wp12 – wind scenarios, concepts & topology...wp12 – wind scenarios, concepts & topology....

1
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 691714. Step 5: Sensitivity analysis Step 3: Topologies for the high wind scenario and four development concepts WP12 – Wind Scenarios, Concepts & Topology Step 1: Assessment of wind potential Motivation Efficient transmission of high amounts of offshore wind generation in the North Seas requires the development of a European offshore grid. The European H2020 project “PROMOTioN ” aims at alleviating technical, regulatory, economic, financial, legal and market barriers Goal: Develop recommendations for a practical deployment plan by: 1. Analysing topological development under contrasting scenarios 2. Using the developed topologies as inputs for a detailed cost-benefits analysis Step 2: Development of wind scenarios Key messages towards a deployment plan 1. The total required cable length for the HVDC grid is sensitive to input assumptions. If the difference between concepts is small, the costs of other aspects (such as protection devices, platforms, advanced controls) have to be considered in detail during the pre- feasibility phase. 2. The most beneficial topology evolves gradually from a few multi-terminal connections to more complex structures. 3. The combined use of the offshore grid for wind evacuation and interconnectors is an important driver for meshing/multi-terminal. 4. The Business as Usual radial connection is competitive if the maximum offshore platform size and cable rating are similar. If this is not the case, the radial solution becomes significantly more expensive. 5. There is no unique way to protect an HVDC grid, the choice of the strategy will depend on costs and on the allowed impact (temporary loss of power infeed) to the onshore grid. 6. A centralized HVDC controller able to perform fast corrective actions (such as curtailment) or a preventive system split might be required in the proposed topologies to avoid overloads following a contingency. Step 4: Demonstration of the technical viability 1. Steady-state security analysis Voltage droop at HVDC converters allows the system to deal with post-contingency DC voltage violations. Fast corrective actions (i.e. curtailment) required to deal with post-contingency branch overloads. 2. Feasibility of the protection schemes Offshore HVDC grid can be protected for all simulated faults (single DC-line fault at several locations in normal and back-up clearing time) by proper selection of DCCBs or fault current limiting converters. Business-as-usual National decentralized hub European decentralized hub European centralized hub 0 10 20 30 40 50 60 Sweden Norway Ireland (NI+RI) Belgium France Denmark Netherlands Germany Great Britain Sweden Norway Ireland (NI+RI) Belgium France Denmark Netherlands Germany Great Britain Sweden Norway Ireland (NI+RI) Belgium France Denmark Netherlands Germany Great Britain Low Central High Offshore target (GW) 2020 2030 2040 2050 TenneT TSO BV [email protected] [email protected] Tractebel Impact [email protected] [email protected] FGH [email protected] The SuperGrid Institute Serge.POULLAIN@supergrid- institute.com

Upload: others

Post on 03-Mar-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WP12 – Wind Scenarios, Concepts & Topology...WP12 – Wind Scenarios, Concepts & Topology. Step 1: Assessment of wind potential. Motivation. Efficient transmission of high amounts

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 691714.

Step 5: Sensitivity analysis

Step 3: Topologies for the high wind scenario and four development concepts

WP12 – Wind Scenarios, Concepts & Topology

Step 1: Assessment of wind potential

Motivation

Efficient transmission of high amounts of offshore wind generation in the North Seas requires the development of a European offshore grid. The European H2020 project “PROMOTioN ” aims at alleviating technical, regulatory, economic, financial, legal and market barriers

Goal:

Develop recommendations for a practical deployment plan by:

1. Analysing topological development under contrasting scenarios

2. Using the developed topologies as inputs for a detailed cost-benefits analysis

Step 2: Development of wind scenarios

Key messages towards a deployment plan

1. The total required cable length for the HVDC grid is sensitive to input assumptions. If the difference between concepts is small, the costs of other aspects (such as protection devices, platforms, advanced controls) have to be considered in detail during the pre-feasibility phase.

2. The most beneficial topology evolves gradually from a few multi-terminal connections to more complex structures.

3. The combined use of the offshore grid for wind evacuation and interconnectors is an important driver for meshing/multi-terminal.

4. The Business as Usual radial connection is competitive if the maximum offshore platform size and cable rating are similar. If this is not the case, the radial solution becomes significantly more expensive.

5. There is no unique way to protect an HVDC grid, the choice of the strategy will depend on costs and on the allowed impact (temporary loss of power infeed) to the onshore grid.

6. A centralized HVDC controller able to perform fast corrective actions (such as curtailment) or a preventive system split might be required in the proposed topologies to avoid overloads following a contingency.

Step 4: Demonstration of the technical viability

1. Steady-state security analysisVoltage droop at HVDC converters allows thesystem to deal with post-contingency DC voltageviolations.Fast corrective actions (i.e. curtailment) requiredto deal with post-contingency branch overloads.2. Feasibility of the protection schemesOffshore HVDC grid can be protected for all simulated faults (single DC-line fault at several locations in normal and back-up clearing time) by proper selection of DCCBs or fault current limiting converters.

Business-as-usual

National decentralized hub

European decentralized hub

European centralized hub

0

10

20

30

40

50

60

Swed

en

Nor

way

Irela

nd (N

I+R

I)

Belg

ium

Fran

ce

Den

mar

k

Net

herla

nds

Ger

man

y

Gre

at B

ritai

n

Swed

en

Nor

way

Irela

nd (N

I+R

I)

Belg

ium

Fran

ce

Den

mar

k

Net

herla

nds

Ger

man

y

Gre

at B

ritai

n

Swed

en

Nor

way

Irela

nd (N

I+R

I)

Belg

ium

Fran

ce

Den

mar

k

Net

herla

nds

Ger

man

y

Gre

at B

ritai

n

Low Central High

Offs

hore

targ

et (G

W)

2020203020402050

TenneT TSO [email protected]@tennet.eu

Tractebel [email protected]@tractebel.engie.com

[email protected]

The SuperGrid [email protected]