trisno winch
DESCRIPTION
okeTRANSCRIPT
Permesinan Bantu Trisno Kusuma Sumantri
( Sistem Bongkar Muat ) 4212100019
Ukuran Utama Kapal 1 m = 3.28084Tipe Kapal : TANKER Panjang (Lpp) : 85 meter 278.8714 ftLebar (B) : 13.5 meter 44.29134 ftTinggi geladak (H) : 6.4 meter 20.997376 ftSarat air (T) : 5.6 meter 18.372704 ftKecepatan dinas (Vs) : 12.5 knot 21.097625 ft/s Lwl : 89.25 meter 292.81497 ft
Koefisien Dari Diagram NSP Cb (Coef Blok) = 0.69054 Cp (Coef Pris) = 0.7017567 Cm (Coef Mids) = 0.982775
A. Perencanaan Sistem Bongkar Muat
1. Perhitungan sistem bongkar muat dengan estimasi waktu 24 jam a. Diameter Pipa
Db = 0,0189 x (Qe/ Vc)0,5
dimana :Vol. Diesel Oil = 4527 m3
waktu = 17 jam = 61200 detik
Qe = Debit pompa= Vol. Diesel Oil / t
= 266.2941 m3/jam = 0.004351 m3/sVc = kecepatan aliran jenis muatan
= 2.5 m/s
Db = 0,0189 x (Qe/ Vc)0,5
= 0.195062 m = 7.679605 inchimaka diambil inchi = 0 m
b. Diameter Pipa yang Digunakan Berdasarkan Standart JISInchi = 8 inchi
Nominal Pipe Size =Outside Diameter = 216.3 mm
Thickness = 6.6 mmInside Diameter = 200 mm
c. Perhitungan head pompa pada discharge1. head statis (hs)
head statis (hs) = Z2 - Z1 Suction = 1.2 mDischarge = 8 m
6.8 m
2. Head Pressure (hp)Head Pressure (hp) = ( Pout - P in )/ ( ρ . g ) Suction = 10 m
(10 - 10 ) / (0,86 x 0,98) Discharge = 10 m0 m ρ Diesel oil = 0.86 m3/ton
Gravity = 9.8 m/s2
3. Head Kecepatan (hv)Head Kecepatan (hv) = ( V2 - V1 ) ²/ ( 2 g ) V suction = 2.5 m/s
(2,5 - 2,5 )2/ (2 x 0,98) V discharge = 2.5 m/s0
4. Loses pada aliran dischargea. Mayor Loses
Mayor loses terjadi pada pipa lurus tanpa ada sambungan, kelokan, fitting pada instalasi.
Hl 1 = f x L x V2 / ( d x 2 g)dimana :
f = kerugian karena gesekan ( friction number)(fungsi dari reynold number untuk menentukan jenis aliran pipa.
Rn = (v x d) / uv = kecepatan aliran fluida 2.5 m/s d = diameter pipa 0.2 m
u = viskositas fluida 0.0000058 m2/sRn = (v x d) / u
= 86206.9
ξ = (Bahan pipa cast iron) 0.0045ξ / d = 0.0225
maka dengan melalui nilai Rn dan (ξ / d), nilai f dari diagram moodyf = 0.029
L = panjang pipa (discharge site) 99 m
no item jumlah k n x k1234
FilterTee jointElbow 90
Gate valve
4121512
0.850.650.750.6
3.47.8
11.257.2
Total 29.65
2
2
3
d = diameter pipa 0.2 mg = gaya gravitasi 9.8 m/s2
maka: Hl 1 = f x L x V2 / ( d x 2 g)= 4.577487 m
b. Minor lossesMinor loses terjadi pada komponen- komponen selain pipa lurus seperti, elbow, strainer, sambungan, dan lain-lain.
hf 1 = Ktot ( v / 2 g)dimana asumsi -asumsi:
hf 1 = Ktot ( v / 2 g)
= 25,45 (3,52 / 2 x 9,8)= 9.454719 m
4. Total HeadTotal head = Hs + Hp + Hv + head discharge + head minor
= 10,5 + 0 + 0 + 5,34677 +15,906320.83221 m
d. Perhitungan Daya PompaP = Ht x ρoil x Q x (g /h)
dimana :Ht = head total 20.83 mρoil = massa jenis fluida (minyak mentah ) 0.86 ton/ m
Q = debit atau kapasitas pompa 0.004351 m3/s g = percepatan gravitasi 9.8h = efisiensi pompa 0.8
P = Ht x ρoil x Q x (g /h)
= 0.954949 W= 0.000955
B. Perencanaan Sistem Stripping
1. Perhitungan sistem stripping dengan estimasi waktu 14 jam a. Diameter Pipa
Db = 0,0189 x (Qe/ Vc)0,5
dimana :Vol. Diesel Oil = 143.653 m3
waktu = 14 jam = 50400 detik
Qe = Debit pompa= Vol. Crude oil / t
= 10.26093 m3/jam = 0.000204 m3/sVc = kecepatan aliran jenis muatan
= 2.5 m/s
Db = 0,0189 x (Qe/ Vc)0,5
= 0.03829 m = 1.50748 inchimaka diambil 1.5 inchi = 0.0381 m
Head Pressure (hp) = ( Pout - P in )/ ( ρ . g ) Suction = 10 m(10 - 10 ) / (0,86 x 0,98) Discharge = 10 m
0 m ρ Diesel oil = 0.86 m3/tonGravity = 9.8 m/s2
b. Diameter Pipa yang Digunakan Berdasarkan Standart JISInchi = 1.5 inchi
Outside Diameter = 48.6 mmThickness = 3.8 mm
Inside Diameter = 40 mm
c. Perhitungan head pompa pada discharge1. head statis (hs)
head statis (hs) = Z2 - Z1 Suction = 12.5 m12,5 - 2 Discharge = 2 m10.5 m
2. Head Pressure (hp)
3. Head Kecepatan (hv)Head Kecepatan (hv) = ( V2 - V1 ) ²/ ( 2 g ) V suction = 2.5 m/s
(3,5 - 3,5 )2/ (2 x 0,98) V discharge = 2.5 m/s0 m
4. Loses pada aliran suctiona. Mayor Loses
Mayor loses terjadi pada pipa lurus tanpa ada sambungan, kelokan, fitting pada instalasi.
Hl 1 = f x L x V2 / ( d x 2 g)dimana :
f = kerugian karena gesekan ( friction number)(fungsi dari reynold number untuk menentukan jenis aliran pipa.
Rn = (v x d) / uv = kecepatan aliran fluida 2.5 m/s d = diameter pipa 0.04 m
u = viskositas fluida 0.0000058 m2/sRn = (v x d) / u
= 17241.38
ξ = (Bahan pipa cast iron) 0.0045ξ / d = 0.1125
no item jumlah k n x k1234
FilterTee jointElbow 90
Gate valve
4554
0.850.650.750.6
3.43.253.752.4
Total 12.8
2
2
3
maka dengan melalui nilai Rn dan (ξ / d), nilai f dari diagram moodyf = 0.0763
L = panjang pipa (suction site) 90 md = diameter pipa 0.04 m
g = gaya gravitasi 9.8 m/s2
maka: Hl 1 = f x L x V2 / ( d x 2 g)= 54.7433 m
b. Minor lossesMinor loses terjadi pada komponen- komponen selain pipa lurus seperti, elbow, strainer, sambungan, dan lain-lain.
hf 1 = Ktot ( v / 2 g)dimana asumsi -asumsi:
hf 1 = Ktot ( v / 2 g)
= 11,1 (3,52 / 2 x 9,8)= 4.081633 m
4. Total HeadTotal head = Hs + Hp + Hv + head discharge + head minor
= 10,5 + 0 + 0 + 30,45 + 3,5469.32494 m
d. Perhitungan Daya PompaP = Ht x ρoil x Q x (g /h)
dimana :Ht = head total 69.32494 mρoil = massa jenis fluida (diesel oil ) 0.5 ton/ m
Q = debit atau kapasitas pompa 0.000204 m3/s g = percepatan gravitasi 9.8h = efisiensi pompa 0.8
P = Ht x ρoil x Q x (g /h)
= 0.086447 W= 8.64E-05 KW