The Obeya System and Hoshin Kanri at Toyota
2
Does Everyone Understand the Direction and Priorities?
Does everyone understand this system of aligning their goals with the company?
3
Probably Not!
4
What is Hoshin Kanri?
5
Ideal Work Environment for Enterprise Excellence
One Voice Leadership
Clear Roles
Engaged Staff
Abnormality ManagementContain
Chronic Problems
Problem Solving Process
Standard Processes
1 2 3 4
PRODUCT
GOAL
Highest
Customer
Satisfaction
Challenge a better way
Leader
Board
6
Hoshin Planning Seeks to Align Resources and
Insure Unity of Effort
After Hoshin Kanri
Company Planning with PDCA
7
Key Points
1. What is Hoshin Kanri?
2. Points of each step in Deploying Hoshin Kanri
1. Hoshin Establishment and Deployment
2. Hoshin Checks
3. Actions
3. Associate’s Role in Hoshin Kanri
4. Hoshin Kanri Process Simulation (Activity)
5. Summary
8
Hoshin is Management Kaizen for BREAKTHROUGH
9
Hoshin Breakthrough Vision: Bring Lexus to Kentucky!
10
Overview of Toyota’s Hoshin Process
One Voice LeadershipExecutive and Senior Leaders must align their Hoshin plans before
deployment through the organization to ensure consistency of direction
11
Hoshin Kanri Requires One Voice Leadership
Principles
Behaviors
One Voice Leadership
Processes & Tools
Methodology
Engaged Staff
Continuous Improvement
Consistent Principles Applied Via Every Day Behaviors
12
Toyota’s Thinking on the Role of Leaders
Customers
Product
The person in the process is in the best position to improve the process
From To This… This…
Customers Product
Partners
Stakeholders
‘You do not work for me; I work for you!’ Chairman Fujio Cho to TMMK Team
Company
13
The Hoshin Process
• Long term goals are achieved via a series of 12-month plans
• The Annual Hoshin process reviews the long term goals, adjusts as needed, then sets the next actionable 12 month plan
12 Month Plan
14
Total Problem Solving Culture
Management led
Problem Solving
Operations Problem Solving(Staff)
Hoshin(Long Term
Strategy
and Plans)Top
Management
Challenge
Breakthrough
Improvements
15
Hoshin Kanri System – Annual Hoshin System
(Activities/Targets)
Hoshin of
Dept. A
Hoshin of
Dept. B
Hoshin of
Dept. C
Company Vision and
mid to long-term
management plan etc.
Company
Hoshin(Activities/Targets)
Hoshin of
Group 2
Hoshin of
Group 3
Hoshin of
Group1
(Activities/Targets)
Individual
Theme
Individual
Theme
Individual
Theme
16
Direction/Activities & Targets
Company
Group
Individual
Department
Company Hoshin
Department
Hoshin
Individual Priorities
Direction/Activities & Targets
Direction/Activities & Targets
Direction/Activities & Targets
Implementation Plan
Catchball
Hoshin Must Incorporate “Catchball” back and forth
between the levels?
17
How is Hoshin Different?
←Achie
vem
ent /
Corp
ora
te
Constitu
tion L
evel
Time→Now Achievement Date
Line representing what
Daily Operations /Work
Kaizen can achieve
Gap (Setting Type Problems)
Reform line that is written from
corporate needs
Hoshin Kanri
Bridges the Gap
18
Hoshin Kanri Process
BUSINESS
ASSESSMENT
ESTABLISH
HOSHIN
DIRECTION
DEVELOP
THE
HOSHIN
IMPLEMENT
THE
HOSHIN
ACHIEVE
RESULTS
I
II
IIIIV
V
19
Hoshin Kanri Flow
Company
Hoshin
Hoshin of
Dept. BHoshin of
Group 2
(Activities/Targets) (Activities/Targets)
Individual
Theme
Individual
Theme
(Activities/Targets)
Hoshin of
Group1Hoshin of
Dept. A
PLAN
Hoshin Strategies
and Deployment
Check Implementation of Hoshin Check(Mid term , end of term , etc.)
DO Implementation of Hoshin
P
D
C
A
P
D
C
A
P
D
C
A
P
D
C
AP
D
C
AP
D
C
A
PD
CA
PD
CA
PD
CA
PD
CA
PD
CA
Act Standardization and Reflection on Hoshin for the Following Year
20
Toyoda Precepts - Basic Philosophy - Five Values
Hoshin in each division & department
Annual President
Policy
Activity / Implementation Check:
Department, Section, Group
Midterm VisionDesign and Goal of Business Model
as a whole Company
Following up:Division General Manager Check⇒President Check
Environmental
ChangeBusiness
Task
Half Year
Monthly, Weekly, Daily
Annual
Annual
3-5 Year
Continuous
Hoshin Management Flow and Timeline for Planning
and Review
21
Grasping the Current Situation during Problem Identification
Dept.
Hoshin
Candidate
Kaizen issues
(from Workplace
Management
review)
Departmentmission
Department vision(with mid-longterm issues,plans)
Environmentalchanges /forecast (withbenchmarks)
Topmanagementthinking
Review result of previous year
22
Recognize
Strengths,
Weakness,
Opportunities and
Threats
Determine the
Current State of
Performance
against Objectives
Define the
Required and/or
Desired State
(Future State
Objective)
Envision Your Ideal
State
Select and
Prioritize
Breakthrough
Objectives
And Targets
Create Flight Plan
and Allocate
Resources; Define
Priorities of
Support
Create a Deployment
Plan
Chain of
Responsibility and
Communication
Loop
Define how you
will Manage the
Progress of the
Plan
Annual Review:
Reflection and
Learning Points
Review Plan
Progress
Mid-year
Quarterly
Monthly
Confirm and
Implement Plan:
A3 Report
How will you
Check?
23
SWOT Analysis of Hoshin Missions
S-O: Pursue opportunities
that are a good fit to your
strengths
W-O: Overcome
weaknesses to pursue
opportunities
S-T: Identify ways to use
strengths to reduce
vulnerability
W-T: Establish a defensive
plan to minimize threats
24
Critical Annual Priorities
• Which processes will be impacted by the Critical Few?
• What will be changed in these processes to achieve the goals?
Business Process
Business Process
CAP
CAP
CAP
Breakthrough Objective
25
Now, It’s Your
Turn
26
Example of Hoshin Breakdown
Maximize Effectiveness
of TPS & TQMPresident
Executive
Dept.
Manager
Target
Direction/
Activity Target=
TargetDirection/
Activity
Improve Kaizen Activity
Improve Employee Ability
Group
Leader = TargetDirection/
Activity
Direction/
ActivityMember
Level-up Employee Training
1. Conduct Needs Assessment
2. Identify Skill Gap
3. Develop Training
4. Conduct Training
etc..
27
Setting Hoshin Items
Expressions that are easily understood are used for
specific procedures.
(1) Why “Purpose”
(2) What “Target Problem”
(3) How “Method”
Note:Do not use ambiguous expressions.
NG: Enhance the education curriculum for different ranks.
Example
OK: Promote the internalization of shared values (why), by
reviewing the education curriculum for different levels
(what) based on trainee and management needs (how).
28
Setting Hoshin Targets
When Issues are solved, exactly how things will be changed should be clarified.(1) What “Evaluation Standard
/Performance Indicator”
(2) How Much “Target Level”
(3) When “Deadline for Accomplishment”
Perspective on Setting Targets
Review
education
curriculum in
order to share
values
Issues
A.Amount Reviewed
B. Trainee Eval.
C.Manager Eval.
Evaluation Standard
A.% of Courses Reviewed
B. Trainee Survey Eval. Score
C.Manager Survey Eval. Score
Performance Indicators
Example of What:
29
What Should You Measure? Only the Most Important
1. Define what must we improve Voice of the Business: What must we improve for our stakeholders and shareholders?
Are we part of the growth plan for the organization?
Voice of the External Customer: If we had your Top 5 Customers here, right now, what would they say you need to improve to gain more of their business? How would they measure these improvements?
Voice of our Operation: People, Processes, Performance?
2. Set Targets “State what you really need to accomplish without prejudice”
3. Prioritize Measures: Top Five/Hot Five:
“If you fail these measures, will you will be fired?”
-Takashi Tanaka
4. Catch-ball – Determine who will lead. Ask: How can we? What can we do?
5. Check alignment: Tie in Company Hoshin to Plant Hoshin to Shop-floor
Hoshin: Set SQDCP-HRD KPI
6. Manage Progress: How will you check and mentor? How often?
30
Hoshin Planning
WHAT :
Target Problem
WHERE :
Which departments
WHAT : Evaluation Standard
/Performance Indicators
HOW MUCH : Target Level
WHEN :
Deadline for Accomplishment
Targ
ets
WHY :
Purposes
WHO :
Person
ResponsibleWHEN :
Implementation Plan
HOW :
Measure/Method
Hosh
in Ite
ms
Hoshin
Plan
31
Example of a Hoshin Plan
32
EX. Hoshin A3 to Improve Productivity for Mold Dept.
33
Direction/Activities & Targets
Company
Group
Individual
Department
Company Hoshin
Department
Hoshin
Individual Priorities
Direction/Activities & Targets
Direction/Activities & Targets
Direction/Activities & Targets
Implementation Plan
Catchball
Hoshin Must Incorporate “Catchball” back and forth
between the levels?
34
Beware of “Tunnel” Management
Company Hoshin
Department Hoshin
Group Hoshin
IndividualHuman
DevelopmentHuman
Development
Human Development
There is a danger that orders will just be
passed on down the line without any idea
for specific actions.
35
The Purpose of Hoshin Checks
Purposes of Checks:
To turn over the Kanri Wheel (PDCA)
Make Corrections on the Implementation Plan for each Theme and Set New Action Plan.
Grasp Kaizen Issues at the Management level that include Establishment of Hoshin and Deployment Methods
Check Points:
Check not only results, but also processes.
Check not only implementation processes for each theme, but also Workplace Management processes.
36
Rapidly Turning Over The Check Cycle
Check Results
Rapidly turning over the check cycle and immediately taking Action is Important
Check results on Monthly,
Quarterly, Half Yearly, Yearly for
company and department
+
・Grasping the gap between the daily plan and actual performance
・Analyzing the gap causes and clarification of actions to be taken the
following day
Process Management (Action)
Day Week
Company
Department ○
Group ○ ○
Individual ○ ○
Month6
monthsYear
○ ○ ○
○
○
○
37
Visual Management for Hoshin Check
Visualization of progress
situation
Awareness sharing of
issues
Quick
action
Example of Visual
Management
1. Numerical
presentation
2. Numerical data
compiled into
graphs.
3. Qualitative data
color coded and
progress
evaluated
0
20
40
60
Jan. Feb. Mar. Apr.
Number of widgets produced
Progress study start check confirm delay
Sticker ● ● ● ● ●
Theme PIC April May June
Multi-processing
through the
creation of
widget pro-
cessing jig
Tim
● ● ●
38
Hoshin Evaluation Format
39
Example of Hoshin Plan
40
Ex. Department Hoshin in Support of Company Hoshin
41
Things to Keep in Mind about Actions
Check
Satisfied Points
Standardization
Unsatisfied Points
Recurrence Prevention
and further Kaizens
Action
Hoshin
Implementation (Do)
Hoshin
Establishment and
Deployment (Plan)
42
Orientation
• Carry on in principle;
standardize highly effective
processes and
• Review target setting method and
resource allocation method
• Review current methods• Review the importance of theme
• Standardize processes and
transition to daily operation
• Bring out issues to achieve an even
higher target level
Strategy Implementation LevelHighLow
Targ
et A
chie
vem
ent L
evel
Low
Hig
h
• Review activities
• Target Setting Review
43
The Hoshin Distillation Process
Define 25% Market
Space
Understand VOC
What Constitutes
Breakthrough?
Define Competitors
Understand
Strengths &
Weaknesses
THE CRITICAL FEW!
Critical Objective #1
Critical Objective #2
Critical Objective #3
Critical Objective #4
Critical Objective #5Idea
Focus!
Owner: Date: Feb 12, 2009
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
a. Reduce # of I/B status calls by 35%.
b. Reduce I/B work content by 25%.
c. Reduce abandonment rate by __%.
Start Target
Week of:
EDM, payment and ISO work content reduction will be pursued as part of the 60 day quality "Blitz." See relevant A3 report
for detail.
6. Countermeasures/Plan
7. Effects Confirmation
8. Follow-up Action
2. Background
1. Theme: Westborough capacity is constrained due to seasonal and weekly demand variation and the related work
content. Inbound status calls comprise a significant portion of total claim work content.
Expansion from single pilot cell to eight additional cells within Westborough operations (initial deployment) was conducted
during October and November (pre-Thanksgiving). Post-Thanksgiving weather driven claim volume, combined with
seasonal FTO requirements and learning curve challenges, as well as the addition of FNOL demand (previously handled
within the call centers) have generated capacity issues. The overcapacity situation has generated increased status calls thus
further straining resources and resulting in high abandonment rates.
3. Current Condition
5. Root Cause Analysis (Inbound Status Calls)
4. Target
WhoWhat
I/B Callers
51%
24%
14%
7% 4%
Insured Shop Claimant
3P Carrier Rental Co.
I/B Call Distribution19%
15%
14%12%
11%
6%
6%
5%4%
4% 4%
Other App Sched/ReschedPmt Info Rental IssueLiab Decision App IssuesSupplement Status/Next StepsPolicy Info SettlementFirst Call
Daily Demand Variation
& Staffing Surplus/(Shortfall)
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
Monday Tuesday Wednesday Thursday Friday
% FNOLs % I/B Status Calls
Average Work Content/Claim
0 5 10 15 20
FNOL
I/B
Outbound Calls
EXT In Calls
COA
Payments
EDM's
ISO
@3.4 I/B per FNOL
Include:
DTP, appraisal kaizen, supplements
kaizen, etc.
A3
A3 Diagram
Idea
Idea
Idea
Idea
Idea
44
Key Elements of Hoshin Deployment
Vision
3-5 Year
Breakthrough
Objectives
Critical
Projects/
Activities
Annual
Improvement
Priorities
Deploy
Throughout
Organization
Implement
Disciplined
Monthly
Review
Annual
Review
Lean Tools
Critical to Success!
Top Level Planning
Team Development& Ownership
45
Deploying Policies at Toyota
45
CEO/COO
Mgmt “Councils”
Division
Plant
Department or Section
Work Group or Team Members
Policy
Policy Policy
Policy Policy Policy
A3 strategies
Action plans
Five-year & Annual corporate policies
People, Cost, NPD, Quality etc.
200+ Divisions
PD
AC
PD
AC
PD
AC
PD
AC
46
Catch Ball Process Steps
• Level II
• Review Level III A3’s, matrices, and bowling charts
• Modify/refine level III and II documents
• Approve red-yellow-green
• conditions for each project
• Level I
• Review Level II A3’s and matrices
• Modify/refine level II and I documents
• Create visual “Line of Site” charts for each Level III and integrate into management standard work
47
Line of Site Exercise
Plant Business Plan
Department Business Plan
Section KPI’s and Standards
Individual Responsibilities
Think of your responsibilities in this upward cascade.
Your direct responsibility is your cost center or section, which supports your department, which supports the Plant Business Plan.
Are you aligning your responsibilities properly?
In other words is what your doing on a daily basis “value added” to the company’s goals?
You must establish and share the direction you are heading in!
Without a plan we keep covering old territory!
Company Plan –Values and Principles
KPI=Key Performance Indicators' – S, Q,D C,
HRD
MACRO vs. MICROPDCA Thinking–What does that
mean?
Micro Level – You!
Macro Level – Company
48
Summary of Hoshin Activity
Vision and Strategy of Company
Activation of workplaces,
Human Resource Development
Daily Management
Hoshin Kanri
Top’s will is permeated
throughout the company
Positioning and the role
of the business
in their charge of
each post become
clear.
・The quality of business and the level of management are
improved and then human resource are developed.
・Workplaces are activated by good communication.
By PDCA being cultured, important problems are solved & business objectives can be attained certainly & effectively.
49
Overview of Toyota
Shop-Floor Leadership
And
Ideal Daily Operations Management
50
If, starting today, you could only hire your future leaders by promoting from within?
What if all future senior and executive leaders had to come only from an entry associate or supervisor?
How would that change your approach to Leader and People development?
It would fundamentally change EVERYTHING!
Your very management system could no longer be just about the numbers…could it?
What if?
51
Floor Management Development System
Management Roles
MANAGEMENT
PROCESS RESULT
PROCESS
ACTIVITY ACTION
EXECUTIVE MANAGEMENT
SENIOR MANAGER
PROCESS MANAGER
PROCESS MEMBER
OPERATIONS MANAGER
AREA MANAGER
52
FMDS is a Comprehensive System that aligns Floor Management and Human Resource Development activities to achieve Company Targets and Support the Succession Pipeline.
• FMDS ensures foundations skills are in place for Ideal Daily Work, and
• Aligns Daily Shop-Floor Activities with Hoshin goals and objectives.
• FMDS Visualizes Shop-Floor Management and Leader Development through:
Visualization of Gap to Standard
Promote Two-way Communication
Defines and Develops Roles and Responsibilities for all members
Supports Toyota’s On-the-Job Development for all members
FMDS is ingrains the Toyota Way Culture into the Managing Structures of FMDS
Understanding FMDS – Floor Management Development System
53
Based on Deloitte’s research on leadership,* some of the key steps organizations can take into consideration when planning and implementing leadership development programs include:
1. Aligning leadership strategy with business strategy in order to measure individual and organization success consistently
2. Creating a clear leadership capability framework so the organization has a defined picture of what a future senior leader needs to do well
3. Recognizing that leadership potential is different from current performance—and learning how to spot and assess for potential using objective criteria
4. Putting decision rights and governance in place for developmental job moves by high-potential individuals
5. Creating high-impact programs to accelerate on-the-job development and the formation of critical support networks
6. Ensuring senior leaders are setting the right example, including being “hands-on” in leadership development programs
* Source: Deloitte’s Leadership by design: An architecture to build leadership in organizations, Deloitte Consulting, 2011.
Leadership by Design is the Toyota Way
54
Ideal Daily Management Process by Management Level
Shop Floor Leadership and the
Ideal Daily Management Process
Manager
Secure
Conditions for
Ideal
Production
Production
Management
Hoshin
Mgmt
Strategic
Activity
Abnormality
Management
Follow-up
Coach, &
Communicate
Asst.
Manager
Secure
Conditions for
Ideal
Production
Production Management Abnormality
Management
Support
Group Leader
and Mgr
Group
Leader
Ensure Basic
of TPS
Secure
conditions for
Ideal
Production
4M Change
Point
Management
Standardized
work
Management
Abnormality
Control
Follow-up
Team
Leader
Secure Pre-
Conditions for
Ideal
Production
Maintain
Ideal
Production
Ensure
Standardized
Work
Three Pillar
Mgmt
Abnormality
Control
Support
Group Leader
and Team
PLAN DO CHECK ACT
ProcessAlign Ideal
Processes
Determine
Knowledge
and Skill
Practice Role
Skill with OJD
Assess Counter-
measure for
Problems
Ro
le R
ela
tio
nsh
ip
55
Managers and Assistant Managers:
• Quickly see how the groups are performing
• Coach Group and Team Leaders in the Business Leadership through Hoshin
• Support Group Leader activity with necessary resources
• Strengthen the groups’ commitment and pride as they strive to achieve shared goals
Group Leaders and Supervisors:
• Focus their management efforts and problem solving activities
• Play a key role in developing Team Leaders and Team Members
• Less reactive and more proactive
• Visually show the need for Support
FMDS as a People and Leader Platform
56
Team Leaders
• Help their teams improve skill by working with team members to solve team problems
• Develop their own skills as a coach and leader while they manage daily activities through the team leader process and 3 Pillar Management
Team Members:
• Can see Group/Area/Shift performance
• Understand how important their job is to the Company’s success
• Have access to information to help solve problems
• Improve team member knowledge and skill level
• Can see how their job impacts Company Success
FMDS as a People and Leader Platform
57
Quote:
“From a Leadership perspective, we use our FMDS and Three Pillar Boards and I try to be a leader from that perspective - of always challenging our Group Leaders and Assistant Managers to think of the next level.
How do we get to the next level? How do we achieve the things that we do? The way I do that, I try to provide the vision for them and let them create the road map.
Jeff Hurst, Manager, Powertrain, TMMK
Leadership, Hoshin, FMDS and Three Pillar Management
58
Overview of Toyota Hoshin Management Connection to
Floor Management Development System
59
• FMDS Uses Hoshin to Set Direction linked to the Company Hoshin
• Drives Activity through Problem Solving (Toyota Business Practice ) and Kaizen
• Engages all Levels of the team through Roll Specific Actions
FMDS - A Leadership Development and Management Tool
60
Hoshin Process and FMDS Activity
Company Hoshin
Main KPISub
KPI
Plant 1
Sub
KPI
Plant 2
Sub
KPI
Plant 3
Plant 1 Hoshin
Main KPISub
KPI
GM 1
Sub
KPI
GM 2
Sub
KPI
GM 3
Department/Section
Hoshin
Main KPISub
KPI
MGR 1
Sub
KPI
MGR 2
Sub
KPI
MGR 3
Group FMDS
Main KPISub
KPI
Factor 1
Sub
KPI
Factor 2
Sub
KPI
Factor 3
Process
KPI
Activity
Process
KPI
Activity
Process
KPI
Activity
Activity
Result
Activity
Result
Activity
Result
Toyota (TIEM)
Hoshin Vision
K21
“Breakthrough”
Initiatives
Only
Toyota (TIEM)
Annual Hoshin
FY ‘18 Toyota (TIEM)
Hoshin
Management
By Department/
Section“A3 Management”
Toyota Hoshin
Management
By Shift through
FMDS
61
Managing at the Process Level
1. Upper Hoshin Achieving Activity
2. Vision Achieving Activity
3. Daily Control; Sustainment Management Activity
Hoshin Process and FMDS Activity
Company Hoshin
Main KPISub
KPI
Plant 1
Sub
KPI
Plant 2
Sub
KPI
Plant 3
Plant 1 Hoshin
Main KPISub
KPI
GM 1
Sub
KPI
GM 2
Sub
KPI
GM 3
Department/Section
Hoshin
Main KPISub
KPI
MGR 1
Sub
KPI
MGR 2
Sub
KPI
MGR 3
Group FMDS
Main KPISub
KPI
Factor 1
Sub
KPI
Factor 2
Sub
KPI
Factor 3
Process
KPI
Activity
Process
KPI
Activity
Process
KPI
Activity
Activity
Result
Activity
Result
Activity
Result
62
The General Manager establishes the Plant vision through Hoshin and communicates targets and expectations
Hoshin Process and FMDS Activity
Company Hoshin
Main KPISub
KPI
Plant 1
Sub
KPI
Plant 2
Sub
KPI
Plant 3
Plant 1 Hoshin
Main KPISub
KPI
GM 1
Sub
KPI
GM 2
Sub
KPI
GM 3
Department/Section
Hoshin
Main KPISub
KPI
MGR 1
Sub
KPI
MGR 2
Sub
KPI
MGR 3
Group FMDS
Main KPISub
KPI
Factor 1
Sub
KPI
Factor 2
Sub
KPI
Factor 3
Process
KPI
Activity
Process
KPI
Activity
Process
KPI
Activity
Activity
Result
Activity
Result
Activity
Result
63
Hoshin Kanri Connection at Every level
Toyota Hoshin Management
By Department – Total Department Engagement
Weekly (VP); Daily (GM)
64
The Department or Section Manager gathers direction from upper level Hoshins and communicates to Section to create Section Hoshin
Hoshin Process and FMDS Activity
Company Hoshin
Main KPISub
KPI
Plant 1
Sub
KPI
Plant 2
Sub
KPI
Plant 3
Plant 1 Hoshin
Main KPISub
KPI
GM 1
Sub
KPI
GM 2
Sub
KPI
GM 3
Department/Section
Hoshin
Main KPISub
KPI
MGR 1
Sub
KPI
MGR 2
Sub
KPI
MGR 3
Group FMDS
Main KPISub
KPI
Factor 1
Sub
KPI
Factor 2
Sub
KPI
Factor 3
Process
KPI
Activity
Process
KPI
Activity
Process
KPI
Activity
Activity
Result
Activity
Result
Activity
ResultThe Assistant Mgr understands Goals, Plans Actions to support Mgr Hoshin and Communicates to Groups or Shift Supervisors
65
Group Leaders/Supervisors Grasp the Area Plan, Plans Group actions to support Hoshin Targets, and Communicates to Group Members targets and collaborates to develop Sub-KPI and Process Activities
Hoshin Process and FMDS Activity
Company Hoshin
Main KPISub
KPI
Plant 1
Sub
KPI
Plant 2
Sub
KPI
Plant 3
Plant 1 Hoshin
Main KPISub
KPI
GM 1
Sub
KPI
GM 2
Sub
KPI
GM 3
Department/Section
Hoshin
Main KPI
Sub
KPI
MGR 1
Sub
KPI
MGR 2
Sub
KPI
MGR 3
Group FMDS
Main KPISub
KPI
Factor 1
Sub
KPI
Factor 2
Sub
KPI
Factor 3
Process
KPI
Activity
Process
KPI
Activity
Process
KPI
Activity
Activity
Result
Activity
Result
Activity
Result
Team Leaders implement group plan components, secure resources, supports team-members and Group Leaders through standards and suggest improvement activities to achieve targets
Team members follow implementation plan and standards, suggest improvement activities and participate in problem solving
66
THE FIVE MAIN MISSIONS OF
FMDS SHOP-FLOOR LEADERSHIP
FMDS and the Five Mission of Shop-Floor Management
Safety Quality Productivity Cost
Human
Resource
Development
The Management Activities
Of the Shop-Floor Group
Actions of the Shop-floor Leadership Group are
responsible for the safety of members and ensuring
the quality, volume, cost, and delivery of the product
created as well as the development of all members
67
THE FIVE MAIN MISSIONS OF
FMDS SHOP-FLOOR LEADERSHIP
FMDS Management Review Cadence
Safety Quality Productivity Cost
Human
Resource
Development
The
1st Week
Of the
Month
The
2nd Week
Of the
Month
The
3rd Week
Of the
Month
The
4th Week
of the
Month
Every
Other
Friday
The Management Activities
Of the Shop-Floor Group
5S is the focus if there is a 5th Week in the Month
68
FMDS Board Layout StandardsHoshin
And the
Five Missions
Safety
Hoshin
Quality
Hoshin
Productivity
Hoshin
Cost
Hoshin
Human
Resource
Development
Hoshin
PLAN
Main KPI
• Main KPI are derived from Sub-KPI’s one Management Level Up
• Main KPI’s Directly linked to the Annual Hoshin
• Visualize Monthly and Historical Trend
• Clear Target is Specified and Visual
• Color Coded/Symbol judgement of Current Status
PLAN
Sub-KPI’s
& Process
Sub-KPI’s
• Breakdown of Main KPI to Pro-active and Reactive Sub-KPI’s
• Clear Visual Targets and Visual Management
• Spikes annotated using handwritten “call-out bubbles”
• Measures daily activity sub-KPI’s to the Process level to support Sub-KPIs
PLAN
Process
Activities
• Evidence of GTS-PDCA Process and Thinking
• Breakdown of Gaps (Issues) that effect Sub-KPI Trends
• Handwritten Concrete Actions to tackle Gaps
• Timetable and Status of Progress
• Ownership and Teamwork
DO
Results
Tracking
• Shows Results tracking from Activities
• Handwritten using QC Tools/Charts
• Logical Connection to Sub-KPI’s
• Did we achieve the target? What was the Result?CHECK
History
Binders
• Toyota Business Practice (Problem Solving Process) supporting documents
• History of Process activities and Results (greater than 90 Days)
• A3, A3, Kaizen Sheet, etc.
• Used to share lessons learned and reflection as part of Yokoten
A
C
T
FM
DS
RE
VIE
W
69
All Support Groups attend the FMDS Review, Including:
• Section or Department Manager*
• Assistant Manager
• All Plant Group Leaders/Supervisors
• Mission Leader (e.g. Safety Team Leader on Safety Review)
• Process Engineering
• Quality Engineering
• Occupational Safety
• Human Resource Representative for Group
Who Attends the FMDS Five Mission Review?
70
Toyota Business Practice (TBP – 8 Step Problem Solving A3 Process) and Quality Circle Leadership and Participation are activity drivers for Leader and People Development
Quality Circle Leadership is the Original Leader development platform of Toyota
Production Team Leaders must Lead at least one TBP or Quality Circle Activity per year
The Group FMDS Board is the Source for TBP, Safety Circle, Quality Circle or Kaizen Circle Activity for Team Leaders to Lead
Some Focus activities may be the focus of a Manager Led or Cross Functional Problem Solving Activity (aka Jishuken)
FMDS, Toyota Business Practice and Leader Development
71
“When I think of FMDS and Three Pillar, it’s REALY TBP (Toyota Business Practice). It’s all about how you get from a large, vague problem to pinpoint the exact issue that you can work on.
When my Team Leaders are looking for a TBP to work on, I say ‘Let’s Go to the FMDS Board.”
– Jeremiah Duncan, V6 Assembly Group Leader, TMMK Powertrain
FMDS, Three Pillar Toyota Business Practice
and Leadership Development
72
The Role of the Production Group Leader
And
Floor Management Development System
73
Supervisor Ideal Daily Management Process
• The Group Leader Role is supported by The Group
Leader Management Process (GLMP).
• The GLMP Process is made up of supporting
management, Leadership and People Development
Routines is Cycled before during and after the Work Shift.
Ensure the Basics
Ensure Operational Imperatives
Secure Conditions for
Ideal Production
Manage 5M Change Points
Manage Standardized
Work
Control Abnormality
Follow-up Cycle (Observe to verify and adjust)
PDCA and Communicate (Observe to verify and adjust)
74
Top portion is daily routines and checks aligned with shop-floor leadership roles.
Problem activity is connect to Group Leader FMDS Board
All problems that are found through:
• Weak Point Management
• audits
• operator suggestion,
• scrap or rework events,
• premature tool failure
Are logged on one set of sheets divided up by the 4Ms – called “Problem Registration System”
Understanding Visual Management Boards
Ideal
Daily
Management
Activity
Proactive
Daily
Activities
Leader Routines
Aligned with Role
Problem
Activity &
Tracking
Problem
Registration
System &
Support
Documents
Counter-
measures for
Previous and
Current month
Support
Documents
75
Promote visualization to clarify and quickly grasp the situation. Information should be shared in a way that is beneficial to all.
Mieruka (Visualize or to Make Visable)
76
How Quickly Can You Understand these Visualized Charts?
77
Now, It’s Your
Turn
78
Toyota’s KPI Pyramid – Visualizing Leading Indicators
79
Start with the Hoshin Statement – Quantitative and Qualitative High Level Vision of the Dept or Section.
Main KPI’s for the FMDS Board are High Level Indicators deemed critical and Targets are derived from the Department or Section Hoshin
FMDS Safety Hoshin Example: Respect our community and create a family-like environment through ensuring mental, emotional, physical and environmental Safety.
FY 2018 Targets: Main KPI’s
Lost Time Accidents: 0%
Recordables: 0%
T/M Safety Dojo Training: 100%
100% T/M Completion of Find and Fix Safety Kaizen: 1 per month
Stimulate Team-member (T/M) involvement to support eyes for safety
and problem solving:
1. Safety Culture: Create a culture for Safety and Health Through
Leadership, Management and T/M engagement
2. Safety System: Enhance safety performance through
implementation of Safety Best Practices
3. Environmental Management: Reduce non-Safe waste through
process kaizen and segregation
Hoshin Main KPI’s
Note:
Safety
is a
Focus
80
FMDS Sub-KPI’s are Proactive and Reactive Measures that can be measured to show potential improvement to achieve Main KPI.
Sub-KPI’s are indicators that will support the overall achievement of the Main KPI and are Fact Driven
Sub-KPI’s may change quarterly and may be Direct (reactive) or Indirect (proactive)
Process Sub-KPI’s breakdown to process level
Sub-KPI’s are tracked by area by shift.
• Safety Sub-KPI Example:
• Acute Injuries Incidents
• Ergonomic Incidents
• Behavior-based
• Near Misses
• Process Related
• Workplace Organization and Layout Related
• Eyes for Safety Dojo Training Completion
Sub-KPI’s and Process Sub-KPI’s
81
FMDS Process Activities are activities at the Process Level intended to Improve the Sub-KPI’s through Countermeasure implementation as a result of Toyota Business Practice 8 Step Problem Solving Process.
There are 2 Measures of daily process activity:
1. Completion
2. Outcome
Process Activity is measured by completion status and is typically displayed on the activity board.
Just as there are 2 measurements of Activities there are also 2 types of Activities:
1. Direct: Results from problem solving a Gap to a standard, defined cause and effect, quantifiable results, and easily linked to Sub and Main KPI’s
2. Indirect Activity: Results from a broad Problem Solving activity with no specific Gap; generally Kaizen or effort to improve overall environment or culture
Process Activity Schedule
82
FMDS Process KPI’s are the Quantifiable results indicators of the process level activity intended to improve the Sub-KPI’s
The Process KPI is the measure of Outcome compared to the target set for the Activity
Process Results KPI answers the question:
• How will you Check?
• How often will you Check?
• How long will you Check? (e.g. 90 days)
• Did you achieve the desired outcome
• Do you understand both success and failure
• What did you learn?
Process Results Tracking
83
Now, It’s Your
Turn
84
• Dojo is used to train and refresher – in a “hands-on” way the leadership and management concepts of The Toyota Way, TPS, FMDS, Point Control, and 3 Pillar Management to all Leaders
• Once per Quarter, the FMDS Dojo team will audit FMDS Boards and Management Boards for Gaps.
• This Gaps are shared with Groups for Improvements
• Groups can earn Bronze, Silver, or Gold Status as they mature their FMDS and 3 Pillar Management Boards and Process
FMDS Dojo Audit
85
The Role of the Production Team Leader
And
Three Pillar Management
86
Operations Team Leader
Ideal Daily Management Process
• The Group Leader Role is supported by The Team
Leader Management Process (TLMP).
• The TLMP Process is made up of supporting
management, Leadership and People Development
Routines is Cycled before during and after the Work Shift.
Ensure the Basics
Ensure Operational Imperatives
Secure Pre-Conditions for
Ideal Production
Maintain Ideal
Production
Ensure 4 Pillar
Standardized Work
Control Abnormality
Follow-up Cycle: Support Team Members and Group Leader Throughout
PDCA and Communicate (Observe to verify and adjust)
87
Two Way Communication regarding any Change:
• Man – Manning and Line Starting Position and Rotation
• Machine – Any Change to equipment or layout
• Material – Any Change to material
• Methods – Any Change to Standardized Work
Change Point must indicate:
• Planned or Unplanned Change
• What Changed and Why (Reason for Change)
• When Change will Start
• When Change will End
Anyone affected by a Change Point must ”Buy off” on the change, risk, effect
Team Leader and Change Point Management
Change Point is Part of
“Secure Pre-Conditions for
Ideal Production” by the
G/L & T/L and is part of the
5 minute morning meeting
88
The Team Leader’s Standardized Work Management Board is the Visual Management the T/L’s STW Management Process, and includes:
• Team Leadership
• Standardized Work Charts
• Weak Points in Standardized Work
• Standardized Work Audits
• Fundamental Knowledge and Skill
• Line Balance of Work Elements
• Safety and 5S Audits
• Safety Kaizen by T/M’s
• One Point Lessons
Team Leaders are Challenged by training and getting T/M involved in performing and improving Standardized Work
3 Pillar: Standardized Work Process Management Board
Standardized Work Process Management
Board
89
The Team Leader’s Machine Care Management Board is the Visual Management of the T/L’s Management Process in support of Total Productive Maintenance Activities, and includes:
• Team Leadership
• Routine Machine Care Audits
• Operator Inspections and Care
• Weak Points in Operational
Availability of Equipment
• Machine Care Standards
• Machine Care Records
• One Point Lessons
• Machine Kaizen Activity
Team Leaders are Challenged by getting T/M involved in performing Machine Care and performing Maintenance themselves.
3 Pillar: Machine Care Management
Machin
e
Care
Kaiz
en
Machin
e
Care
One
Poin
t
Lessons
Machin
e
Care
Guid
e
Group Leaders
Team Leaders
Machine Care Process Management
Board
Daily Machine Care
Kamishibai Station
90
Assembly Point Management is the Team Leader’s Management Process in support of Quality. It includes:
• Team Leader TBP, Quality Circle and Kaizen Activities
• Customer Defect Tracking
• Quality Related Standardized Work
• Pre-control Charts
• Tool torque calibration check sheets
• Quality Check Station calibration
• Start-up/Shut-down check sheets
• Quality Check Audits
• Weak Point Management
• QA Network Activity List
• QA Network Countermeasure Focus
3 Pillar: Assembly Point Management
Assembly Point Management
Board
Team Leaders are Challenged through
leading Toyota Business Practice Problem
Solving and by getting T/M involved Quality
Circle Activities
91
In Machining and Machine intensive areas, Team Leaders must ensure skilled Team Members understand the effect of tooling on quality and equipment. Tooling Point Management is a rigorous process of care and control of tooling.
Other forms of 3 Pillar - Tooling Point Management
Tool inspection
Holder inspection
Ultrasonic wash standard
Tool set standard
Tool run out check standard
Point Angle Degree Confirmation
Point Wear, Flank Wear, Edge Wear,
Surface Wear, etc.
Abnormal Wear, Chipping,
Etc.
92
Don’ts:
• Managing Results
• Reward Lagging Indicators
• Look at FMDS as a task vs. a Management and Development Process
• Manage outside your role (e.g. Group Leaders do not manage as a Team Leader)
Do’s:
• Use FMDS and Three Pillar for Two Way Communication
• Use for Visual Abnormality Management
• Manage Activities not Results
• Practice “Go and See” for FMDS and 3 Pillar Management
• Prioritize One Mission for targeted Problem Solving while maintaining the remaining missions
• Continuously encourage, coach, and support
FMDS and Three Pillar Do’s and Don’ts
93
• The Foundation of FMDS and 3 Pillar Management is The Toyota Way and supports Toyota’s corner stone activities of Hoshin Kanri, Toyota Business Practice, On the Job Development
• FMDS is a System of Visualization for Floor Management
• FMDS is a Gateway Leader Development Platform that combats leadership development failure points by connecting leader development to real business needs and responsibility for leading and developing others
• Abnormality Management is the Toyota Management Way
• FMDS and 3 Pillar Management instill the Toyota Way Culture, daily
• Standards or Basic Rules are critical to identification of Abnormity
• Each level ins the organization has a unique role in FMDS
Summary
94
The Benefits of Implementing the Obeya System
• The Obeya promotes coordination, strategy and flexibility while leveraging the expertise and support of teammates from diverse areas.
• The Obeya promotes the Full and Effective utilization of Resources and Talents in order to reach our full potential, which is critical to a Lean Organization
• The ability to maintain Proper Problem Awareness in Real-time:• Monitor Value Creation, Flow of Value, and Opportunities for our
Customers, Partners, Stakeholders, Team-members, and our Organization.
• Listen to Team-member concerns.
• Collaborate to make discoveries, resolve problems together, accelerate leader and team-member development
• Accelerates Leader development
• Accelerates Lean Culture development and deployment
95
96
Focus Obeya on Problem Solving
and Burden Reduction
97
Shop Floor LeadershipDaily
“How’s Your Process”CheckAnd
PDCA Meeting
98
Burden Reduction with ”How’s Your Process”
“Without Standards, there can be no Kaizen”
An old Toyota Sensei trick would be to ask an operator, “What makes a good day for you?”
The Operator would respond with “if my machine runs well, or I did not run out of material,
etc.” Then the Toyota Sensei would ask, “Well, are you having a good day?”
1. So the Sensei would set a standard: “What makes a good day?”
2. The Operator would confirm the standard
3. The Sensei would identify the current state
4. The Operator would identify the gaps
Today, we have “How’s Your Process” Checks by Leaders
• “How’s Your Process?” Check is a engagement communication tool to connect with
Team-members on issues and re-enforce a culture of safety at and quality from each
process source.
• From just after the morning meeting until first break, Team Leaders engage each team-
member and asks “How’s Your Process?”
• Process issues are logged, prioritized and countermeasures are developed – whenever
possible – with the support of the Team-member
• Weekly, a HYP meeting is held with Management, Safety and Quality and other leaders
to report out on HYP and the effectiveness of the countermeasures implemented
99
Thank You. What are Your Questions?