Page 1: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics and The Warrenton Aquatics and Recreation FacilityRecreation Facility

Warrenton, VirginiaWarrenton, Virginia

Derek DiPiazzaDerek DiPiazzaConstruction ManagementConstruction Management

Page 2: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

Presentation OutlinePresentation Outline– Project IntroductionProject Introduction– Analysis IAnalysis I

Construction EthicsConstruction Ethics

– Analysis IIAnalysis IIFabric DuctFabric Duct

– Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

– ConclusionsConclusions– Q&AQ&A

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Page 3: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Project OverviewProject Overview– CostCost

$22 Million$22 Million– SizeSize

59,738ft59,738ft22

– Schedule DurationSchedule Duration18 Months18 Months

– Building FunctionBuilding FunctionAquatic and Recreation FacilityAquatic and Recreation Facility

– Building SpacesBuilding SpacesCompetition Swimming Pool, Leisure Competition Swimming Pool, Leisure Swimming Pool, Spectator Seating, Swimming Pool, Spectator Seating, Locker Rooms, Fitness Room, Juice Bar, Locker Rooms, Fitness Room, Juice Bar, Office SpaceOffice Space

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 4: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Existing ConditionsExisting Conditions– Open SiteOpen Site– Access from North and SouthAccess from North and South

Project Architecture & Building Project Architecture & Building EnvelopeEnvelope– Combination of Metal Shingles, Beige Combination of Metal Shingles, Beige

Brick, and Simulated Stone FaçadeBrick, and Simulated Stone Façade– Standing Seam Metal RoofStanding Seam Metal Roof– Silo Entrance Incorporates Local Silo Entrance Incorporates Local

ArchitectureArchitecture

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 5: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Project Team & DeliveryProject Team & DeliveryProject Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 6: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Relevant Building SystemsRelevant Building Systems– Mechanical SystemMechanical System

4 AHU’s, 3 Energy Recovery Units4 AHU’s, 3 Energy Recovery Units

Metal Ductwork Intensive for Metal Ductwork Intensive for Large, Open SpacesLarge, Open Spaces

– Structural SystemStructural SystemStructural SteelStructural Steel

CIP ConcreteCIP Concrete

MasonryMasonry

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 7: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Page 8: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

ProblemProblem– Industry has tainted imageIndustry has tainted image– Uneven playing fieldUneven playing field– Poor social responsibilityPoor social responsibility

GoalsGoals– Define the need for ethics Define the need for ethics

trainingtraining– Develop training program for Develop training program for

industry and universitiesindustry and universities

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 9: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

MethodologyMethodology– Research the current methods Research the current methods

for ethics training in the industryfor ethics training in the industry– Develop and distribute ethical Develop and distribute ethical

need surveyneed survey– Identify top ethical Identify top ethical

transgressionstransgressions– Create training programCreate training program– Quantify results from exit surveyQuantify results from exit survey– Make necessary conclusionsMake necessary conclusions

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 10: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Initial ResearchInitial Research– Industry relies on codesIndustry relies on codes

CMAACMAA

ASCEASCE

– Companies do not trainCompanies do not trainExpectations when hiredExpectations when hired

– Survey resultsSurvey results

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 11: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 12: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Ethical transgressions definedEthical transgressions defined– Barbara Jackson, California Barbara Jackson, California

Polytechnic State UniversityPolytechnic State University– Surveyed industry membersSurveyed industry members– Rated the top 15 transgressions Rated the top 15 transgressions

based on frequency and severitybased on frequency and severity

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 13: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 14: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Construction Ethics ProgramConstruction Ethics Program– Program created in PowerPointProgram created in PowerPoint– Defines each transgressionDefines each transgression– Proposes solution to eachProposes solution to each– Situational quizzesSituational quizzes– Final ExamFinal Exam– Alternate ANGEL FormatAlternate ANGEL Format

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 15: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Quantifying Program ResultsQuantifying Program Results– Exit SurveyExit Survey

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 16: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Conclusions Conclusions – Construction Ethics Training Program Construction Ethics Training Program

is valid toolis valid tool– The program is better alt. to current The program is better alt. to current

ethical training methodsethical training methods– People will act more ethicallyPeople will act more ethically

RecommendationRecommendation– All companies and universities should All companies and universities should

use this tool to increase ethical use this tool to increase ethical practices in order to construct practices in order to construct buildings more ethicallybuildings more ethically

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 17: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

Analysis IIAnalysis IIFabric DuctFabric Duct

Page 18: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

ProblemProblem– Corrosive EnvironmentCorrosive Environment– Seasonal Ductwork SystemsSeasonal Ductwork Systems– Labor and Cost IntensiveLabor and Cost Intensive– Large Building LoadLarge Building Load

GoalsGoals– Reduce ScheduleReduce Schedule– Reduce CostReduce Cost– Increase Duct QualityIncrease Duct Quality

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 19: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

MethodologyMethodology– Complete takeoff of current Complete takeoff of current

system including cost and system including cost and durationduration

– Design fabric duct systemDesign fabric duct system– Determine cost and durationDetermine cost and duration– Analyze structural effectsAnalyze structural effects– Compare duct propertiesCompare duct properties– Conclusion & recommendationConclusion & recommendation

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 20: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Design ConsiderationsDesign Considerations– Air FlowAir Flow– DispersionDispersion– Fabric BreathabilityFabric Breathability

Comparison CriteriaComparison Criteria– CostCost– DurationDuration– Structure LoadStructure Load– Duct PropertiesDuct Properties

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 21: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

OutcomeOutcome– Single duct distribution systemSingle duct distribution system– Over $90,000 in savingsOver $90,000 in savings– Schedule savings of 35 daysSchedule savings of 35 days– Load/Ft reduced from 9 lbs/ft to less Load/Ft reduced from 9 lbs/ft to less

than 1lb/ftthan 1lb/ft– Duct propertiesDuct properties

Better air distributionBetter air distributionLess maintenanceLess maintenanceNot corrosiveNot corrosiveBetter air qualityBetter air quality

– Anti-MicrobialAnti-Microbial– No dust settlingNo dust settling

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 22: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

ConclusionConclusion– The fabric duct system is superior in The fabric duct system is superior in

every comparisonevery comparison

RecommendationsRecommendations– The fabric duct system should be The fabric duct system should be

installed over the double walled, spiral installed over the double walled, spiral aluminum ductwork in the aquatic aluminum ductwork in the aquatic spacesspaces

– Fabric duct should be considered in Fabric duct should be considered in all large, open layout spaces all large, open layout spaces

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 23: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

Page 24: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

ProblemProblem– Mixed system useMixed system use– Local site congestionLocal site congestion– Labor and cost intensiveLabor and cost intensive

GoalsGoals– Determine the best structural column Determine the best structural column

option in the aquatic spacesoption in the aquatic spaces– Reduce ScheduleReduce Schedule– Reduce CostReduce Cost

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 25: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

MethodologyMethodology– Determine building loadsDetermine building loads– Design steel columnDesign steel column– Design reinforced masonry Design reinforced masonry

pilasterpilaster– Conduct comparative analysisConduct comparative analysis– Conclusion & recommendationConclusion & recommendation

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 26: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Design ConsiderationsDesign Considerations– Loading requirementsLoading requirements– Space requirementsSpace requirements

Design ResultsDesign Results– W10x33 Steel MemberW10x33 Steel Member– 24”x24” reinforced pilaster24”x24” reinforced pilaster

Comparison CriteriaComparison Criteria– CostCost– ScheduleSchedule– ConstructabilityConstructability

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 27: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

OutcomeOutcome

Steel Savings=$60,045Steel Savings=$60,045

Steel Duration Savings= 18.6DaysSteel Duration Savings= 18.6Days

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 28: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Constructability OutcomeConstructability Outcome– CIP RequirementsCIP Requirements

FormworkFormwork

PumpPump

ScaffoldingScaffolding

– SteelSteelCraneCrane

– PilasterPilasterScaffoldingScaffolding

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 29: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

ConclusionsConclusions– The steel columns are less expensive, The steel columns are less expensive,

save time, and require no additional save time, and require no additional erection equipmenterection equipment

– The masonry pilaster is also a better The masonry pilaster is also a better alternativealternative

RecommendationRecommendation– The use of W10x33’s steel members The use of W10x33’s steel members

should be used as the columns that should be used as the columns that support the roof trusses in the aquatic support the roof trusses in the aquatic spaces of buildingspaces of building

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 30: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

ConclusionsConclusions

Page 31: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Construction EthicsConstruction Ethics– Definite need for ethical trainingDefinite need for ethical training– Effective method for developing ethics Effective method for developing ethics

in industry and universitiesin industry and universities

Fabric DuctFabric Duct– Fabric system is cheaper, faster to Fabric system is cheaper, faster to

install, lighter, and provides better install, lighter, and provides better propertiesproperties

Structural RedesignStructural Redesign– Steel system is cheaper, faster to Steel system is cheaper, faster to

install, and provides better install, and provides better constructabilityconstructability

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 32: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

AcknowledgmentsAcknowledgments– Penn State Department of Penn State Department of

Architectural EngineeringArchitectural Engineering– Forrester Construction CompanyForrester Construction Company– DuctSox Inc.DuctSox Inc.– Rickmond EngineeringRickmond Engineering– B2E Consulting EngineersB2E Consulting Engineers– Grimm and Parker ArchitectsGrimm and Parker Architects– AE StudentsAE Students

Special thanks to my family, Special thanks to my family, friends, and Katiefriends, and Katie

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A

Page 33: The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management

The Warrenton Aquatics andThe Warrenton Aquatics andRecreation FacilityRecreation Facility

Questions??Questions??

Project Project IntroductionIntroduction

Analysis IAnalysis IConstruction EthicsConstruction Ethics

Analysis IIAnalysis IIFabric DuctFabric Duct

Analysis IIIAnalysis IIIStructural RedesignStructural Redesign

ConclusionsConclusions

Q & AQ & A