Page 1: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

2015 Materials Updates

1

Page 2: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

2

QMP Summary Templates in 2015 Pantry.QC Tester Names included on QMP Summary Reports

(155).Quantities need to be included on QMP Summary Reports

(155).QMP Concrete Ancillary Spreadsheet to help define

quantities in Region Specific Pantry spreadsheet folder..Note: May not be fields on templates for Testers and

Quantities, Trying to get them updated, if they are not, please included near bottom of the report.

2015 Materials Audits

Page 3: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

3

*601 Concrete Curb & Gutter

Item Number Item Description Unit SF Per LF LF to Date CY to date

601.0105 Concrete Curb Type A LF 0.750 0

601.0110 Concrete Curb Type D LF 0.750 0

601.0115 Concrete Curb Type G LF 0.700 0

601.0120 Concrete Curb Type J LF 0.700 0

601.0150 Concrete Curb Integral Type D LF 0.750 0

601.0155 Concrete Curb Integral Type J LF 0.700 0

601.0205 Concrete Gutter 24-Inch LF 1.375 0

601.0319 Concrete Curb & Gutter 19-INCH LF 1.215 0

601.0322 Concrete Curb & Gutter 22-INCH LF 1.361 0

601.0331 Concrete Curb & Gutter 31-INCH LF 1.799 0

601.0342 Concrete Curb & Gutter Integral 18-INCH LF 0.750 0

601.0344 Concrete Curb & Gutter Integral 36-INCH LF 1.792 0

601.0405 Concrete Curb & Gutter 18-INCH Type A LF 1.000 0

601.0407 Concrete Curb & Gutter 18-INCH Type D LF 1.000 0

601.0409 Concrete Curb & Gutter 30-INCH Type A LF 1.500 0

601.0411 Concrete Curb & Gutter 30-INCH Type D LF 1.500 0

601.0413 Concrete Curb & Gutter 6-INCH Sloped 30-INCH Type G LF 1.472 0

601.0415 Concrete Curb & Gutter 6-INCH Sloped 30-INCH Type J LF 1.472 0

601.0417 Concrete Curb & Gutter 30-INCH Type K LF 1.500 0

601.0419 Concrete Curb & Gutter 30-INCH Type L LF 1.500 0

601.0452 Concrete Curb & Gutter Integral 30-INCH Type D LF 1.500 0

601.0454 Concrete Curb & Gutter Integral 30-INCH Type J LF 1.472 0

601.0456 Concrete Curb & Gutter Integral 30-INCH Type L LF 1.500 0

601.0501 Concrete Curb & Gutter Integral 4-INCH Sloped 36-INCH LF 1.736 0

601.0501 Concrete Curb & Gutter Integral 6-INCH Sloped 36-INCH LF 1.792 0

601.0551 Concrete Curb & Gutter 4-INCH Sloped 36-INCH Type A LF 1.736 0

601.0553 Concrete Curb & Gutter 4-INCH Sloped 36-INCH Type D LF 1.736 0

601.0555 Concrete Curb & Gutter 6-INCH Sloped 36-INCH Type A LF 1.792 0

601.0557 Concrete Curb & Gutter 6-INCH Sloped 36-INCH Type D LF 1.792 0

601.0574 Concrete Curb & Gutter 4-INCH Sloped 30-INCH Type G LF 1.451 0

601.0576 Concrete Curb & Gutter 4-INCH Sloped 30-INCH Type J LF 1.451 0

601.0580 Concrete Curb & Gutter 6-INCH Sloped 36-INCH Type R LF 2.180 0

601.0582 Concrete Curb & Gutter 6-INCH Sloped 36-INCH Type T LF 2.180 0

601.0600 Concrete Curb Pedestrian LF 0.500 0

SUB TOTAL CY 0

Page 4: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

Materials Diary entry report. Now can also be used to reference an external

document like a certification. This will eliminate need for using the “900” report. Features Bid Item “Pull Down” menu. Can reference multiple documents per entry. Will auto fill Doc. I.D. with bid item or can enter own

I.D. Write Doc. I.D. on document and insert in binder

behind e-guide sheet.

New 905 Report on MIT for 2015

4

Page 5: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

5

Page 6: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

Certification of Compliance:

A Certification of Compliance shall be furnished (for each contract) by the guardrail installer for each manufacturer of beam guard for the contract. The certification needs to be have the date, signature and title of the person certifying the product. Information on the certificate shall include the following:

State Project ID

Highway Number

Project Description

County

Name or Brand of Manufacturer

Product Identification Number (ie: AASHTO M180 Class A Type II)

Signed Buy America Certification Statement* 

*Note about Buy America Certification: Certification statement needs to state where the steel/iron has been melted, molded, galvanized, epoxy coated etc. A signature is required on the Buy America certification. Also, mill and manufacturer certification is expected to be on file and provided upon request. Buy America is a mandate of the Federal Highway Administration, enacted in 1983.

 

All guardrail materials and associated guardrail components are to meet the material requirements of WisDOT Standard Specification, Section 614 and AASHTO Specification M180. Any guardrail material not in conformance with specifications will be removed and replaced at no cost to the Wisconsin Department of Transportation.

 

The engineer will verify that the Certification of Compliance Product Identification number is on the shipment of beam guard delivered to the project site.

Beam Guard policy revised 2/11/15.

6

Page 7: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

7

Page 8: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

Examples of Product Identification Stamps on panels from each of the “Approved” Beam Guard manufacturers will be included with April 2015 update to WisDOT C & M Manual 6-25.3.5.

8

Page 9: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

Example of “155” report if Project verification testing has been performed. “155” Beam Guard Template found in Pantry with QMP Templates.

9

Page 10: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

Additional “Hot” Topics

10

614.2.5 Posts and Offset Blocks

614.2.5.1 Wood Posts and Offset Blocks

(1) Furnish sawed posts and offset blocks of one of the following species:

Douglas fir Southern pine Ponderosa pine Jack pine White pine

Red pine Western hemlock Western larch Hem-fir Oak

(2) Ensure that posts are the size the plans show and conform to the nominal and minimum dimensions

tabulated in 507.2.2.3. The contractor does not have to surface the posts. Provide posts of the net length

the plans show after setting and cut off.

(3) Use stress graded posts rated at 1200 psi fb or higher. Determine the stress grade rating for douglas fir,

western larch, and southern pine as specified in 507.2.2.4.

C & M 8-50 RequirementsPOSTS, TREATED WOOD

Guardrail

Right of Way (Security Fence)

Screen Fence

Sign, Etc.

Field A manufacturer's certification of treatment must be made available by the contractor upon request of the engineer.

A diary entry is required for these items.

** Stay tuned, I would recommend requesting certification for Beam Guard Posts to validate conformance to these requirements.

Page 11: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

715.2 Materials

715.2.1 General

(4) Ensure that the concrete mix report includes a cover sheet with signature blocks for both the mix

developer and the engineer. Have the mix developer sign and date each copy attesting that all

information in the report is accurate. The engineer will sign and date each copy of the report. The

engineer’s signature verifies that the engineer had the opportunity to review the mix report, to check that it

meets the concrete mix requirements, and to comment. The engineer will return a signed copy to the

contractor within 3 business days of receiving the report.

C & M 8.35.1.2 Requirements:8-35.1.2 Contractor Concrete Mix Design

The contractor is responsible for providing the design of the concrete mixture for use on the project and for any

necessary adjustments during production. A mix design may be a new design or one used on a previous project.

New mixtures are those that use different material sources or quantities than a previously used mix.

A PCC Technician II, hired or employed by the contractor, is required to develop and submit the mix design

report to the engineer before the production of concrete for the project. The mix design must meet the conditions

specified in the QMP provision. The report can include a number of different mix designs, but each mix design is

required to have supporting laboratory or field test results. Multiple mix designs will enable the use of the most

appropriate mix on a project, for given conditions. The contractor must complete department worksheet

WS5014, Concrete Mix Design, and submit to the engineer. The engineer’s signature verifies that the engineer

had an opportunity to review the mix design.

New WS form will be included with next C & M update, please use “new”

form and have contractor fill out completely. New form example along

with updated “Ancillary Concrete Daily Test Report”.

11

Page 12: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

12

Page 13: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

13

Page 14: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

Buy America ProvisionRemember to verify on all certifications/report of tests for steel and iron products that Buy

America requirements have been met. Upon review of these documents either place check marks and/or highlight the Buy America statements. Also upon completion of the project have the prime contractor provide completed form WS4567 to be included with the Materials Records.

14

APRIL 2013

BUY AMERICA PROVISION

All steel and iron materials permanently incorporated in this project shall be domestic products and all manufacturing and coating processes for these materials from smelting forward in the manufacturing process must have occurred within the United States. Coating includes epoxy coating, galvanizing, painting and any other coating that protects or enhances the value of a material subject to the requirements of Buy America. The exemption of this requirement is the minimal use of foreign materials if the total cost of such material permanently incorporated in the product does not exceed one-tenth of one percent (1/10 of 1%) of the total contract cost or $2,500.00, whichever is greater. For purposes of this paragraph, the cost is that shown to be the value of the subject products as they are delivered to the project. The contractor shall take actions and provide documentation conforming to CMM 2-28.4 to ensure compliance with this “Buy America” provision.

http://roadwaystandards.dot.wi.gov/standards/cmm/cm-02-28.pdf#cm2-28.4

Upon completion of the project certify to the engineer, in writing using department form WS4567, that all steel, iron, and coating processes for steel or iron incorporated into the contract work conform to these "Buy America" provisions. Attach a list of exemptions and their associated costs to the certification form. Department form WS4567 is available at:

http://roadwaystandards.dot.wi.gov/standards/forms/ws4567.doc

Page 15: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

15

Page 16: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

WisDOT staff can get assigned testing equipment through the Region Labs. This can include shovels, air meters, slump cones, thermometers, Infrared thermometers (heat guns) etc. Rhinelander office see Dean Gritzmacher or John Brophy…Rhinelander Lab phone 715-365-5735

Wisconsin Rapids office see Pat Shuda or Jeff Michalski…Rapids Lab phone 715-421-8060

All field staff can get sampling supplies from each Region Lab, such as Sample Bags, Sample Cards, AC cans, Tack Jugs, Cylinder Molds and Caps.

All field staff can utilize each Lab to test samples. Samples can be dropped off during normal hours or can be placed in the Lab Entry in Rhinelander or Drop Off Room in Wisconsin Rapids. Door combinations can be obtained through lab staff or your P.M.

Field Samples intended for Madison can be dropped off at each lab along with completed sample cards and they will get shipped out from there.

Nuclear Gauges and Validators can be signed out through each Region Lab. Check with each lab for specific sign-out and transport needs.

HMA mix samples will be tested at each Region Lab. Coordinate paving schedules with Dean and Pat as soon as dates and times are known.

Testing equipment and miscellaneous sampling supplies

16

Page 17: 1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports

Questions?

17