    CF SERIES COOLING TOWERSINGLE-CELL UP TO 6000m3/HR FLOW RATELarge Counterflow Engineered Design

    F I B R E G L A S S W O O D S T E E L C O N C R E T E

  • 8/10/2019 Cf Counterflow

    2/8

    :: Esso Refinery Port Dickson Reconstruction, 3500 m3/hr (2 cells).

    :: Amsteel Mill Banting, 10800 m3/hr (4 cells).

    :: Ibn Battuta Gate Complex Dubai,950m3/hr/cell.

    :: Malacca Cogen Power Plant, 12500 m3/hr(5 cells).

    Guaranteed Thermal PerformanceWe provide 100% thermal performanceguarantee for CF series cooling tower. We shallcertify that tower supplied meets the specifiedperformance conditions when the tower isinstalled according to plans.

    Design FlexibilityCF series counterflow cooling tower has beenengineered to deliver maximum heat transfercapability. Because of its counterflow design,CF tower has inherent advantages which cangreatly reduce space requirement of tower onby utilizing advance computer software,TRUWATER engineering team custom designeach system according to your specificrequirements.

    Minimum Energy Consumption

    We can choose from the industrys mostefficient tower components to obtain highperformance capability. For example, byselecting the most efficient film type fills, highheat transfer rate can be achieved; choosingthe right fan assembly will greatly improvetower efficiency; etc.

    Extremely Long Service LifeCF series cooling tower utilizes only

    components which are manufactured fromthe finest raw materials and have beenproven to be reliable in the field. Allcomponents are carefully selected for theircorrosion resistance and suitability for coolingtower applications.

    Reduce visible plumeIf your site conditions require, we will design aHybrid Cooling Tower to reduce unwantedplume from the cooling tower, the HybridCooling Tower mixes moist air with dry air toreduce the plume effect.

    presents the following uniquecustomer benefits:

    CF Series Cooling Tower

    1

  • 8/10/2019 Cf Counterflow

    3/8

    2

    :: IPG Gas Singapore, 1300m3/hr/cell.

    :: Palm Jumeriah Trunk Dubai, 22660 m3/hr(11 cells).

    :: Megasteel Malaysia, 21000 m3/hr (6 cells).

    :: Mewah Oleochemicals Johore, 3600 m3/hr.

    :: Bangkok International Airport,12000m3/hr (5 cells).

    :: Putrajaya Pricinct 1 Annex, 9000 m3/hr(2X3-cell back to back).

    :: Bang Pakong Power Plant Thailand,35800 m3/hr (12-cell back to back).

    :: Petronas VCM Reconstruction, 13500 m3/hr(3 cells).

  • 8/10/2019 Cf Counterflow

    4/8

    3 D Modelling Utilizing advanced TEKLA Structures 3DModelling System Software,our engineering team custom designeach system to meet your specificproject requirement.

    Innovative DesignTruwater's vast experience and resourcesenable us to design state of the art

    cooling systems which are provenperformers in the field. Our innovationsinclude all the FRP Pultruded StructuralCooling Tower which provides long usefullife from a high strength non-corrosivemonolithic structure, without depletingour precious forests.

    Mechanical Equipment

    High efficiency fans and corrosion-resistant material are seleccted.Fans are driven by spiral bevel gearreducers selected wtih a mimimumAGMA service factor of 2.0.Motors are furnished according tocustomer's specification and aremounted outside the discharge airstream. Driveshafts are built from stainlesssteel or advance composite material andare dynamically balanced at the factoryto minimize operating vibrations.Fan cylinders feature velocity-recoverydesign made of FRP material.

    High Performance Heavy Duty Fill Fill or heat transfer media is the mostimportant component of CF SeriesSafety Maintenance Cooling Tower.

    The high performance heavy duty PVCfill maximizes cooling efficiency andhorse-power requirement.

    CF Series Features

    3

  • 8/10/2019 Cf Counterflow

    5/8

    Drift Eliminators CF Series utilizes a 3-pass, sinusoidal drifteliminations with very low pressure dropwhile still maintaining excellent driftdroplet removal capabilities.

    Water Distribution SystemFRP or PVC header pipe coupled withPVC lateral pipes with non clogging polypropylene nozzles distribute water

    evenly over the entire full surface. Thewater distribution system requires verylittle maintenance and minimal operatingpump head.

    Access & SafetyHandrails are provided around the fandeck perimeter. Each tower includes avertical ladder as standard. Free standing

    stairway can be provided as option. Ahatch in the fan deck allows access tothe drift eliminator and water distributionarea by means of built-in ladder. Eachgear reducer is equipped with extendedoil line outside fan cylinder wtih sight glassand level indicator. Fan cylinders areequipped with removable access door.Drive shafts are protected with couplingguards to restrain the shaft in the event ofa coupling failure.

    Other Features : - Motor Drive Shaft Gear Reducer Casing Fan Cylinder Safety Maintenance Platform

    CF Series Features

  • 8/10/2019 Cf Counterflow

    6/8

    Engineering We employ computer programs andCAD techniques in our engineering toprovide quick response to ourcustomers.

    Our computer programs cover thefollowing:

    1. Multipurpose counterflow designprogram.

    2. Multipurpose crossflow designprogram.

    3. Counterflow (and crossflow)performance curve calculation& display.

    4. Plume Abatement System designprogram.

    5. Test interpretation program tocalculate the test results accordingto the CTI Code ATC-105.

    We can supply cooling towers withdesign complying with CTI, DIN, BS orJIS requirements.

    Quality ControlWe carry out inspection of towercomponents and part according toour QC program. Tower materialssuch as wood, steel, fibreglass andplastics will be inspected as per ourquality control procedure. Equipmentsuch as fan assembly, gearbox, motorand drive shaft will be tested jointly withthe manufacturer of each equipment.We assure that items supplied are inconformance to our engineeringstandards and contract requirements.

    CF SeriesSupport & Services

    5

  • 8/10/2019 Cf Counterflow

    7/8

    Field Erection Our erection crews are well-trained andhave sufficient knowledge and skills toundertake erection contracts with fullconfidence. Prior to physical erectionwork we will pay special attention to theerection schedule and establish a criticalpath. Our supervisor will also identify allgoverning regulatory requirements

    related to construction practices,building codes, and safely requirements.He will survey the availability of stagingspace, equipment availability, manpowerstrengths and skill level, as well as factorssuch as prevailing weather conditionswhich may affect the erection methodsand scheduling.

    Tower inspection & UpgradingWe provide cooling tower inspection toinvestigate and analyse your existingtower conditions. Our experiencedengineer will report to you the overallphysical appearance, current level ofthermal operation, structural condition,mechanical equipment status andupgrading potential after eachinspection.

    We apply modern upgrading orretrofitting techniques to maximize theperformance of your cooling tower. Ourapproach involves a step-by-stepinvestigation; namely, pre-testing of thetower-physical inspection-analysis-engineering-fabrication-construction-

    and post-testing to determine the degreeof improvement achieved.

    CF SeriesSupport & Services

    6

  • 8/10/2019 Cf Counterflow

    8/8

    TC-M M SERIES COOLING TOWERMULTI-CELL 60-1500 HRT COOLING CAPACITYModular Design Counterflow Type

    LOW DRIFT LOSS EFFICIENT PERFORMANCE EASY MAINTENANCE

    TC-ES ESSERIES COOLING TOWERSINGLE-CELL UP TO 1500HRT COOLING CAPACITY

    ENERGY CONSERVATION SPACE SAVING DESIGN FLEXIBILITY

    High Performance Counterflow Type

    TX-SX SERIES COOLING TOWERMULTI-CELL 100-2000 HRT COOLING CAPACITYModular Design Crossflow Type

    LOW NOISE SUPER LOW NOISE ENERGY SAVING SUPER LOW NOISE

    Truwater Cooling Towers Sdn Bhd (188113-A)Executive Suite 702, Block B, Kelana Business Centre, No. 97, Jalan SS7/2, Kelana Jaya, 47301 Petaling Jaya, Selangor, Malaysia.Tel. : +603 7880 8800 Fax : +603 7804 5519E-mail : [email protected] Website : www.truwater.com.my

    TCT/A/005

    TX-CX SERIES COOLING TOWERSINGLE-CELL UP TO 1500HRT COOLING CAPACITYHigh Performance Crossflow Type

    PROVEN PERFORMANCE RELIABILITY EASY INSTALLATION