process.
To evaluate the Servicing Concepts, the advantages and disadvantages for each were established based
on several evaluation criteria. This preliminary evaluation examined the concepts from an ability to meet
the servicing needs as well as a high level examination based on the 5-point criteria outlined in Section
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 23
5.3. Each concept was given a Low, Medium or High rating with concepts receiving a Low rating being
screened out and not carried further to detailed evaluation.
The Servicing Concepts that were carried forward were then combined in order to build overall Servicing
Strategies that would alleviate any existing constraints and satisfy the projected growth within Brantford to
2031. The complete Servicing Strategies were also evaluated using a detailed 5-point strategy evaluation
described in Section 5.5. The result of this evaluation was the selection of the Preferred Servicing
Strategy.
Figure 3.7 – Servicing Option Evaluation Flow Diagram
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 24
5.3 Evaluation Criteria
Detailed evaluation matrices supporting the evaluation of servicing options within the localized areas were
developed and used for selection of preferred servicing for the 2014 Master Servicing Plan. The
complete evaluation matrices are included in Appendix 3C. The servicing strategies were subject to a 5-
point evaluation which includes five major areas of impact: Technical, Environmental, Financial,
Legal/Jurisdictional, and Socio-Cultural. The 5-point evaluation criteria and their associated impacts are
described in Table 3.6.
Table 3.6 – Evaluation Criteria
CRITERIA DESCRIPTION
Technical Impact
Describes any overall technical advantage/disadvantage to an option related to:
o capacity requirements and level of service
o performance under power outage conditions
o alignments that can maximize a service area
o utilization of existing infrastructure
Describes difficulty of construction (construction in limited areas, crossings,
protection of utilities, trees or structures)
Assesses whether existing infrastructure upgrades are required
Describes risk considerations:
o Level of security of water supply/transmission or wastewater
treatment/conveyance
Describes the ability for phasing:
o staged growth and maximizing the use of existing or planned infrastructure
o incremental extensions of infrastructure as growth progresses
o balanced infrastructure costs with staged level of growth (high-level
comment)
Describes impact on the sizing of planned and existing infrastructure
Highlights trunk infrastructure that potentially should be oversized to benefit future
growth
Comments on whether growth areas will need to be serviced by existing or new
infrastructure
Compares relative sizing differences between alternatives
Describes the technical consideration required for construction:
o Highlights need for deep pipe construction, creek/highway/railway crossings,
alignment changes, and potential challenges during construction
o Where applicable, comments on construction of projects that can be
coordinated with road improvements or construction
o Describes potential opportunities/constraints to servicing build out
o Notes flexibility of servicing the mature state growth (post Places to Grow)
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 25
CRITERIA DESCRIPTION
Environmental Impact
Describes the potential impacts of the option on the natural environment,
proximity to existing natural features and designations including but not limited
to: ESAs, ANSIs, conservation authority regulation limits, vegetation, woodlands,
wildlife, aquatic resources and fisheries
Highlights requirements for major environmental crossings, development through
environmental designated areas, and requirements for mitigative action
Financial Impact
Describes the capital cost relative to other options
Considers construction costs for new infrastructure and for upgrades to existing
system
Highlights major projects that differ from other options that significantly contribute
to the capital costs
Describes large up-front costs required for phasing of growth
Comments on post-construction impacts such as operation and maintenance
costs and requirements, and compares to other options
Legal/Jurisdictional Impact
Notes any land requirement issues and agency concerns that may arise related to
project alignments, land acquisition, planning permits, crossings etc.
Comments on compliance with Regional Guidelines and Policies
Describes the potential impacts related to opportunity or requirements for
integrated planning, design, construction with other servicing such as bridge, road
construction etc.
Notes if coordination with involved parties is required
Socio-Cultural Impact
Describes the potential impacts to residents, archaeological/heritage resources,
and visual aesthetics
Describes any potential noise, dust, vibrations, traffic disruptions to residents and
businesses during and following construction
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 26
5.4 Servicing Concepts
The water network, along with the previously identified Opportunities and Constraints, were examined
within the larger, City-wide context as well as at a local level. A long list of high level Servicing Concepts
were introduced early in the analysis and were investigated. The Concepts are listed below and were
evaluated to determine which concepts are feasible to carry forward to make up City-Wide Servicing
Strategies.
1. Do Nothing & Limit Community Growth
2. Water Conservation and Efficiency
3. Expand Existing System
Optimize pumping station feeds
Prioritize Albion Feed
Eliminate Albion Feed
4. New Feed to move water through Northwest
5. Optimized/New Storage (Pumped and Elevated)
6. Zone Boundary Re-Alignment
Southwest service area
Downtown/Grand River
7. Inter-Regional/County Agreements
5.4.1 Servicing Concept Evaluation
A preliminary evaluation process for the servicing concepts was undertaken to determine which high level
concepts should be carried forward or screened out.
The results of the screening evaluation process is provided in Appendix 3C and is summarized below.
1. Do Nothing & Limit Community Growth – Screened Out
2. Water Conservation and Efficiency – Carried Forward
3. Expand Existing System – Carried Forward
Optimize pumping station feeds
Prioritize Albion Feed
Eliminate Albion Feed
4. New Feed to move water through Northwest – Carried Forward
5. Optimized/New Storage (Pumped and Elevated) – Carried Forward
6. Zone Boundary Re-Alignment - Carried Forward
Southwest service area
Downtown/Grand River
7. Inter-Regional/County Agreements – Screened Out
The advantages and disadvantages for each of the concepts is outlined in Appendix 3C. For the Do
Nothing and Limit Community Growth options, it is recognized that these alternatives are required for
evaluation under the Class EA process. It essentially identifies the existing conditions, and helps to define
the extent of the problem. In this case the “Do Nothing” alternative does not address the problem and
needs of the study. The Do nothing alternative would not alleviate existing wastewater servicing
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 27
deficiencies or meet the servicing needs of population and employment growth mandated through the
Province’s Places to Grow Act and the City’s growth conformity. For this reason the Do Nothing
Alternative is not considered a viable alternative and has been screened out. Similarly, the Limit Growth
alternative does not meet growth conformity and has also been screened out as a viable alternative.
5.5 Servicing Strategies
The following servicing concepts were carried forward through the preliminary evaluation and were
combined to create City-wide Servicing Strategies:
1. Water Conservation and Efficiency – Common to All Strategies
2. Expand Existing System
Optimize pumping station feeds
Prioritize Albion Feed
Eliminate Albion Feed
3. New Feed to move water through Northwest
4. Optimized/New Storage (Pumped and Elevated)
5. Zone Boundary Re-Alignment
Southwest service area
Downtown/Grand River
While each of these concepts on their own may not satisfy all growth and capacity constraints within the
system, they have been combined to generate the Servicing Strategies.
At the servicing strategy level of detail, additional development of infrastructure location, capacity and
purpose has been undertaken. The application of the servicing concepts as they related to the unique
service areas across the City, including Greenfield and intensification areas, has been completed to
determine the proposed infrastructure requirements.
Four Servicing Strategies were developed and evaluated. The descriptions for the Strategies are shown
below and are depicted in Figure 3.5 to Figure 3.8.
Strategy 1 – Optimize Pumping to Upper Zones and Add New Elevated Storage
Select system-wide water transmission capacity increases and extension to Greenfield and future
service areas
Optimize pumping feeds to Pressure Zones 2/3 via the Tollgate PS, Wayne Gretzky PS and
Albion PS. Operational improvements within the three pumping stations to supply demand in
Zone 2/3
Satisfy storage requirements within Pressure Zone 1 by construction of new elevated tank
Strategy 2 – Optimize Pumping to Upper Zones and Downtown South Pressure Zone Re-Alignment
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 28
Select system-wide water transmission capacity increases and extension to Greenfield and future
service areas
Optimize pumping feeds to Pressure Zones 2/3 via the Tollgate PS, Wayne Gretzky PS and
Albion PS. Operational improvements within the three pumping stations to supply demand in
Zone 2/3
Pressure Zone Re-Alignment within Downtown South in order to improve operational conditions
within areas of lower elevation and higher pressure Strategy 3 – Eliminate Albion PS Feed, New/Modified Northwest Feed & Optimize Storage
Select system-wide water transmission capacity increases and extension to Greenfield and future
service areas
Remove the Albion PS Feed and decommission Albion PS. Supply to Zones 2/3 will be achieved
via Wayne Gretzky PS and Tollgate PS
Modification of the operation of the 400 mm watermain and PRVs along Hardy Rd to promote
transmission from Zone 4 to Zone 2/3.
Satisfy storage requirements within Pressure Zone 1 by construction of new elevated tank
Strategy 4 – Prioritize Albion PS Feed & Optimize Storage
Select system-wide water transmission capacity increases and extension to Greenfield and future
service areas
Prioritize the supply of Pressure Zone 2/3 from Albion PS.
Satisfy storage requirements within Pressure Zone 1 by construction of new elevated tank
Common Elements:
Common to all Servicing Strategies is the requirement for extension of the water distribution network into
the Northwest growth area and Southeast Greenfield growth area. This will enable growth to progress
towards the Municipal Boundary. Also common to all Strategies is the need for upgrades to the existing
watermain network within intensification corridors and the Urban Growth Centre. Since the timing and
scale of intensification growth within the downtown core is relatively uncertain, a lump sum amount of
intensification servicing upgrades have been recommended. Within the intensification corridors, a trunk
watermain upgrade along King George Road has been recommended within all Strategies to service the
Zone 2/3 growth north of Fairview Drive.
Capacity Upgrades along King George Road
Extend existing system to unserviced areas
Optimize PS feeds
Implement Water
Conservation and
Efficiencies
Figure 3.8 – Strategy 1 – Optimize Pumping to Upper Zones and Add New Elevated Storage
New Elevated Storage for Zone I
Extend existing system to unserviced areas
Optimize PS feeds
Implement Water
Conservation and
Efficiencies
Figure 3.9 – Strategy 2 – Optimize Pumping to Upper Zones and Downtown South Pressure Zone Re-Alignment
Capacity Upgrades along King George Road
Zone Boundary re-alignment in Downtown South to improve
service levels. Achieved through valving, new tank and new feeds
Modify operation of existing 400 mm feed along
Hardy RoadDecommission Albion St PS
Implement Water
Conservation and
Efficiencies
Figure 3.10 – Strategy 3 – Eliminate Albion PS Feed, New/Modified Northwest Feed & Optimize Storage
New Elevated Storage for Zone I
Capacity Upgrades along King George Road
Extend existing system to unserviced areas
Extend existing system to unserviced areas
Implement Water
Conservation and
Efficiencies
Figure 3.11 – Strategy 4 – Prioritize Albion PS Feed & Optimize Storage
New Elevated Storage for Zone I
Reinforce feed from Albion to Zone 2/3
Capacity Upgrades along King George Road
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 33
5.5.1 Servicing Strategy Evaluation
At this stage, each Strategy was subjected to a five-point evaluation, which includes environmental,
technical, socio/cultural, financial, and legal/jurisdictional impacts. Each Strategy was scored based on
the positive and negative aspects identified for each impact category using a rating system of high,
medium and low, where high indicates “more favorable”.
The results of the Servicing Strategy evaluation process is provided in Appendix 3C and is summarized
below.
Table 3.7 – Servicing Strategy Evaluation
Strategy Overall Score
Strategy 1 – Optimize Pumping to Upper Zones and Add New Elevated
Storage
High
Selected as Preferred
Strategy 2 – Optimize Pumping to Upper Zones and Downtown South
Pressure Zone Re-Alignment Medium
Strategy 3 – Eliminate Albion PS Feed, New/Modified Northwest Feed &
Optimize Storage Low
Strategy 4 – Prioritize Albion PS Feed & Optimize Storage Medium
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 34
6 Preferred Water Servicing Strategy
This section summarizes the preferred Water Servicing Strategy for the City of Brantford to service
projected growth to 2031. In addition, this section includes the capital costing and implementation plan
for the preferred solution.
6.1 Preferred Servicing Strategy
Several separate water servicing components are recommended throughout the City of Brantford that
collectively make up the overall Preferred Strategy. Strategy 1 was determined to be the Preferred
Servicing Strategy from the 5-point evaluation to satisfy growth to 2031. This Strategy consists of
expansion of the existing network into Greenfield growth areas as well as optimization of pumping feeds
into the upper zones as well as the addition of new elevated storage.
Greenfield growth within the 2031 horizon extends along Shellard Lane west of McGuiness Drive. The
Preferred Water Servicing Strategy within this area requires extension of the trunk watermain along
Shellard Lane. In addition, a local network of local watermains along the future road alignments will be
required to support growth in the area.
Greenfield growth will also extend north of Hwy 403 on either side of Oak Park Road. Extension of the
water network into this area, crossing Hwy 403 will service the new growth. Local loop of watermains
within the growth area is also recommended.
The main components that make up the Preferred Servicing Strategy are as follows:
New 5.0 ML Zone 1 Elevated Tank (TWL: 271 m)
New Zone 4 watermains to service Northwest Brantford
New Zone 1 watermains to service Southwest Brantford
Twinning of Zone 2/3 Watermain on King George Rd
Intensification Upgrades (as required under further detailed study)
Holmedale WTP Raw Water Canal Storage Capacity Upgrade
Key benefits of the preferred Water Servicing Strategy include:
Provision of floating storage within Pressure Zone 1, that will improve pressures to existing users
in the Strawberry Hill area and provide additional storage to service future growth
Maximizing use of existing feeds to Pressure Zone 2/3
Extension of existing servicing to future growth areas, in the northwest and southwest parts of the
City
Reinforcing feed on King George Street., which will support future intensification along the
corridor
Setting the stage for future servicing of growth post-2031
The preferred Water Servicing Strategy can be seen in Figure 3.12. Each individual project is listed with
its respective estimated capital cost in Table 3.8.
Figure 3.12 - Preferred Water Servicing Strategy
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 36
6.2 Capital Program for the Preferred Water Servicing Strategy
As described in the previous sections and depicted in Figure 3.9, the Preferred Water Servicing Strategy
has been developed to satisfy the existing and growth areas within Brantford to 2031. The capital costs
for each project within the Preferred Strategy were developed according to the costing methodology
presented in Section 2.3. These projects are listed according to their project number and are shown in
Table 3.8. Included in the Water Capital Program, is the project description, proposed timing, sizing, and
estimated total project cost. Further timing and implementation details are shown in Section 6.3.
BRANTFORD MASTER SERVICING PLAN Manually Entered in Capital Program Table
Lookup in Project Detail Sheet
Table 3.8 Preferred Water Servicing Strategy Capital Program DC Compone
Project
Number Project Name Project Description Year In Service Class EA Schedule Project Type Size/ Capacity Length (m)
Total Project Cost
(2014$)
1 North West Brantford Watermain 1New 400 mm watermain from existing 750 mm watermain stub on Fen Ridge Ct north aproximately 1,100 m on easement,
Hwy 403 crossing and future road alignment (shared easement with wastewater project WW-9)2021-2026 A+ WDM 400 mm 1100 m $3,170,000
2 North West Brantford Watermain 2New 300 mm watermain along future east west road connecting to future watermain projects W-1 and W-3 on new road
alignments 2026-2031 A+ WDM 300 mm 992 m $1,586,000
3 North West Brantford Watermain 3New 300 mm watermain along new road alignment connecting to future 300 mm watermain projects W-2 and W-10 on new
road alignments 2026-2031 A+ WDM 300 mm 635 m $1,033,000
4 West of Conklin Watermain 4New 300 mm watermain along future road north of Shellard Lane conecting to new 400 mm watermain W-7 to the east and
W-7 to the west south of Shellard Lane2021-2026 A+ WDM 300 mm 1678 m $3,128,000
5 West of Conklin Watermain 5New 300 mm watermain along future road south of Shellard Lane from the new 400 mm watermain W-7 to existing 300 mm
watermain on Powell Rd 2016-2021 A+ WDM 300 mm 2112 m $3,789,000
6 West of Conklin Watermain 6New 300 mm watermain along future road south of Shellard Lane connecting to new 400 mm watermain W-7, 300 mm
watermain W-5 and connecting to existing 300 mm watermain on Blackburn Dr. 2016-2021 A+ WDM 300 mm 1138 m $2,054,000
7 West of Conklin Watermain 7New 400 mm watermain west along Shellard Lane from existing 400 mm watermain, south on future road connecting to new
300 mm watermain W-6, west on future road connecting to new 300 mm watermain W-5.2014-2016 A+ WDM 400 mm 1604 m $3,310,000
8 King George Rd Watermain New 300 mm watermain along King George Rd from Dunsdon St to Powerline Rd. 2026-2031 A+ WDM 300 mm 1531 m $3,530,000
9 Elevated Storage Tank Elevated Storage Tank in PD1 located in the vicinity of the John Noble Home site 2016-2021 B (Separate) WS 5 ML 0 m $7,319,000
10 North West Brantford Watermain 10New 300 mm watermain along new road alignments from future 400 mm watermain W-1 to future 300 mm watermain W-3
on new road alignments2021-2026 A+ WDM 300 mm 1493 m $2,865,000
11 North West Brantford Watermain 11New 300 mm watermain from existing 400 mm watermain on Savannah Oak Dr. north on future easement including Hwy
403 crossing and connecting to new 300 mm watermain W-102026-2031 A+ WDM 300 mm 741 m $2,405,000
12 General Intensification Upgrades Lump Sum cost for pipe upgrades within intensification areas (Approx 2,000 m of 300mm at urban construction costs) 2014-2031 A+ WDM 300 mm 2000 m $5,598,000
13 Holmedale WTP Raw Water Canal UpgradesUpgrades to existing Holmedale Canal to expand its capacity from 16 ML to 74 ML providing security of supply and
emergency2016-2021 A+ WDM 58 ML $5,598,000
$45,385,000
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 38
6.3 Implementation & Class EA Requirements
As outlined in Volume II of the Master Plan, this Water, Wastewater and Stormwater Master Servicing
Plan sets out to satisfy the EA Approach II requirements according to the MEA Class EA document.
The Preferred Water Servicing Strategy will support the servicing needs of the City of Brantford’s
Greenfield and urban growth to 2031. This Strategy will be implemented in accordance with each
projects Class EA schedule. The Class EA requirements for each project have been identified in the
Capital Program Table 3.8. Schedule A and A+ projects may move forward to design and construction,
with A+ projects requiring public notification prior to implementation. A separate Class EA for the
proposed Elevated Tank (Schedule B) is currently underway and will proceed to implementation upon
Schedule B completion. The Preferred Water Strategy does not identify any other Schedule B or
Schedule C projects.
During the next steps of the implementation program, primarily during detailed design of the projects, the
following requirements will be considered:
Finalization of property requirements
Refinement of infrastructure alignment
Identification of preferred construction methodologies
Completion of additional supporting investigations as required (geotechnical, hydrogeological, etc)
Review and mitigation of potential construction related impacts
Satisfying of all provincial, municipal and conservation authority approval requirements
Based on the consultation undertaken with the review agencies during the Master Plan process, it is
recommended that all key projects undertake a pre-design consultation with the applicable review
agencies. This early consultation prior to the detailed design will ensure sufficient technical and
environmental information is available to support the preferred design and that the project scope is well
understood. Ultimately this process will facilitate project approvals moving forward.
With respect to City planning and budgeting, these program will be utilized as high level baseline
estimates for the City capital budgets. These costs will be further developed and refined during the
implementation phases as more detailed information becomes available. For example, effort has been
given during the Master Servicing Plan analyses to identify potential impacts related to the natural
environment such as environmental features and endangered species. Despite these efforts, there is
potential that additional project requirements, costs and implementation time may be required to obtain
approvals and mitigate the impacts.
Given the growth-related nature of the servicing strategies, the capital programs form the foundation for
the water, wastewater and stormwater components of the City of Brantford Development Charges (DC)
By-Law.
The anticipated timing of each project within the Preferred Strategy has been established based on the
projected population and employment growth within the City of Brantford. The water program’s project
scheduling has also been cross referenced with water program to ensure project coordination along
common alignments. The project timing has been broken down according to the anticipated duration of
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 39
the design and construction of the projects. This implementation schedule for the program is shown in
Table 3.9.
In addition to the coordination of water and wastewater timing, other opportunities to coordinate the
Master Servicing Plan projects were investigated to potentially achieve cost savings and efficiencies.
The Preferred Water Servicing Strategy, Wastewater Servicing Strategy (Volume IV) and Transportation
Master Plan Preferred Strategies were overlaid to determine the opportunities to coordinate works along
common alignments.
Additionally, the City of Brantford updates its Water, Sewer and Road asset condition ratings on an
annual basis. As part of the Master Servicing Plan, the aggregated condition of the three assets were
compiled and analyzed to determine priority alignments for State of Good Repair works. As
intensification growth occurs within the City, and infrastructure upgrades are required based on capacity
needs, this State of Good Repair coordination analysis will provide a baseline condition reference for
coordination of upgrades. On a go forward basis, there will be opportunity to align growth-related and
State of Good Repair Projects.
BRANTFORD MASTER SERVICING PLAN STUDY
DESIGN
Table 3.9 -Capital Program Scheduling and Implementation CONSTRUCTION
Project
Number Project Name Project Description
1 North West Brantford Watermain 1
New 400 mm watermain from existing 750 mm watermain stub on Fen Ridge Ct north aproximately 1,100 m on easement, Hwy 403 crossing and future road alignment (shared easement with
wastewater project WW-9)
2 North West Brantford Watermain 2New 300 mm watermain along future east west road connecting to future watermain projects W-1 and W-3 on new road alignments
3 North West Brantford Watermain 3New 300 mm watermain along new road alignment connecting to future 300 mm watermain projects W-2 and W-10 on new road alignments
4 West of Conklin Watermain 4New 300 mm watermain along future road north of Shellard Lane conecting to new 400 mm watermain W-7 to the east and W-7 to the west south of Shellard Lane
5 West of Conklin Watermain 5New 300 mm watermain along future road south of Shellard Lane from the new 400 mm watermain W-7 to existing 300 mm watermain on Powell Rd
6 West of Conklin Watermain 6New 300 mm watermain along future road south of Shellard Lane connecting to new 400 mm watermain W-7, 300 mm watermain W-5
and connecting to existing 300 mm watermain on Blackburn Dr.
7 West of Conklin Watermain 7
New 400 mm watermain west along Shellard Lane from existing 400
mm watermain, south on future road connecting to new 300 mm
watermain W-6, west on future road connecting to new 300 mm
watermain W-5.
8 King George Rd WatermainNew 300 mm watermain along King George Rd from Dunsdon St to
Powerline Rd.
9 Elevated Storage TankElevated Storage Tank in PD1 located in the vicinity of the John
Noble Home site
10 North West Brantford Watermain 10
New 300 mm watermain along new road alignments from future 400
mm watermain W-1 to future 300 mm watermain W-3 on new road
alignments
11 North West Brantford Watermain 11
New 300 mm watermain from existing 400 mm watermain on
Savannah Oak Dr. north on future easement including Hwy 403
crossing and connecting to new 300 mm watermain W-10
12 General Intensification UpgradesLump Sum cost for pipe upgrades within intensification areas
(Approx 2,000 m of 300mm at urban construction costs)
13 Holmedale WTP Raw Water Canal UpgradesUpgrades to existing Holmedale Canal to expand its capacity from
16 ML to 74 ML providing security of supply and emergency
2030 20312014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2029
IMPLEMENTATION PROGRAM - SCHEDULE
2026 2027 2028
City of Brantford 2014 Master Servicing Plan (MSP)
for Water, Sanitary and Stormwater Services Volume III
July, 2014
Page 41
7 Post-2031 Vision
The 2014 Master Servicing Plan has put forward a comprehensive water servicing strategy to service
growth within the City of Brantford to the approved Places to Grow 2031 forecast. While the approved
urban boundary and growth targets are to 2031, the Master Servicing Plan also considered implications of
potential post-2031 growth on the system. Post-2031 growth is anticipated to occur within both
Intensification and Greenfield Areas.
The Preferred Water Servicing Strategy addresses the growth needs to 2031, and also establishes
flexibility within the system to implement a post-2031 strategy, once the long-term targets are confirmed
and approved.
The majority of the water and wastewater infrastructure extensions have occurred towards the north and
west, following the residential and employment growth within the City of Brantford. Throughout this
growth, the City of Brantford has incorporated some minor strategic oversizing of trunk infrastructure to
support development beyond existing growth horizons. Though 2031 is the planning horizon for this
Master Servicing Plan, there is an expectation that there could be post-2031 growth extending further into
Greenfield areas outside of the current urban boundary.
In developing the Preferred Water Servicing Strategy and recommending specific capital projects, this
Master Servicing Plan has considered the long-term Greenfield growth that could occur and ensured that
flexibility is built into the program.
Based on information available at this time, the potential post-2031 period considerations are depicted on
the following Figure 3.13.
#
#
#"
$
#
WayneGretzky PSand Res
North WestPS and Res
Tollgate RdPS and Res King George
Rd El Tank
HolmedaleWTP
AlbionSt PS
EXISTING WATER INFRASTRUCTURE" Elevated Tank# PS & Reservoir$ Water Treatment Plant
<250>= 250
PRESSURE ZONESPressure Zone 1Pressure Zone 2/3Pressure Zone 4Municipal BoundaryRiversSix Nations of the Grand River TerritoryWater_Post 2031 Vision
´City of Brantford2014 Master Servicing Plan (MSP)for Water, Sanitary and Stormwater Services
Figure 3.13 - Potential Post Period Considerations
July 20141:44,000 | UTM83-17n
Appendix 3A - Water Demand Projections
BRANTFORD MASTER SERVICING PLAN
Water Demand Projections
Avg day (lpcd)
Max Day
Factor
Peak Hour
FactorResidential 300 2 3Employment 300
Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011* 2016 2021 2026 20311 32,614 36,101 41,757 46,958 52,860 1 20,542 21,224 22,831 24,062 25,0942 44,766 45,155 46,486 47,235 47,722 2 14,391 14,778 15,104 15,410 15,6013 12,016 12,713 13,995 15,159 16,195 3 9,415 9,856 11,371 11,727 11,8334 4,254 4,256 4,486 4,487 4,487 4 2,544 2,725 2,744 5,483 7,151
Total 93,650 98,225 106,723 113,839 121,264 Total 46,892 48,582 52,049 56,682 59,678* Forecast
Population Growth Population Growth
Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011 2016 2021 2026 20311 0.35 3,487 9,143 14,344 20,246 1 0.44 682 2,289 3,520 4,5522 0.48 389 1,720 2,469 2,956 2 0.31 387 713 1,019 1,210 5.384102098 16.89143521 24.21909917 28.9325573 0.13 697 1,979 3,143 4,179 3 0.20 441 1,956 2,312 2,418 5.38 16.89 24.22 28.934 0.05 2 232 233 233 4 0.05 181 200 2,939 4,607 5.38 16.89 24.22 28.93
Total 4,575 13,073 20,189 27,614 Total 1,690 5,157 9,790 12,786
Water Demand Calculation
Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011 2016 2021 2026 20311 7,450 8,497 10,193 11,754 13,524 1 5,623 5,828 6,310 6,679 6,989 1 13,074 14,324 16,503 18,433 20,5132 10,227 10,343 10,742 10,967 11,113 2 3,939 4,055 4,153 4,245 4,302 2 14,166 14,399 14,896 15,212 15,4163 2,745 2,954 3,339 3,688 3,999 3 2,577 2,710 3,164 3,271 3,303 3 5,322 5,664 6,503 6,959 7,3014 972 972 1,041 1,042 1,042 4 696 751 756 1,578 2,078 4 1,668 1,723 1,798 2,620 3,120
Total 21,394 22,766 25,316 27,450 29,678 Total 12,836 13,343 14,383 15,773 16,672 Total 34,230 36,110 39,699 43,224 46,350
Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011 2016 2021 2026 20311 11,598 13,690 17,084 20,205 23,746 1 8,754 9,163 10,127 10,866 11,485 1 20,352 22,853 27,211 31,070 35,2312 15,920 16,153 16,951 17,401 17,694 2 6,132 6,364 6,560 6,744 6,858 2 22,052 22,517 23,512 24,145 24,5523 4,273 4,692 5,460 6,159 6,781 3 4,012 4,277 5,186 5,399 5,463 3 8,285 8,968 10,646 11,558 12,2434 1,513 1,514 1,652 1,653 1,653 4 1,084 1,193 1,204 2,847 3,848 4 2,597 2,706 2,856 4,500 5,501
Total 33,304 36,049 41,147 45,417 49,872 Total 19,982 20,996 23,077 25,856 27,654 Total 53,286 57,045 64,224 71,273 77,526
Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011 2016 2021 2026 2031 Pressure Zone 2011 2016 2021 2026 20311 22,351 25,490 30,580 35,261 40,573 1 16,870 17,483 18,929 20,038 20,966 1 39,221 42,973 49,509 55,299 61,5392 30,680 31,029 32,227 32,901 33,340 2 11,818 12,166 12,460 12,735 12,907 2 42,498 43,196 44,687 45,637 46,2473 8,235 8,863 10,016 11,063 11,996 3 7,732 8,129 9,492 9,812 9,908 3 15,967 16,991 19,508 20,876 21,9044 2,915 2,917 3,124 3,125 3,125 4 2,089 2,252 2,269 4,734 6,235 4 5,005 5,169 5,394 7,860 9,360
Total 64,181 68,299 75,947 82,351 89,034 Total 38,509 40,030 43,150 47,320 50,016 Total 102,690 108,329 119,097 129,671 139,050
Pressure Zone 2011 2016 2021 2026 20311 235.6 264.5 314.9 359.6 407.82 255.2 260.6 272.1 279.5 284.23 95.9 103.8 123.2 133.8 141.74 30.1 31.3 33.1 52.1 63.7
Total 616.7 660.2 743.3 824.9 897.3
Total Water Demands
Average Day Demands (m3/d) Average Day Demands (m3/d) Average Day Demands (m3/d)
Maximum Day Demands (L/s)
Maximum Day Demands (m3/d)
Peak Hour Demands (m3/d) Peak Hour Demands (m3/d) Peak Hour Demands (m3/d)
Population Projections Employment Projections
Water Design Criteria
Maximum Day Demands (m3/d) Maximum Day Demands (m3/d)
Residental Demands Employment Demands
for Water, Sanitary and Stormwater Services2014 Master Servicing Plan (MSP)
ordCity of Brantf
Appendix 3B - Historical Water Demand
BRANTFORD MASTER SERVICING PLAN
Historical Water Demand
Monthly Average Max Day Total Monthly Monthly Average Max Day Total Monthly
Date Supply in ML/D Supply in ML/D Supply in ML/D Date Supply in ML/D Supply in ML/D Supply in ML/D
Jan-08 32.03 33.39 992.83 Jan-09 32.32 36.20 1001.92
Feb-08 31.66 33.41 918.05 Feb-09 31.72 34.22 888.21
Mar-08 31.87 34.00 988.04 Mar-09 31.19 35.19 967.00
Apr-08 33.13 36.98 993.87 Apr-09 31.63 35.93 948.83
May-08 34.65 39.59 1074.06 May-09 34.61 41.81 1072.83
Jun-08 36.51 42.81 1095.23 Jun-09 37.79 47.98 1133.57
Jul-08 42.08 53.54 1304.59 Jul-09 36.54 44.78 1132.75
Aug-08 36.22 39.73 1122.93 Aug-09 35.31 40.39 1094.48
Sep-08 36.28 41.81 1088.51 Sep-09 35.63 39.10 1068.93
Oct-08 33.16 35.91 1027.83 Oct-09 31.84 34.75 987.06
Nov-08 31.67 35.65 950.09 Nov-09 30.50 33.87 915.02
Dec-08 31.55 34.24 978.20 Dec-09 30.43 33.27 943.43
Total 410.81 12534.23 Total 399.51 12154.02
Peak Instantaneous Demand 10-Jul 71.14 Peak Instantaneous Demand 17-Jul 74.46
Monthly Average Max Day Total Monthly Monthly Average Max Day Total Monthly
Date Supply in ML/D Supply in ML/D Supply in ML/D Date Supply in ML/D Supply in ML/D Supply in ML/D
Jan-10 31.77 33.70 984.92 Jan-11 30.20 34.76 936.24
Feb-10 30.91 32.90 865.50 Feb-11 30.47 33.56 944.59
Mar-10 30.46 31.92 944.11 Mar-11 30.48 32.88 944.91
Apr-10 31.31 37.80 939.43 Apr-11 30.01 32.06 930.36
May-10 36.12 48.05 1119.71 May-11 32.59 39.81 1010.14
Jun-10 34.83 38.21 1079.64 Jun-11 37.60 43.56 1165.49
Jul-10 38.55 50.68 1194.97 Jul-11 47.47 57.50 1471.54
Aug-10 38.90 45.79 1167.15 Aug-11 37.64 42.26 1166.80
Sep-10 35.68 43.99 1070.41 Sep-11 34.24 38.02 1061.56
Oct-10 32.33 37.51 1002.19 Oct-11 31.28 35.71 969.67
Nov-10 30.71 36.12 921.34 Nov-11 30.52 51.11 946.12
Dec-10 30.64 36.34 949.69 Dec-11 30.46 42.03 944.26
Total 402.21 12239.09 Total 402.96 12491.68
Peak Instantaneous Demand 20-Aug 61.84 Peak Instantaneous Demand 22-Jul 71.74
Monthly Average Max Day Total Monthly Monthly Average Max Day Total Monthly
Date Supply in ML/D Supply in ML/D Supply in ML/D Date Supply in ML/D Supply in ML/D Supply in ML/D
Jan-12 31.00 37.41 961.19 Jan-13 32.21 38.39 998.57
Feb-12 30.86 33.09 895.11 Feb-13 30.97 33.68 867.16
Mar-12 32.41 34.23 939.90 Mar-13 30.27 32.47 938.31
Apr-12 33.20 36.12 995.91 Apr-13 30.68 35.74 920.42
May-12 40.96 52.71 1269.60 May-13 35.71 47.16 1106.90
Jun-12 42.21 53.56 1266.50 Jun-13 36.37 43.71 1091.00
Jul-12 49.25 56.73 1526.89 Jul-13 37.51 45.88 1162.72
Aug-12 41.54 48.93 1287.95 Aug-13
Sep-12 38.20 45.78 1145.97 Sep-13
Oct-12 34.58 37.18 1071.99 Oct-13
Nov-12 31.63 34.51 885.67 Nov-13
Dec-12 30.82 32.39 984.40 Dec-13
Total 436.66 13231.08 Total 233.72 7085.08
Peak Instantaneous Demand 16-Jul 88.08
for Water, Sanitary and Stormwater Services2014 Master Servicing Plan (MSP)
ordCity of Brantf
Appendix 3C - Water Evaluation Tables
Water Concepts Evaluation Tables
Brantford Water Concept Evaluation
Concept Number Concept Description Advantages Disadvantages Rating Carried forward/ Screened out
1
Do nothing or limit growth No cost in the short term Existing and future capacities issues not solved
Does not address growth within existing urban boundary
Would limit growth
Does not comply with Places to Grow targets
Low Screened out
2
Water Conservation and Efficiency Maximizes use of existing infrastructure
Potentially no major facility or conveyance upgrades
required
Would reduce demand flow in system, creating savings in
pumping, treatment
Minimize total upgrades needed
Requires implementation of major flow reduction program
High potential not to meet flow reduction targets
Dependent on public and private participation and
commitment
Not considered feasible as a complete solution
Medium Carried Forward
3
Expand existing system
● Optimize pumping station feeds
● Prioritize Albion
● Eliminate Albion
Addresses growth within existing urban boundary
Optimize/maximize use of existing PS and WTP
May trigger linear infrastructure upgrades
May trigger capacity constraints and PS upgradesHigh Carried Forward
4
New zone 2/3 feed from zone 4 Provides security of supply
Provides additional capacity and increases potential to
service growth areas outside existing urban boundary
Utilizes surplus capacity in Zone 4. Helps to reduce current
operational and maintenance issues.
Potentially high capital and construction costs
Most costly water transfer option
Potentially greater impact to the environment Medium Carried Forward
5
New/optimize storage (pumped and
elevated)
Maximizes use of existing infrastructure
Would minimize the need for upgraded infrastructure
Cost effective in the long and short term
Provides security of supply and system operation
Resolves local pressure fluctuation issues.
High capital and construction cost
Unlikely to be able to efficiently solve all constraints
Site acquisitions required for storage facilities; locating
sufficient land supply for required volumes may be difficult
Increases asset stock; New storage facility will incur
additional O&M costs
Medium Carried Forward
6
Zone Boundary Realignment Addresses growth within existing urban boundary
Optimize/maximizes use of existing PS and WTP
Moderate cost associated with valve installation
May require high capital cost; construction of new trunk
main
Not considered feasible as a complete solution on its own
Medium Carried Forward
7
Inter-Municipal agreements Existing neighboring infrastructure in close proximity to
Brantford service areas
Potential to free-up capacity in Brantford system
Fundamentals of agreement need to be established
Confirmation of available capacity and trunk system impacts
need to be confirmed
Need to enter into Inter-Municipal cost sharing supply
agreements
Low Screened out
for Water, Sanitary and Stormwater Services
2014 Master Servicing Plan (MSP)ordCity of Brantf
Water Strategy Evaluation Tables
Brantford Water Strategy Evaluation
Strategy Strategy 1 Strategy 2 Strategy 3 Strategy 4
Description
Expand existing system optimizing pumping feeds to upper zones, new storage and implement water conservation and efficiency measures
Expand existing network optimizing pumping feeds to upper zones, pressure zone realignment Downtown South, and implement water conservation and efficiency measures
Expand existing network eliminating the Albion PS feed, new feed to move water through the Northwest, new storage, and implement water conservation and efficiency measures
Expand existing network prioritizing the Albion PS feed, new storage, and implement water conservation and efficiency measures
EnvironmentalFocused infrastructure on existing and future roads, minimizing environmental impacts Focused infrastructure on existing and future roads, minimizing environmental impacts Focused infrastructure on existing and future roads, minimizing environmental impacts Focused infrastructure on existing and future roads, minimizing environmental impacts
Projects do not require crossings of the Grand River. Projects do not require crossings of the Grand River. Projects do not require crossings of the Grand River. Projects do not require crossings of the Grand River.
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north.
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north.
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north.
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north.
Greater potential for environmental impact during construction of new elevated tank, compared to
Strategy 2
Greater potential for environmental impact during construction of new elevated tank, compared to
Strategy 2
Greater environmental impact due to construction of new elevated tank, compared to Strategy 2
Impact to be mitigated through completion of Class EA procedure subsequent mitigative measures
and construction technique
Impact to be mitigated through completion of Class EA procedure subsequent mitigative measures
and construction technique
Impact to be mitigated through completion of Class EA procedure subsequent mitigative measures
and construction technique
Sub-Score (1, 2, or 3) 2 3 2 2
TechnicalMaximizes use of existing Albion St PS, Tollgate Rd PS, and Wayne Gretzky PS feeds to Zone 2/3. Maximizes use of existing Albion St PS, Tollgate Rd PS, and Wayne Gretzky PS feeds to Zone 2/3. New feed to move water through the Northwest, to provide supply to Zone 2/3 via PRV, not
considered a sustainable or efficient mode of operation.
Elimination of Albion PS and establish a new primary zone 2/3 feed via existing zone 4 Hardy Road
PRV.
New Hardy Road feed not considered a sustainable or efficient mode of operation. New feed may
cause high pressure issues along Hardy Road and Golf Road area.
Prioritizing the feed from Albion Zone 2 PS feed could provide increased supply to the King George
St. However, there is limited benefit to other areas of the water distribution system.
There is currently no floating storage provided within Zone 1. The introduction of a new elevated
tank (TWL = 271 m) to service Zone 1 will improve pressure in the Strawberry Hill area, address
increased storage required due to growth in the west, ensure adequate provision of fire flow, and
balance pressures in the Zone 1 system overall.
Pressure zone re-alignment through pressure reducing valves and increase to existing zone 1 HGL
to improve level of service in Zone 1 (high pressure in low areas and low pressure in Strawberry
Hill). Zone split will be difficult and may require the construction of new trunk mains and/or
modifications to existing mains
There is currently no floating storage provided within Zone 1. The introduction of a new elevated
tank (TWL = 271 m) to service Zone 1 will improve pressure in the Strawberry Hill area, address
increased storage required due to growth in the west, ensure adequate provision of fire flow, and
balance pressures in the Zone 1 system overall.
There is currently no floating storage provided within Zone 1. The introduction of a new elevated
tank (TWL = 271 m) to service Zone 1 will improve pressure in the Strawberry Hill area, address
increased storage required due to growth in the west, ensure adequate provision of fire flow, and
balance pressures in the Zone 1 system overall.
Future demands due to growth would require a series of watermain extensions in the northwest and
in the West Conklin development, as well as plans for new watermains in intensification areas where
rehabilitation is already required.
Future demands due to growth would require a series of watermain extensions in the northwest and
in the West Conklin development, as well as plans for new watermains in intensification areas where
rehabilitation is already required.
Future demands due to growth would require a series of watermain extensions in the northwest and
in the West Conklin development, as well as plans for new watermains in intensification areas where
rehabilitation is already required.
Future demands due to growth would require a series of watermain extensions in the northwest and
in the West Conklin development, as well as plans for new watermains in intensification areas where
rehabilitation is already required.
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north. Future looping with Zone 2/3 via PRV in the Northwest will be
required for security of supply
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north. Future looping with Zone 2/3 via PRV in the Northwest will be
required for security of supply
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north. Future looping with Zone 2/3 via PRV in the Northwest will be
required for security of supply
New watermains in the Northwest (Zone 4) area, to service industrial lands, will require crossing of
Hwy 403 to service lands to the north. Future looping with Zone 2/3 via PRV in the Northwest will be
required for security of supply
New watermain from Tollgate PS helps improve pressures in the intensified area of Zone 2/3. New
feed on King George St. will improve pressures along the intensification corridor.
New watermain from Tollgate PS helps improve pressures in the intensified area of Zone 2/3. New
feed on King George St. will improve pressures along the intensification corridor.
New watermain from Tollgate PS helps improve pressures in the intensified area of Zone 2/3. New
feed on King George St. will improve pressures along the intensification corridor.
West Conklin Development will require extension of existing watermain and watermain looping, via
Shellard Lane extension.
West Conklin Development will require extension of existing watermain and watermain looping, via
Shellard Lane extension.
West Conklin Development will require extension of existing watermain and watermain looping, via
Shellard Lane extension.
West Conklin Development will require extension of existing watermain and watermain looping, via
Shellard Lane extension.
Maximizes use of existing pumping capacity at Water Treatment Plant Zone 1. Maximizes use of existing pumping capacity at Water Treatment Plant Zone 1. Maximizes use of existing pumping capacity at Water Treatment Plant Zone 1.
Sub-Score (1, 2, or 3) 3 1 2 2
Socio / CulturalStrategy balances conveyance solutions with storage. Strategy balances conveyance solutions with storage. Strategy balances conveyance solutions with storage.
As new infrastructure will be constructed within built-up areas, there is some potential for
impact/disruption to residents and local traffic.
As new infrastructure will be constructed within built-up areas, there is some potential for
impact/disruption to residents and local traffic.
Class EA Feasibility Study for a storage tank is currently underway. Preliminary preferred site was
identified at the John Noble Home site (Mt Pleasant St and Veterans Memorial Pkwy).
Class EA Feasibility Study for a storage tank is currently underway. Preliminary preferred site was
identified at the John Noble Home site (Mt Pleasant St and Veterans Memorial Pkwy).
Class EA Feasibility Study for a storage tank is currently underway. Preliminary preferred site was
identified at the John Noble Home site (Mt Pleasant St and Veterans Memorial Pkwy).
Construction could cause temporary traffic disruption to (Mt Pleasant St and Veterans Memorial
Pkwy).
Construction could cause temporary traffic disruption to (Mt Pleasant St and Veterans Memorial
Pkwy).
Construction could cause temporary traffic disruption to (Mt Pleasant St and Veterans Memorial
Pkwy).
Potential for perceived visual impact caused by elevated tank, to neighbouring community and Home
for the Aged. This is being addressed through the public consultation process as part of the Class
EA Feasibility Study.
Potential for perceived visual impact caused by elevated tank, to neighbouring community and Home
for the Aged. This is being addressed through the public consultation process as part of the Class
EA Feasibility Study.
Potential for perceived visual impact caused by elevated tank, to neighbouring community and Home
for the Aged. This is being addressed through the public consultation process as part of the Class
EA Feasibility Study.
Potential to cause high pressure issues along Hardy Road and Golf Road area.
Sub-Score (1, 2, or 3) 2 3 2 2
Financial Strategy 1 and 4 have approximately equivalent cost Highest cost option due to pressure zone modifications Mid cost option Strategy 1 and 4 have approximately equivalent cost
Total cost lower than strategies 2 and 3 Total cost lower than strategies 2 and 3
Sub-Score (1, 2, or 3) 3 1 2 3
Legal / Jurisdictional Will require land acquisition for new elevated tank. Will not require land acquisitions. Will require land acquisition for new elevated tank. Will require land acquisition for new elevated tank.
Permitting required from the Ministry of Transportation for the Hwy 403 watermain crossing(s). Permitting required from the Ministry of Transportation for the Hwy 403 watermain crossing(s). Permitting required from the Ministry of Transportation for the Hwy 403 watermain crossing(s). Permitting required from the Ministry of Transportation for the Hwy 403 watermain crossing(s).
Sub-Score (1, 2, or 3) 2 3 2 2
Total Score 12 11 10 11
Overall Score High Medium Low Medium
for Water, Sanitary and Stormwater Services2014 Master Servicing Plan (MSP)
ordCity of Brantf
Appendix 3D - Unit Costs
CITY OF BRANTFORD MASTER SERVICING PLAN
WATER LINEAR UNIT RATES Valves Trenchless Crossings, all include a valve at each side of crossing
For Creeks & Trans Canada For Regional Roads, Rail and Hydro Corridors For Freeways, Major Creek Crossings Trenchless Rates
Inflation 0.00% Inflation 0% Length = 20 Length= 60 Length= 150 Inflation 0%Pipe
Diameter
(mm)
#REF!
Cost 2013$
Diameter (mm)
Cost 2012$ Cost 2013$
Diameter
(mm)Cost 2013$
Diameter
(mm)Cost 2013$
Diameter
(mm)Cost 2013$
Diameter
(mm) Cost 2012$
Unit Rate
2013$
250 $916 $916 250 27,703 $27,703 250 $140,130 250 $308,610 250 $688,500 250 4,220 4,220
300 $1,018 $1,018 300 30,781 $30,781 300 $155,700 300 $342,900 300 $765,000 300 4,689 4,689
400 $1,131 $1,131 400 34,201 $34,201 400 $173,000 400 $381,000 400 $850,000 400 5,210 5,210
450 $1,260 $1,260 450 36,565 $36,565 450 $185,000 450 $408,000 450 $911,000 450 5,588 5,588
500 $1,434 $1,434 500 41,746 $41,746 500 $203,000 500 $442,000 500 $979,000 500 5,967 5,967
600 $1,584 $1,584 600 54,320 $54,320 600 $243,000 600 $512,000 600 $1,117,000 600 6,725 6,725
750 $1,835 $1,835 750 75,595 $75,595 750 $308,000 750 $623,000 750 $1,330,000 750 7,861 7,861
900 $2,176 $2,176 900 80,675 $80,675 900 $341,000 900 $701,000 900 $1,511,000 900 8,997 8,997
1050 $2,548 $2,548 1050 107,935 $107,935 1050 $419,000 1050 $824,000 1050 $1,736,000 1050 10,134 10,134
1200 $3,961 $3,961 1200 138,012 $138,012 1200 $501,000 1200 $952,000 1200 $1,967,000 1200 11,270 11,270
1350 $4,500 $4,500 1350 161,148 $161,148 1350 $570,000 1350 $1,067,000 1350 $2,183,000 1350 12,406 12,406
1500 $5,383 $5,383 1500 195,550 $195,550 1500 $662,000 1500 $1,204,000 1500 $2,422,000 1500 13,543 13,543
1650 $6,034 $6,034 1650 223,816 $223,816 1650 $741,000 1650 $1,328,000 1650 $2,649,000 1650 14,679 14,679
1800 $7,083 $7,083 1800 282,059 $282,059 1800 $880,000 1800 $1,513,000 1800 $2,936,000 1800 15,815 15,815
2100 $7,715 $7,715 2100 327,728 $327,728 2100 $1,017,000 2100 $1,741,000 2100 $3,369,000 2100 18,088 18,088
2400 $8,191 $8,191 2400 373,396 $373,396 2400 $1,154,000 2400 $1,968,000 2400 $3,801,000 2400 20,360 20,360
Valve Spacing
Diameter (mm)Valve Spacing
(m)
150 300200 300250 300300 300400 300450 600500 600600 600750 600900 6001050 600
1200 2000
1350 2000
1500 2000
1650 2000
1800 2000
2100 2000
2400 20001 Taken from MOE maximum spacing
for Water, Sanitary and Stormwater Services
2014 Master Servicing Plan (MSP)ordCity of Brantf
Appendix 3 E - Preliminary Water Model Results
FMs & SiphonsFMSiphon
Pipe d/D< 0.5 d/D0.5 - 0.75 d/D0.75 - 0.85 d/D0.85 - 1.0 d/D> 1.0 d/DMunicipal BoundaryRivers
´City of Brantford2014 Master Servicing Plan (MSP)for Water, Sanitary and Stormwater Services
Preliminary Wastewater Model Results2011 PDWF
July 20141:44,000 | UTM83-17n
FMs & SiphonsFMSiphon
Pipe d/D< 0.5 d/D0.5 - 0.75 d/D0.75 - 0.85 d/D0.85 - 1.0 d/D> 1.0 d/DMunicipal BoundaryRivers
´City of Brantford2014 Master Servicing Plan (MSP)for Water, Sanitary and Stormwater Services
Preliminary Wastewater Model Results2011 PWWF
July 20141:44,000 | UTM83-17n
FMs & SiphonsFMSiphon
Pipe d/D< 0.5 d/D0.5 - 0.75 d/D0.75 - 0.85 d/D0.85 - 1.0 d/D> 1.0 d/DMunicipal BoundaryRivers
´City of Brantford2014 Master Servicing Plan (MSP)for Water, Sanitary and Stormwater Services
Preliminary Wastewater Model Results2031 PDWF
July 20141:44,000 | UTM83-17n
FMs & SiphonsFMSiphon
Pipe d/D< 0.5 d/D0.5 - 0.75 d/D0.75 - 0.85 d/D0.85 - 1.0 d/D> 1.0 d/DMunicipal BoundaryRivers
´City of Brantford2014 Master Servicing Plan (MSP)for Water, Sanitary and Stormwater Services
Preliminary Wastewater Model Results2031 PWWF
July 20141:44,000 | UTM83-17n