companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_l-u1.pdf · the qatar fertilizer...

33
Company Vol. 02 OUR TOP PROJECTS 03

Upload: others

Post on 19-Mar-2020

16 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

Com

pany

Vol

. 02

OUR TOP PROJECTS

03

Page 2: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the
Page 3: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

TOP

PROJ

ECTS

AL

PHAB

ETIC

AL

ORDE

R

L-U

Page 4: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the
Page 5: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

LAGGAN TORMORE / NORTH SEA (UK) OFFSHORE

EPC CONTRACTOR: PETROFAC / END USER: TOTAL

LAGGAN AND TORMORE ARE TWO GAS AND CONDENSATE FIELDS SITUATED ABOUT 125 KM NORTH-WEST OF THE SHET-

LAND ISLANDS IN THE UK. THE LAGGAN AND TORMORE PROJECT INVOLVES THE DEVELOPMENT OF THE TWO FIELDS AND

CONSTRUCTION OF A GAS PROCESSING PLANT AND EXPORT PIPELINE. HERE, WATER DEPTHS DESCEND RAPIDLY FROM

AN AVERAGE OF 120 M TO 600 M AND BEYOND. IT IS A UNIQUELY CHALLENGING ENVIRONMENT IN WHICH TO OPERATE,

BUT ALSO ONE WITH GREAT POTENTIAL.

“We are delighted to work with Skema and the kind of support you extend to us in the critical

phase of the project.”

Senior Electrical Engineer

UNITEDKINGDOM

Ireland

France

Germany

Page 6: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: PETROFAC / END USER: TOTAL

The indoor distribution boards supplied for the project are

internal arc proof, have ESD functionality and IP31 de-

gree of protection. The outdoor distribution boards have

IP65 degree of protection.

All electrical details and requirements (short circuit, di-

electric, etc.) comply with IEC 61439.

“Good company. Good people. Good quality.”

Electrical Engineer

SOLUTIONS DELIVERED

SKEMA WAS AWARDED THE CONTRACT FOR THE DESIGN, ENGINEERING, MANUFACTURING, INSPECTION AND TESTING OF 81 INDOOR AND OUTDOOR DISTRIBUTION BOARDS.

Page 7: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

MOPUSTOR YME / NORWAYOFFSHORE

EPC CONTRACTOR: SBM-GUSTO MSC / END USER: TALISMAN ENERGY NORGE

THE PROJECT CONSISTS OF THE DEVELOPMENT OF A PRODUCTION UNIT FOR THE YME PROJECT. THE YME FIELD IS LO-

CATED IN THE EGERSUND BASIN IN THE NORTH SEA, APPROXIMATELY 110 KM OFFSHORE IN THE NORWEGIAN CONTINEN-

TAL SHELF. THE YME FIELD CONSISTS OF TWO MAIN RESERVOIRS, BETA AND GAMMA, WHICH ARE APPROXIMATELY 12 KM

APART. THE YME RE-DEVELOPMENT PROJECT IS BASED ON A MOPUSTOR, WHICH IS A MOBILE OFFSHORE PRODUCTION

UNIT WITH A SUBSEA STORAGE TANK. THE MOPUSTOR IS LOCATED IN AT THE GAMMA RESERVOIR WITH SURFACE COM-

PLETION OF THE GAMMA WELLS AND TIE BACK OF THE COMPLETED SUBSEA BETA WELLS.

NORWAY Finland

Sweden

Page 8: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: SBM-GUSTO MSC / END USER: TALISMAN ENERGY NORGE

SOLUTIONS DELIVERED

SKEMA WAS RESPONSIBLE FOR THE DESIGN, ENGINEERING, MANUFACTURING AND TESTING OF:

INTELLIGENT POWER MOTOR CONTROL CENTERS (62 COLUMNS, 283 DRAWERS)

The LV Switchgear supplied for the project complies with

the most stringent requirements for offshore marine ap-

plications: compact dimensions for limited space, han-

dles on the front of the Switchgear to prevent injury to

personnel in the event of sudden movements, shock-re-

sistant plinth.

“Skema’s performance in terms of the delivery of hard-ware and the submission of documents was excellent.

Particularly in relation to the close-out of the final doc-umentation (Manufacturing Record Books and Technical

Operating and Maintenance Manuals), Skema was an ex-ample to other suppliers. We would like to take this op-portunity to thank Skema for all their efforts in ensuring

a successful close-out of the purchase order.”

Project Expeditors

Page 9: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

RUSSIA

Kazakhstan

NIZHNEKAMSK REFINERY / RUSSIAONSHORE

END USER: TANECO

THE REFINING AND PETROCHEMICAL COMPLEX IN NIZHNEKAMSK, REPUBLIC OF TATARSTAN, 250 KM FROM THE CAPITAL

CITY OF KAZAN, IS ONE OF THE MOST AMBITIOUS OIL & GAS PROJECTS IN RUSSIA, WHICH DOUBLED THE REFINED CRUDE

RUN FROM ANNUAL 7 TO 14 MILLION TONS. THE REFINERY HAS AROMATICS UNITS AND A DEEP CONVERSION SECTION

WITH A FLUIDIZED CATALYTIC CRACKER, A DISTILLATE HYDROCRACKER, A DELAYED COKER, AND A GASIFICATION PLANT.

THE PETROCHEMICAL PLANT INCLUDES PURIFIED TEREPHTHALIC ACID, POLYETHYLENE TEREPHTHALATE, LINEAR ALKYLB-

ENZENE AND POLYPROPYLENE UNITS, PLUS THE ASSOCIATED POWER GENERATION FACILITIES.

Page 10: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

END USER: TANECO

Skema operates actively in Russia, supplying its prod-

ucts for use on projects in an array of different indus-

tries: Oil & Gas, petrochemical, energy and utilities, pro-

cessing and manufacturing.

SOLUTIONS DELIVERED

MOTOR CONTROL CENTERS (600 COLUMNS, 2,529 DRAWERS)

POWER CENTERS (124 COLUMNS)

DISTRIBUTION BOARDS “We have been very happy with the support Skema gave us in relation to every aspect of our operations. Skema’s

state-of-the-art products are very attractive to Russian design-engineering organizations and end users.

The high-level professional skills of Skema’s specialist team that conducts the training sessions is

particularly noteworthy”.

Managing Director

Page 11: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: BECHTEL / END USER: GASCO

THE $ 1.5 BILLION ONSHORE GAS DEVELOPMENT (OGD) III PROJECT INVOLVES THE EXPANSION OF THE PRODUCTION CA-

PACITY OF A MASSIVE GAS-PROCESSING PLANT IN HABSHAN, APPROXIMATELY 130 KM SOUTH-WEST OF ABU DHABI, IN

THE UNITED ARAB EMIRATES. THE HABSHAN COMPLEX IS ONE OF THE LARGEST GAS-PROCESSING PLANTS IN THE WORLD.

OGD III / UAE ONSHORE

IranIraq

Saudi Arabia

Yemen

Oman

UAEQatar

Kuwait

Page 12: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

“I appreciate all aspects of Skema’s performance, and in particular: your team’s efforts in turning around accurate en-gineering documentation in a timely fashion, Skema’s proactiveness

in dealing with third parties, Skema’s flexible and adaptable man-ufacturing approach to accommodate EBCL’s construction priori-

ties, and Skema’s swift clear communication with the OGD III Project team and the overall quality of Skema’s work product. Skema’s ap-

proach to the OGD III project has been most professional at all times and its high caliber performance has been noted.”

Project Director

INTEGRATED PROTECTION AND CONTROL SYSTEM (IPCS)

The IPCS is based on ICUs (Integrat-

ed Control Units) located in each sub-

station, which communicate with the

motor starters and the protection re-

lays, making all the information avail-

able for the operator workstations

and the redundant servers installed

in the Main Control Room, and op-

erate as a gateway with the DCS,

which sends commands and receives

feedback via the TCP/IP interface.

The IPCS created for the Gasco OGD

III project not only displays the status

and alarms of all the components of the

electrical network but also greatly as-

sists the operators in maintaining the

plant because it stores the parameter

settings of all the control units (both

motor managers and protection relays)

and compiles the sequence of events

and the disturbance waves recorded by

the protection relays in case of faults.

Page 13: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: BECHTEL / END USER: GASCO

The Intelligent LV Switchgear supplied for the project com-

plies with the most stringent requirements of the Oil & Gas

industry, the internationally recognized Shell DEP: inter-

nal-arc proof, IP 41 external protection, Form 4 separa-

tion, IP 4X internal protection, IP 20 protection when a

drawer has been removed from the assembly, secondary

PVC-insulated 600/1000 V grade wiring, stranded cop-

per conductors (minimum size 2.5 mm2), busbar insula-

tion 2kV AC 60 sec, distribution busbars (droppers) fully

segregated by insulated material, contactor and starter

units fully withdrawable, drawers which are mechanically

identical but electrically different are not interchangeable.

SOLUTIONS DELIVERED

INTELLIGENT 415 V SWITCHGEAR / MOTOR CONTROL CENTERS (378 COLUMNS, 1662 DRAWERS)

14 REMOTE TERMINAL UNITS

INTEGRATED PROTECTION AND CONTROL SYSTEM (IPCS)

Page 14: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

THE QATAR FERTILIZER COMPANY (QAFCO) SITE IS LOCATED ABOUT 40 KM SOUTH OF DOHA CITY AND 7 KM SOUTH OF

THE RESIDENTIAL AREA OF MESAIEED. THE PROJECT FACILITIES INCLUDE TWO AMMONIA PLANTS WITH A TOTAL DAI-

LY PRODUCTION CAPACITY OF 4,600 TONS AND A UREA PLANT WITH A DAILY PRODUCTION CAPACITY OF 3,850 TONS,

ALONG WITH OTHER SUPPORT UTILITIES. WITH THESE HUGE PRODUCTION CAPACITIES, QAFCO IS CONSIDERED TO BE

THE LARGEST AMMONIA AND UREA PROJECT ANYWHERE IN THE WORLD, AND ALSO THE MOST INVESTMENT-INTENSIVE.

QAFCO 5-6 / QATARONSHORE

EPC CONTRACTOR: SAIPEM / END USER: QAFCO

Saudi Arabia

Yemen

Oman

UAE

IranIraq

QATAR

Kuwait

Page 15: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

“We confirm your performance as excellent (Grade A).”

Head of Contracting & Procurement

INTELLIGENT PMCCs

The Intelligent Motor Control Centers

were equipped with an on-board touch-

screen operator interface to operate

the switchboards and compile data on

trends, alarms and event sequences.

This operator interface acts as a

gateway to the DCS (Distributed Con-

trol System) to allow the process con-

trol system to start/stop motors and

record the activation of alarms.

The PMCC switchboards were de-

signed to prevent any risk of a short

circuit and internal arc fault at 75 kA-

690 V for 0.3 seconds – to this end,

they were fully type-tested by an in-

dependent laboratory.

WATCH THE VIDEO!

Page 16: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

Skema was awarded the contract for the design, man-

ufacturing, inspection, testing and supervision of the

on-site commissioning of reliable, high-performance

Intelligent LV Switchgear.

SOLUTIONS DELIVERED

INTELLIGENT MOTOR CONTROL CENTERS (1,223 COLUMNS, 1,608 DRAWERS)

POWER CENTERS (193 COLUMNS)

DISTRIBUTION BOARDS (274 COLUMNS)

11 INTERFACE MONITORING SYSTEMS (IMS)

1.5 km = the total length of the Intelligent PMCC columns

supplied by Skema

EPC CONTRACTOR: SAIPEM / END USER: QAFCO

Page 17: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

IranIraq

Saudi Arabia

Yemen

Oman

UAEQatar

KuwaitSATAH FULL FIELD / UAEONSHORE

EPC CONTRACTOR: NPCC-TECHNIP CONSORTIUM / END USER: ZAKUM DEVELOPMENT COMPANY (ZADCO)

SATAH FULL FIELD IS LOCATED 200 KM NORTHWEST OF ABU DHABI, UNITED ARAB EMIRATES. THE SATAH FULL FIELD

DEVELOPMENT PROJECT’S OBJECTIVE IS TO MAXIMIZE CRUDE OIL PRODUCTION AND OIL RECOVERY BY REDUCING THE

WELL HEADS’ BACK PRESSURE AND INTRODUCING OF GAS INJECTION AND GAS LIFT FACILITIES. THE PROJECT SCOPE IN-

VOLVES OFFSHORE BROWNFIELD WORKS TO THE EXISTING WELL HEAD PLATFORMS AND PRODUCTION MANIFOLD PLAT-

FORM, INSTALLATION OF INFIELD PIPELINES, AS WELL AS MODIFICATIONS AND INSTALLATION OF NEW FACILITIES AT THE

ONSHORE SATAH PLANT AT ZIRKU ISLAND.

Page 18: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: NPCC-TECHNIP CONSORTIUM / END USER: ZAKUM DEVELOPMENT COMPANY (ZADCO)

Skema was awarded the contract for the design, manufac-

turing, inspection and testing of Power and Lighting Distri-

bution Boards and Lighting Panels (Safe Area) for the on-

shore portion of the project. The Distribution Boards supplied

for the project are for both indoor and outdoor usage; they

have IP42 degree of protection, meet special requirements

for saline environments and are equipped with a very large

number of cables.

SOLUTIONS DELIVERED

POWER MOTOR CONTROL CENTERS (18 COLUMNS)

DISTRIBUTION BOARDS (12 COLUMNS)

CABLE BOXES AND GLANDS

Page 19: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

GEORGIA

AZERBAIJAN

Caspian Sea

Turkey

IranIraq

Syria

Black Sea

THE EXISTING SOUTH CAUCASUS PIPELINE EXPORTS GAS FROM THE CASPIAN SEA SHAH DENIZ FIELD STARTING

FROM THE SANGACHAL TERMINAL (NEAR BAKU, AZERBAIJAN) THROUGH GEORGIA UP TO THE TURKISH BORDER. THE

690-KILOMETER PIPELINE INCLUDES A 442-KILOMETER SECTION IN AZERBAIJAN AND A 248-KILOMETER SECTION

IN GEORGIA. THE EXPANSION OF THE SOUTH CAUCASUS PIPELINE INVOLVES THE LAYING OF NEW PIPELINE ACROSS

AZERBAIJAN AND THE CONSTRUCTION OF TWO NEW COMPRESSOR STATIONS IN GEORGIA. THIS TRIPLES THE GAS

VOLUMES EXPORTED THROUGH THE PIPELINE TO OVER 20 BILLION CUBIC METERS PER YEAR.

SCP EXPANSION / AZERBAIJAN AND GEORGIA ONSHORE

EPC CONTRACTOR: CB&I / END USER: SOUTH CAUCASUS PIPELINE COMPANY / A JV BETWEEN: BP (OPERATOR), STATOIL, TOTAL, LUKOIL, NICO, TPAO, SOCAR

Page 20: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

MV AND LV SWITCHGEAR

Skema’s Intelligent Power Motor Con-

trol Centers were designed to deal with

seismic loads at the following levels:

> Earthquake-proof construction:

Zone 4

> Peak Horizontal Ground

Acceleration: 0.83g

> Peak Vertical Ground

Acceleration: 0.59g

> Seismic Design Code:

ASCE 7/IBC 2000

The robustness of the modules was

tested in relation to the following

structural aspects:

> Resistance and stability for

individual modules

> Ground anchors

> Links between modules (bolts)

> Internal links to modules (rives)

In addition, Skema’s Switchgear was

successfully tested for seismic loads in

compliance with IEC 60068-3-3 (1 g).

The incomers, the bus-ties and the ACB

feeders of the PMCCs and the cells of

the MV switchgear are equipped with

protection relays configured accord-

ing to the IEC 61850 communica-

tion protocol. Goose signals are used

by the PMCCs to exchange informa-

tion, and by the MV cells to exchange

information and provide protection.

Page 21: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

PACKAGED SUBSTATION

Skema supplied for the Project a 400V

Modular Primary Substation, a pre-

fabricated, modular enclosure inclu-

sive of all external appurtenances and

walkways, access ways and stairways.

The Packaged Substation is designed

for extreme outdoor conditions (-34°C

/+38°C) and incorporates the require-

ments for seismic, wind, snow and ice

loading, elevated at a typical 1,800

mm to underside of steel above site

grade on a steel support frame.

The Packaged Substation is composed

of two Modules:

> The Modular Primary Substation

(32,000 mm (L) x 4,000 mm (W)

x 3,500 mm (H) - weight 71,790

kg), designed to house MV 10kV

Switchgear, a 10/0.42 kV Trans-

former, LV electrical switchgear,

Motor Control Centers, CDAS and

PMS cabinets and LV distribution

boards

> The HVAC module (dimensions =

8,000 mm (L) x 4,000 mm (W) x

3,500 mm (H) - weight 19,000 kg),

used for conditioning and pressur-

ization of the substation

HVAC SYSTEM

The HVAC system consists of 2 pack-

aged air conditioning units suitable

for overpressure, cooling and heat-

ing control during summer and winter

conditions. The 2 redundant automat-

ic units (1 duty, 1 standby) are capa-

ble also of automatic changeover with

programmable timetable and a manu-

al mode is available for maintenance.

The units are installed indoor on a

dedicated Module adjacent to the

substation building and provide sup-

ply and recirculate air flow from/to

the electrical room.

The transformer room is provided

with 2 exhaust fans (1 duty, 1 stand-

by) and fresh air intake. A temper-

ature transmitter will be monitoring

the room temperature which will be

kept within the design limits through

the duty fan started by the HVAC Lo-

cal Control Panel. When the fans are

not operating, a non-return damper

isolates the indoor from the outdoor.

A static electric heater in the trans-

former room keeps the room at +5°C

during winter, in case the transform-

er is not running.

The fresh air intake for the HVAC

units and the transformer room has

been installed on the roof of the

HVAC module and of the substa-

tion, and it has been realized with

materials, dimensions and weld-

ing length suitable to prevent any

gas from entering the substation.

The constant overpressure of the

building prevents entry of any airborne

contaminants that should be present

outdoor, and the filters included in the

HVAC packaged units ensure suitable

indoor ambient conditions.

FIRE & GAS SYSTEM

The Fire & Gas System has been de-

signed to prevent the presence of gas

and fire (by means of detectors) inside

the substation.

“The construction site manager has asked us to thank Skema for the way in which you have shipped and provided packing and as-sembly documentation for the Modular Sup-

port Frame. The site team were impressed with the individual marking of each piece of

the frame, identifying the container it is in and where it is located within it. The level

of detail Skema has provided has simplified the site assembly of the sub-frame and is

much appreciated.”

Procurement, Engineering & Construction

Page 22: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

Skema acted as an EPC contractor for the solutions de-

livered, managing, coordinating and monitoring every

aspect of the project: detailed design, project manage-

ment, scheduling, procurement and expediting, QA/HSE

management, documentation, fabrication, all multidisci-

plinary installation activities (architectural, mechanical,

E&I, HVAC, etc.), and testing and pre-commissioning at

Skema’s facilities.

SOLUTIONS DELIVERED

PACKAGED SUBSTATION

MV 10 KV SWITCHGEAR (81 COLUMNS)

INTELLIGENT POWER MOTOR CONTROL CENTERS (409 COLUMNS, 1,201 DRAWERS)

DISTRIBUTION BOARDS (4 COLUMNS)

26 LOCAL CONTROL PANELS

EPC CONTRACTOR: CB&I / END USER: SOUTH CAUCASUS PIPELINE COMPANY / A JV BETWEEN: BP (OPERATOR), STATOIL, TOTAL, LUKOIL, NICO, TPAO, SOCAR

Page 23: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

TENGIZ FIELD (TENGIZ IS KAZAKH FOR “SEA”), IN WESTERN KAZAKHSTAN, IS LOCATED IN THE LOW-LYING WETLANDS

ALONG THE NORTHEAST SHORES OF THE CASPIAN SEA AND IS ONE OF THE BIGGEST OIL FIELDS IN THE WORLD. DIS-

COVERED IN 1979, TENGIZ CONTAINS 24 BILLION BARRELS OF HIGH QUALITY OIL AND SIX TO NINE BILLION BAR-

RELS (1 KM³ AND 1.4 KM³) OF RECOVERABLE OIL. IT IS DEEP, HAVING A TARGET DEPTH OF 4,500 M. IT ALSO CON-

TAINS SIGNIFICANT GAS RESERVES (18,000 BILLION M3). THE PROCESSING PLANT IS MADE UP OF BUILDING BLOCKS.

TENGIZ / KAZAKHSTAN ONSHORE /

END USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAIGAZ / LUKARCO

Page 24: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

FIELD SUBSTATION REPLACEMENT

The Field Substation Replacement

Project aims to upgrade and ration-

alize the existing Field Power Supply

System by replacing 6 existing field

substations with 3 new substations.

SOLUTIONS DELIVERED

Skema was awarded the contract for

the design, manufacturing, inspec-

tion and testing of HV switchboards

and Remote Terminal Units (RTUs):

> 3 35 kV, 1250 A, gas insulated

switchboards (26 columns)

> 3 6 kV, 1250 A, 20 kA, 1 sec., air in-

sulated switchgear units (74 Columns)

> 4 redundant RTUs (10 columns)

and Electrical Control Systems -

based on PLC

> Switchgear continuous thermal

monitoring solution

> Arc fault protection system

Page 25: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

INTEGRATED PROTECTION AND

CONTROL SYSTEM

The Integrated Protection and Con-

trol System (IPCS) for the project

was designed to monitor and con-

trol HV and LV switchgear located in-

side the different packaged Substa-

tions (North, South and West). Each

packaged substation is equipped

with a redundant Interface Con-

trol Unit (ICU) controlling 33 kV and

6.6 kV Switchgear with protocol IEC-

61850, Low Voltage Switchgear and

other utilities (HVAC, UPS, F&G) via

Modbus and hardwired interfaces.

A SCADA system is installed in the

Field Control Room to control and

supervise the electrical network.

Every substation is also equipped

with 4 video cameras and a vocal

communication system. This allows

to control the unattended substa-

tions (both through cabled alarms

and alarms generated by the vid-

eo cameras registering unexpect-

ed movements), and to commu-

nicate with the operators, giving

them directions. Data are record-

ed and are available in real time

for an Asset Lifet ime Manage-

ment System (maintenance and

energy ef f ic iency management

of the plant and its components).

SWITCHGEAR CONTINUOUS

THERMAL MONITORING SOLUTION

Skema provided TCO with Ex-

ertherm™, a continuous thermal mon-

itoring solution which allows to moni-

tor, in real time, the thermal health and

status of key bus bar joints and criti-

cal cable connections. This is achieved

by installing small plastic, non-con-

tact, non-powered, lifetime calibrat-

ed infrared and cable sensors within

the main electrical panels supplied.

This solution provides numerous tan-

gible benefits over traditional period-

ic scans, including greatly increased

levels of safety and integrity protec-

tion and reliability assurance through-

out the lifecycle of the electrical pan-

els. The integrity protection was further

enhanced by utilising a Load-Map™

software module which enables TCO to

dynamically adjust the thermal alarm

levels applicable to the load on the cir-

cuit being monitored, which provided

TCO with a level of integrity protec-

tion even at lower utilized load levels.

ARC FAULT PROTECTION SYSTEM

The 6 kV switchgear supplied for the

project has been equipped with a REA

arc fault protection system, which can

operate as a stand-alone device or in

combination with other modules, like

the REF relays. The REA arc fault pro-

tection system function is based on de-

tecting the intense light of an electric

arc, alone or on a detection of light and

simultaneous phase or neutral over-

current. On detection of an arc fault,

the REA protection system delivers

trip commands in less than 2.5 ms to

all circuit breakers that feed the fault

zone. Furthermore, the system oper-

ation indicators help localizing faults

by selectively guiding the maintenance

staff to the fault zone, that was identi-

fied by the arc fault protection system.

The REA module supplied for the project

features: two high-speed, galvanically

isolated, insulated gate bipolar tran-

sistor (IGBT) outputs (HSO1 and HSO2)

for CB tripping purposes; it offers one

heavy-duty relay output (TRIP3) to be

used, for example, as a circuit-breaker

failure protection (CBFP) output for an

upstream circuit-breaker, or as an alarm

output; it features an adjustable three-

phase overcurrent or two-phase and

neutral overcurrent condition monitor-

ing function, which enhances the relia-

bility of the arc fault detection by elim-

inating unwanted CB tripping caused

by light not related to any arc fault,

e.g. flash light used in photography.

Page 26: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

END USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAIGAZ / LUKARCO

Skema supplied products and solutions to the Tengiz

field, and specifically for the Central Power Station, the

Central Distribution Substation, for KTL 1 and KTL

2 Load Relief Substations, Sulfur Forming, Train 2.3

Power Station Upgrade, Plant Nitrogen System, and the

Kulsary Rip Sea Rail Yard.

SOLUTIONS DELIVERED

MV 10/35 KV SWITCHGEAR (183 COLUMNS)

INTELLIGENT POWER MOTOR CONTROL CENTERS (190 COLUMNS, 782 DRAWERS)

4 REMOTE TERMINAL UNITS

DISTRIBUTION BOARDS (218 COLUMNS)

INTEGRATED PROTECTION AND CONTROL SYSTEM (IPCS)

Page 27: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: SAIPEM / END USER: STAATSOLIE MAATSCHAPPIJ SURINAME

THE STAATSOLIE MAATSCHAPPIJ SURINAME N.V. IS LOCATED IN SURINAME, NEAR PARAMARIBO, IN THE WANICA DISTRICT.

THE PROJECT IS A MAJOR EXPANSION TO THE EXISTING REFINERY, AND THE OBJECTIVE IS TO INCREASE THE CRUDE CA-

PACITY AT THE FACILITY TO 15,000 BARRELS PER DAY. ELECTRICAL LOADS FOR THE ABOVE UNITS SHALL BE FED FROM

THE NEW ELECTRICAL SUBSTATION IN THE L-01 PLANT.

TOUT LUI FAUT REFINERY / SURINAME ONSHORE

SURINAME

Brazil

Bolivia

Paraguay

GuyanaFrench Guiana

Page 28: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

“I would like to express my complete satisfaction for the activities performed by you during the engineering and

construction of equipment.”

Field Electrical Engineer

“It was really a great pleasure to work and deal with Skema as a switchgear supplier for the refinery project. I was well impressed with the quality of the products delivered by Skema (medium and low voltage switchgear). The technical

support and assistance in resolving the issues during commissioning stage was very good. I can recommend Skema as a professional company offering very good quality products.”

Commissioning Engineer

LV SWITCHGEAR /

INTELLIGENT MCCs

The Low Voltage Switchgear and In-

telligent MCCs supplied for the pro-

ject are equipped with smart relays

that communicate with the ECMS us-

ing the IEC 61850 Protocol, which

affords a number of benefits, such as

interoperability between all the de-

vices in the substations regardless

of the manufacturer, and free allo-

cation of real functions on all levels,

allowing for the construction of flex-

ible and open, yet tailored, solutions

that are future-proofed to deal with

upcoming advances in communica-

tion technology.

The IEC 61850 standard provides

long-term validity through the di-

viding of applications and commu-

nications, and support throughout

the life cycle thanks to the intro-

duction of a standardized substa-

tion configuration language (SCL).

The result is an appreciable reduc-

tion in costs for the secondary system

over its life cycle. The LV bus duct is of

the compact type with copper lines; it

provides a complete solution for con-

nections between power stations and

transformers and the main panel board.

LV switchgear features:

> 13 Incomers REF 615

> 5 bus-tie REF 630

> 352 LTMR motor managers

MV SWITCHGEAR

The Medium Voltage switchgear for the

project is equipped with a metal enclo-

sure suitable for indoor installations.

Since the switchgear is highly modular,

the selection of components required

by any application is very simple.

The switchgear’s functional units are

guaranteed arc-proof in accordance

with IEC 62271-200 Standards, ap-

pendix AA, class A accessibility, crite-

ria 1 to 5. All the installation, operation

and maintenance operations can be

carried out from the front of the unit.

The switchgear and earthing switches

are operated from the front, with the

door closed. The communication pro-

tocol for the MV protection relays is IEC

61850, as it is for the LV switchgear.

MV switchgear features:

> Rated current 1250 A

> 1 REF 630

(used for protection and ATS)

> 17 REF 615

Page 29: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: SAIPEM / END USER: STAATSOLIE MAATSCHAPPIJ SURINAME

Skema was awarded the contract for the design,

manufacturing, inspection and testing of the MV and

LV Switchboards and the Electrical Integrated Control

and Monitoring System. The ECMS is based on a redun-

dant RTU which operates as a gateway between the elec-

trical users and the DCS. The DCS controls all the pro-

cess motors via a redundant Ethernet link over Modbus/

TCP; the motor activation time is shorter than 200 ms,

while the total loop response time is shorter than 400 ms.

SOLUTIONS DELIVERED

INTELLIGENT POWER MOTOR CONTROL CENTERS (109 COLUMNS, 461 STARTERS)

8 BUS DUCT LINES 3200 A

MV 6 KV SWITCHGEAR (24 COLUMNS)

MV 12.3 KV SWITCHGEAR (35 COLUMNS)

3 REMOTE TERMINAL UNITS

ECMS SYSTEM“The support at site is always very good, by dedi-

cated and highly skilled service engineers.”

Project Engineer

Page 30: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

ALGERIA

Morocco

Western Sahara

Lybia

Tunisia

Mauritania

UTBS / ALGERIAONSHORE

EPC CONTRACTOR: SAIPEM / END USER: SONATRACH

THE UTBS (UNITÉ DE TRAITEMENT DE BRUT À HASSI MESSAOUD) CONSISTS OF THREE IDENTICAL TREATMENT TRAINS, EACH

WITH CAPACITY OF 100,000 BARRELS PER DAY, FOUR 50,000 M3 PRODUCT STORAGE VATS, TWO AERIAL ELECTRIC LINES

OF 30 KV, A STATION OF 30 KV AND 45 KM PIPELINES TRANSPORTING OIL, WATER AND GAS. THE PROJECT, WHICH AIMS

TO IMPROVE CRUDE OIL QUALITY AND PRODUCTION RATES, SIGNIFICANTLY CONTRIBUTES TO SONATRACH’S HASSI MES-

SAOUD FIELD OPTIMIZATION PRODUCTION PROGRAM, GIVEN THE EXTENT OF THE FIELD’S RESERVES, THEIR QUALITY AND

THEIR COMPLEXITY. THE FACILITY IS DESIGNED TO TREAT AND TRANSPORT CRUDE OIL FROM SIX FIELDS SOUTH OF THE

MAIN FIELD TO A STORAGE CENTER AT HAOUD EL HAMRA. HASSI MESSAOUD IS ALGERIA’S OLDEST AND LARGEST FIELD.

Page 31: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

EPC CONTRACTOR: SAIPEM / END USER: SONATRACH

Skema was awarded the contract for the design, engineer-

ing, manufacturing, supply, inspection, testing and ons-

ite commissioning of LV Switchgear and Bus Ducts for the

UTBS Project.

SOLUTIONS DELIVERED

MOTOR CONTROL CENTERS (63 COLUMNS, 279 DRAWERS)

POWER CENTERS (11 COLUMNS)

DISTRIBUTION BOARDS (5 COLUMNS)

BUS DUCTS

Page 32: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the
Page 33: Companypressrelease.skemaq.it/wp-content/uploads/2017/07/vol3_L-U1.pdf · the qatar fertilizer company (qafco) site is located about 40 km south of doha city and 7 km south of the

www.skemaq.it