quality management program (qmp) review htcp program iri news

24
2014 WisDOT Quality Management Program Update

Upload: melanie-carson

Post on 23-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Quality Management Program (QMP) Review  HTCP Program  IRI News

2014 WisDOT Quality Management Program Update

Page 2: Quality Management Program (QMP) Review  HTCP Program  IRI News

Quality Management Program (QMP) Review HTCP Program IRI News

Outline

Page 3: Quality Management Program (QMP) Review  HTCP Program  IRI News

QUALITY MANAGEMENT

FHWA Six Building Blocks of Quality Assurance 1. Contractor Quality Control

2. Aids to Acceptance

3. Dispute Resolution

4. Independent Assurance

5. Lab Accreditation or Qualification

6. Technician Qualification and Certification

Page 4: Quality Management Program (QMP) Review  HTCP Program  IRI News

• Quality of Materials and Proper Installation is key

• Three part Quality Management Program (QMP) -• QC Testing by Contractors• QV Testing by Department Staff• Independent Assurance/Oversight by Department Staff

• Contractor QC testing for acceptance is the center piece of the department's Quality Management Program.

QMP Review

Page 5: Quality Management Program (QMP) Review  HTCP Program  IRI News

Section 701 General QMP Requirements –

701.2.2 Quality Control Plan Submit 10 business days before production or placement Engineer reviews and comments

701.2.3 Personnel Certification Personnel required to be trained and certified by HTCP

701.2.4 Laboratory Certification Contractor Portable and fixed labs to be reviewed and qualified See department website for list Ken Nwankwo POC for qualification, 608-246-5388

QMP Review

Page 6: Quality Management Program (QMP) Review  HTCP Program  IRI News

Section 701 General QMP Requirements –

701.2.5 Equipment Contractor furnishes the necessary equipment and supplies for

performing quality control testing. The engineer may inspect the measuring and testing devices to

confirm both calibration and condition. Calibrate testing equipment according to CMM 8-30 and maintain a

calibration record at the laboratory.

QMP Review

Page 7: Quality Management Program (QMP) Review  HTCP Program  IRI News

Section 701 General QMP Requirements –

701.2.6 Documentation Document daily – results to WisDOT contact person same day Use forms provided in CMM chapter 8. Enter data into the applicable MRS software within 5 business days

after results are available. If the original document is handwritten and then transferred to an

electronic document, the original handwritten document should be maintained as the “source” document.(CMM 8-30.9.6)

QMP Review

Page 8: Quality Management Program (QMP) Review  HTCP Program  IRI News

Section 701 General QMP Requirements –

701.2.6 Documentation Document daily – results to WisDOT contact person same day Use forms provided in CMM chapter 8. Enter data into the applicable MRS software within 5 business days

after results are available. If the original document is handwritten and then transferred to an

electronic document, the original handwritten document should be maintained as the “source” document.(CMM 8-30.9.6)

QMP Review

Page 9: Quality Management Program (QMP) Review  HTCP Program  IRI News

Section 701 General QMP Requirements – 701.3 Contractor Testing

QC testing Random Sampling Required Use Sampling and Testing Methods in Spec and CMM Notify Engineer of failed tests Engineer may observe sampling and testing

701.4 Department Testing QV Testing – usually a percentage of QC Testing Random Sampling Required Use same Sampling and Testing Methods as Contractor Testers required to be certified thru HTCP

QMP Review

Page 10: Quality Management Program (QMP) Review  HTCP Program  IRI News

Section 701 General QMP Requirements –

701.3 Independent Assurance Evaluates Department QV and Contractor QC Performs Independent Assurance Program

Split Sample testing Proficiency sample testing Witness sampling and testing Test Equipment Calibration checks Reviews contract req’d data and contractor process control information Can request additional sampling and testing Checks to assure testers are certified by HTCP

QMP Review

Page 11: Quality Management Program (QMP) Review  HTCP Program  IRI News

Dispute resolution process for non-conforming materials - Section 106.3.4.3.5 - defined as:

Engineer and contractor to make every effort to avoid conflict

Contractor Inspections, testing, corrective actions and process control charts are to be used to determine solution

Third party testing will be used if resolution cannot be made by evaluating existing data

QMP Review

Page 12: Quality Management Program (QMP) Review  HTCP Program  IRI News

Highway TechnicianCertification Program

Page 13: Quality Management Program (QMP) Review  HTCP Program  IRI News

HTCP CERTIFICATION

FHWA Six Building Blocks of Quality Assurance 1. Contractor Quality Control

2. Aids to Acceptance

3. Dispute Resolution

4. Independent Assurance

5. Lab Accreditation or Qualification

6. Technician Qualification and Certification

Page 14: Quality Management Program (QMP) Review  HTCP Program  IRI News

• Certification/Training is provided by HTCP- UW Platteville

• Multistate-locations, 30% in Platteville

• Certification good for 3 Years

• Training is provided January thru July

• Skilled Technicians trained to national and state standards

• Certification is achieved by demonstrating proficiency thru Testing Sampling Techniques, Lab Procedures and Specification knowledge

HTCP CERTIFICATION

Page 15: Quality Management Program (QMP) Review  HTCP Program  IRI News

HTCP CERTIFICATION

Page 16: Quality Management Program (QMP) Review  HTCP Program  IRI News

• Re-Certification required every 3 Years• Certification now expires June of 3rd year

• How:• Retake the course• Take the written test on exam day• Schedule a test at HTCP-Platteville• Attend a comprehensive testing site

HTCP RE-CERTIFICATION

Page 17: Quality Management Program (QMP) Review  HTCP Program  IRI News
Page 18: Quality Management Program (QMP) Review  HTCP Program  IRI News

TRANSPORTATION MATERIALS SAMPLING (AGGREGATE SAMPLING)

HMA TRUCK BOX SAMPLING (NEW via On-line) AGGTEC- I AGGTEC- II ATTS HMA-IPT HMA-TPC HMA-MD PCCTEC-I PCCTEC-II CONCRETE STRENGTH TESTING (CST) GRADINGTEC- I PROFILER NUCDENSITYTEC- I

HTCP Certifications

Page 19: Quality Management Program (QMP) Review  HTCP Program  IRI News
Page 20: Quality Management Program (QMP) Review  HTCP Program  IRI News
Page 21: Quality Management Program (QMP) Review  HTCP Program  IRI News

HMA Truck Box Sampling •QV sampling and testing has increased for HMA

•Threshold for QV testing increased from 1/30,000 tons per mix design to 1/5,000 per mix design.

•This requirement has increased the workload for sampling

• Decision was to add more samplers by utilizing AGG-Techs

•HMA-TBS is a self paced course on on-line.

Page 22: Quality Management Program (QMP) Review  HTCP Program  IRI News

HMA Truck Box Sampling

•QV sampling and testing has increased for HMA

•Threshold for QV testing increased from 1/30,000 tons per mix design to 1/5,000 per mix design.

•This requirement has increased the workload for sampling

• Decision was to add more samplers by utilizing AGG-Techs

Page 23: Quality Management Program (QMP) Review  HTCP Program  IRI News

• Now Effective• New Localized Roughness Threshold• New Category IV PCC and HMA (urban pavement)

thresholds• Regional training – April 7 thru April 17

• ½ Day on Spec review, PROVAL Use and Data Analysis

• If attending, please bring laptop to load PROVAL and review MRS Data

• Engineer post testing ride of pavement needs increased attention

• Will be become part of Standard Spec in 2015

IRI Ride News

Page 24: Quality Management Program (QMP) Review  HTCP Program  IRI News

Contacts for IRI Specification and Testing:

Joe Wilson, 608-246-7955, [email protected] Sorensen, 608-246-3855, [email protected] Parry, 608-246-7939, [email protected]

WisDOT Ride QMP