tool and sub-systems – low and zero-cost solutions

20
Tool and Sub-Systems – Low and Zero-Cost Solutions Andreas Eberhard VP Technical Services Power Standards Lab (PSL) 1201 Marina Village Parkway #101 Alameda, CA 94501 W:+001.510 522 4400 M: +001.510.919.4369 [email protected] www.powerstandards.com

Upload: others

Post on 10-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tool and Sub-Systems – Low and Zero-Cost Solutions

Tool and Sub-Systems –Low and Zero-Cost Solutions

Andreas EberhardVP Technical ServicesPower Standards Lab (PSL)

1201 Marina Village Parkway #101Alameda, CA 94501W:+001.510 522 4400M: +001.510.919.4369

[email protected]

Page 2: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Reasons not to comply:

• Compliance costs money

• Certification costs money

• Reasons to comply:

• Required by most 300mm fabs:

• Intel, IBM, Motorola, TI, Fujitsu, NEC

• Increased reliability – reduced service costs

• It’s the real world…

Tool vendors: why comply with SEMI F47?

Page 3: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Necessary but not sufficient

• Makes sense to require subsystem compliance

• RF Generators

• Pumps, motors, fans

• Robots

• Critical AC related components

• Computers and sensors

• Not sufficient – integration and software issues

Tool vendors: require component suppliers to comply with SEMI F47

Page 4: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Because the tool manufacturers demand compliance

• Push-down: customer, equipment supplier, component supplier

• Black box for tool vendors

Component suppliers: why comply with SEMI F47?

Page 5: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Power sensitive circuits from

DC 24V, not from AC sources

(Control circuits, interlocks,

EMO, etc.)

► From DC Supply Output

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 1

Page 6: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Universal input power supplies

(AC 85-264V input range)

• Take power from two phase

(Avoid Phase-Neutral, or get three-phase supplies)

• Load conditions (de-rate…)

Cursor: -1ms -38.1 Volts www.PowerStandards.com

-200

-120

-40

40

120

200

Vol

ts

L1-N load - m illis e conds - 6/12/03 7:08:49 AM-26 13 52 91 130 169 208 247 286 325 364

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 2

Page 7: Tool and Sub-Systems – Low and Zero-Cost Solutions

© 2006 Power Standards Lab. All rights reserved.

•Sensors - pressure, speed, unbalance

•Solution: de-sensitize, or insert software time delays

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 3

Page 8: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Software adjustments

(e.g. delays on alarm signals)

• Increased bulk capacitor values

• Hardware delays in sensor signals

(de-sensitize if possible)

• Use fab-supplied UPS power for critical loads

(if end-user provides house UPS)

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 4

Page 9: Tool and Sub-Systems – Low and Zero-Cost Solutions

© 2006 Power Standards Lab. All rights reserved.

• Interaction between subsystems during sags - different responses and alarms

• Components have different pass/fail criteria – e. g RF

• Solution: testing, software adjustments

• Automatic re-start function

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 5

Page 10: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Avoid mismatched equipment

voltages (208Vac powering 230Vac equipment)

• Consider Circuit Breaker

Characteristics (Do not use Instantaneous Trip)

• Avoid the use of AC power “ice-

cube” general purpose relays

(sensitive from 70-85% Vnom)

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 6

Page 11: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Delay settings on phase-sense relays,

GFI (do not violate SEMI S2!)

• Change recovery settings on

Adjustable Speed Drives

• Disable or change pre-programmed

under-voltage trip limits

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 7

Page 12: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Do not use phase monitoring relays

in interlock circuits

• Utilize a non-volatile memory

• Use robust inverter drives that allow

for lower DC bus levels

Low-cost or zero-cost solutions (continued)Typical Problem Areas - 8

Page 13: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Power quality sensor PQ1 –

use software to record customer-caused

events outside SEMI F47, and use software

to reset and restart process after voltage dip event

• Senor can be used as a defense against power

Power Disturbances at end-user (finger pointing)

Low-cost or zero-cost solutions (continued)

Page 14: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Don’t get incorrectly blamed by customers

• Converts Voltage Sags from an Energy Storage

issue into a Software issue

• Huge cost savings

Low-cost or zero-cost solutions (continued)

Page 15: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Testing and Tweaking

(Small Engineering changes

during test, try different capacitors

on DC supplies etc.)

Low-cost or zero-cost solutions (continued)

Page 16: Tool and Sub-Systems – Low and Zero-Cost Solutions

Low-cost or zero-cost solutions (continued)

• None of these solutions requires making the power better

• All of these solutions are low cost, or free

• Find the sensitivities during testing

• Every tool can be made SEMI F47 compliant!

Page 17: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Power conditioning at sensitive spots

(as a last resort)

• Dip-proofing inverter

• Sag corrector

• UPS

• UPS for entire tool (not allowed by

many end-users due to cost and

maintenance issues – batteries!)

Higher-cost solutions

Page 18: Tool and Sub-Systems – Low and Zero-Cost Solutions

• Find the sensitivities during testing.

• Adjust the design (hardware, software) as required

• Power conditioning is not usually necessary

• Future designs: design for dip immunity from the start

• Already the case at major tool manufacturers

• Pre-test during design stage or with Beta-Tools

Conclusion: low-cost and zero-costdip immunity solutions are available.

Page 19: Tool and Sub-Systems – Low and Zero-Cost Solutions

PSL

© 2006 Power Standards Lab. All rights reserved.

Why should semiconductor tool manufacturers do SEMI F47 Testing and Certification?

• Lower maintenance cost

• No need for unnecessary and expensive power storage devices

• End-users can’t blame tool vendors

• Self-defense weapon if PQ1 is integrated

• Mandatory requirement by most end-users

• Competitive Advantage

• Improvement of electrical tool design

Page 20: Tool and Sub-Systems – Low and Zero-Cost Solutions

© 2006 Power Standards Lab. All rights reserved.

More information

http://www.PowerStandards.com/SEMIF47.htm