ACTION MAY BE TAKEN ON ANY ITEM*
Persons with a disability or language barrier may request this document in alternative formats or transactions
or other reasonable accommodations by contacting John Liosatos (520) 792-1093. Requests should be made
as early as possible to allow time to arrange the accommodation.
177 N. Church Avenue, Suite 405, Tucson AZ 85701
Phone: (520) 770-9410 Fax: (520) 620-6981
RTAmobility.com
Regional Transportation Authority Transportation Planning Committee (TPC)
Minutes of February 2, 2011, Meeting Committee Members Present: Jurisdiction Representatives: Priscilla Cornelio, Pima County DOT, Chair John Carlson, CTAC Craig Civalier, Town of Oro Valley, Vice Chair Toni Garcia-Bullington, University of Arizona Ryan Benavides (for Barbara Johnson), Town of Marana Ben Goff, Pima County DOT Jim Glock, City of Tucson DOT Ursula Kramer, Pima County DEQ Farhad Moghimi, Town of Sahuarita Albert Letzkus, Pima County DOT Mark Pugh (for Fred Stevens), San Xavier District of Mary McLain, Sun Tran/Sun Van the Tohono O’odham Nation Ed Stillings, FHWA James Zumpf, ADOT Statewide Planning-PHX Public/Agencies: Staff: Curtis Lueck, CLA & Associates Cherie Campbell Paul Casertano Carlos de Leon Jim DeGrood Gary Hayes Pat Kendall John Liosatos Joan Reedy Rob Samuelsen Sheila Storm Tim Thurein 1. Call to Order and Introductions
The meeting was called to order by Priscilla Cornelio, Chair, at 9:03 a.m. and introductions were made.
2. Election of Chair and Vice Chair
Motion was made by Mr. Glock to nominate Priscilla Cornelio as RTA TPC Chair and Craig Civalier as RTA TPC Vice Chair to continue in their respective offices and close the nomination process, seconded by Mr. Moghimi, unanimously approved and accepted by the candidates.
3. Approval of Minutes of January 5, 2011
Motion was made by Mr. Moghimi to approve the minutes of the Jan. 5, 2011, meeting, seconded by Mr. Civalier, and unanimously approved.
DRAFT
2
4. Call to the Audience No discussion occurred. 5. Announcements/Comments
Mr. Liosatos mentioned that a calendar of upcoming meetings and events is available to attendees. Other announcements followed:
• The next RTA Board meeting is scheduled for March 24, 2011; subject to change. The Board will likely have a Special Session/Study Session in early March dealing with financial issues, such as bonding and the desired extent of roadway improvement expenditures over the next five years.
• Mr. DeGrood introduced Carlos de Leon who has joined PAG as the Director of Transit Services.
• There will be an RTA Technical Management Policy Subcommittee meeting Monday, Feb. 7, at 3 p.m. in the small conference room.
• Mr. Moghimi announced the memorial services for Dennis Skelton to be held at Rancho Resort Clubhouse in Sahuarita, Saturday, Feb. 5 at 2 p.m. Mr. Skelton served on both CART and EPAC Committees.
• Ms. Cornelio extended an invitation to Pima County’s first major corridor ribbon cutting ceremony, the I-19 Frontage Road project, to be held in Green Valley Thursday, Feb. 3, at 2 p.m. This is the third fully completed RTA project.
• Mr. Civalier announced that the RTA and Sun Tran Oro Valley will unveil the Dial-A-Ride in Oro Valley on Feb. 14, at 9:30 a.m.
HANDOUT: Meeting Schedule for Transportation Planning Committee, Feb. 2, 2011
6. In-Kind Form
The in-kind form was circulated.
7. Report on Recent RTA Board, RTA TMC and RTA CART Meetings
Mr. DeGrood reported that all three of the committees met last month. CART met on the Jan.18, TMC on Jan.19 and RTA Board on Jan. 27. The major issues presented to these committees follow:
• The cash flow forecast looking at potential revenues over the coming five years. There is a considerable gap between the low revenue forecast and Eller College forecast, which is more aggressive. Recommendations will be taken to the RTA Board study session.
• FY 2012-2013 projects are about the same in all scenarios.
• Reports were also given on transit and the current IGA status.
• Recommendation for Project Review and the Value Analysis process.
• The RTA Board approved the Policies, Objectives and Procedures Revision.
• The implementation of the ThinkTank comment process recommendations. The ThinkTank identified work that needs to be done with the utility partners and public outreach processes.
• Currently, a ThinkTank is in development that deals with 404 permitting issues.
• The RTA Board approved multiple IGA amendments to include: the Town of Sahuarita, Downtown Links, Broadway Blvd., Bike Lanes in Sahuarita and the SR 77 Wildlife Viaduct.
In response to a question by Mr. Glock about the ThinkTank results Mr. DeGrood mentioned that better data analysis tools are being developed by staff. Mr. Liosatos explained that to speed up and make the process better, PAG is using a software program that looks for key words, the program searches for the words and does the counting.
3
8. RTA TIP Subcommittee Report
Mr. Benavides, TIP Subcommittee Chair, reported that the group met on Jan. 18, with a presentation on recent activities of the RTA Safety Working Group.
Mr. Liosatos added that a draft TIP 2012-2016 is being prepared for the Open Houses.
9. RTA Working Groups’ Monthly Report
Paul Casertano, PAG Lead for the RTA Safety Working Group, reported that the working group recommends expenditures in the following RTA Safety Element categories: Intersection Safety and Capacity Improvements with recommendation on selection of improvements, At-grade Railroad Safety/ Bridge Deficiencies providing recommendations on selection of at-grade improvements and Signal Technology upgrades to improve intersection traffic flow. The Working Group received the following requests for funding and project modifications:
• Pima County requested an increase in funding for Ina/Oracle Road. The recommendation was approved by the Working Group, TPC and RTA Board.
• The County also requested a Railroad Bridge reallocation of funding to a bridge rehabilitation based on some savings that were being experienced for the Sabino Canyon Road Bridge. The recommendation was approved by the Working Group, TPC and RTA Board.
• Oro Valley recently requested funds to modify a signal communications project to allow for remote signal timing adjustments. Increased funds were approved by the Working Group. The request is being reviewed internally by RTA before moving forward to the RTA TIP Subcommittee, then on to RTA TPC.
• Work continues on the Regional Traffic Signal Services Program overseen by the RTA Safety Working Group. This program is aimed at the retiming of traffic signals throughout the region. The program work was started about 24 months ago. More than 600 intersection traffic signal timing plans have been updated since the start of the program. These include signal timing optimization as well as updates to the pedestrian walk phase to ensure compliance with national standards.
10. RTA Project Review Process
Mr. DeGrood mentioned that this report has been added as a standing item. The biggest process in the next few months is dealing with financial issues. Projections are varied and somewhat bleak. Priorities will be set for which projects and funds are available to build which projects. New financial constraints have been put into place. The Value Analysis Program needs to be implemented, with the first projects subject to the new process likely to be the Houghton and Grant Road projects. In answer to Mr. Carlson’s question about “projects that currently have less than adequate funding,” Mr. DeGrood said, “What is in the ballot is what we committed to the public to deliver.” Focus will be on how we comply with that requirement. Everything will be looked at. Mr. Hayes commented on the specifics of the plan based on four, five-year cycles. Each five-year cycle has very specific projects to “begin construction.” He reemphasized “begin construction” during that first five years. That doesn’t mean you have to do everything in year one, which would be 2011-2012. We’ve got until 2016 to “begin construction” on the elements that are defined in the second five years. Discussion continued on the two phases of the Kolb Road extension project.
11. RTA Project Update (construction, billings and IGAs)
Mr. DeGrood reported that to date, the RTA Board has collected $302.5 million in excise taxes since 2006 with $267.7 expended through the end of December. At the end of December the balance was $55.8 million through the end of January, which has now declined to $49 million, with a burn-off of
4
$6.7 million last month. There is a total of $568 million worth of funding committed on 403 projects, 28 of which are under construction and, 174 are complete. Of the RTA Roadway element projects, four projects are now completed: the Twin Peaks TI, Camino de Manana, Houghton/Old Vail intersection (part of the Houghton Corridor project), and Phase I of Sahuarita Road. The I-19 Frontage Road will be completed this week. Current roadway element projects under construction are: Speedway Blvd. (between Camino Secco & Houghton), Tanque Verde Road (between Catalina Hwy & Houghton), La Canada Drive (Ina to Calle Concordia) and La Cholla (between River & Ruthrauff). There was a recent bid opening by Pima County on Jan. 25, for Magee Road (between Mona Lisa & La Canada Drive). That project was estimated at $23 million, the low bidder was Ashton at $15.7 million, 32 percent under the engineer’s estimate. Mr. DeGrood reported that of the major projects bid to date, the RTA is 29 plus percent under the engineer’s estimate that were current at the time of the bid. The track record shows that we are considerably under those estimates. Mr. DeGrood said the only thing that is up is the soft costs. The four Safety element projects that are under construction now: Starr Pass and Mission intersection, Starr Pass and Santa Cruz HAWK, Ft. Lowell/Campbell intersection (down to paving and due to wrap up in a month), and Wilmot/Nicaragua intersection. Other projects outside the roadway and safety element include the Phase 3, Bus Storage and Maintenance Facility project and the Modern Streetcar waterline relocations, scheduled to start upon the conclusion of the gem & mineral show. Last month the revenues collected (posted two months after they are collected at the cash register) represent sales that occurred during November 2010. In 2009, $504 million or about 2.23 percent was collected in the same month the year prior. The RTA fund balance stands at $49 million.
12. Future Agenda Items None heard. 13. Adjournment
The next regularly scheduled meeting will be on Wed., March 2, 2011, at 9:00 a.m. Motion was made by Mr. Civalier to adjourn the meeting, seconded by Mr. Moghimi, and unanimously approved. Meeting adjourned at 9:42 a.m.
2
TIP
ID
Existing Lanes
After Lanes
STREET/PROJECT NAME
TERMINI
PROJECT DESCRIPTION
AIR QUALITY STATUS
TOTAL
PROJECT
COST
(000's) 2011 2012 2013 2014
PROPOSED FUNDING
(IN THOUSANDS OF DOLLARS)
FISCAL YEAR
2015
PAG 2011 - 2015 TIP PROJECTS
TIP STATUS
LENGTH (Mi.)
Sponsor ID
State/Fed ID
Sponsor
TIP Amendment #9 - Proposed
Amendment
action
Item A 2.02 SR 86: Valencia to Kinney
MP 159.5 to MP 166.1
Widen to 6 lanes
AQ STATUS : ANALYZED Active
6.60
9200
0
0
D
57167 0
0
0
ASTP 1540
45633
0
C
2.6%
ASTP
0
0
0
0
0
0
2
6
0
0
0
1540
45633
0
C
2.6%
ASTP
0
0
0
0
0
0
Active
9994
0
0
D
ASTP
PROPOSED
H713701CADOTIncrease
Funding
Page 102/15/2011
TIP
ID
Existing Lanes
After Lanes
STREET/PROJECT NAME
TERMINI
PROJECT DESCRIPTION
AIR QUALITY STATUS
TOTAL
PROJECT
COST
(000's) 2011 2012 2013 2014
PROPOSED FUNDING
(IN THOUSANDS OF DOLLARS)
FISCAL YEAR
2015
PAG 2011 - 2015 TIP PROJECTS
TIP STATUS
LENGTH (Mi.)
Sponsor ID
State/Fed ID
Sponsor
TIP Amendment #9 - Proposed
Amendment
action
Item B 73.10 SR86: Pedestrian Compatibility Study
SR86: MP 112-115 (Sells)
Study
AQ STATUS : EXEMPT Active
0.00
50
0
0
Study
55 0
0
0
2.6% 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Active
55
0
0
Study
2.6%
PROPOSED
ADOTIncrease
Funding
Page 202/15/2011
TIP
ID
Existing Lanes
After Lanes
STREET/PROJECT NAME
TERMINI
PROJECT DESCRIPTION
AIR QUALITY STATUS
TOTAL
PROJECT
COST
(000's) 2011 2012 2013 2014
PROPOSED FUNDING
(IN THOUSANDS OF DOLLARS)
FISCAL YEAR
2015
PAG 2011 - 2015 TIP PROJECTS
TIP STATUS
LENGTH (Mi.)
Sponsor ID
State/Fed ID
Sponsor
TIP Amendment #9 - Proposed
Amendment
action
Item C 10.11 I-10: Ina to Cortaro Frontage Roads
Ina to Cortaro
Reconstruct & widen frontage rds. to 40'
AQ STATUS : EXEMPT
1.00
0
0
0
5000 0
0
0
0
0
0
0
0
0
0
0
0
2
2
4000
0
0
DR
2.6% 0
0
0
0
0
0
0
0
0
New
1000
0
0
D
2.6%
PROPOSED
ADOTSplit from
Project 5.02
5.02 I-10: Ina to Marana Frontage Rds.
Ina to Marana
Reconstruct & widen frontage rds. to 40'
AQ STATUS : EXEMPT Active
3.00
0
0
0
40000 0
0
0
0
0
0
30000
0
0
DC
NH 0
0
0
2
2
0
0
0
0
0
0
0
0
0
0
0
0
Reserve
0
0
0
PROPOSED
ADOTPlace in
Reserve
45.01 SR 86: MP 124.5 - 128.5 (San Isidro
Rd. Segment)
MP 124.5 to MP 128.5
Reconstruct & widen to 40 ft.
AQ STATUS : EXEMPT Active
4.00
1600
0
0
D
11500 0
0
0
ASTP 0
0
0
0
0
0
0
0
0
2
2
7000
2900
0
C
ASTP
2.6%
0
0
0
0
0
0
0
0
0
Active
1600
0
0
D
ASTP
PROPOSED
ADOTIncrease
Funding
Page 302/15/2011
TIP
ID
Existing Lanes
After Lanes
STREET/PROJECT NAME
TERMINI
PROJECT DESCRIPTION
AIR QUALITY STATUS
TOTAL
PROJECT
COST
(000's) 2011 2012 2013 2014
PROPOSED FUNDING
(IN THOUSANDS OF DOLLARS)
FISCAL YEAR
2015
PAG 2011 - 2015 TIP PROJECTS
TIP STATUS
LENGTH (Mi.)
Sponsor ID
State/Fed ID
Sponsor
TIP Amendment #9 - Proposed
Amendment
action
Item C 3.03 SR 86: MP 128.5 - 132.8 (Santa Rosa
Ranch Rd. Segment)
MP 128.5 to MP 132.8
Reconstruct & widen to 40 feet
AQ STATUS : ANALYZED Active
4.30
0
0
0
D
S=600
15600 0
0
0
0
0
0
0
0
0
0
0
0
2
2
15000
0
0
DC
ASTP 0
0
0
0
0
0
0
0
0
Active
0
0
0
D
S=600
PROPOSED
ADOTIncrease
Funding
105.03 SR 86: MP 132.8 - 137.1 (Kitt Peak Rd.
Segment)
MP 132.8 to MP 137.1
Reconstruct & widen to 40'
AQ STATUS : EXEMPT Active
5.70
7000
0
0
DC
15000 0
0
0
ASTP 0
0
0
0
0
0
0
0
0
2
2
13000
0
0
C
ASTP 0
0
0
0
0
0
0
0
0
Active
2000
0
0
DC
ASTP
PROPOSED
ADOTIncrease
funding
Page 402/15/2011
TIP
ID
Existing Lanes
After Lanes
STREET/PROJECT NAME
TERMINI
PROJECT DESCRIPTION
AIR QUALITY STATUS
TOTAL
PROJECT
COST
(000's) 2011 2012 2013 2014
PROPOSED FUNDING
(IN THOUSANDS OF DOLLARS)
FISCAL YEAR
2015
PAG 2011 - 2015 TIP PROJECTS
TIP STATUS
LENGTH (Mi.)
Sponsor ID
State/Fed ID
Sponsor
TIP Amendment #9 - Proposed
Amendment
action
Item D 9.11 Adaptive Traffic Control
Various
Install adaptive traffic control system
AQ STATUS : EXEMPT
0.00
0
0
0
275 0
0
0
0
0
0
0
0
0
0
0
0
0
0
275
0
0
DC
HSIP 0
0
0
0
0
0
0
0
0
New
0
0
0
PROPOSED
MaranaAdd Project
3.11 PAG Regional Road Safety
Assessment Program
Various
Regional program to identify safety issues
AQ STATUS : EXEMPT
0.00
0
0
0
75 0
0
0
0
0
0
0
0
0
0
0
0
0
0
70
0
0
DC
L=5
HSIP 0
0
0
0
0
0
0
0
0
New
0
0
0
PROPOSED
OWP-PAGAdd Project
5.11 Pedestrian Crosswalk Countdown
Signals
All Town Signals
Replace existing pedestrian crossing signals
AQ STATUS : EXEMPT
0.00
0
0
0
43 0
0
0
0
0
0
0
0
0
0
0
0
0
0
43
0
0
DC
HSIP 0
0
0
0
0
0
0
0
0
New
0
0
0
PROPOSED
SahuaritaAdd Project
Page 502/15/2011
TIP
ID
Existing Lanes
After Lanes
STREET/PROJECT NAME
TERMINI
PROJECT DESCRIPTION
AIR QUALITY STATUS
TOTAL
PROJECT
COST
(000's) 2011 2012 2013 2014
PROPOSED FUNDING
(IN THOUSANDS OF DOLLARS)
FISCAL YEAR
2015
PAG 2011 - 2015 TIP PROJECTS
TIP STATUS
LENGTH (Mi.)
Sponsor ID
State/Fed ID
Sponsor
TIP Amendment #9 - Proposed
Amendment
action
Item D 6.11 Pedestrian Crosswalk Countdown
Signals
All Town signals not to current countdown
standard
Replace existing pedestrian crossing signals
AQ STATUS : EXEMPT
0.00
0
0
0
13 0
0
0
0
0
0
0
0
0
0
0
0
0
0
13
0
0
DC
HSIP 0
0
0
0
0
0
0
0
0
New
0
0
0
PROPOSED
MaranaAdd Project
4.11 San Xavier Road - Mission Plaza
Curbing
San Xavier Road at Mission Plaza
Curbing and reflectors to provide safety barrier
AQ STATUS : EXEMPT
0.00
0
0
0
75 0
0
0
0
0
0
0
0
0
0
0
0
0
0
70
0
0
DC
L=5
HSIP 0
0
0
0
0
0
0
0
0
New
0
0
0
PROPOSED
Tohono
O'odham
Add Project
7.11 Traffic Signal Modules - 12" Yellow
LED
All Town signals not to current standard
Replace existing lamps with LED
AQ STATUS : EXEMPT
0.00
0
0
0
16 0
0
0
0
0
0
0
0
0
0
0
0
0
0
16
0
0
DC
HSIP 0
0
0
0
0
0
0
0
0
New
0
0
0
PROPOSED
MaranaAdd Project
Page 602/15/2011
TIP
ID
Existing Lanes
After Lanes
STREET/PROJECT NAME
TERMINI
PROJECT DESCRIPTION
AIR QUALITY STATUS
TOTAL
PROJECT
COST
(000's) 2011 2012 2013 2014
PROPOSED FUNDING
(IN THOUSANDS OF DOLLARS)
FISCAL YEAR
2015
PAG 2011 - 2015 TIP PROJECTS
TIP STATUS
LENGTH (Mi.)
Sponsor ID
State/Fed ID
Sponsor
TIP Amendment #9 - Proposed
Amendment
action
Item D 8.11 UPS Battery Backup Installation
Silverbell Road at Coyote Trail Elementary School
Install UPS Battery backup system at HAWK
AQ STATUS : EXEMPT
0.00
0
0
0
4 0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
0
DC
HSIP 0
0
0
0
0
0
0
0
0
New
0
0
0
PROPOSED
MaranaAdd Project
2.11 Urban Arterial Sign Panel Upgrades
Various
Upgrade traffic sign panels along urban arterial
AQ STATUS : EXEMPT
0.00
0
0
0
750 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
New
750
0
0
DC
HSIP
PROPOSED
TucsonAdd Project
2.08 Valencia Rd. Street Lighting and
Sidewalk
Valencia Rd. from Westover to Cardinal Ave
Install street lighting, curbs and sidewalks
AQ STATUS : EXEMPT Active
0.00
641
500
0
C
1217 0
0
0
RTA
HES
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Active
167
500
550
C
RTA
HES
HSIP
PROPOSED
RTA-37p
4RTVLSPima CountyAdd HSIP
Funding
Page 702/15/2011
177 N. Church Avenue, Suite 405, Tucson AZ 85701
Phone: (520) 770-9410 Fax: (520) 620-6981
RTAmobility.com
Regional Transportation Authority Transportation Improvement Program Subcommittee (TIP) Minutes of February 15, 2011, Meeting Committee Members Present: Jurisdiction Representatives: Joel Gastelum, City of South Tucson, Vice Chair Lisa Danka, ADOT-Financial Services Sal Caccavale, Pima County DOT Mayela Sosa, FHWA Thomas Garcia (for Farhad Moghimi), Town of Sahuarita Staff: Danny Granillo (for Todd Emery), ADOT-Tucson Paul Casertano Artemio Hoyos, Pascua Yaqui Tribe Jim DeGrood Andy McGovern, City of Tucson DOT Robert Done Jose Rodriguez, Town of Oro Valley Zonia Kelley Pat Kendall John Liosatos Jeremy Papuga Gabe Thum Tim Thurein 1. Call to Order and Introductions
Joel Gastelum, Vice Chair, called the meeting to order at 9:01 a.m. 2. In-Kind Form
The in-kind form was routed to attendees. 3. Approval of Minutes of Previous Meeting – Jan. 18, 2011
Motion was made by Mr. Hoyos to approve the minutes of the Jan. 18, 2011, meeting, seconded by Mr. Rodriguez, and unanimously approved.
4. Review and Approve Agenda
Motion was made by Mr. Caccavale to approve the agenda, as presented, seconded by Mr. Hoyos, and unanimously approved.
DRAFT
2
5. RTA Project Discussion Jim DeGrood reported on the following RTA updates:
Mr. DeGrood reported that the RTA Board has approved $565 million of project funding to date and about $279 million has been expended. The RTA has collected just above $300 million, received a deposit yesterday in the amount of $6.49 million, which is about 7.9 percent above the same month last year. This represents December holiday receipts. This is a healthy increase but not quite as high as we saw in 2008 and is still about 2 percent under what was collected in December 2008. Mr. DeGrood reported the RTA Board approved nine IGAs last month, including the wildlife crossing on State Route 77. The Technical Management Policy Subcommittee has been working on the recommendations from the RTA project review that concluded last summer. The RTA Board approved revisions to its policies, objectives and procedures document. Also presented to the RTA Board was the value analysis process that is needed to move forward with for all RTA projects. All RTA projects over $25 million would mandatorily receive this analysis. There is a short version of this for projects that are over $10 million but less than $25 million. The value analysis process would be optional for projects under $10 million. The RTA Board also received copies of the RTA Charter. The Technical Management Committee approved the RTA Charter and this will be used on future projects. A presentation was made to the RTA Board on the 5-year financial outlook. As mentioned in the past, $465 million in projects have been identified in the Roadway element only. If a 3% growth rate is looked at, in the coming 5 years, the conservative revenue growth rate would be at about less than $335 million in collections. Compared to the $465 million in the Roadway element alone, not including the Modern Streetcar expenditures, or the $74.5 million of outstanding RTA Safety and Environment and Economic Vitality element projects that have yet to be constructed. Needing to be discussed is how much of the $465 million project requests are felt comfortable going forward with, and how much bonding will be done. There will be a special study session with the RTA Board on Feb. 28. Recommendations will be presented to the board on what course of action with respect to bonding is recommended. Mr. DeGrood has put together a number of scenarios looking at construction programs that vary between $285 million in roadway expenditures to the full $465 million in expenditures, and what that means. In all of the scenarios, the projects that are ready now to go to construction will be moved ahead under any circumstance. This is what is being looked at as a baseline recommendation. For the projects further out, the recommendation will be to move cautiously with those and slow down the development of those projects and develop them in a fashion that they can be readily phased, and then re-evaluate the financial position again in 2 years.
6. RTA Working Group Report
Jeremy Papuga of the RTA Transit Working Group reported the working group’s recent activities include:
• Transit Working Group – Oversees nine funding categories which include; Transit Corridor, Bus Pullouts, Weekday and weekend Bus Service Improvements, Bus Frequency Improvements, Special Needs Transit, Neighborhood Transit Circulators, Express Service, Streetcar Project and Park-n-Ride Transit Centers.
• Mr. Papuga said the working group continues to work on a number of projects for delivery of the RTA plan, including design of the Broadway/Houghton Park-n-Ride. The design work on this project continues and is at about 95 percent completed. He said half of the approved bus pullout projects are in the construction phase and the remaining are still in right-of- way acquisition. Phase 3 of the bus storage facility is 40 percent completed. At the last working group meeting, the City of Tucson
3
reported that the construction of this project has created 69 jobs in the community. The Transit Working Group also monitors the Sun Shuttle route performance on a monthly basis. The group has been discussing how it plans on moving forward in the next year in regard to expected performance levels. A new Sun Shuttle Dial-a-Ride (DAR) was implemented yesterday in Oro Valley in partnership with Coyote Run. Monthly updates have been received in regard to the Modern Streetcar project. Last month the streetcar project received a “finding of no significant impact” regarding the environment.
• A project that the TWG has been working diligently on is the Regional Para-Transit System Plan that was completed about a year ago and the group is still working on implementing plan recommendations. The RTA recently has taken over the county’s contract for Handi-car para-transit services, which is a curb-to-curb transit service. The group has been discussing what policies should be implemented to regionalize those services. It has been recommended that the fares for Handi-car service match the fares for the urban Sun Van service. Also the TWG will continue to discuss duplicative services in the region and find ways to minimize the financial impact and consolidate those services.
• Lastly Mr. Papuga discussed the implementation of new fare technology. Smartcard technology is coming to the region, with a “go live” date of August. The first phase of implementation has already begun. The special services office of the City of Tucson already issuing reduced fare IDs and has a new workstation to get people onboard with the transition in August.
• Mr. Jose Rodriguez asked if there are any benches installed for the bus pullouts and who is responsible. Mr. Papuga replied the installation benches and shelters are part of the project.
7. RTA TIP Amendments as Needed
Mr. Thurein reviewed Amendment #9 to the FY 2011-2015 TIP which contains the following RTA items (Handout of TIP Amendment 9 is available upon request)
• Item D –Includes TIP ID # 2.08, Valencia Road Street Lighting and Sidewalk. Proposing the addition of $550,000 of Highway Safety Improvement Program (HSIP) funding, reducing the amount of RTA funding by $474,000. The HSIP discussion will occur at the next meeting of the PAG TIP following this meeting. Staff is asking for a recommendation of approval of this TIP amendment item in the caveat that the HSIP item is approved in the next meeting. Mr. Paul Casertano was available for any questions regarding this TIP amendment.
Motion was made by Mr. Caccavale to recommend approval of the RTA item (Item D), contained in Amendment #9 to the FY 2011-2015 TIP to the RTA Board, seconded by Mr. Garcia, and unanimously approved.
8. Other Business
Mr. John Liosatos wanted to take a few moments to announce Ms. Pat Kendall’s retirement in early
April and thank her for many years of service to the TIP Committee and wish her well. No other discussion occurred. 9. Adjournment
The next regularly scheduled meeting will be on April 19, 2011, at 9:00 a.m. All agenda items were covered, and the meeting adjourned at 9:18 a.m.
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011
RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Roadway Improvements
Grant Road, Oracle to Swan City of Tucson $17,200 Planning & Design $ only
Broadway, Euclid to Country Club City of Tucson $5,969 Planning & Design $ only
La Canada, Calle Concordia to River Pima County $27,565 Phase 1 Under Construction
22nd. Street, I-10 to Tucson Blvd. City of Tucson $10,450 Planning, Design & ROW
Houghton Rd, I-10 to Tanque Verde (part a) City of Tucson $20,232 Design, ROW and Construction
Sahuarita Road, I-19 to Country Club Sahuarita $6,680 Phase 1 Under Construction
Tanque Verde, Catalina Highway to Houghton Pima County $12,833 Under Construction
Magee/Cortaro Farms, Thornydale to La Canada Pima County $29,570 Planning & Design $ only
Magee, La Canada to Oracle Pima County $5,850 Planning & Design $ only
La Cholla, Ruthrauff to River Pima County $14,760 Under Construction
I-19 Frontage Road Pima County $3,920 Under Construction
Valencia, Ajo to Mark Pima County $5,000 Planning & Design $ only
Speedway, Camino Seco to Houghton City of Tucson $14,127 Under Construction
Downtown Links, I-10 to Broadway City of Tucson $21,571 Planning & Design $ only
Camino De Manana Marana $6,185 Completed
Twin Peaks, Silverbell to I-10 Marana $30,752 Completed
Sunset, Silverbell to River Pima County $350 Planning & Design $ only
Siverbell, Grant to Ina City of Tucson $3,223 Planning & Design $ only
La Cholla, Magee to Tangerine Pima County $23,400 Planning & Design $ only
Valencia, Alvernon to Kolb Pima County $10,700 Planning, Design & ROW
Kolb, Extension to Sabino Canyon City of Tucson $2,550 Planning & Design $ only
Tangerine, I-10 to La Canada Marana $2,600 Planning & Design $ only
Wilmot, North of Sahuarita Road Pima County $9,800 Design, ROW and Construction
Total Plan Element (23) $285,287
Safety - Intersection
Improvements
Grant/Craycroft City of Tucson $5,772 Completed
Golf Links/Wilmot City of Tucson $1,950 Completed
Ft. Lowell/Campbell City of Tucson $4,997 Under Construction
Starr Pass/Mission City of Tucson $4,650 Under Construction
Wilmot/Park Place City of Tucson $1,700 Completed
Starr Pass/La Cholla City of Tucson $275 Completed
Sixth/Euclid City of Tucson $250 Completed
Country Club/Pima City of Tucson $250 Completed
Nogales/Drexel City of Tucson $250 Completed
Stone/Glenn City of Tucson $250 Completed
Old Vail/Valencia City of Tucson $250 Completed
2/23/2011 1 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Safety - Intersection
Improvements Rita/Old Vail City of Tucson $250 Completed
Camino Seco/Wrightstown City of Tucson $800
Oracle/Auto Mall City of Tucson $250
Grant/Rosemont City of Tucson $100
St. Mary's/Silverbell City of Tucson $50 Cancelled
Detection Cameras, 30 Intersections City of Tucson $750 Completed
Tanque Verde/Pima City of Tucson $500
6th/Highland City of Tucson $175 Under Construction
Prince/Runway City of Tucson $300 Completed
Golf Links/Kolb City of Tucson $4,000
Harrison/Irvington City of Tucson $250
Wilmot/Nicaragua (construction) City of Tucson $700 Under Construction
Speedway/6th City of Tucson $180
Drachman/Stone City of Tucson $500
Left Turn Phasing Upgrades City of Tucson $75
Rita Road/Science & Tech Park City of Tucson $1,500
Agency Total (56) $30,974
La Cholla/Overton Pima County $1,040 Completed
Benson Hwy./Valencia Pima County $450 Completed
Valencia/Wilmot Pima County $300 Completed
Tanque Verde/Soldier Trail Pima County $370 Completed
Ina/Wade Pima County $150 Completed
Houghton/Sahuarita Pima County $2,500 Completed
Kolb/Valencia Pima County $6,900
Flowing Wells/Wetmore Pima County $117 Completed
Alvernon Way/Valencia Pima County $2,500
Campbell/Skyline Pima County $225 Completed
Palo Verde/Michigan & Coach Pima County $175 Completed
La Cholla/River Pima County $1,100 Completed
Camino Verde/Valencia Pima County $900 Completed
Mona Lisa/Orange Grove Pima County $385
Ina/Oracle Pima County $5,050
Continental/Camino del Sol Pima County $998 Completed
Alvernon/Los Reales Pima County $350 Completed
Nogales/Old Nogales Pima County $450
Kolb/Ventana Canyon Pima County $500
2/23/2011 2 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Safety - Intersection
Improvements Cardinal/Valencia Pima County $600
Agency Total (20) $25,060
Alpha Ave./Duval Mine Sahuarita $400 Completed
Duval Mine/La Canada Sahuarita $400 Completed
Old Nogales/Nogales Highway Sahuarita $50
Pima Mine/Rancho Sahuarita Sahuarita $375
Nogales Highway/Pima Mine Sahuarita $700
Agency Total (5) $1,925
Lambert Lane/La Cholla Oro Valley $900 Completed
Glover/La Cholla Oro Valley $730 Completed
Count-down Pedestrian Signals Oro Valley $47
Agency Total (3) $1,677
South Tucson Intersections (6) South Tucson $365 Completed
Silverbell/Ina Marana $1,000 Completed
Silverbell/Coachline Marana $350 Completed
Tangerine/Thornydale Marana $350 Completed
Silverbell/Cortaro Marana $200
Agency Total (4) $1,900
Safety - Intersection
Improvements Total Plan Sub-Element (94) $62,199
Safety - Elderly &
Pedestrian Improvements
HAWK - Euclid/Lester City of Tucson $175 Completed
HAWK - Broadway/Sarnoff City of Tucson $175 Completed
HAWK - Santa Clara/Drexel City of Tucson $175 Completed
HAWK - Stone/Cushing City of Tucson $175 Completed
HAWK - 6th Ave/14th St City of Tucson $175 Completed
ADA Improvements City of Tucson $1,500 Completed
Sam Hughes Safe Routes to School City of Tucson $300 Completed
2/23/2011 3 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Safety - Elderly &
Pedestrian Improvements HAWK - Swan/17th City of Tucson Completed
HAWK - Wrightstown/Fountain Park City of Tucson Completed
HAWK - Euclid/9th City of Tucson Completed
HAWK - Esmond/Rita City of Tucson Completed
HAWK - Starr Pass/Santa Cruz City of Tucson Under Construction
HAWK - Sahuara/Pima City of Tucson Completed
HAWK - Country Club/Silver City of Tucson Completed
HAWK - Flower/Alvernon City of Tucson Completed
HAWK - Wilson/6th City of Tucson Completed
HAWK - Old Spanish Trail/Kenyon City of Tucson Completed
HAWK - Camino Seco/Kenyon City of Tucson Completed
HAWK - Old Spanish Trail/29th City of Tucson Completed
HAWK - Golf Links/La Paloma Academy City of Tucson
HAWK - Escalante/Prudence City of Tucson Completed
HAWK - Drexel/Liberty City of Tucson Completed
HAWK - Drexel/Del Moral City of Tucson Completed
HAWK - Grande/St. Clair City of Tucson Completed
HAWK - 12th/Alvord City of Tucson Completed
HAWK - 3rd/Swan City of Tucson
2nd/Speedway Pedestrian Refuge City of Tucson $20 Completed
Main/18th Ave Pedestrian Refuge City of Tucson $30
Broadway/Old Spanish Trail Pelican City of Tucson $300
Oaktree/Drexel Pedestrian Refuge City of Tucson $20
COT School HAWKS City of Tucson $750
Speedway/10th HAWK City of Tucson $150
22nd/Lakeshore HAWK City of Tucson $150
Speedway/Arcadia HAWK City of Tucson $150
Agency Total (34) $6,495
HAWK - Camino Fennimore/Tanque Verde Pima County $200 Completed
HAWK - Camino La Zorella/Orange Grove Pima County $200 Completed
Agua Caliente Safe Routes to School Pima County $697 Completed
Fruchthendler School Walking Paths Pima County $427 Completed
HAWK - Curtis/Shannon Pima County $289 Under Construction
Valencia Street Lighting / Sidewalk Pima County $244
Homer Davis Safe Routes to School Pima County $250
Picture Rocks Safe Routes to School Pima County $450 Under Construction
$2,250
2/23/2011 4 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Safety - Elderly &
Pedestrian Improvements Bear Canyon Shared Use Path Pima County $170
Camino de Oeste Sidewalk Pima County $70
Laguna Sidewalk Pima County $245
Manzanita Sidewalk design Pima County $95
Camino del Sol Pedestrian Ramps Pima County $75
Agency Total (13) $3,412
HAWK - 6th/31st South Tucson $175 Completed
HAWK - 6th/34th South Tucson $175 Completed
HAWK - 26th/10th Ave South Tucson $140
ADA Improvements South Tucson $300
Agency Total (4) $790
La Cholla School Walking Path Oro Valley $123 Completed
Great Expectations School Flasher Sahuarita $25 Completed
HAWK - Hohokam Pascua Yaqui $321 Completed
Health Center to Senior Center Sidewalk Pascua Yaqui $185 Under Construction
Agency Total (2) $506
San Xavier Elderly/Pedestrian Master Plan Tohono O'odham $511 Completed
Safety - Elderly &
Pedestrian Improvements Total Plan Sub-Element (56) $11,739
Safety - Transit Corridor
Bus Pullouts
Bus Pullouts Package 1 (7) City of Tucson $988 Completed
Bus Pullouts Package 2 (4) City of Tucson $612 Completed
Bus Pullouts Package 3 (4) City of Tucson $424 Completed
Bus Pullouts Package 4 (6) City of Tucson $650 2 Completed, 2 Underway
Bus Pullouts Package 5 (5) City of Tucson $720 2 Completed
Agency Total (26) $3,394
2/23/2011 5 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Valencia, Mark to Camino de la Tierra (10 ) Pima County $494 9 Completed
ADA Accessible Stop @Ina/Oracle Pima County $148
Palo Verde Corridor (3) Pima County $257 3 Completed
Agency Total (14) $360
Sahuarita Park & Ride Sahuarita $75 Completed
Agency Total (1) $75
Marana Civic Center pullouts Marana $85
Agency Total (3) $85
RTA Bus Pullout Package 1 (40) RTA $7,030
Agency Total (40) $7,030
Safety - Transit Corridor
Bus Pullouts Total Plan Sub-Element (84) $10,859
Safety - At-grade Railroad
Safety/Bridge Deficiencies Sabino Canyon & Golder Ranch Bridge RehabilitationsPima County $1,090 1 Completed
Marsh Station/Cienaga Creek - Repair Pima County $250
Colossal Cave Rd/UPRR Safety Upgrade Pima County $300
Ruthrauff Rd/UPRR Safety Study Pima County $65
Agency Total (5) $1,705
Pima Mine Rd @ Santa Cruz River Sahuarita $1,100 3 allocations
La Canada - El Toro Road Rail Crossing Sahuarita $540 Completed
Agency Total (2) $1,640
Alamo Wash Bridge (Grant/Craycroft Intersection) Tucson $2,000 Completed
Speedway / Union Pacific Railroad Underpass Tucson $250 2 allocations
Downtown Rail Safety Project Study Tucson $150
Nogales Branch UPRR Safety Study Tucson $100
Rita Road /UPRR Safety Upgrade Tucson $300
2/23/2011 6 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Agency Total (5) $2,800
Rancho Vistoso / Big Wash Bridge Repair $420
Agency Total (1) $420
Safety - At-grade Railroad
Safety/Bridge Deficiencies Total Plan Sub-Element (13) $6,565
Safety - Signal Technology UPS/LED (30 intersections) City of Tucson $300 Completed
Pre-emption & Transit Priority City of Tucson $100 Completed
U of A Atlas Study City of Tucson $100 Operational
i2 Signal Maintenance City of Tucson $45 3 year commitment
NTCIP Communications City of Tucson $35
Regional Transportation Data Network City of Tucson $370
Fire Station 17 Flasher City of Tucson $40 Completed
RTDN Regional System City of Tucson $750
Regional Traffic Operations Center City of Tucson $30
i2 Signal Network enhancements City of Tucson $105
Real Time traffic Signal Timing and Traffic Info City of Tucson $200
Agency Total (11) $2,075
Regional Traffic Signal Communications Pima County $1,300
Ina Road Signal Coordination Pima County $225 Operational
Regional Traffic Signal Battery Backup Pima County $250 Completed
Agency Total (3) $1,775
Speed Alert Monitoring System South Tucson $60
Emergency Signal - 27th & 6th South Tucson $200 Completed
UPS - South Tucson Signals South Tucson $72 Completed
Agency Total (3) $332
Wireless Signal Equipment Upgrades Marana $279
Agency Total (1) $279
UPS - Oro Valley Signals Oro Valley $63 Completed
2/23/2011 7 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Wireless Signal Link Oro Valley $224
Agency Total (2) $287
Nogales Highway Speed Monitor Station Sahuarita $35 Completed
UPS - Sahuarita Signals Sahuarita $39 Completed
Wireless Signal Equipment Upgrades Sahuarita $36
Agency Total (3) $110
I-10 Interchange Signal Communications ADOT $98
Ajo Signal Interconnect ADOT $110
Regional Traffic Signal Data Connection to ITOC ADOT $90
Agency Total (3) $298
Regional MUTCD Compliance PAG $270
Various Signal Technology Projects TBD $87
Regional Traffic Signal Services PAG $700 2 allocations
Regional Traffic Signal Model PAG $165
Agency Total (4) $1,222
Safety - Signal Technology Total Plan Sub-Element (30) $6,080
Total Plan Element (277) $97,442
Environmental & Economic
Vitality-
Greenways, Pathways,
Bikeways, and Sidewalks Sidewalks Package 1 City of Tucson $1,000 Completed
Sidewalks Package 2 City of Tucson $2,800 Completed
Bike Lane Construction City of Tucson $912 Completed
ADA Sidewalks Package City of Tucson $238 Completed
EP&SW Shared Use Path COT; S. Tucson $2,150 Partial Completion
Bike Lane package 2 City of Tucson $1,671 Completed
Arroyo Chico Greenway City of Tucson $1,000 Under Construction
FY 09 Sidewalks City of Tucson $1,355 Completed
Greenways, Pathways,
Bikeways, and Sidewalks Church/Franklin Island Modification City of Tucson $30 Completed
2/23/2011 8 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Pre-design for TEA projects City of Tucson $100
4th Ave. Bike Boulevard (design) City of Tucson $300
Armory Park/Santa Rita Park TE (design) City of Tucson $200
Ironwood Hills Drive Sidewalks (design) City of Tucson $30 Cancelled
Glenn Street Neighborhood Improvement (TE) City of Tucson $119
Ft. Lowell Rd Sidewalk City of Tucson $300
Hughes Access Rd Bike Lanes City of Tucson $1,250
Bike Lane Package 3 City of Tucson $400
Third Street Bike Boulevard City of Tucson $90
Liberty Bike Boulevard City of Tucson $62
Agency Total (22) $14,007
Kolb Road Bike Lane Project Pima County $165 Completed
Bike Lane Construction Pima County $2,405 Partial Completion
Bike Lane Package 2 - design Pima County $131
Colossal Cave Bike Lane Construction Pima County $547
Valencia Road Bike Lane Gap Closure Pima County $473
Sidewalk Package 1 Pima County $1,525 Partial Completion
Pantano River Park Pima County $1,200 Under Construction
Centennial Elem/Flowing Wells Jr. Hi Sidewalks Pima County $178
White House Canyon Rd. Bike Lanes Pima County $297
Julian Wash Greenway/Pantano River Park R/W Pima County $504
Bear Canyon Bike Lanes Pima County $470
Valencia Road Bike Lane (Bike Lane 2 design) Pima County $360
Riverpark Path Pavement Markings Pima County $35
Flowing Wells Rd Bike Lanes Pima County $25
Riverpark Path Signage Pima County $32
Urban Loop Pima County $300
Pantano River Park (design, Speedway S 0.5 mi) Pima County $85
Middle School Markings Pima County $45
Abrego Bike Lanes Pima County $94
Alvernon/Contractors Way (Bike Lane 2 design) Pima County $250
Rillito Shared Use Path @ Country Club Pima County $415
Loma Alta Bike Lanes Pima County $75
Rillito Riverpark Bridge over Cmo de la Tierra Pima County $110
Greenways, Pathways,
Bikeways, and Sidewalks Camino de Oeste Bike Lanes Pima County $95
Sabino High Bike Safety Elements Pima County $46
Rillito Riverpath & Camino de la Tierra Bike/Ped Pima County $46
2/23/2011 9 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Pantano Riverpath Bike/Ped Pima County $42
Agency Total (27) $9,950
Old Nogales Highway Bike Lanes Sahuarita $442 Completed
Santo Tomas Sidewalk & Street Lighting Sahuarita $100 Completed
La Villita Bike Lane Sahuarita $75
Camino de Las Quintas Sidewalk Sahuarita $420
Agency Total (4) $1,037
La Cholla Bike Lanes Oro Valley $400 Completed
CDO Shared Use Path Phase 2 Oro Valley $873
Calle Concordia Bike Lanes Oro Valley $150
Agency Total (1) $1,423
Head Start Sidewalks Pascua Yaqui $272
Agency Total (1)
36th Street Greenway South Tucson $150 Completed
Agency Total (1) $150
San Xavier Road: From Little Nogales to I-19 Tohono O'odham $27
San Xavier Shared Use Path Tohono O'odham $400
Agency Total (2) $427
Greenways, Pathways,
Bikeways, and Sidewalks Total Plan Sub-Element (60) $26,567
Critical Wildlife Linkages Wildlife Linkages Study Marana $21 Completed
Camino de Manana Wildlife Crossings Marana $726 Completed
Tangerine/La Cholla Wildlife Linkages Study Marana/Oro Valley $78
Agency Total (3) $825
Wildlife Movement through Culvert Study Pima County $365 Study Underway
2/23/2011 10 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Critical Wildlife Linkages Wildlife Fencing Study Pima County $122 Study Underway
Agency Total (2) $487
SR 86 Wildlife Movement Study ADOT $79
SR 77 Wildlife Crossing Improvements ADOT $8,231
Agency Total (2) $8,310
Sahuarita Wildlife Study Sahuarita $100
Sahuarita Road Culvert Expansions Sahuarita $568
Sahuarita Road Pre/Post Construction Monitoring Sahuarita $135
Agency Total (3) $803
Houghton Road Wildlife Deflection Study Tucson $34
Agency Total (1) $34
Wildlife Connectivity Workshop AZ Game & Fish $61
Agency Total (1) $61
Critical Wildlife Linkages Total Plan Sub-Element (12) $10,520
Environment & Economic
Vitality Element Total Plan Element (72) $37,087
$134,529
Transit Element-
Weekday Evening Bus
Service Expansion Transit Weekday Extended Service City of Tucson
FY 07 $425
FY 08,09,10 $6,728
FY 11 $2,270
$9,423
2/23/2011 11 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Weekend Bus Service
Expansion Transit Weekend Extended Hours of Service City of Tucson
FY 08,09,10 $2,796
FY 11 $1,082
$3,878
Bus Frequency & Area
Expansion Bus Frequency (PLUGS) City of Tucson
FY 07 $427
FY 08,09,10 $2,078
FY 11 $957
Sun Tran Bus Storage & Maint. Facility City of Tucson $22,000 Completed
Seamless Regional Fare System / Rebranding City of Tucson $8,232
Bus Frequency & Area
Expansion New Buses - Local Match City of Tucson $24,522 First 90 Buses delivered
$58,216
South Tucson Transit Operations South Tucson $683
Total Plan Sub-Element (5) $58,899
Neighborhood Circulator
Bus Systems Circulator Bus System Study RTA $39 Completed
Green Valley Circulator Pima County $132 Absorbed into Sun Shuttle
Circulator Bus Service - Sun Shuttle RTA 11 Routes Operational
Circulator Bus Service Support Tucson $330
Ajo Dial-A-Ride Pima County $980 Absorbed into Sun Shuttle
$1,481
Special Needs Transit for
Elderly and Disabled
Citizens
Volunteer Transit Services-Pima Council on Aging
(PCOA) PCOA $4,900 20-year authorization
Sun Van service (para-transit) City of Tucson
FY 07,08 $1,410
FY 09,10 $3,621
FY 11 $1,892
Sun Van Expansion Vehicles $61
2/23/2011 12 of 13 1:06 PM
REGIONAL TRANSPORTATION AUTHORITY OF PIMA COUNTY
APPROVED DETAILED PROJECT LISTING
AS OF JANUARY 31, 2011RTA
Committed
Lead Funding
Plan Element & Categories Project Description Agency (000's) Project Comments
Pima County Special Needs Pima County
FY08 $561
FY09 $961
FY10 $1,095
$14,501
Express Service Expansion Ajo-Tucson Expansion to 5 days/week Pima County $2,038 Absorbed into Sun Shuttle
Sun Tran Express Expansion City of Tucson
FY 09,10 $2,051
$1,888
$5,977
Downtown/University high-
capacity transit (streetcar) Downtown Streetcar City of Tucson $54,706
Park & Ride Lots Houghton/Broadway & Houghton/Old Vail Lots City of Tucson $5,400 Temp site open
Oro Valley Park & Ride Lot Oro Valley $2,480 Completed
Casino Del Sol Park & Ride Pascua Yaqui $0
In exchange for Early Rte 27
Exp.
Total Plan Element (32) $156,745
Administration $2,965
Total Approved/In Process Projects (403) $579,525
2/23/2011 13 of 13 1:06 PM
Roadway Improvement Element
22nd St: I-10 to Tucson Blvd SR5A 19a 1, 5 J. Cuaron Pre-Plan'g 80% 4/08 6/09
Ph II:
7/09 TBD 12/13 2014 2015 0% 12/18 TBD
Planning on hold for I-10 to Park which includes roadway alignment selection and corridor plan. The Citizen Oversight Committee (COC) meetings are on hold pending further stakeholder meetings with the Ward
5 Office.
22nd Street/Kino Interchange 19b 1, 5
J. Cuaron/F
Felix
Plan'g/
Design 90% 1/07 6/08 7/08 10/2009 04/2010 11/2010 3/2011 2010 05/2011 0% 05/2012 TBD
The project is at 90% design for the 22nd/Kino Interchange. Construction ready to start July 2011. TDOT had just approved a design contract for the widening of 22nd from Park to Tucson Blvd, including a new
bridge over the UPRR. However, due to funding constraints a stop work order was issued in December, 2010. Right-of-way acquisitions for both segments are underway, pending available funding. See 22nd St: I-
10 project status for reach to west. IGA amendment for next phase of funding being prepared.
Broadway: Euclid to Country Club SR3A 17 5, 6 M. Antol Planning 5% 09/2010 09/2011 09/2011 08/2015 08/2016 0% TBD TBD
The planning team has completed the data collection and historic assessment for the corridor. The original M/C 1987 approved alignment, which has the impacts for the widening occurring largely on the North
side of the street will be the recommended alignment. We are in midst of conducting a traffic engineering analysis and integration of the bus rapid transit system as part of that analysis to help us clarify mobility
needs. RTA Project charter needs to be rewritten for this project. Stakeholder meetings will be planned in spring 2011 Kick off open house planned for May-late spring. Citizen Task Force selected and finalized
after the kick off open house. 18 month planning and design to 15%.
Downtown Links, I-10 to Broadway S30N 16a 1, 6 Tom Fisher Design 50% 12/06 7/08 8/08 09/2009 10/2011 03/2012 6/12 TBD 04/2011 0% TBD
This project is divided into 4 phases: Phase I design of the 8th Street drainage is 100% complete and will be coordinated with design and construction of the streetcar line on 8th Street to go out to bid in early
2011. An IGA with the the RTA has been approved for $9 million. Phase II design of the 6th Street/St. Mary's segment is almost 100% complete and will go out to bid in mid 2011, pending RTA funding. Utility
work by others is in progress. Phases III and IV design is at 30% and on hold, pending RTA funding.
Grant: Oracle to Swan SR2A-C 18 2, 3, 6 M. Antol Plan'g 80% 10/06 09/2011 8/09 09/2010 1/10 06/2011 0% 12/18 TBD
Grant/Oracle Intersection Project was issued NTP for design and construction. Appears as separate RTA reporting element now. 30% design and DCR for GRIP project from Oracle to Swan was submitted for
review by City at end of July and is complete. Beginning development of Community Character and Vitality Plan, which involves development of design guidelines, and overlay zone, and amendment of 7 area
and neighborhood plans to revitalize and reuse remnant properties, and to help realize the community's future vision for land use on Grant road. We have begun a land use outreach effort to build support and
identify specific changes and language will occur through 2011. Plan and overlay zone will be brought to City of Tucson Planning Commission and then Mayor and Council for Adoption. It is anticipated that this
planning effort will reduce R/W acquisition costs over the life of the project.
Grant/Oracle Intersection SR2AR1 3 T. Weideman Design 90% 03/2010 CONT. 03/2010 11/2010 2/11 05/2011 TBD N/A 0% N/A TBD
TEP issued indemnification and will begin relocating 3/11. Right-of-way acquisition is underway. Land Use Planning ongoing with the GRIP. 11/24/10 - 60% comments sent to consultant for revision. 1/5/11 -
SWG indemnified, expect work to begin in April. 90% plans due 2/9/11.
Houghton, I-10 to Valencia SR1A 32a 4 M. Dillard Design 30% ADOT 10/04 11/06 9/08 2018 12/08 TBD 30% Design Concept Complete
Val. (exclusive) to MAC Way (exclusive) M. Dillard Design 30% 10/04 8/08 2011
UPRR to I-10 M. Dillard Design 30% 10/04 8/08 2018 Federal funding obligation request approved by ADOT. Design underway.
(Houghton over UPRR Bridge- see below)
Houghton, 22nd to Valencia SR1B 32c 4 M. Dillard Design 30% ADOT 10/04 2/07 9/08 12/11 12/08 0% 2016 TBD 30% Design Concept Complete
Irvington (inclusive) to Val. (inclusive) M. Dillard Design 98% ADOT 10/04 4/09 9/08 8/09 4/10 11/00 3/11 6/11 0% 100% design plans to be completed in February 2011, estimate construciton Summer 2011, pending funding
Escalante (exclusive) to Irvington (exclusive) M. Dillard Design 30% ADOT 10/04 9/08 2013
22nd (exclusive) to Escalante (inclusive) M. Dillard Design 30% ADOT 10/04 9/08 2016
Houghton, Tanque Verde to 22nd SR1C 32b 2, 4 M. Dillard Design 30% ADOT 10/04
6/07
11/08 05/2009 2019 12/08 TBD
30%/Design Concept Complete
Broadway Intersect. M. Dillard Design 75% ADOT 10/04 5/09 05/2009 3/10 3/11 6/11 2011 95% design plans due March 2011
Speedway (inclusive) to Broadway (exclusive) M. Dillard Design 30% ADOT 10/04 05/2009 2014
Broadway (exclusive) to 22nd (inclusive) M. Dillard Design 30% ADOT 10/04 05/2009 2015
Tanque Verde (inclusive) to Speedway (exclusive) M. Dillard Design 30% ADOT 10/04 05/2009 2019
Houghton Rd/UPRR Bridge Replacement SR1D 32e 4
PC DOT/A.
McGovern Plan'g 15% 6/09 12/10 6/09 12/10 2012
This project is being managed by Pima County DOT, but funded by Federal and RTA funds allocated to TDOT. Project Assessment Report submitted for ADOT review/approval. Design change order required
due to changing UPRR requirements.
Kolb Rd Extension SR8A 26 2 M. Graham Design 30% 5/09 9/09 2011 Phase IIB Scope of Work contract signed. Have met with ADOT and FHWA to outline the environmental process. Phase 1 design approaching 90% stage.
Silverbell, Ina to Grant SR6A 5 1 A. Dinauer Planning 68% 05/09 12/10 1/11 07/2014
The total known project deficit, at this point, is now at least $16M. Recent public open houses were held on 101910 & 102110 in Tucson and Marana, respectively. As recently as November 2010, RTA staff was
resistant to the City's request for additional RTA dollars to cover all/a portion of the archeological costs. It is anticipated that the DCR will be completed in early 2011. Remaining items within the current
preliminary engineering contract are the locating of water lines and working with the USACE to try to figure out what it takes to obtain a Preliminary Jurisdictional Delineation.
Speedway, Camino Seco to Houghton SR4A 28 2 F. Felix Const 15% PCDOT 12/02 10/06 9/08 6/09 6/10 7/10 11/10 09/2010 25% 09/2012 NAC
NAC is the low bidder. Construction began 9/07/2010. The project will have at least five phases. First phase work includes underground in preparation to relocate overhead power lines to underground conduits.
Underground work should be done by the spring 2011. Second phase will begin road improvements to the north side of Speedway. Awaiting Corps of Engineers approval on archaeological recovery plan, east of
Bonanza Ave. Work will continue between Camino Seco and Bonanza until clearance is given.
Safety Element
Ft Lowell/Campbell Intersect. SN03 36c 3 M. Skilsky Constr 50% 5/07 9/08 4/09 12/09 4/10 5/10 95% 3/11
Falcone
Bros
Construction Underway.
Grant/Craycroft Intersect. SN01 36a 2, 6
F. Reyes F.
Felix Constr 100% 10/07 4/085/07
(started) 5/10 1/09 100% 12/09
NAC
Construct
ion
Construction complete. Finalizing ROW acquisitions.
Starr Pass/Mission Intersection SN04 36d 1 M. Skilsky Constr 25% 7/07 12/07
5/08
10/09
(75%
resubmitt
al)
4/09 1/10
(90%
resubmitt
al) 4/10 n/a n/a 8/10 25% 3/11
Borderlan
d
Construction Underway. Landscaping and art installation to be performed by other contractors.
Intersection Improv RTA FY 09 SN09 41ax
Grant/Rosemont N001 41ax 2, 6 C. Saltzman Design 95% 8/09 01/10 04/10 TBD 0% TBD TBD Design underway.
Oracle/Auto Mall N002 41ax 3 C. Saltzman Design 60% 5/09 05/2010 TBD 0% TBD Design underway. Meeting with Tucson Mall ownership.
Tanque Verde/Pima N004 41ax 2, 6 C. Saltzman Design 60% 8/09 01/10 TBD 0% TBD TBD Design underway. 30% Design & Utility plans submitted for review 01/10. Change Order for Water Mods and R/W pending.
Wilmot/Nicaragua N005 41ax F. Felix Constr 5% 7/09 09/09 12/09 5/10 9/10 n/a n/a 11/10 0% 1/11 SAP Construction start 11/8/10.Camino Seco/Wrightstown Intersection
Improvements SM04 36ab F. Felix Design 90%
04/21201
0 TBD TBD TBD
The intersection has been added to the widening of Camino Seco from Speedway to Wrightstown project. Both RTA and impact fees will fund the construction. Design review at 90 percent. Awaiting comments to
additions. Construction start not until fall 2011.
Wd #
%
Phase
Compl PS&E End30% PlansStartEnd
Intersection Safety and Capacity Improvements
Project status as February 2011Start ContractorPoss'n
100%
Acq'dDate Mobil-
ized
% Contr.
Compl Date Compl
75%
Plans
90%
Plans
MONTHLY REPORT - City of TucsonPlanning Design Right-of-Way Construction
Project
ManagerCurr.
PhaseRTA #Project Name CIP #
COT 1 2/23/2011
Wd #
%
Phase
Compl PS&E End30% PlansStartEnd Project status as February 2011Start ContractorPoss'n
100%
Acq'dDate Mobil-
ized
% Contr.
Compl Date Compl
75%
Plans
90%
Plans
MONTHLY REPORT - City of TucsonPlanning Design Right-of-Way Construction
Project
ManagerCurr.
PhaseRTA #Project Name CIP #
ADA Accessibility Projects ($150k) S111 37k CW T. Fisher Const 30% 1/08
no design
needed n/a n/a 03/2010 30% TBDTDOT
Streets
Remaining funding to be used as local match for FTA grants. TDOT Streets has completed 51 ADA bus stop improvements to date. Working on select stops throughout the city where ADA improvements have
been requested. Also collaborating with UofA College of Architecture on four new custom shelters.
PELICAN - La Paloma AcademySH08-
H005 37y C. Saltzman Design 15% 12/10Combined with Federal funding. Project Assessment report being prepared.
HAWK - Starr Pass & Santa Cruz LaneSH08-
H018 37y 1 M. Skilsky Const 25% 10/09 1/10 4/10 25% 1/11 BorderlandConstruction underway.
HAWK - Swan/3rd StSH08-
H019 37y C. Saltzman Design 75% 1/09 3/09 8/09 TBD 0% TBD TBDConsultant designing HAWK at new location. Spring 2011 construction expected.
Signal Technology
Transit Corridor Bus Pullouts
Bus Pullouts Package 4SB04 38d
1, 3,
5, 6 See below See below
6th St/Euclid (NB) F. Reyes Constr 100% 12/08 2/09 4/09 6/09 Core Project completed 12/10.
6th St/Highland (WB) M. Skilsky Constr 5% 5/09 8/09 1/10 4/10 6/10 7/10
West
Point
Project complete.
5th St. / Alvernon (SB) T. Weideman R/W 100% 3/09 5/09 8/09 10/09 12/09 no TBD 0% TBD TBD Tank removal has occurred; TDOT proceeding with r/w acquisition starting 11/10.
24th St / C. Club (SB) (NAME CHANGE) J. Gutierrez Bid 100% 5/09 7/09 8/09 05/10 10/10 n/a n/a 01/2011 0% TBD KE&G Project substantially complete.
Bus Pullouts Package 5 SB05 38i 1,3,4 Holder
Craycroft / 29th (NB) R/W 25% n/a n/a 9/09 11/09 02/10 6/10 8/10 Cont. Mod approved to include Record of Survey. Mylars to be turned in week of 11-8-2010. Mylars signed & is in R/W acquisition phase.
29th / Craycroft (EB) R/W 25% n/a n/a 9/09 11/09 02/10 6/10 8/10 Cont. Mod approved to include Record of Survey. Mylars to be turned in week of 11-8-2010. Mylars signed & is in R/W acquisition phase.
Congress / El Rio Health Center (WB) Const 100% n/a n/a 9/09 10/9 10/9 12/9 7/10 8/10 10-Nov 8/10 100% 12/10 SAP Project substantially complete.
Environmental & Economic Vitality Element
Greenways, Pathways, Bikeways and Sidewalks
Bikeways
RTA Bicycle Lane Restriping Package 2 49B2 41am D. Swartz Design
90%
100% 1/09 6/09 1/10 11/09 100% 7/10 NAC
Project being readied for bid advertisement.
4th Ave/Fontana Bike Blvd. SP03 41bc 3, 6 T. Thivener
Constructio
n 0% 6/09 11/09 11/09 07/2010 3/10Construction underway.
Transportation Enhancement Pre-Design S01F 41bb A. McGovern
Plan'g &
Design 15% 6/09 4/10RTA funding being used as local match requirements for several Transportation Enhancement projects. Work includes preparation of Project Assessment and environmental clearance documents.
Pathways and Greenways
Arroyo Chico Wash ImprovementsRP01
(Parks) 41ao 6 Julie Parizek Constr 88% 3/07 9/07 10/07 02/08 10/2010 11/2009 11-2009 n/a n/a 12/2009 88% tbd SQPThe project has experienced delays and additional costs because of unexpected site conditions and termination of a subcontractor. The current completion date is in January 2011.
El Paso & Southwestern Greenway SP01 41af 1, 3, 6 T. Thivener Plan'g 60% 7/08 10/09 10/09 4/10 1/11 0% TBD TBDPhase 2, master plan well underway. Openhouses held in January on draft master plan.
Transit Element
Bus Frequency & Area Expansion
Bus Frequency (PLUGS) K. Heineking Op'g n/a n/a n/a 6/07 n/a n/a n/a n/a Annual n/a Plugs are well used and appreciated by passengers and employees.
Sun Tran Bus Storage & Maintenance Facility- Phase
2
MRC2 /
M177 /
M157 3 T. Fisher Constr 100% 9/99 2/07 1/95 6/08 100% 11/2009
DL
Withers
Phase 2 is 100% complete.
Sun Tran Bus Storage & Maintenance Facility- Phase
3MRC2/AR
RA 3 T. Fisher Constr 40% 8/09 12/09 02/2010 1/96 07/2010 40%
DL
Withers
Project is mostly funded with $16.022 million in FTA Stimulus grant funds. Bid openings were July 14th. Contract awarded to DL Withers began construction on September 7th. PCCP parking deck for 100 buses
is complete. New administration building walls are complete. Maintenance building expansion walls are almost complete. Mechanical and electrical work in progress.
Seamless Fare System MRC9 Sun Tran
Approval of Project Management Plan 90% and Testing Plan 80%. Currently under review are Final Master Program Schedule. Onsite survey conducted for Special Services and Employee Badging.
SRFS/Rebranding MRC8 Sun Tran
320 out of 324 total transit vehicles have been rebranded. Sun Tran collaborated with the RTA on a series of public open houses to discuss potential changes to the Sun Shuttle system. Sun Tran staff
continues to work towards a seamless regional system, providing brochures, schedules and system maps for Sun Shuttle and updating neighborhood circulator information on suntran.com.
Weekend Bus Service Expansion
Transit Weekend Extended Service
Phase III - Supportive Service
M406/M59
0/M724/M8
90/M930 K. Heineking Op'g n/a n/a n/a 6/08 n/a n/a 8/08 n/a Annual n/a
Ridership is high on these much needed services.
Expansion
Transit Weekday Express Service
New Enh'd Expr's - OV, GV, OV Raytheon & Rita
RanchMRB1 /
M163 K. Heineking Plan'g n/a n/a n/a 6/08 n/a n/a 2/09 n/a Annual n/aRidership for the expresses is strong and the service continues to be popular .
Downtown/University high-capacity transit (streetcar)
Downtown Streetcar
MRC3 /
M158 /
M258 50 1, 6 S. Ginn
Final
Design 90% 12/07 8/08 12/2010 02/2011 12/2010 02/2011 0% 11/12 TBD
The City of Tucson received FTA approval to enter Project Development as an exempt project on October 2, 2009. FTA granted the city pre-award authority to move forward with the procurement of the
streetcars and rail, utility relocations, demolition and property acquisition. A Notice To Proceed was given to Oregon Ironworks on June 4, 2010. Last Progress report was February 9, 2011 at OIW. URS is
moving forward with track design for the entire project with 90% submittals to be submitted by March 2011. GLHN is moving forward with the design of the maintenance facility site. The City of Tucson was
awarded $63 million in TIGER funds on February 18, 2010. Grant Agreement was signed Decmeber 27, 2010. COT and RTA signed IGA for $45 in May 2010. COT met with FTA and the PMOC December 13,
2010 for Quarterly Report. Draft EA Supplemental was approved for public comment (comment period is November 2nd through December 2nd). FONSI was issued in January 2011. PMOC reviewing Bottoms
up cost estimate. Draft Finance Plan was submitted December 2, 2010 and approved by FTA. Awaiting funding for Cushing Street Bridge project. Water package began in December 2010.
Park and Ride Facilities
Broadway & Houghton MRC1 51e 2 T. Fisher Design 99% 6/07 12/08 10/09 02/2010 06/2010 11/2010 03/2011 3/09 Y 0% 06/2012 TBD
Design is 99% complete. Currently working with A&E staff to review site and building details. Second plan submittal to DSD in February. Project may be bid out separate from intersection pending RTA direction.
Houghton/Old Vail (Rita Ranch) MRC4 51e 4 T. Fisher ROW 50% 6/07 3/08 4/08 9/08 10/08 2/09 N
temp
facility
100%
complete 0% 01/2011 TBD
The temporary Park & Ride (at 10000 E. Old Vail) was completed in Feb 2009 and is in operation. Facility being maintained by Streets. Old Vail Partners have delayed their development project which includes
the permanent facility. Temporary right of entry was renewed in June for one more year. No new communications with the developer since January.
Elderly & Pedestrian Improvements
COT 2 2/23/2011
Wd #
%
Phase
Compl PS&E End30% PlansStartEnd Project status as February 2011Start ContractorPoss'n
100%
Acq'dDate Mobil-
ized
% Contr.
Compl Date Compl
75%
Plans
90%
Plans
MONTHLY REPORT - City of TucsonPlanning Design Right-of-Way Construction
Project
ManagerCurr.
PhaseRTA #Project Name CIP #
Future Projects
Completed ProjectsRoadway Improvement Element
Sixth/Euclid SG02 B. Hunt Complete 100% N/A 03/07 Project completed.
MAC Way Intersection SR1A 32a 4
Jesse
Gutierrez Const 100% 10/04 11/06 8/08 11/08 3/09 6/09 6/09 100% 6/10Construction complete
Safety Element
Country Club/Pima SG04 B. Hunt Complete 100% N/A 06/07 Project completed.
Nogales/Drexel SG05 B. Hunt Complete 100% N/A 06/07 Project completed.
Old Vail/Valencia SG06 B. Hunt Complete 100% N/A 06/07 Project completed
Rita/Old Vail SG07 B. Hunt Complete 100% N/A 06/07 Project completed.
Fire Station 17 Flasher SG08 Saltzman Complete 100% as-built plans completion 6/08 1 01/09 Project completed.
Sixth/Euclid SG02 B. Hunt Complete 100% N/A 03/07 Project completed.
Starr Pass/La Cholla SG01 36f 1 B. Hunt Complete 100% 11/07 100% 2/08 P.A.C.E. Project completed.
Stone/Glenn SG03 B. Hunt Complete 100% N/A 6/07 Project completed.
Wilmot/Park Place Inter. SN05 36e 6 Gutierrez Complete 100% 11/07 1/08 3/08 10/08 2/09 1/09 6/09 7/09 100% 11/09 Project completed.
Golf Links/Wilmot Intersection SN02 36b 4 Fred Felix Complete 100% 3/07 12/07 5/08 9/09 12/2009 n/a n/a 5/03 100% 09/10 SAP Project completed.
Intersection Improv RTA FY 09 SN09 41ax
St. Mary's/Silverbell N003 41ax 1 Saltzman Complete 100% 6/09 TBD 0% TBD Project completed.
Elderly & Pedestrian Improvements
HAWK - Broadway/Sarnoff SH05 B. Hunt Complete 100% N/A Project completed.
HAWK - Euclid/Lester SH04 B. Hunt Complete 100% N/A Project completed.
HAWK - Santa Clara/Drexel SH03 B. Hunt Complete 100% N/A 6/07 Project completed.
HAWK - 6th St/WilsonSH08-
H006 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - 12th Ave/Calle AlvordSH08-
H007 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Alvernon & FlowerSH08-
H008 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Cmo Seco & KenyonSH08-
H009 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - C. Club/SilverSH08-
H010 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Desert Sky (Rita/Esmond Lp/Rankin)
SH08-
H001 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Drexel & Del MoralSH08-
H011 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Drexel/LibertySH08-
H012 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Escalante & PrudenceSH08-
H013 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Euclid/9thSH08-
H003 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Grande & St. Clair StreetSH08-
H015 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - OST/29th StSH08-
H016 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - OST/KenyonSH08-
H017 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Pima/SahuaraSH08-
H014 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Swan/17th StSH08-
H002 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - Wrightstown/Ftn ParkSH08-
H004 Saltzman Complete 100% as-built plans complete 6/08 100% 1/09 PACEConstruction complete. As-Built Plans complete
HAWK - So. 6th Ave/14th St SH07 37a 5
M. Antol
Saltzman Complete 100% 9/07 5/08 as-built plans complete 11/08 100% 3/09 PACEConstruction complete. As-Built Plans complete
Church & Franklin Island Modification SY03 41at T. Weideman Complete 100% 5/09 11/09 n/a n/a 01/05/10 100% 01/15/10 K and BConstruction complete
HAWK - So. Stone/Cushing SH06 37b 5
M. Antol
Saltzman Complete 100% 9/07 5/08 as-built plans complete 11/08 100% 3/09 PACEConstruction complete. As-Built Plans complete
Video Detection Cameras SG09 36aj P. Burton Complete 100% 03/2009 100% 02/2010 in-house
Camera systems installed and operational at all 30 specified locations .
ADA Accessibility Projects ($238k) SE01 37l CW J. Chase Complete 100% 1/08 3/09 03/2009 90% 04/2010 Varies Complete.
Sam Hughes Safe Routes to School SH14 37m Z. Canchola Complete 100% 08/2009 5/10 N/A 7/10 Complete.
Signal Technology
i2 Maintenance Contract 490H 40e CW Annual 100% Annual contract - $23K per year. FY 2009 complete.
U of A Atlas Study SC03 40c CW F. Leyva
Equip
Purch'd N/A N/A TBD
Processing payment. RHODES program is operational.
UPS/LED (30 intersections) 490E 40a CW P. Burton Complete 100% N/A N/A 1/08 01/2010 30 intersections fully operational.
Pre-emption & Transit Priority SC02 B. Hunt Complete 100% N/A 6/07 Project completed.
Transit Corridor Bus Pullouts
Bus Pullouts Package 1 SB01 38b CW J. Chase See below
Broadway and Alvernon, WB Complete 100% 7/07 3/09 5/09 12/09 n/a n/a 4/10 100% 09/10
So. AZ
Pav'g
Complete.
Country Club and Kleindale, NB & SB Complete 100% 11/07 n/a n/a 11/07 100% 2/08 in-house
Grant and Alvernon, NB Complete 100% 6/08 8/08 0% 10/08
Irvington and Campbell, WB & SB Complete 100% n/a n/a 6/08 100% 8/08
So. AZ
Pav'g
Oracle Rd. and Glenn St., NB Complete 100% 10/08 4/09 0% 6/09 Pav'g
Bus Pullouts Package 2SB02 38c 3, 5, 6 Saltzman See below
Ajo Way at Park Ave, EB Complete 100% 11/08 11/08 100% 3/09
NAC
Const.
Construction Complete.
Oracle and Grant, NB Dropped N/A 1/07 None None 0% None None Location dropped. Replaced with Stone and Yavapai.
Oracle and Grant, SB Complete 100% 11/08 100% 10/09
West
Point
Construction Complete.
Complete
Intersection Safety and Capacity Improvements
Complete
Complete
Complete
Complete
Complete
COT 3 2/23/2011
Wd #
%
Phase
Compl PS&E End30% PlansStartEnd Project status as February 2011Start ContractorPoss'n
100%
Acq'dDate Mobil-
ized
% Contr.
Compl Date Compl
75%
Plans
90%
Plans
MONTHLY REPORT - City of TucsonPlanning Design Right-of-Way Construction
Project
ManagerCurr.
PhaseRTA #Project Name CIP #
Speedway and 6th Ave., EB Complete 100% 11/08 11/08 100% 11/09
NAC
Const.
Construction Complete.
Stone and Yavapai, SB Complete 100% 11/08 11/08 100% 02/10
West
PointConstruction Complete.
Bus Pullouts Package 3SB03 38d
1, 3,
5, 6 F. Felix See below
Country Club & Broadway, NB Complete 100% Fall 2008 4/09 99% 7/09
West
Point
Complete.
Ft. Lowell & Dodge, EB Complete 100% n/a n/a
Winter
2008 100% 3/09
West
Point
Complete.
Irvington and Park, WB Complete 100% n/a n/a 11/08 100% 12/08
West
Point
Complete.
Old Nog Hwy & Los Reales, WB Dropped --- Location dropped. Casino added bus pullout themselves.
Bus Pullouts Package 4SB04 38d
1, 3,
5, 6 See below See below
6th St/Campbell (WB) J. Chase Complete 100% 12/08 1/09 4/09 5/09 07/09 09/09 08/09
Bus Pullouts Package 5 SB05 38i 1,3,4 Holder
Flowing Wells / Roger Rd. (SB) Complete 100% n/a n/a 9/09 10/9 12/09 NA 7/10 n/a 9/10 100% 10-Oct
West
Point
Construction Complete
Environmental & Economic Vitality Element
Greenways, Pathways, Bikeways and Sidewalks
Pathways and Greenways
Ironwood Hills Sidewalk SK21 41bg T. Weideman Dropped ---12/04/09 - Project cancelled due to funding.
Bikeways
RTA Bicycle Lane Restriping Package 1 49B1 41af CW D. Swartz Complete 100% 12/07 11/08
10/08
7/09 100% 01/2010Project completed Jan. 2010.
Sidewalks Package 1 SK01 Completed Locations Listed Below
22nd St., Wilmot to Kolb F. Reyes Complete 100% 12/07 Construction completed under Road Recovery in March 2005 (N. side).
Alvernon, Broadway to 22nd F. Felix Complete 100% 3/07 Construction complete. Final payment made.
Broadway, Wilmot to Kolb J. Chase Complete 100% 6/07 Construction complete. Final payment made.
Grant, Dragoon to I-10 T. Weideman Complete 100% 6/09 n/a n/a 7/09 100% 9/09 K/B Construction complete.
Swan, 22nd to 29th J. Gutierrez Complete 100% 5/07 Construction complete. Final payment made.
Wetmore, Oracle to Stone T. Weideman Complete 100% 9/07Construction complete. Final inspection on October 3, 2007. Final payment October 15, 2007. Billed RTA.
Sidewalks Package 2 SK02 41b CW F. Reyes Location details below
22nd St., Alvernon to Swan Complete 100% 9/07 7/08 9/08 11/08 12/08 8/09 100% 12/09 SQP
Broadway, Alvernon to Swan
Craycroft, Broadway to 22nd
Mission Rd., Ajo to IrvingtonTanque Verde, Kolb to Sabino Canyon
Sidewalks Package 3 SK03 41ay CW Location details below
Craycroft, Glenn-Speedway Complete 100% 11/08 100%
So. AZ
Pav'g
Complete
Grant, Swan-Wilmot Complete 100% 11/08 100%
West
Point
Complete
Stone, Grant-Drachman T. Weideman Complete 100% 5/09 TBD TBD 4/10 5/10 n/a n/a 06/2010 5% 08/2010
NAC
Construct
ion
Project complete October 2010.
Country Club, Broadway-22nd St T. Weideman Complete 100% n/a n/a 8/09 90% 9/09
West
Point
Project complete.
Transit Element
Weekday Evening Bus Service Expansion
Transit Weekend Extended Service
Phase I - Core Service K. Heineking Op'g 12/06 Annual Evening service was added to Routes 3, 4, 6, 7, 8, 9, 11, 16 - Implemented February 2007. Service is on-going and successful.
Phase II - Essential Service K. Heineking Op'g 3/07 Annual Evening service was added to Routes 1,10, 15, 17, 19, 22 34 - Implemented May 2007. Service is on-going and successful.
Phase III - Supportive Service K. Heineking Op'g 6/07 Annual Evening service will be added to Routes 2, 21, 27, 23, 26, 29 - Implemented August 2007. Service is on-going and successful.
Weekend Bus Service Expansion
Transit Weekend Extended Service
Phase I - Core Service K. Heineking Op'g 6/07 Annual Enhanced Sat/Sun service hours will be added to Routes 3, 4, 6, 7, 8, 9, 11, 16 - Implemented August 2007. Service is on-going and extremely successful.
Phase II - Essential Service K. Heineking Op'g 9/07 Annual Enhanced Sat/Sun service hours will be added to Routes 1, 10, 15, 17, 19, 22, 34. Implemented November 2007. Service is on-going and extremely successful.
Express Service Expansion
Transit Weekday Express Service
New Enhanced Expresses - 391 Marana Express K. Heineking Op'g 3/07 Annual
New express from Marana schedule to begin service Feb 2009 has been accelerated utilizing ADOT funding in support of the I-10 construction. Service is on-going and very successful.
Construction completed 11/09
Change order approved to modify design from a pullout to a pullthrough. Contract extended to 4/14/2010. Have Authority to Acquire. In acquisition process. Mylars are signed and awaiting R/W. Will build
pullout and wait for bus shelter pad since that is the only need for R/W. Jim Stoyanoff working with Chase Bank. Est. const. start Oct. 18, 2010. Construction complete.
10/10 100% 11/10
West
Point
Complete
Complete
Grant/Silverbell (EB) M. Holder Complete n/a 4/09100% n/a 2/10 N/A05/09
Complete
Complete
5/10
Complete
COT 4 2/23/2011
Bus Pullouts Package 6 RTA 38j Holder
- Alvernon / Ft. Lowell SB
- Alvernon / Glenn SB
- Alvernon / Glenn NB
- Alvernon / Pima SB
- Alvernon / Pima NB
R/W &
Const.
55%
0% 10/2009 01/2010 05/2010 N/A 7/10 West Point
PSOMAS - Cont. Mod. #1 for Utility Coord. approved 4-19-2010.
Cont. extended to 7-9-2010. 75% Prop. Owner ltrs. sent 5/10.
Property owner issues being discussed. Cultural Resource
Clearance Waivers requested 6-23-10. Contract extended to 1-9-
10 for post design services. Environmental clearance requested 10-
26-10. 100% mylars at Tucson Water for signature. Mylars signed
by all. 100% utility submittal made. R/W acquisition proposals due
12-15-10. Tierra selected for R/W acquisition. Request for
construction bids to be sent 1-7-11. West Point low bidder @
$287,175.70.
Bus Pullouts Package 7 RTA38j Holder
- First Ave. / Ft. Lowell NB
- First Ave. / Ft. Lowell SB
- First Ave. / Prince SB
- First Ave. / Roger SB
- Ft. Lowell / First Ave. EB
R/W &
Const.
50%
20% 10/2009 01/2010 04/2010 N/A 8/10 20% West Point
Transystems - 75% Prop. Owner ltrs. sent 4-26-2010. Cont. Mod.
#1 for Utility Coord. approved 4-27-2010. Cont. extended to 7-9-
2010. Property owner issues being discussed. Cultural Resource
Clearance Waivers requested 6-25-10. This is anticipated to be the
second package to start construction since only two of the five bus
pullouts requires R/W. 9-1-10 Environmental Clearance
requested. Contract extended to 2-20-10 for post design services.
100% Mylars to be turned in on 11-12-10. Proposals for R/W
acquisition due 10-9-10. Request for bids week of 11-22-10. Bids
due 12-7-10. RTA Board to approve 12-9-10. West Point low
bidder @ $266,747. DOWL selected for R/W Acquisition.
Bus Pullouts Package 8 RTA38j Holder
- Wilmot / Broadway SB
- St. Mary's / Silverbell EB
- 29th / Columbus EB
- 22nd / Country Club WB
R/W &
Const.
62%
40% 10/2009 11/2009 02/2010 N/A 7/10 11/2010 40% SAP
EPS Group - 75% Prop. Owner ltrs. Sent 5-4-2010. Cont. Mod. #1
for Utility Coord. approved 4-27-2010. Cont. extended to 7-9-2010.
Property owner issues being discussed. Cultural Resource
Clearance Waivers requested 6-25-10. Environmental Clearance
requested 8-3-2010. This will be the first package to start
construction since only one of the four bus pullouts requires R/W.
Construction bids advertised 8-31-10. Bids due 9-29-10. Southern
Arizona Paving low bidder @ $234,773. Contract extended to 1-9-
10 for post design services. SAP to start at 29th /Columbus 11-29-
10 then move to Wilmot/Broadway. Tierra performing R/W
acquisition for the one bus pullout that requires R/W. SAP finished
29th/Columbus, started Wilmot/Broadway.
Bus Pullouts Package 9 RTA38j Holder
MONTHLY REPORT - RTA
Project Name RTA #
Project
ManagerCurr.
Phase
% Phase
Compl
Planning Design
Project Status as of January 2011Start End Start
30%
Plans
75%
Plans
90%
Plans
PS&E
EndDate
Compl Contractor
Right-of-Way Construction
Poss'n
100%
Acq'dDate Mobil-
ized
% Contr.
Compl
- Alvernon / 22nd SB
- Alvernon / 29th NB
- Alvernon / 32nd SB Design 100% 10/2009 12/2009 06/2010 N/A 11/10
Kimley Horn - Cont. Mod. #1 for Utility Coord. approved 4-27-2010.
Cont. extended to 7-9-2010. 75% Prop. Owner ltrs. sent 5/10.
Property owner issues being discussed. Cultural Resource
Clearance Waivers requested 7-1-10. Contract extended to 1-9-10
for post design services. KHA wrapping up plans to submit 100%.
100% plan submittal made. Mylars submitted and are at Tucson
Water for signature. Mylars signed & ready to be sent out for
printing.
Bus Pullouts Package 10 RTA38j Holder
- Ft. Lowell / Alvernon WB
- Campbell / Adams SB
- Campbell / Prince SB Design 100% 10/2009 11/2009 05/2010 N/A 7/10
EEC - Cont. Mod #1 for Water Mod. approved 3-3-2010. #2 for
Campbell/Prince SB mod. Approved 4-14-2010. #3 for Utility Coord.
Approved 4-19-2010. Cont. extended to 7-9-2010. 75% Prop.
Owner ltrs. sent 5/10. Property owner issues being discussed.
Cultural Resource Clearance Waivers requested 6-25-10.
Contract extended to 2-20-2010 for post design services.
Environmental Clearance requested 11-9-10. 100% mylars due any
day. Mylars submitted & approved. R/W acquisition bids due 2-23-
2011.
Bus Pullouts Package 11 RTA38j Holder
- Oracle / Prince NB
- Oracle / Prince SB
- Oracle / Glenn SB
- Prince / Oracle EB Design 100% 10/2009 12/2009 07/2010 N/A 9/10
EEC - Cont. Mod. #1 for Utility Coord. approved 4-27-2010. Cont.
extended to 7-9-2010. 75% Prop. Owner ltrs. sent 5/10. Property
owner issues being dicsussed. Cultural Resource Clearance
Waivers requested 8-2-10. Contract extended to 1-28-10 for post
design services. 100% mylars due week of 11-15-10.
Environmental Clearance requested 11-24-10. Mylars submitted &
approved.
Bus Pullouts Package 12 RTA38j Holder
- Valencia / San Fernando EB
- 12th / Valencia NB
- Park / Irvington NB
- 12th / Nebraska NB
- 6th / Veterans NB
R/W &
Const.
0%
0% 10/2009 12/2009 05/2010 N/A 8/10
AMEC - Cont. Mod. #1 for Utility Coord. approved 4-19-2010. Cont.
extended to 7-9-2010. 75% Prop. Owner ltrs. sent 5/10. Proerty
owner issues being discussed. Cultural Resource Clearance
Waivers requested 7-1-10. Contract extended to 1-9-10 for post
design services. Environmental Clearance requested 11-4-10.
Awaiting 100% mylars. DOWL selected for R/W acquisition. Mylars
submitted & approved. Out to bid 2-10-2011.
Bus Pullouts Package 13 RTA38j Holder
- Speedway / Wilmot EB
- Speedway / Euclid EB
- Speedway / Swan EB
- Speedway / Swan WB
- Swan / Speedway SB Design 100% 10/2009 11/2009 04/2010 N/A 8/10
Stantec - 75% Property Owner ltrs. sent 4-26-2010. Cont. mod #1
for Utility Coord. approved 4-26-2010. Cont. extended to 7-9-2010.
Cultural Resource Clearance Waivers requested 7-1-10. Contract
extended to 2-11-10 for post design services. 100% mylars due
week of 11-15-10. Environmental Clearance requested 11-24-10.
Mylars submitted & approved.
Bus Pullouts Package 14 RTA38j Holder
- 6th Ave. / 39th SB
- 6th Ave. / 39th NB
- 6th Ave. / 36th NB
- 6th Ave. / 29th SB
- 6th Ave. / 29th NB
- 6th Ave. / 26th NB Design 100% 10/2009 01/2010 05/2010 N/A 9/10
AECOM - Cont. Mod. #1 for Utility Coord. approved 4-19-2010.
Cont. extended to 7-30-2010. 75% Prop. Owner ltrs. sent 5/10.
Property owner issues being discussed. Design consultant
finalizing plans. Traffic signal & street light mods being reviewed by
COT Electric Shop.
MONTHLY REPORT - Town of Marana
Project Name/Description RTA # Project Status as of January 2011
RTA Roadway Element - Planning / Design
Tangerine Road Corridor - I-10 to La
Cañada Blvd. 1
Scott
Leska DCR 10 Aug-10 Aug-12 Nov-12 Mar-13 Jul-13 Nov-13 Mar-14
RTA Approved total funding of $2.6 mil. Psomas
is working. They have been provided an NTP on
August, 25, 2010. Work is progressing. Montly
TAC meetings are held at Marana.
Camino de Mañana/Dove Mt Ext Linda
Vista Blvd. to Tangerine Road/Dove Mt. 2
Scott
Leska PSE 100 Sep-05 Jun-06 Mar-07 complete complete Complete Complete
Construction substantially complete. Warrenty
period has started.
Twin Peaks Linda Vista TI RTA 3a Twin
Peaks Blvd. to Camino De Manana 3a
Keith
Brann PSE 100 2002 2004 2004 complete complete Complete Complete
Construction substantially complete. Contractor is
finalizing some outstanding work items. Warrenty
period has started on most of the project.
Twin Peaks Bridge and Roadway RTA 3b
Twin Peaks Blvd. in Continental Ranch
Neighborhood to the Linda Vista/ I-10 TI 3b
Keith
Brann PSE 100 2002 2004 2004 complete complete Complete Complete
Construction substantially complete. Contractor is
finalizing some outstanding work items. Warrenty
period has started on most of the project.
Twin Peaks Roadway RTA 3b Twin Peaks
Blvd. - Tiffany Loop Drainage 3c
Scott
Leska Design 35 2002 2004 2011 Complete Complete Mar-11 Apr-11
Design has started to finalize design of Tiffany
Loop Drainage as part of the Twin Peaks Road TI.
Project Name/Description RTA # Project Status as of January 2011
RTA Roadway Element - ROW / Construction
Tangerine Road Corridor - I-10 to La
Cañada Blvd. 1
Scott
Leska DCR 0 NA NA NA NA NA
Right-of-Way and Construction has not been
determined at this time.
Camino de Mañana/Dove Mt Ext RTA -2
Linda Vista Blvd. to Tangerine Road/Dove
Mt. 2
Scott
Leska Construction 100% 100% 97% May-09 Dec-10 98%
Construction substantially complete. Contractor is
finalizing some outstanding work items. Warrenty
period has started on most of the project.
Design
Start
Date
End
Date
Start
Date
30%
Plans
End
60 %
Plans
End
Date
Complete
%
Contract
Complete Contractor
Project
Mgr
Current
Phase
% Phase
Compl
Right-of-Way
100%
Possessi
on
100%
Acquired
Project
Mgr
Current
Phase
% Phase
Compl
Planning
Borderland Construction
90%
Plans
End PS&E End
Construction
Date Mobilized
TBD
Twin Peaks Linda Vista TI RTA 3a Twin
Peaks Blvd. to Camino De Manana 3a
Morris
Reyna -
Scott
Leska construction 100% complete complete May-09 Dec-10 99%
Construction substantially complete. Contractor is
finalizing some outstanding work items. Warrenty
period has started on most of the project. Final
touches and small amount of work continues.
Contractor is working on change orders that will
amount to about $2 million.
Twin Peaks Bridge and Roadway RTA 3b
Twin Peaks Blvd. in Continental Ranch
Neighborhood to the Linda Vista/ I-10 TI 3b
Morris
Reyna -
Scott
Leska construction 100% complete complete May-09 Dec-10 99%
Work scheduled to be complete October 2010.
Ribbon cutting ceremony on November 18th.
Final touches and small amount of work is almost
complete. Project is in warrenty period
Twin Peaks Roadway RTA 3b Twin Peaks
Blvd. - Tiffany Loop Drainage 3c
Scott
Leska Design 0% complete complete N/A N/A N/A Design has started.
Project Name/Description RTA # Project Status as of January 2011
RTA Safety Element
Silverbell/Coachline RTA 36 36
Scott
Leska Construction 100 yes May-08 Aug-08 Sep-08 Oct-08 Construction is completed.
Silverbell/Ina Intersection RTA 36 36
Gus
Lipins Construction 100 yes May-08 May-08 May-08 Feb-09
Construction is completed. Project under Warrenty
period and 404 Mitigation monitoring still active.
Tangerine/Thornydale Intersection RTA 36 36
Scott
Leska Construction 100 yes May-08 Feb-09 Jun-09 Dec-09 Final construction is complete.
Silverbell/Cortaro Intersection RTA 36 36
Scott
Leska construction 0% Jan-10 Aug-10 Sep-10 Feb-11 May-11
Negotiating final contract for approval. NTP will be
given in April 2011. Due to the cold weather, the
work wont start because the rubber chip seal
needs warmer ambient tempatures to meet
specifications.
Project Name/Description RTA # Project Status as of January 2011
RTA Environment & Economic Vitality Element
Pulice
Pulice
TBD
Project
Mgr
Current
Phase
% Phase
Compl
Design Construction
Design
StartedDesign
Complete
Project
Bid Date
Design
Started Contractor
Date Mobilized
Date
Complete Contractor
Diggum Construction
Granite Construction
Southern Arizona Paving
Southern Arizona Paving
Project
Mgr
Current
Phase
% Phase
Compl
Design
Design
Complete
Project
Bid Date
Date Mobilized
Date
Complete
Construction
Project Name/Description RTA #
Project
Mgr
Current
Phase
% Phase
Compl Project Status as of January 2011
Transit Element
Marana Park and Ride RTA 51c Parking
lot for Park & Ride 51
Scott
Leska
Not in Design
Yet N/A TBD TBD TBD TBD TBD
Not yet started design. Internal staff looking at
remainders from total take parcels from Twin
Peaks Interchange for suitability as park and ride
sites. It is anticipated that this will start near the
end of the Twin Peaks Construction.
Marana Circulator Service RTA 48 48
TBD
MONTHLY REPORT - Town of Oro Valley
Project Name/Description
RTA Roadway Element - Planning / Design
Project Name/Description
RTA Roadway Element - ROW / Construction
Project Name/Description
RTA Safety Element
Wireless Signal Link 40
Jose
Rodriguez
System has
been
ordered 50% N/A N/A N/A N/A January 30, 2011
Equipment has been ordered and
currently awaiting shipment.
Pedestrian Countdown Heads 36
Jose
Rodriguez
Ped.
Heads have
arrived 80% N/A N/A N/A N/A January 31, 2011
Equipment has arrived and
Engineering staff will be installing the
equipment which is anticipated to
take about two weeks to install.
Rancho Vistoso Blvd/ Big Wash Bridge -
R&R Barrier Walls 39
Jose
Rodriguez Design 15% December 10,2010 August 31, 2011 September 1, 2011 TBD TBD
Engineering staff is currently working
on the design.
Project Name/Description
RTA Environment & Economic Vitality Element
Canada Del Oro Shared Use Path 41
Jose
Rodriguez Design 5% July 8, 2010 January 8, 2010 TBD TBD TBD
Scoping document has been
submitted to ADOT for review and
comments.
Wildlife Linkages Crossing Study 42E
Phil
Trenary Study 50% April 1, 2010 June 1, 2011 N/A N/A June 1, 2011
Reports are due this March from the
Arizona Game and Fish Department
who were contracted to perform the
crossing study.
Project Status as of Dec 2010
TBD
N/a
Date
Mobilized Date Complete
Project Status as of February 2011
TBD
RTA #
Project
Mgr
Current
Phase
% Phase
Compl
Design
Contractor
Construction
Design Started Design Complete Project Bid Date
Design Started Design Complete Project Bid Date
Date
Mobilized
Design Construction
Project Status as of February 2011
% Contract
Complete Contractor
RTA #
Project
Mgr
Current
Phase
% Phase
Compl Date Complete Contractor
RTA #
Project
Mgr
Current
Phase
% Phase
Compl
RTA #
Project
Mgr
60 % Plans End
90%
Plans
PS&E
End
100% Posses-
sion 100% Acquired Date Mobilized
Date
Complete
Planning Design
Start Date
30%
Plans
Current
Phase
% Phase
Compl
Right-of-Way Construction
Start Date End Date
Calle Concordia Bike Lanes 34.1
Jose
Rodriguez Design 15% December 15, 2010 March 1, 2011 TBD TBD TBD
In House Staff are working on 15%
plans and scheduling an open House
in March
Project Name/Description RTA #
Project
Mgr
Current
Phase
%
Phase
Compl
Transit Element
TBD
Project Status as of February 2011
MONTHLY REPORT - Pasqua Yaqui Tribe
Project Name/Description RTA # Project Status as of February 2008
RTA Roadway Element - Planning / Design
Project Name/Description RTA # Project Status as of February 2008
RTA Roadway Element - ROW / Construction
Project Name/Description RTA # Project Status as of February 2008
RTA Safety Element
Design
Start
Date
End
Date
Start
Date
30%
Plans
60 %
Plans
90%
Plans
PS&E
EndProject Mgr
Current
Phase
% Phase
Compl
Planning
Project Mgr
Current
Phase
% Phase
Compl
Right-of-Way Construction100%
Posses-
sion
100%
Acquired
Date
Mobilized
Date
Complete
% Contract
Complete Contractor
Project Mgr
Current
Phase
% Phase
Compl
Design
Design
Complete
Project
Bid Date
Design
Started
Construction
Date
Mobilized
Date
Complete Contractor
Project Name/Description RTA # Project Status as of February 2008
RTA Environment & Economic Vitality Element
Project Mgr
Current
Phase
% Phase
Compl
Design
Design
Started
Design
Complete
Project
Bid Date
Construction
Date
Mobilized
Date
Complete Contractor
MONTHLY REPORT - Pima CountyDesign
Roadway Improvement ElementI-19 Frontage Road: Continental
to Canoa (4INFRC, DOT 37)
35
Damon
Ballesteros
PCDOT Under CON Nov-06 Aug-08 May-08 Aug-08
Over
shldr
review
Oct-08 Dec-08 Apr-09 Sep-08 Jun-09 Aug-09 Jul-09 100% Feb-11
Borderland
Const.
Construction activities have been completed and dedication ceremony was held February 3rd. Final clean up
activities will be completed by end of month, and project will enter landscape establishment period.
La Canada Drive: Ina to Calle
Concordia (4RTCCI)
11Mike Bertram
HDR Inc. Under CON Jul-99 Aug-01
Will be
omitted
Will be
omitted
Will be
omitted Feb-09 Jun-09 Apr-08 Jul-09 Sep-09 Nov-09 50% Oct-11
KE&G
Construction
Project construction activities are continuing with cross drainage culverts, roadway grading, paving, concrete
structures, earthwork, curbing, and storm drainage elements all still fully underway.
La Canada Drive: River to Ina
(4LCRRI)
11Mike Bertram
HDR Inc.
Under
Devel. Feb-06 Jun-09 Nov-09
Will be
omitted Aug-10
Combine
d with
Stage 5 Mar-11 Jul-09 Jul-11 Sep-11 Jul-11 Jul-13
Environmental document has been approved, and minor updates will be provided as needed. 404 permit efforts
are underway with responses to comments having been provided to the Corps of Engineers. Detailed design
activities are continuing and plan set is at approximately 90% completion level. Right of way efforts are underway
for roadway portions, easements and Temporary clearances. Utility relocation efforts have been initiated for
Western Area Power Administration and Metro water work will likely commence later this Spring. A Joint Trench
will be utilized for Qwest, SW Gas and TEP and provisions and agreement elements are underway. Public
meetings have been held to present right of way, drainage development, and art work and final art elements have
been accepted. Construction advertisement is planned for Spring 2011 pending approval by ADOT/FHWA.
La Cholla Boulevard: River to
Ruthrauff (4LCITR-DOT 20)
10
Dean
Papajohn
PCDOT Under CON Jul-07 Dec-08 Jan-09
Will be
omitted
Over
shldr
review
April
2009
Will be
omitted Jul-09 Jan-09 Oct-09 Jan-10 Dec-09 60% Jul-11
Eagle Rock
Construction
Southbound bridge is constructed and carrying traffic. Concrete barrier, concrete parapet, and metal railing to be
installed. Existing bridge has been demolished and shafts, piers and abutments for northbound bridge are
complete. Bridge girders will be placed mid February. Curb and sidewalk for northbound La Cholla and
eastbound Ruthrauff are under construction and lanes are scheduled to be paved later this spring.
Magee Road: La Canada Drive to
Oracle (4MRLCO-DOT 6)
(Stage 3) 12Paul Bennett,
PCDOT
Under
Devel. Sep-07 Sep-09 Oct-10
Will be
omitted May-11 Oct-11 Dec-11 Mar-11 Dec-11 May-12 Apr-14
Final design activities are underway and right of way efforts as well as utility coordination activities have been
initiated in parallel with final design. Coordination with ADOT is ongoing for the Oracle intersection.
Magee/Cortaro Farms: Mona
Lisa to La Canada (4RTMLI)
(Stage 1)7
Bill
Schlesinger,
DMJM Harris
Under
Devel. Sep-07 Sep-09 Sep-09 Jan-10 Apr-10
Combine
d with
Stage 5 Nov-10 Jan-10 Jan-11 Jan-11 Apr-11 Apr-13
Project is awaiting award by BOS at February 15th meeting. Once contract is finalized, partnering and precon
meetings will be held and preliminary construction activities will be initiated. Vegetation salvaging and
preliminary utility activities have been initiated.
Magee/Cortaro Farms Corridor
Study and Thornydale to Mona
Lisa (Stage 2) (4MCFTL)
7Paul Bennett,
PCDOT
Under
Devel. Sep-07 Sep-09 May-10
Will be
omitted Nov-10
Combine
d with
Stage 5 May-11 Oct-10 Jul-11 Jul-11 Sep-11 Jun-14
Detailed design activities are fully underway and approximately 90% complete and moving forward with right of
way, permitting and utility design work. Current timeline is to be ready to advertise for advertisement by
Spring/Summer 2011, pending coordination efforts with utility providers.
Tanque Verde Road: Catalina
Hwy to Houghton (4TVCHH)
27Nancy Cole
CIP-PDG Under CON Feb-07 Mar-09 Apr-09
Will be
omitted Jul-09 Aug-09 Nov-09 Apr-09 Dec-09 Dec-09 Mar-10 45% Sep-11 SAP
February will see remaining south side paving in place (near Cat Hwy) as well as north side paving from
Houghton to Amberwood (eastern 1/3). Depending on progress with culvert and drainage work the project may
adjust finish date a month or more earlier.
*Valencia Road: Mark to Wade
(4RTVMW)
21aPaul Bennett,
PCDOT
Under
Devel. Aug-07 Dec-11 Jan-12
Will be
omitted Jul-12
Combine
d with
Stage 5 Dec-12 Mar-12 Dec-12 Dec-12 Mar-13 Sep-14
Kickoff meeting has been held and preliminary project efforts have been initiated with survey, traffic, preliminary
environmental activities starting. Detailed design schedule will be developed and provided as part of start up
efforts.
La Cholla Boulevard: Tangerine
to Magee (4RTLTM)
4
Dean
Papajohn
PCDOT
Under
Devel. Apr-09 Jun-10 Jun-10
Will be
omitted Nov-10 Apr-11 Jun-11 Jun-10 Jul-11 Jul-11 Nov-11
Design is approximately 70% complete. Plans for utilities to use for relocations have been distributed. A majority
of the legal descriptions have been provided to Real Property for initiating acquisition. Metro Water's Matter Well
has prior rights and needs to be relocated and coordination efforts for this activity are underway. Application for
Individual 404 Permit will be submitted shortly. Other utility coordination efforts are ongoing.
Sunset Road: Silverbell to I-10
(4RTSUN)
8Rick Ellis,
PCDOT
Under
Devel. Mar-10
Preliminary planning efforts have been underway in conjunction with the Silverbell improvement project between
Grant Road and Ina Road, currently being led by the City of Tucson. Preliminary discussion with other agencies
regarding various activities on Silverbell, as well as I-10 have been coordinated with the respective jurisdictions.
Next steps will be evaluated as part of ADOT's I-10 phasing and implementation study that is scheduled to be
conducted in Spring/Summer 2011.
Valencia Road: Alvernon Road to
Kolb Road (4VAKDP)
24
Damon
Ballesteros
PCDOT
Under
Devel. Jul-10 Jul-11 Aug-11
Will be
omitted Feb-12
Combine
d with
Stage 5 Aug-12 Feb-12 Aug-12 Aug-12
Preliminary investigation, survey geotech, drainage and research work is all underway. Coordination with UPRR
and with ADOT is ongoing as it relates to their specific areas of concern. Project efforts will be coordinated with
segment to the east from Wilmot to Kolb.
Barraza/Aviation Parkway: Palo
Verde to I-10 (4RTBAR)
20 TBD Future
First Avenue: Orange Grove to
Ina (4RTFIR)
13 TBD Future
Railroad Overpass: Ruthrauff
Road (4RTRAI)
9 TBD Future
Wilmot Road: South of 1-10
(4RTWIL)
33
Bob
Roggenthen
PCDOT-
Traffic
Under
Devel.
Solicitation for design consultants is underway and is now available.
*Valencia Road: Mt. Eagle to Ajo
(4RTVEA)
21b TBD Future Nov-10 N/A
*Valencia Road: Wade to Mt.
Eagle (4RTVWE) 21c TBD Future
Project Status as of January 2011Start
EAMR
& 15%
Plans Start
30%
Plans
60%
Plans
90%
Plans
PS&E
End
Start
(begin
legals)Project Name RT
A #
Project
Manager
Curr.
Phase
CON
Clear-
ance
Planning Right-of-Way Construction
End
Mobilize
Date
%
Compl
Date
Compl
Con-
tractor
PCDOT 1, Printed 2/24/2011, 8:17 AM
MONTHLY REPORT - Pima CountyDesign
Project Status as of January 2011Start
EAMR
& 15%
Plans Start
30%
Plans
60%
Plans
90%
Plans
PS&E
End
Start
(begin
legals)Project Name RT
A #
Project
Manager
Curr.
Phase
CON
Clear-
ance
Planning Right-of-Way Construction
End
Mobilize
Date
%
Compl
Date
Compl
Con-
tractor
RTA Safety Element
Kolb & Valencia Intersection
Improvement (4RTKVI)
36
Damon
Ballesteros
PCDOT
Under
Devel. Feb-08 Jul-11
Solicitation efforts have been finalized and recommendation will be presented to BOS at February 15th meeting,
Once approved, scope and fee negotiation efforts will be initiated. Anticipate design activities starting in Summer
2011, and will coordinate with section to the west from Alvernon to Wilmot.
Alvernon Way/Valencia
Intersection Improvements
36
Bob
Roggenthen
PCDOT-
Traffic
Under
Devel. Jan-09 Dec-10 Feb-10 Dec-10 Jun-11 Apr-12
Project approved by RTA in January 2008. New money added to project from Valencia widening. Rescoping for
engineering contract. Significant delays due to management decision to impose a moratorium on procurement
processes. Project delayed due to change in scope. Jan 4, 2010 PSOMAS is awarded contract for design and is
moving forward. Working on ROW acquisition and 90% plans. TEP committed to move power line. ROW limits
accepted. Developer will be donating ROW.
Ina/Oracle DESIGN for
Intersection Improvements
36
Bob
Roggenthen
PCDOT-
Traffic
Under
Devel. Jul-08 Nov-10 Jul-10 Jul-11 Jul-11 Oct-11
Project approved by RTA in January 2008. Design engineering contract in place. This project will be coordinated
with Ina/Oracle Bus Pullouts. Significant ROW will need to be acquired. If concept is acceptable by ADOT, this
project will move forward to Public Review. Construction start date is pending due to the purchase of a gas
station in area. Appraisals are complete and proposal will be presented to GAS STATION OWNERS. Gas
Station has accepted proposal. ADOT has approved indirect left turn geometry. Have conducted Six public
meetings. Review due to soft cost. Last public meeting held Nov 30
Mona Lisa at Orange Grove
36
Bob
Roggenthen
PCDOT-
Traffic On Hold Jul-08 Mar-10 Not req TBD
Project approved by RTA in January 2008. Engineering in progress. Significant delays due to management
decision to impose a moratorium on procurement processes. Design is complete. Project is on-hold due to
budget, decision will be made after public meetings.
Valencia Street Lighting
37 &
41
Bob
Roggenthen
PCDOT-
Traffic
Under
Devel. Jan-10 >>> >>> >>> >>> >>> Dec-10 Not Req'd >>> >>> Jun-11 Nov-11
Federal Project, Working on Evironmental Assessment. Internal review of project.
Agua Caliente Elementary- Safe
Routes to Schools (PHASE 1)
4SRSAC
37
Kathryn
Skinner
PCDOT Compl. Apr-08 May-09 Mar-09 100% Aug-09
COMPLETE - Project will remain on list until Phase 2 is complete.
Agua Caliente Elementary- Safe
Routes to Schools (PHASE 2)
4SRSAC
37 Pending Pending Apr-08 Pending Pending
Location of memorial is pending. Once that has been resolved the project will resume.
Picture Rocks Safe Routes to
School (4PRDWE)37
Jason Bahe
PCDOT Under CON Apr-07 >>> >>> >>> >>> >>> Apr-10 Not Req'd >>> >>> Dec-10 25% Apr-11
SQP
Construction
Project construction efforts and activities are continuing with sidewalk, minor drainage, pathway and pacing work
all ongoing.
Laguna Elementary Safe Routes
to Schools (4LESMI)37
Sal
Caccavale
PCDOT
Under
Devel. Aug-06 >>> Apr-10
Will be
omitted >>> Oct-10 Apr-11 Apr-10 Feb-11 Jul-11 Jan-12
PS&E's at 100% stage and await pickup of final comments. All required documents have been submitted to
ADOT-EPG for final approval. Once EPG's approval is received we will submit for ADOT contruction
authorization to advertise for construction.
Homer Davis Safe Routes to
Schools (4HDBPE)37
Sal
Caccavale
PCDOT
Under
Devel. Aug-06 >>> Apr-10 Mar-11 >>> Oct-11 Jan-12 Apr-10 Nov-11 Apr-12 Dec-12
PS&E's at 30% stage. R/W legals and plans are in process.
Ina & Oracle SunTran Bus Pullout
38
Bob
Roggenthen
PCDOT-
Traffic
Under
Devel. >>> >>> >>> >>> >>> Oct-10 Feb-09 Oct-09 Mar-11 Aug-11
Project approved by RTA in January 2008. Design engineering contract being initiated. This project will be
coordinated with Ina/Oracle Intersection project. Pending ADOT permit. Project submitted for ADOT permit
review.
PCDOT 2, Printed 2/24/2011, 8:17 AM
MONTHLY REPORT - Pima CountyDesign
Project Status as of January 2011Start
EAMR
& 15%
Plans Start
30%
Plans
60%
Plans
90%
Plans
PS&E
End
Start
(begin
legals)Project Name RT
A #
Project
Manager
Curr.
Phase
CON
Clear-
ance
Planning Right-of-Way Construction
End
Mobilize
Date
%
Compl
Date
Compl
Con-
tractor
RTA Environment & Economic Vitality Element
Flowing Wells: River - Roger
Sidewalk Package 1)
(4SWFWR)
41
Kathryn
Skinner
PCDOT
Under
Devel. Oct-08 >>> >>> >>> >>> >>> Jul-10 Apr-11 Aug-11
IGA finalized. Design consultant under contract. Design was kicked off in May 09. 60% design submitted. Pre-
final plans submitted. Received additional comments from PC RWCD in early January. Meeting will be scheduled
for late January with RWCD to resolve comments. Final plans submitted in February. Project will begin
construction once the ARRA pavement preservation project on this segment is complete (ARRA project
scheduled to begin in April). Consultant working with Real Property on required TCEs. Consultant preparing
SWPPP. TCEs and SWPPP submitted for 2nd review 7/1/10. Awaiting final TCE. Coordinating with community
relations as to whether construction would be better to schedule during summer.
Orange Grove Bike Lanes:
Oracle - Cmo de Zorrela (Bike
Package 1) (4BLOGO)
41
Kathryn
Skinner
PCDOT
Under
Devel. Mar-08 >>> >>> >>> >>> >>> Mar-11 TBD n/a TBD
Working with JOC contractor on design. Design underway including coordination cultural resources,
environmental compliance and traffic engineering. Design plans and environmental documents have been
reviewed for plans from 1st Ave to La Zorrela. Investigating design options to continue bike lanes to Oracle at the
west and the constraints near the Pima Wash Crossing. Construction from Shadow Bluffs Drive (west of 1st Ave)
to Camino la Zorrela completed in October. Design and Construction from Oracle to Shadow Bluffs is separate
from current construction project. Phase 2 scope has been determined January 2010. Design for phase 2 under
way. Design for phase 2 under way. 60% design meeting and plans submitted.
Mission Rd Bike Lanes: San
Xavier - Drexel (Bike Package 1)
(4BLMPS)41
Kathryn
Skinner
PCDOT On Hold May-09 >>> >>> >>> >>> >>>
Project is on hold until an IGA between the county and tribe covering the ownership and maintenance of the road
is finalized. ON HOLD.
Valencia Rd Bike Lanes: Cardinal
- Mission (Bike Package 2)
(4BLVCM) 41
Kathryn
Skinner
PCDOT
Under
Devel. Dec-08 >>> >>> >>> >>> >>> Mar-11 Apr-11 May-11
Phase 2 design underway with AECOM. 60% plans submitted.
Alvernon Way: Golf Links - Ajo
(Bike Package 2) (4BLAGL)41
Kathryn
Skinner
PCDOT Future Jul-09 >>> >>> >>> >>> >>> TBD D E S I G N O N L Y
F U T U R E
Country Club Bike Lanes :
Irvington - Valencia (Bike
Package 2) (4BLCCI) 41
Kathryn
Skinner
PCDOT Future Jul-09 >>> >>> >>> >>> >>> TBD D E S I G N O N L Y
F U T U R E
Bear Canyon Bike Lanes: Snyder -
Indian Bend(Bike Package 2)
(4BLBCS)
41
Kathryn
Skinner
PCDOT
Under
Devel. Dec-08 >>> >>> >>> >>> >>> Jul-10 Jan-11 May-11
IGA sent to Recorder's office 6/30/08. Project only has design funding approved. Selection of design consultant in
progress.Design consultant under contract, design kicked off in May. Additional scope approved at 6/27 Bike/Ped
meeting that will extend this project to Tanque Verde Rd on the south end. Amendment for additional scope
approved by Procurement 8/4/09. Cultural survey complete. 60% plans submitted in September, review
comments being addressed, submittal scheduled for January 22, 2010. Prefinal submitted. Construction funding
for FY2011. Scope was increased to include more bike lanes, consultant is working on revised plans. Final plans
to be submitted 7/8/2010. Final Plans received 8/1/10. Plans are with JOC contractors for bid, actual construction
will begin in January. Low bid JOC contractor selected, purchase order for work being completed for construction
to begin mid-January. Construction in progress.
Centennial Elementary & Flowing
Wells Jr. High Safe Routes to
School Enhancement
41
Jason Bahe,
PCDOT Pending
Project/Design consultant will need to be procured to perform all necessary design tasks and activities. Internal
clearance efforts are still being reviewed as soft costs are evaluated and further direction is received. Solicitation
effort is anticipated to be initiated shortly. Detailed design schedule will be established once consultant designer
is on board.
Oracle Sidewalks: Orange Grove -
River 41 TBD TBD
Evaluating which portion of the project can be built with the current budget. RTA has taken the lead for design
and permit acquisition
Colossal Cave Bike Lanes:
Cienega HS to Pistol Hill Rd
(Package 3) 41 TBD TBD
Due to State Budget cuts County does not have HURF match required for this project. Project on hold until
complete funding is identified.
Rillito River
41
Steve
Anderson,
PCNRPR Pending
Pending
Rillito River-Country Club to
Hacienda Del Sol
41
John Spiker,
PCNRPR
Under
Devel. Dec-09 Apr-10 Dec-11 Jan-11 Jan-11
Phase 1 improvements moving into construction stage through Job Order Contractor. Project to include pathway
and drainage improvements. Project charter sent out in December 2010 as developed by the Project
Management Office.
Pantano River Park
41
Nancy Cole,
CIP PDG Under CON
not
required Oct-09 99% Jan-11
Norquay
Construction
The project is substantially completed and in use at this time, for all items except a small portion of landscape still
in development. Final punchlist work is in progress, Norquay should be completed in February with final work. A
park opening is scheduled for early April.
Manzanita41
Matt Zoll,
PCDOT
Under
Devel. >>> >>> Jan-11 >>> >>> >>> Dec-11
not
required Design only
Project Scope finalized and processed QCL selection through Procurement (KHA). Approved 12/6/10. Design
initiated 12/13/10 and school workshop tentatively scheduled for late Spring 2011.
Miscellanous Markings & Signs41
Matt Zoll,
PCDOT
Under
Devel. Jan-11 >>>Developing IGA with City of Tucson
Pantano Property Acquisitions
41
Steve
Anderson,
PCNRPR
Under
Devel. Jul-09 Oct-09
Project appraisals are complete; just waiting for Real Property to finish up the acquisitions. Project is probably 4-8
weeks from being wrapped up.
Wildlife Linkages
Wildlife Fencing & Culvert
Crossing Study 42
Rick Ellis,
PCDOT
Opera-
tional Dec-08 >>> >>> >>> >>> >>> >>> >>> >>> >>>
Fencing: The fencing study is moving along and testing trials have been completed, and efforts are being
initiated for developing the final report. Remaining activities include analyzing the data, developing
recommendations and developing reports and final documents. Culvert: Field efforts have been completed, and
video footage is being reviewed to categorize animal behavior at culverts and is approximately 15% complete.
Remaining activities include continued analyzing of the data (approximately 10% complete), developing
recommendations and developing reports and final documents.
Transit Element
None Currently Active
P L A N N I N G O N L Y
Design completed, Permits Completed
PCDOT 3, Printed 2/24/2011, 8:17 AM
Project Name/Description RTA # Project Status as of February 2011
RTA Roadway Element - Planning / Design
Sahuarita Rd - I-19 to Country Club Rd
Phase I - I-19 to La Villita Rd Joel Harris Design 100% Dec-05 Oct-07 Dec-07 Dec-07 Apr-08 Dec-08June, 10
2009
DCR has been completed. Bid's Opened June 10, 2009. Construction Contract awarded at July
13, 2009 Council meeting. Construction NTP issued on Septmebr 8, 2009. Construction contract
duration of 450 days.
Phase II - La Villita Rd to Country Club Road Joel Harris Design 60% Dec-06 Aug-08 Jul-09 Dec-09 Feb-11 Apr-11 Jul-11
DCR has been completed. Phase II Design consultant selected - EEC. Design contract awarded
at July 13, 2009 Council meeting. Design NTP issued on July 14, 2009. Final List selection for
CMAR in January 2011 - anticipate start of construction Summer of 2011
Project Name/Description RTA # Project Status as of February 2011
RTA Roadway Element - ROW / Construction
Sahuarita Rd - I-19 to Country Club Rd
Phase I - I-19 to La Villita Rd Joel Harris Construction 99% Jun-10 Nov-10 Sept. 8, 2009 Dec-10 99%(for construction updates please see: www.sahuaritaroad.com) Construction NTP issued on
Septmebr 8, 2009. Ribbon cutting January 19, 2011. Finalizing punch list items
Phase II - La Villita Rd to Country Club Road Joel Harris Design 60% TBD - 2010 TBD - 2010 2011 TBD 0Right-of-Way Acquisitions anticipated to begin at 60% Design status. Construction to start upon
completion of design and necessary ROW acqusitions. CMAR contract negotiations underway.
Project Name/Description RTA # Project Status as of February 2011
RTA Safety Element
Pima Mine Road Bridge ReplacementRick
RobinsonPre-Design 90% - Dec-10 (DCR) - - - Project Design Concept Report ongoing
Pima Mine Road /Nogales Highway IntersectionRick
RobinsonDesign 95% Mar-11 Mar-11 Mar-11 Sep-11
Waiting for final UPRR signal coordination/design. Final Intersection plans anticipated late
February, construction anticipated to start March 2011 with an approximate duration of 6 months.
La Canada Drive/El Toro Road at-grade railroad
crossing (Part of La Canad Drive Phase III project)Joel Harris Construction 100% Jun-06 Feb-09 Mar-09 Apr-09 Mar-10 Construction completed with the Town's La Canada Drive Phase III roadway improvement project.
Pima Mine Road / Rancho Sahuarita Blvd.
Intersection
Rick
RobinsonConstruction 90% May-07 Jun-08 Jan-10 Mar-11
Construction ongoing. Traffic Signal construction 95% complete (finalize in conjunction with
UPRR crossing signal). UPRR surface work complete - UPRR Signal work ongoing.
Project Name/Description RTA # Project Status as of February 2011
RTA Environment & Economic Vitality Element
Sahuarita Rd Wildlife Crossing StudyRafael
CancinoStudy 100%
Jun-10
(with SR-Phase II)
TBD
(with SR-Phase II)
TBD
(with SR-Phase II)
TBD
(with SR-
Phase II)
TBD
(with SR-
Phase II)
Town received final report from SWCA. Final report was submitted to Wildlife Linkages
Committee. Recommendation from the study are being evaluated for incorporation into the design
of the Sahuarita Rd Phase II project.
Project
Mgr
Current
Phase
% Phase
Compl
Design
Date
Mobilized
Construction
Design Started Design Complete
Psomas
Contractor
Construction
DMA Engineering
Design
Design Started Design Complete Project Bid Date
Project Bid Date
Date
Complete
% Contract
Complete
Date
Mobilized
Date
Complete
Project Mgr Current Phase
% Phase
Compl
Right-of-Way
100% Possession 100% Acquired
Project Mgr Current Phase
% Phase
Compl
Southern Arizona Paving
TBD
Date
Complete Contractor
Construction
Date Mobilized Contractor
End Date Start Date
30% Plans
End
60 % Plans
End
90% Plans
End PS&E End
MONTHLY REPORT - Town of Sahuarita
Project Mgr Current Phase
% Phase
Compl
Planning Design
Start Date
TBD (with SR-Phase II)
KE&G
Southern Arizona Paving &
Construction
Project Name/Description RTA #
RTA Roadway Element - Planning / Design
Project Name/Description RTA #
RTA Roadway Element - ROW / Construction
Project Name/Description RTA #
RTA Safety Element
Speed Alert Monitor Systems 40g
Joel
Gastelum Under
Development N/A
IGA has been recorded. In contact with
Contractor awaiting cost estimates
31st and 6th Ave. Pedestrian Crossing 36
Joel
Gastelum Complete May-10 Project Complete. HAWK in operation
34th St. and 6th Ave. Pedestrian Crossing 36
Joel
Gastelum Complete May-10 Project Complete. HAWK in operation
26th and 10th Ave Pedestrian Crossing 37ao
Joel
Gastelum
Under
Development
ADA Upgrades 37ap
Joel
Gastelum
Under
Development
Project Name/Description RTA #
RTA Environment & Economic Vitality Element
El Paso and Southwestern Railroad Greenway 41
Mick Jensen/
Joel
Gastelum Design
Collaborative project between City of
Tucson, City of South Tucson and Pima
County. Sage Landscaping has been
selected for the design concept report
of Greenway.
36th Street Greenway Element 41
Joel
Gastelum Complete 8-Oct May-10 Project Complete
Project
Mgr
Current
Phase
% Phase
Comply
Design
Design
Started
Project Status as of November 2010
Construction
Date
Complete
Borderland
Design
Complete
Project
Bid Date
Date
Mobilized Contractor
PACE Electrical
Construction Inc.
PACE Electrical
Construction Inc.
Date
Mobilized
Date
Complete Contractor
Project Status as of January 2011
Construction
Project
Mgr
Current
Phase
% Phase
Compl
Design
Design
Started
Design
Complete
Project
Bid Date
Contractor
Project Status as of November 2010
60 % Plans
End
90%
Plans
PS&E
End
Project Status as of November 2010
Construction
Date
Mobilized
Date
Complete
% Contract
Complete
Project
Mgr
Current
Phase
% Phase
Compl
Right-of-Way100%
Posses-
sion
100%
Acquired
MONTHLY REPORT - City of South Tucson
Project
Mgr
Current
Phase
% Phase
Compl
Planning Design
Start
Date End Date
Start
Date
30%
Plans
MONTHLY REPORT - Tohono O'odham Nation
Project Name/Description RTA # Project Status as of Sept 2010
RTA Roadway Element - Planning / Design
Project Name/Description RTA # Project Status as of Sept 2010
RTA Roadway Element - ROW / Construction
Project Name/Description RTA # Project Status as of Sept 2010
RTA Safety Element
Project Name/Description RTA # Project Status as of Sept 2010
RTA Environment & Economic Vitality Element
Completed Projects
San Xavier Mission Plaza Pedestrian
Improvements
Nathan
Barrett
Post-
Construction
99% Apr-07 7-Nov 22-Oct 20-Jan 30-Sep
Landscaping maintenance period ends
December 31, 2009
Project Mgr
Current
Phase
% Phase
Compl
Planning Design
Start
Date
End
Date
Start
Date
30%
Plans
60 %
Plans
Project Mgr
Current
Phase
% Phase
Compl
Right-of-Way100%
Posses-
sion
100%
Acquired
90%
Plans
PS&E
End
Construction
Date
Mobilized
Date
Complete
% Contract
Complete Contractor
Project Mgr
Current
Phase
% Phase
Compl
Design
Design
Started
Design
Complete
Project
Bid Date
Construction
Date
Mobilized
Date
Complete Contractor
Construction
Design
Started
Design
CompleteProject Mgr
Current
Phase
% Phase
Compl
Design
Project
Bid Date
Date
Mobilized
Date
Complete Contractor
Sahara Development, Inc.