  • 7/28/2019 Vpod Versapod II

    1/20

    VersaPOD Installation Instructions

    www.siemon.com

  • 7/28/2019 Vpod Versapod II

    2/20

    Table of Contents

    2

    VersaPOD Installation Instruction Notes . . . . . . . . . . . . . . . . . . . 37

    1. Safety Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4

    2. VP1 Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5

    3. VP2 Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6

    4. V-POD Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

    V-POD Leveling Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8

    VP1 Baying Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9

    VP2 Baying Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10

    V-POD Door Installation & Removal . . . . . . . . . . . . . . . . . . . . . . . .11

    V-POD Door Bonding Kit Instructions . . . . . . . . . . . . . . . . . . . . . . .12

    VP1 Side Panel Installation & Removal . . . . . . . . . . . . . . . . . . . . . .13

    VP2 Side Panel Installation & Removal . . . . . . . . . . . . . . . . . . . . . .14

    V-POD Equipment Rail Adjustment . . . . . . . . . . . . . . . . . . . . . . . . .15

    V-POD Accessories

    V-POD Brush Guard VP1 & VP2 Installation Instructions . . . . . .16

    V-POD Fan Kit VP1 & VP2 Installation Instructions . . . . . . . . . .17

    V-POD Castor Wheels Installation Instructions . . . . . . . . . . . . .18

    Shelving Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19

    WARNING: Failure to follow this information can result in injury or death.

    CAUTION: Failure to follow this information can lead to possible equipment damage.

    NOTE: Clarifying information or comment.

    !

    i

  • 7/28/2019 Vpod Versapod II

    3/20

    WARNINGS

    Read and understand all instructions for proper installation and use of this product as improper use of this product may lead to serious injuryor death.

    To remove the cabinet from the pallet for final placement, ensure the pallet is located on a level surfaceand remove the four (4) bolt-dow n brackets. Once removed, be sure to use sufficient personnel to safel yremove the cabinet from the pallet . To aid in avoiding this potential i ssue, removal all doors and sidepanels to reduce the overall weight of the cabinet.

    NOTE: These four (4) bolt-dow n brackets can also be used as stabil izing brackets once thecabinets are in their final position within the Telecommunications Space.

    Obtain adequate assistance to stabilize the cabinet during movement. Do not attempt to move largecabinets wi th a single person. All equipment must be unloaded from cabinets prior to movement.

    Temporary TransportOptional castors are available for relocation of cabinets. W hile castors are capable of supporting a fullyloaded cabinet, they should only be used to move the cabinet between locati ons. W hen relocating cabinetsusing castors, they must be moved with extreme care as they may tip if they experience sudden stops,excessive force, or travel over irregular surfaces. It is recommended to move the cabinet using the front orrear of the cabinet as the leading edge do not push on the sides. Once in place, the leveling feet (andbolt-down brackets) shall be fully deployed to offer maximum stability.

    A standalone cabi net should be level, st able, and anchored to the f loor. Tw o or more cabinets can bebayed together (coupled) to enhance their st abilit y. Each cabinet should be anchored to t he floor.

    Before loading equipment in the cabinet, be sure to adjust the leveling feet to level the cabinet. Do not use casters to stabilize the cabinet; always anchorthe leveling feet or the cabinet frame to the floor.

    Alw ays load the cabinets such that the heaviest equipment (e.g. UPS units, large

    enterprise switches) is located at the lowest point in the cabinet and add lighterequipment on higher levels. This will serve to further reduce the potential risk ofcabinets tipping over. Utilizing the bolt-dow n brackets w ith also help in this regard.The same consideration should be taken when and if shelving is deployed withinthe cabinet especially w hen using sliding shelves as loads placed on themdestabilize the cabinet when extended from within the confines of the cabinet.

    The Maximum Load Capacity o fthe cabinet should not exceed 1000kg (2205 lbs.)

    The M aximum Anticipated Ambient Temperature inside a fully loaded CabinetSystem is (10C - 60C).

    The Enclosure Cabinets are intended to be installed in accordance with the applica-ble requirements of the Nat ional Electrical Code and the local Authoriti es HavingJurisdiction (AHJ).

    The Minim um spacings between the accessories and components and the EnclosureCabinet shall be maintained for safe operation of the equipment when installed inaccordance w ith the N ationl Electric Code.

    The V-POD cabinet can support many equipment configurations. The amount of force required to tip or destabilize the cabinet differs with eachconfiguration. Be sure to read and follow your equipment manufacturers specific assembly, installation, and safety instructions.

    W hen servicing slide-mounted equipment (e.g. servers, KVM sw itches), secure all equipment, other than the unit being serviced, in position to preventthem from inadvertently slidi ng out and destabilizing the cabinet. Also, be sure to extend only one sliding unit at a time as the extension of multiple unitsmay result in the cabinet tippi ng over. W hen extending sliding units, do so slowl y as quick extension of these units can also cause the cabinet to tip over.

    3

    VersaPOD Installation Instruction Notes

    SAFETY INFORMATION

    !

    i

  • 7/28/2019 Vpod Versapod II

    4/20

    For protection of the equipment and personnel, ground each cabinet individually as per applicable regional industry standard such as the

    Telecom muni cati ons Equipm ent Bonding Conducto r (TEBC) or Signal Reference Grid (SRG). Each V-POD cabin et comes equip ped wi th mul tip lebonding locations as well as a Door Bonding Kit that consists of a (#12 AWG Wire) and associated mounting hardware (see page 12 for DoorBonding Kit installation information).

    As with any grounding and bonding concerns, the local Authority Having Jurisdiction (AHJ) has the final approval as to what is consideredcompliant for a specific installation.

    NOTE: Cabinet bonding locations can be further augmented wit h the addition of a grounding bus bar such asSiemons V-POD grounding kit (p/n VP-GRD) which off ers an ANSI-J-STD-607-A compliant t ap point f orgrounding and bonding of the cabinet as well as any equipment installed within the cabinet.

    CAUTIONS

    Both the front and rear doors of the V-POD cabinet offer the unique ability to hinge open from either theleft or right. This is achieved by turning the associated door handle inw ards. W hen both handles areexercised at the same time, the door is released from the cabinet. W hile this facili tates easy removal ofthe doors, it can also result in damage to the doors or hinges if precautions are not taken. Be sure toalways check the status on one handle prior to operating the other and handle all doors securely duringremoval.

    When remounting doors, be sure to properly align and reinsert the hinge pins in the applicable hingegrommets. If the hinge pins are not reinserted properly, the door could fall off the next time it is opened.

    When removing side panels from cabinets, be aware that they are very large and extra care should betaken when handling to avoid personal injury or damage to the panel.

    When remounting side panels, be sure that the panels are inserted into the proper rectangular openings ofthe lower side panel support bracket and that the locking clips located at the top and middle of the paneldoors are fully engaged (see page 11 for Side Panel installat ion informat ion).

    Proper management of cables plays an important role in helping to reduce obstruction of proper air floww ithin cabinets. Cables should be managed behind patch panels in a manner that prevents them fromencroaching upon any horizontal equipment mounting spaces. Such spaces should remain as open as possible to maximum f ront-to-back air flow w ithinthe cabinets.

    NOTE: M anagement of cables and airflow can be further enhanced by using Siemons V-POD Vertical Cable M anagement Trays (p/n VP-TRAY)which is an accessory item that provides multiple points of cable management between bayed cabinets.

    NOTE:Component Servicing - Defective units should be repaired by personnel trained by the manufacturer, or returned to the manufacturer for

    repair or replacement.

    VersaPOD Installation Instruction Notes

    4

    SAFETY INFORMATION CONTINUED

    i

    Full Door (Hinged Right)

    i

  • 7/28/2019 Vpod Versapod II

    5/20

    4

    VP1 Diagram

    5

  • 7/28/2019 Vpod Versapod II

    6/20

    VP2 Diagram

    6

    2/MATERIALS:CRSOFVARYINGTHICKNESS,FINISH:BLACK

    POWDERCOAT,.

    NOTES:1)ALLITEMSAREPACKAGEDTOGETHER.

    VP2-2AB1

    11SHOWNFORREFERENCE

  • 7/28/2019 Vpod Versapod II

    7/20

    V-POD Options

    7

    This instruction booklet applies to the following V-POD part numbers:

    VP1-(X)(X)(X)(X)11 . . . . . . . .45 RM S, 760mm x 1000mm Cabinet, Black

    Use 1st (X) to specify Side Panels: 0 = no side panels, 1 = 1 side panel, 2 = 2 si de panels

    Use 2nd (X) to specify Front Door: A = Full vented/ dual handle, B = Split vented/ dual handle

    Use 3rd (X) to specify Rear Door: A = Full vented/ dual handle, B = Split vented/ dual handle

    Use 4th (X) to specify Lock: 1 = keyed lock, 2 = tumbler combinat ion lock

    Note

    Doors & Side Panels Doors Only No Doors or Side Panels

    (For reference only)

    i

    This instruction booklet applies to the following V-POD part numbers:

    VP2-(X)(X)(X)(X)11 . . . . . . . .45 RM S, 760mm x 1200mm Cabinet, Black

    Use 1st (X) to specify Side Panels: 0 = no side panels, 1 = 1 side panel, 2 = 2 si de panels

    Use 2nd (X) to specify Front Door: A = Full vented/ dual handle, B = Split vented/ dual handle

    Use 3rd (X) to specify Rear Door: A = Full vented/ dual handle, B = Split vented/ dual handle

    Use 4th (X) to specify Lock: 1 = keyed lock, 2 = tumbler combinat ion lock

    Note

    Doors & Side Panels Doors Only

    i

    No Doors or Side Panels

    (For reference only)

  • 7/28/2019 Vpod Versapod II

    8/20

    V-POD Leveling Instructions

    8

    Parts Description Required Tools

    M ake sure the cabinet isas close to its final position

    wit hin the room as possible.

    1Place level on lowersupport bracket of the front

    door as shown. Using a #2 Phillipsscrew driver adjust the leveling

    feet located in the left and rightcorner of the cabinet until thecabinet registers as level from leftto r ight.

    2Place the level inside thecabinet pointing from the

    front t o the rear. Using the #2Phillips screw driver adjust the

    rear leveling foot until the cabinetreads level from front to back.Repeat this step for the oppositeside.

    3Place the level across therear door support bracket to

    insure the cabinet reads level andadjust accordingly.

    Re-check all plumb and levelreadings as a final validation.

    4

    #2 Phillips Screw Driver

    Bullet Level

    Leveling Feet (4)

    (pre-installed)

  • 7/28/2019 Vpod Versapod II

    9/20

    VP1 Baying Instructions

    9

    Parts Description Required Tools

    Make sure cabinets thatare to be bayed together

    are level, plumb and placed sothat the cabinets are in direct

    contact with each other.

    1Place the first bayingbracket on the front of the

    cabinet just under the door nearthe bottom as shown and secure

    w ith t he (2) Torx bolts provided.

    2Place the second bayingbracket on the rear of the

    cabinet just under the door nearthe bottom as shown and secure

    w ith the (2) Torx bolts provided.

    3Place the third bayingbracket on the forward

    portion of the top lid of the cabinet.Line it up with the 2 threaded holes

    and secure to the cabinet with the(2) Torx bolts provided, as shownabove.

    4

    Place the forth bayingbracket on the back portion

    of the top lid of the cabinet. Line itup with the 2 threaded holes andsecure to the cabinet with the (2)Torx bolts provided, as show nabove.

    5

    T-30 Torx Tool

    Bullet Level

    (4) Baying Brackets

    (8) T-30 Torx Bolts

  • 7/28/2019 Vpod Versapod II

    10/20

    VP2 Baying Instructions

    1 0

    Parts Description Required Tools

    Make sure cabinets thatare to be bayed together

    are level, plumb and placed sothat the cabinets are in directcontact with each other.

    1Place the first bayingbracket on the front of the

    cabinet just under the door nearthe bottom as shown and securew ith t he (2) Torx bolts provided.

    2Place the second bayingbracket on the rear of the

    cabinet just under the door nearthe bottom as shown and securew ith t he (2) Torx bolts provided.

    3Place the third bayingbracket on the forward

    portion of the top lid of the cabinet.Line it up with the 2 threaded holesand secure to the cabinet w ith the(2) Torx bolts provided, as shownabove.

    4

    Place the forth bayingbracket on the back portion

    of the top lid of the cabinet. Line itup with the 2 threaded holes andsecure to the cabinet with the (2)Torx bolts provided, as show nabove.

    5

    T-30 Torx Tool

    Bullet Level

    (4) Baying Brackets

    (8) T-30 Torx Bolts

  • 7/28/2019 Vpod Versapod II

    11/20

    Grab both lever handles atthe same time and move

    them into the open position. Thiswill disengage all 4 hinge pins. Thedoor can now be removed.

    CAUTION: Be aware thatonce both handles are

    exercised at the same time, thedoor will be released from thecabinet and can fall if not heldsecurely.

    2

    V-POD Door Installation & Removal

    1 1

    Required ToolsInstallation for BothFront and Rear Doors

    M ake sure both lever handles onthe door are in the unlocked andopened position as shown in theimage above.

    1

    Place the door in the V-POD opening and l ine up

    the edges of the door with theouter edge of the cabinet as

    shown.

    2Close the door completelyand then close the other

    lever handle engaging the hingepins on the opposite side.

    4Removal for Both Frontand Rear Doors

    M ake sure both handles are in theunlocked position.

    1

    None

    W ith the door in place,close one of the lever

    handles (either left or right) untilthe hinge pins, both top and

    bottom, engage into the guidebushings as shown.

    3

  • 7/28/2019 Vpod Versapod II

    12/20

    Split Door Bonding

    Using the 5/16 nutprovided, attach the other end ofthe w ire to the end of the extensionpost on the cabinet.

    8

    Full Door Bonding

    Identify which of the (2)front bonding posts that wi ll beused.

    1Full Door Bonding

    Identify the door bondingpost that is located at the samecorner from the cabinet postselected in step 1.

    2Full Door Bonding

    Using the 5/16 N ut Driverattach one end of the w ire to thebonding post with t he 5/16 nutprovided.

    3Full Door Bonding

    Using the 5/16 nutprovided, attach the other end ofthe coiled wire to t he post on thecabinet.

    4

    5/16 Nut Driver

    Parts Description Required Tools

    Split Door Bonding

    Identify which of the (2)front bonding posts that w ill beused.

    5

    (2) 5/16 Hex Nut

    Lock washers

    Star w ashers

    #12 AWG solid wire

    Split Door Bonding

    Identify the door bondingpost that is located at the samecorner from the cabinet postselected in step 5.

    6 Split Door BondingUsing the 5/16 N ut Driver

    attach one end of the w ire to thebonding post with t he 5/16 nutprovided.

    7

    V-POD Door Bonding Kit Instructions

    1 2

    Grounding

    Installers should insure that thegrounding strap are terminated atone end to the door and at the otherend to the Cabinet Enclosure chassisand are all secured and make goodcontact with the metal.

    Note: Tighten to 45 in. lbs minimumtorque.

  • 7/28/2019 Vpod Versapod II

    13/20

    1 3

    VP1 Side Panel Installation & Removal

    Required Tools

    Side Panel Installation

    Install the lower side panelsupport bracket using the (4) Torxbolts provided.

    1Install the (2) side latch Lbrackets using the (4) Torx

    bolts provided.

    2Take hold of t he side panelas shown in the above

    image and place the clips at thebottom of the panel into the two

    rectangular openings of the lowerside panel support bracket.

    3Push the top of the sidepanel into place until the

    locking clips at the top of the panelengage.

    4

    Apply pressure to the middleof the side panel and

    engage the side panel slide latchesinto the L brackets installedduring Step 2.

    5

    T-30 Torx Tool

    Side Panel Removal

    Disengage the slide latcheslocated in the middle of the sidepanel

    1M ake sure the top latchesare in the unlocked

    position. Open the latches and tiltthe panel tow ard you.

    2Lift the side panel off t helower support bracket.

    CAUTION: Be aware that the sidepan el s a re la rge and ext ra car eshould be taken when handling toavoid personal injury or damage tothe panel.

    3

    Parts Description

    (2) Side Latch L Brackets

    (1) Support Bracket

    (8) T-30 Torx Bolts

  • 7/28/2019 Vpod Versapod II

    14/20

    VP2 Side Panel Installation & Removal

    1 4

    Required Tools

    Side Panel Installation

    Install the lower side panelsupport bracket using the (4) Torxbolts provided.

    1Install the (2) side latch Lbrackets using the (4) Torx

    bolts provided.

    2Take hold of the side panelas shown in the above

    image and place the clips at thebottom of the panel into the two

    rectangular openings of the lowerside panel support bracket.

    3Using a T-30 Torx tool attachthe bracket as shown above4

    Apply pressure to themiddle of the side panel and

    engage the side panel slide latchesinto the L brackets using astraight bale screw driver.

    5

    T-30 Torx Tool

    Side Panel Removal

    Disengage the side quarterturn latches located in the middleof the side panel

    1M ake sure the top l atchesare in the unlocked

    position. Open the latches and tiltthe panel toward you.

    2Lift the side panel off thelower support bracket.

    CAUTION: Be aware that the sidepan el s a re la rge and e xt ra car eshould be taken when handling toavoid personal injury or damage tothe panel.

    3

    Parts Description

    (2) Side Latch L Brackets

    Lower Support Bracket

    V Center Support Bracket

  • 7/28/2019 Vpod Versapod II

    15/20

    V-POD Equipment Rail Adjustment

    1 5

    Required ToolsTo change the depth of theequipment rails start by

    removing all (6) T-30 Torx boltsthat hold the equipment rail inplace. There are (2) bolts locatedat the t op, (2) in the middle and (2)on the bottom.

    1

    Determine new mountinglocation and place cage

    nuts in keyhole slots. Note that (1)empty keyhole slot is needed

    between cage nuts. Alignmounting locations at top, middleand bottom.

    2Secure the equipment railusing the same (6) T-30

    bolts removed from Step #1.

    3Repeat steps 1-3 with theequipment rail on opposing

    side. Inspect mounting location toinsure that the equipment rails are

    aligned with each other andvertically perpendicular to the floor.

    4

    T-30 Torx Tool

  • 7/28/2019 Vpod Versapod II

    16/20

    V-POD Brush Guard Installation Instructions

    1 6

    Parts Description Required ToolsInstallation of LargeBrush Guard

    After removing the large blankfil ler panel from the top of the

    cabinet, locate the large brushguard over the opening.

    1Installation of LargeBrush Guard

    Using the (4) Torx screws, securethe Large Brush Guard in pl ace as

    shown.

    2

    Installation of SmallBrush Guard

    After removing the small blankfil ler panel from the top of thecabinet, locate the small brushguard over the opening.

    3Installation of SmallBrush Guard

    From the underside of the top lid,secure the Small Brush Guard withthe (2) Torx screws and w ashersprovided.

    4

    T-30 Torx Tool(1)V-POD Large Brush Guard

    (4) T30 Torx Screws

    (1) V-POD Small Brush Guard

    (2) T-30 Torx bolts

    (2) Flat Washers

  • 7/28/2019 Vpod Versapod II

    17/20

    1 7

    V-POD Fan Kit Installation Instructions

    Parts Description Required ToolsAfter removing the largefil ler panel locate the fan

    kit over the larger opening in thetop of the cabinet so that the

    power cord drops down into thecabinet.

    1Using the (4) Torx screws,

    secure the Fan in place2

    Route to power cordneatly to one side and plug

    into closest receptacle.

    3

    T-30 Torx Tool(1) V-POD Fan Kit w ith

    power cord

    (4) Torx Screws

  • 7/28/2019 Vpod Versapod II

    18/20

    V-POD Castor Wheels Installation Instructions

    1 8

    Parts Description Required Tools

    Remove all doors and sidepanels.1

    Lay the cabinet on its sideon top of a protected

    surface, so as not to damage thefinish.

    CAUTION: Do not att emptto perform this step wit h

    fewer than 2 technicians to avoidper sonal in ju ry or dama ge to th ecabinet.

    2W ith cabinet on is side,slide the w heels over the

    existing threaded studs (4/ wheel)located near the leveling feet and

    secure with the (4) 10mm hex nutsprovided.

    3Carefully stand the cabinetback up on to the casters.

    CAUTION: Do not attempt tope rf orm th is st ep w it h fe w er

    than 2 techs to avoid personalinjury or damage to the cabinet.

    4

    10mm Socket W rench(4) V-POD Castor Wheels

    (16) 10mm Hex Nuts

    Underside

    of Cabinet

  • 7/28/2019 Vpod Versapod II

    19/20

    Accessory Shelves - Installation Instructions

    1.Safety Warning - M aximum w eight load - 34 kg (75lbs).

    2.Each shelf is provided w ith t w o star w ashers and one grounding

    screw.3.Place one star washer in betw een shelf and cabinet rail and other star

    w asher betw een shelf and ground screw.

    4.Securely fasten ground screw to cabinet rail.

    1 9

  • 7/28/2019 Vpod Versapod II

    20/20

    Notes

    To assist safe installations, comply with the following:

    A. Do not attempt to perform this w ork with few er than 2 technicians

    B. Never touch uninsulated wire terminals unlessthe circuit has been disconnected.

    C. Never install this device in a wet location.

    D. Never install wiring during a lightning storm.

    Global HeadquartersWat ertown, Connecticut USA

    Tel: (1) 866-548-5814