the millau viaduct: ten years of structural monitoring

6
Structural Engineering International 4/2015 Technical Report 375 The Millau Viaduct: Ten Years of Structural Monitoring Emmanuel Cachot, Civil Eng. CEVM, Millau, France; Thierry Vayssade, Civil Eng. CEVM, Millau, France; Michel Virlogeux, Civil Eng. MV Consultant, Bonnelles, France; Hervé Lancon, Civil Eng. SITES, Ecully, France; Ziad Hajar, Civil Eng. EIFFAGE TRAVAUX PUBLICS, Vélizy, France; Claude Servant, Civil Eng. EIFFAGE TRAVAUX PUBLICS, Vélizy, France. Contact: [email protected] DOI: 10.2749/101686615X14355644770776 Abstract The Millau viaduct’s monitoring and instrumentation system was designed by a team of experts already involved in structural engineering of the bridge. With the client they set objectives and priorities. Data management, system monitoring and maintenance were also examined. After describing the monitiring program, the results are presented for the first few operating years of the structure. Keywords: Cable-stayed bridge, ortho- tropic steel box girder, Pylons, instru- mentation, long term monitoring, structural behaviour, durability tests, wind effects, temperature assessment Presentation of the Viaduct The Millau Viaduct (Fig. 1), crossing the turn in Southern France is a multi- span cable-stayed bridge with a total length of 2460 m and 343 m height at the top of the pylons (Fig. 2). The deck is 27.75 m wide overall, and is equipped with heavy barriers and wind screens to protect users from side winds. It was constructed in a series of assembly and launch cycles from platforms installed behind the north and south abutments (1743 m on the south side and 717 m on the north). The deck is a trapezoidal orthotropic steel box-girder 4.20 m high at the cen- treline and whose deck plate is made from 12–14 mm thick steel plates. The piers are composed of single box- sections at the bottom, which split into two shafts in the upper prestressed Fig. 1: The viaduct (Units: [–]) Fig. 2: Longitudinal view and cross-section of the viaduct 3.00 14.025 14.025 4.00 32.050 3.00 4.20 3.00 3.50 3.50 1.00 1.00 3.50 3.50 C0 204 m 342 m 244.8 m 221.7 m 144.5 m 77.7 m 88.9 m 342 m 342 m 2460 m 3.025% 342 m 342 m 342 m 204 m Béziers Clermont-Ferrand P1 P2 P3 P4 P5 P6 P7 C8 part, and rest on a series of four circu- lar shafts, 4.5 or 5 m in diameter. The deck is supported by spherical bearings and is stitched to the pier, with vertical prestressing tendons. Each span is supported by 11 pairs of stays arranged in a half-fan shape and anchored on both sides of the pylons along the deck centreline. The 87 m high steel pylons in the shape of an inverted Y are orientated longi- tudinally as extensions of the divided pier shafts. With these structural characteristics, the viaduct holds the world records for multiple-span cable-stayed bridge length and pier height (P2: 245 m and P3: 221 m). Monitoring and Follow-up: Project Design and Objectives As the contracting authority, the French Government fixed the viaduct monitoring and follow-up objectives in the Appendix 10 of the “Concession Specifications”, which insists on a 120 year “useful project life”, a period of time during which the viaduct must be used as originally planned, receiving the appropriate maintenance and serv- ice, without any need for major repairs. Monitoring was divided into three phases with different objectives: con- struction, delivery and operation. The installation of instrumentation equipment during the works was car- ried out with the aim of optimizing its use in the long term, during the deliv- ery and monitoring phases. During construction, controls were needed to check the structure’s geometry and movements, principally during launching operations to install the deck. The topographical tech- niques used thus enabled engineers to monitor the viaduct’s behaviour and confirm compliance with forecasts based on the original calculations. On completion of the viaduct, the baseline status was registered, and notably also the structure’s reaction to static and dynamic stresses during load testing. This baseline serves as a “zero

Upload: dangngoc

Post on 08-Jan-2017

237 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: The Millau Viaduct: Ten Years of Structural Monitoring

Structural Engineering International 42015 Technical Report 375

The Millau Viaduct Ten Years of Structural MonitoringEmmanuel Cachot Civil Eng CEVM Millau France Thierry Vayssade Civil Eng CEVM Millau France Michel Virlogeux Civil Eng MV Consultant Bonnelles France Herveacute Lancon Civil Eng SITES Ecully France Ziad Hajar Civil Eng EIFFAGE TRAVAUX PUBLICS Veacutelizy France Claude Servant Civil Eng EIFFAGE

TRAVAUX PUBLICS Veacutelizy France Contact claudeservanteiffagecom

DOI 102749101686615X14355644770776

Abstract

The Millau viaductrsquos monitoring and instrumentation system was designed by a team of experts already involved in structural engineering of the bridge With the client they set objectives and priorities Data management system monitoring and maintenance were also examined After describing the monitiring program the results are presented for the first few operating years of the structure

Keywords Cable-stayed bridge ortho-tropic steel box girder Pylons instru-mentation long term monitoring structural behaviour durability tests wind effects temperature assessment

Presentation of the Viaduct

The Millau Viaduct (Fig 1) crossing the turn in Southern France is a multi-span cable-stayed bridge with a total length of 2460 m and 343 m height at the top of the pylons (Fig 2) The deck is 2775 m wide overall and is equipped with heavy barriers and wind screens to protect users from side winds It was constructed in a series of assembly and launch cycles from platforms installed behind the north and south abutments (1743 m on the south side and 717 m on the north)

The deck is a trapezoidal orthotropic steel box-girder 420 m high at the cen-treline and whose deck plate is made from 12ndash14 mm thick steel plates

The piers are composed of single box-sections at the bottom which split into two shafts in the upper prestressed

Fig 1 The viaduct (Units [ndash])

Fig 2 Longitudinal view and cross-section of the viaduct

300

14025 14025400

32050

300

420

300350 350100 100350 350

C0

204 m 342 m

244

8 m

221

7 m

144

5 m

777

m

889

m

342 m 342 m

2460 m

3025

342 m 342 m 342 m 204 m

BeacuteziersClermont-Ferrand

P1 P2 P3 P4 P5 P6 P7 C8

part and rest on a series of four circu-lar shafts 45 or 5 m in diameter

The deck is supported by spherical bearings and is stitched to the pier with vertical prestressing tendons

Each span is supported by 11 pairs of stays arranged in a half-fan shape and anchored on both sides of the pylons along the deck centreline

The 87 m high steel pylons in the shape of an inverted Y are orientated longi-tudinally as extensions of the divided pier shafts

With these structural characteristics the viaduct holds the world records for multiple-span cable-stayed bridge length and pier height (P2 245 m and P3 221 m)

Monitoring and Follow-up Project Design and Objectives

As the contracting authority the French Government fixed the viaduct monitoring and follow-up objectives in the Appendix 10 of the ldquoConcession Specificationsrdquo which insists on a 120

year ldquouseful project liferdquo a period of time during which the viaduct must be used as originally planned receiving the appropriate maintenance and serv-ice without any need for major repairs

Monitoring was divided into three phases with different objectives con-struction delivery and operation

The installation of instrumentation equipment during the works was car-ried out with the aim of optimizing its use in the long term during the deliv-ery and monitoring phases

During construction controls were needed to check the structurersquos geometry and movements principally during launching operations to install the deck The topographical tech-niques used thus enabled engineers to monitor the viaductrsquos behaviour and confirm compliance with forecasts based on the original calculations

On completion of the viaduct the baseline status was registered and notably also the structurersquos reaction to static and dynamic stresses during load testing This baseline serves as a ldquozero

376 Technical Report Structural Engineering International 42015

structure was in good working order and ageing within the expected timeframe

The measurements carried out before opening the viaduct to traffic were as follows

bull Dynamic measurements taken by Nantes CSTB

ndash under ambient excitation to determine the principal struc-turersquos vibration modes and fre-quencies (Table 1)

ndash under pulsed excitation to measure damping of the fi rst natural vibration modes

bull Static measurements under static loads

ndash measurement of deck deforma-tion under a regulatory load induced by 30 trucks weighing around 30 t

pointrdquo for long-term monitoring and the first stages of maintenance

During the operational phase long-term monitoring includes three aspects specific parameter controls linked to vehicle and passenger safety checks on structural behaviour and checks on ageing

The viaduct monitoring was deliber-ately separated from the control sys-tems designed for traffic safety Wind speed measurement (which can result in closure of the bridge) uses a channel that is independent of other monitor-ing information

Most of the follow-up instrumentsmdashsensors data acquisition modules and networksmdashare industrial devices chiefly from the electronics technol-ogy sector

Particular care is needed to manage quantities of data which must be organ-ized in the early stages of monitoring codes recording formats file formats file names and data processing

Contracting authorities often feel that monitoring should be a long-term process In the case of Millau Viaduct a continuous follow-up period was planned for the first years of operation with dynamic recording of a considerable number of param-eters enabling the viaductrsquos reaction in periods of great wind stress to be anticipated At the end of this period knowledge of the structurersquos behav-iour especially in storm conditions was complete

The viaduct also includes provisions for maintenance and monitoring access (all parts of the structure must be accessible for upkeep purposes) Since its opening to traffic it has had two detailed periodic inspections in 2005 and 2011 in addition to annual

inspection visits carried out without any special means apart from the drone (Fig 3)

Structural Monitoring During the Operational Phase

Millau Viaductrsquos instrumentation is divided into two separate systems the static system and the dynamic system Each system has its own acquisition chain and its own dedicated applica-tion (Fig 4)

Several types of measurements were taken

ndash Measurement just before opening to traffi c to check compliance of real behaviour with calculated behav-iour and

ndash Continuous measurement after opening to traffi c to ensure the

Fig 4 System layout for viaduct instrumentation acquisition sets (Units [ndash])

Fig 3 Drone used for pier section inspec-tion (Units [ndash])

Vertical vibration modes

Frequencies calculated

Frequencies measured

4 025 0256

6 028 0293

8 0321 0336

10 037 0385

12 0423 0433

15 0474 0494

17 0532 0549

21 0589 0604

26 0639 0653

28 0685 0702

29 0725 0748

32 0766 0762

34 0797 0815

36 0818 0833

Table 1 Comparison of frequencies measured and calculated for the fi rst 14 vertical modes of the deck (Units Hz)

Structural Engineering International 42015 Technical Report 377

Since its opening to traffic measure-ments have been taken with the fol-lowing three fundamentally different aims

1 The fi rst and most important aim is to keep a permanent check on oper-ating conditions to ensure the via-duct is safe for traffi c and users The viaduct is thus equipped with sensors and specifi c devices which enable the following to be carried out

ndash Traffi c monitoring ndash Wind speed measurement ndash Detection of slippery phenomena ndash Continuous monitoring of the fol-

lowing parameters

bull opening of extension joints at the abutments

bull average air and deck temperatures

bull relative steel deck humidity (Fig 5)

bull pavement surface temperature

All these measurements can be viewed in real time in the operations control room at Saint-Germain toll station 6 km north of the viaduct (Fig 6)

Monitoring of the different values measured is displayed on the screen in digital and graphic form This dis-play enables vigilance level thresh-olds to be closely observed An alert is issued if a predefined threshold is crossed

2 The second aim is to supervise struc-tural ageing The viaduct is equipped with instrumentation that enables the following to be monitored

ndash Foundations Height measure-ments are taken by direct levelling and redundant measurements with an inclinometer enabling abso-lute foundation settlement and any

Fig 5 Deck temperature and relative humidity

5040302010

0ndash10ndash20100

H

RdegC

80

60

40

20

046

2008411 416 421 426 5651 511

Monthday

516 521 526 531 65 610 615 620 625 630

Air temperature Central box girder East box girder West box girderRelative humidity Central box girder East box girder West box girder

Fig 6Operations control room (Units [ndash])

December 2006 origin (mm)

November 2007

December 2008

January 2010

October 2010

CO s = 0 +04 +10 +14 +22

P1 s = 0 ndash13 +01 +05 ndash04

P2 s = 0 ndash02 ndash04 +07 +06

P3 s = 0 ndash15 ndash12 ndash10 ndash08

P4 s = 0 +07 +05 +12 +14

P5 s = 0 +02 ndash02 +10 +12

P6 s = 0 ndash09 ndash20 ndash08 ndash04

P7 s = 0 ndash12 ndash14 +12 +17

C8 s = 0 ndash01 ndash03 +00 +01

Origin 2007 with four guide marksOrigin 2008 with four guide marks

Table 2 Average pier and abutment settlement since 2006

differential to be assessed over time (Table 2)

ndash Piers The end piers P1 and P7 include inclinometric sensors with continuous measurement via the

monitoring system Pier deforma-tion measurements are carried out with extensometers to follow the development of creep in the concrete and the temperature is measured to assess the effects of transverse thermal gradients

ndash Deck Vertical alignment mea-surements (of spans and supports) are taken Deck and air tempera-tures are measured as well as air humidity inside the box-girder Accelerometer measurements are carried out if the wind speed thresh-old is overtaken

ndash Pylons Geometric measurements are carried out with prisms and inclinometers as are accelerometer measurements at the top of pylons P2 to P4 if the wind speed threshold is overtaken

ndash Cable stays Monitoring of damp-ing in the six instrumented cable stays on the south side of P3 pylon and of the tension in strands equipped with measuring cells

ndash Displacement in expansion joints at the abutments Each expansion

378 Technical Report Structural Engineering International 42015

Fig 7 Evolution of displacements at the abutment (Units y-axis cm)

10095908580757065605550454035302520151050

ndash5ndash10ndash15

942005 3232006 1092006 4272007 11132007 5312008 12172008 752009 1212010 892010 2252011 9132011

Difference WestndashEast (cm) Displacement East (cm)

Fig 8 Legend on next page

Vaverage meteorologyVmax meteorology

50

ms

45

40

35

30

25

20

15

5

10

0447

5000

mm mm

(b) (c)(a)

4000

3000

2000

1000

0000 10 20 30

ms

Dis

plac

emen

t

Dis

plac

emen

t

935 1423 1911 2359Heures

Vaverage deckVaverage pylon 2Vmax deckVmax pylon 2 West

Deck windPylon 2 windGreisch design WestGreisch design North West

Deck windPylon 2 windGreisch design WestGreisch design North West5000

4000

3000

2000

1000

0000 10 20 30

Wind Speed

ms

joint is equipped with a pair of sen-sors to monitor deck deformation and displacement in relation to the abutments (Fig 7)

This instrumentation enables the con-tracting authority and their experts to monitor the viaductrsquos state of health

3 The third and last aim is to com-pare actual viaduct behaviour with the predictions and ensure compli-ance with the initial implementation study calculations

Wind effects

With the participation of Nantes CSTB strong wind sequences were studied during the Klaus and Xynthia windstorms (24 January 2009 and 28 February 2010 respectively)

These studies confirmed that the results of theoretical calculations car-ried out by the Greisch design office during the detailed design stage were safe when compared with the results of calculations made on the basis of recordings measured by the different sensors (Fig 8)

Temperature effects

In order to confirm the pertinence of Michel Virlogeuxrsquos calculation assumptions about the effects of tem-perature based on the analysis car-ried out on Normandy Bridge the deck was equipped at the construc-tion stage with 27 temperature sen-sors in a section located on the P2ndashP3 span This was to allow continuous

recordings from the viaductrsquos opening date in late December 2004 and there-after ( acquisition approximately every 30 min)

Analysis carried out on the basis of recordings made over a 7 year period from 2005 to 2011 enabled the deckrsquos theoretical behaviour to be accurately determined develop-ment of the average box-girder tem-perature vertical and transversal thermal gradient values for the deck and concomitance between the two phenomena when statistically ana-lyzed Similarly a correlation was established between these values and meteorological data particularly atmospheric temperature and solar radiation (Figs 9 and 10)

Structural Engineering International 42015 Technical Report 379

Fig 9 Correlation between maximum daily average deck temperatures and maximum daily atmos-pheric temperatures

6000

5000

4000

3000

2000

1000

000

ndash1000

ndash10 ndash5 0 5 10 15 20

Maximum daily atmospheric temperature (degC)

Correlation Tavmax ndash Tatmmax

Max

imum

dai

ly a

vera

ge d

eck

tem

pera

ture

(degC

) 95

95

y = 12382x ndash 04942R2 = 09485

25 30 35 4530

ndash2000

Concrete tests

Measurements of concrete drilled samples were also planned in order to monitor sustainability and ageing in the reinforced concrete of the piers simultaneously (carbonation and chlo-ride penetration) The first measure-ments carried out in 2008 and 2013 on samples taken from the foot and

at right angles to the base of pier P2 showed the following

ndash The values measured that is com-pressive strength tensile strength by concrete splitting static Youngrsquos modulus (B60) are much greater than those taken into account in the calculations 75 MPa on average in compressive strength 7 MPa in

tensile strength and an average longi-tudinal elasticity modulus of 45 GPa

ndash Oxygen permeability (according to AFPC-AFREM recommendations) is 410ndash17 m2 on average

ndash Chloride content is almost undetect-able at any depth given a detection limit equal to 0005 of concrete mass

Conclusion

The instrumentation programme deployed from the construction stage to confirm initial calculations and monitor the viaductrsquos behaviour was much more extensive than the pro-grammes usually set up for cable-stayed large structures at that time Having monitored the behaviour of all the viaductrsquos components during construction (foundations piers and temporary piers deck pylons cable-stays) the operations involved in the completion and delivery stage enabled basic values to be established which have since served as benchmarks for monitoring and maintenance during the operation of the viaduct

Since the viaductrsquos opening to traffic on 16 December 2004 the monitoring

Fig 8 Comparison of the different measurements and calculations during cyclones Klaus and Xynthia (a) Cyclone Klaus wind speed recordings (b) transversal mode 1 (c) vertical mode 6 (d) wind speeds observed during cyclone Xynthia (e) transversal mode 3 and (f) vertical mode 4 (Units Fig 8e and f y-axis cm)

50

45

40

35

30

25

20

15

10

0

Dis

plac

emen

t (cm

)

Ref PY2Greisch sud-est

5

Wind speed0 5 10 15 20 25 30

(e)

Wind speed

Ref PY2Greisch sud-est

50

45

40

35

30

25

20

15

10

00 5 10 15

Dis

plac

emen

t (cm

)

20 25 30

5

(f)

(d) 200 Vmoy_MF (kmh)

VmoyH_PY2 (kmh)Vmax_MF (kmh)

VmaxH_PY2 (kmh)VminH_PY2 (kmh)

180

160

140

120

100

80

60

40

20

0

ndash20272 1424 272 1648 272 1912 272 2136 282 000 282 224 282 448

Date and hour

380 Technical Report Structural Engineering International 42015

Fig 12Weigh-in motion for lorries (Units [ndash])

Fig 10 Vertical linear thermal gradient according to daily solar radiation

Correlation GTzmax ndash Rth

2300

1800

1300

800

300

ndash200ndash2000 2000 4000 6000

Daily solar radiation (Wh m2)

8000 10 000 12 0000

95

95

y = 00018x + 05286R2 = 08741

Ver

tica

l lin

ear

ther

mal

gra

dien

t (degC

)

Fig 11 Comparison of measured and calculated values (ORTHOPLUS Project)

yy (Measure)

yy (Finite elementmethod)xx (Measure)

xx (Finite elementmethod)

(m

m)

150

120

90

60

30

ndash30

ndash600 2 4 6 8

t (s)10 12 14

0

October 2010 in order to compare and contrast the results of meas-urements taken on site with those obtained from 3D calculations using the fi nite element method (Fig 11)

2 The LCPC (central bridges and roads laboratory) project involving weigh-in motion on instrumented bridges The aim is to ensure the capacity of systems to measure loads on orthotropic deck structures with satisfactory accuracy and reli-ability and thus to supply contract-ing authorities and operators with information about behaviour under traffi c based on detailed knowledge of the actual loads applied The data obtained is useful for the struc-turersquos monitoring and supervision (Fig 12)

Reference

[1] Virlogeux M Servant C Cremer JM Martin JP Buonomo M Millau Viaduct FRANCE Struct Eng Int 2005 15(1) 4ndash7

system has thus confirmed that the viaductrsquos behaviour has remained compliant with the detailed design calculations

The Millau Viaduct has also con-tributed to the following research programmes

1 The laquoORTHOPLUSraquo project which aims to upgrade the mechani-cal behaviour of orthotropic deck sections and their coating so as to optimize their overall lifecycle Two test campaigns were carried out on Millau Viaduct in October 2009 and

Page 2: The Millau Viaduct: Ten Years of Structural Monitoring

376 Technical Report Structural Engineering International 42015

structure was in good working order and ageing within the expected timeframe

The measurements carried out before opening the viaduct to traffic were as follows

bull Dynamic measurements taken by Nantes CSTB

ndash under ambient excitation to determine the principal struc-turersquos vibration modes and fre-quencies (Table 1)

ndash under pulsed excitation to measure damping of the fi rst natural vibration modes

bull Static measurements under static loads

ndash measurement of deck deforma-tion under a regulatory load induced by 30 trucks weighing around 30 t

pointrdquo for long-term monitoring and the first stages of maintenance

During the operational phase long-term monitoring includes three aspects specific parameter controls linked to vehicle and passenger safety checks on structural behaviour and checks on ageing

The viaduct monitoring was deliber-ately separated from the control sys-tems designed for traffic safety Wind speed measurement (which can result in closure of the bridge) uses a channel that is independent of other monitor-ing information

Most of the follow-up instrumentsmdashsensors data acquisition modules and networksmdashare industrial devices chiefly from the electronics technol-ogy sector

Particular care is needed to manage quantities of data which must be organ-ized in the early stages of monitoring codes recording formats file formats file names and data processing

Contracting authorities often feel that monitoring should be a long-term process In the case of Millau Viaduct a continuous follow-up period was planned for the first years of operation with dynamic recording of a considerable number of param-eters enabling the viaductrsquos reaction in periods of great wind stress to be anticipated At the end of this period knowledge of the structurersquos behav-iour especially in storm conditions was complete

The viaduct also includes provisions for maintenance and monitoring access (all parts of the structure must be accessible for upkeep purposes) Since its opening to traffic it has had two detailed periodic inspections in 2005 and 2011 in addition to annual

inspection visits carried out without any special means apart from the drone (Fig 3)

Structural Monitoring During the Operational Phase

Millau Viaductrsquos instrumentation is divided into two separate systems the static system and the dynamic system Each system has its own acquisition chain and its own dedicated applica-tion (Fig 4)

Several types of measurements were taken

ndash Measurement just before opening to traffi c to check compliance of real behaviour with calculated behav-iour and

ndash Continuous measurement after opening to traffi c to ensure the

Fig 4 System layout for viaduct instrumentation acquisition sets (Units [ndash])

Fig 3 Drone used for pier section inspec-tion (Units [ndash])

Vertical vibration modes

Frequencies calculated

Frequencies measured

4 025 0256

6 028 0293

8 0321 0336

10 037 0385

12 0423 0433

15 0474 0494

17 0532 0549

21 0589 0604

26 0639 0653

28 0685 0702

29 0725 0748

32 0766 0762

34 0797 0815

36 0818 0833

Table 1 Comparison of frequencies measured and calculated for the fi rst 14 vertical modes of the deck (Units Hz)

Structural Engineering International 42015 Technical Report 377

Since its opening to traffic measure-ments have been taken with the fol-lowing three fundamentally different aims

1 The fi rst and most important aim is to keep a permanent check on oper-ating conditions to ensure the via-duct is safe for traffi c and users The viaduct is thus equipped with sensors and specifi c devices which enable the following to be carried out

ndash Traffi c monitoring ndash Wind speed measurement ndash Detection of slippery phenomena ndash Continuous monitoring of the fol-

lowing parameters

bull opening of extension joints at the abutments

bull average air and deck temperatures

bull relative steel deck humidity (Fig 5)

bull pavement surface temperature

All these measurements can be viewed in real time in the operations control room at Saint-Germain toll station 6 km north of the viaduct (Fig 6)

Monitoring of the different values measured is displayed on the screen in digital and graphic form This dis-play enables vigilance level thresh-olds to be closely observed An alert is issued if a predefined threshold is crossed

2 The second aim is to supervise struc-tural ageing The viaduct is equipped with instrumentation that enables the following to be monitored

ndash Foundations Height measure-ments are taken by direct levelling and redundant measurements with an inclinometer enabling abso-lute foundation settlement and any

Fig 5 Deck temperature and relative humidity

5040302010

0ndash10ndash20100

H

RdegC

80

60

40

20

046

2008411 416 421 426 5651 511

Monthday

516 521 526 531 65 610 615 620 625 630

Air temperature Central box girder East box girder West box girderRelative humidity Central box girder East box girder West box girder

Fig 6Operations control room (Units [ndash])

December 2006 origin (mm)

November 2007

December 2008

January 2010

October 2010

CO s = 0 +04 +10 +14 +22

P1 s = 0 ndash13 +01 +05 ndash04

P2 s = 0 ndash02 ndash04 +07 +06

P3 s = 0 ndash15 ndash12 ndash10 ndash08

P4 s = 0 +07 +05 +12 +14

P5 s = 0 +02 ndash02 +10 +12

P6 s = 0 ndash09 ndash20 ndash08 ndash04

P7 s = 0 ndash12 ndash14 +12 +17

C8 s = 0 ndash01 ndash03 +00 +01

Origin 2007 with four guide marksOrigin 2008 with four guide marks

Table 2 Average pier and abutment settlement since 2006

differential to be assessed over time (Table 2)

ndash Piers The end piers P1 and P7 include inclinometric sensors with continuous measurement via the

monitoring system Pier deforma-tion measurements are carried out with extensometers to follow the development of creep in the concrete and the temperature is measured to assess the effects of transverse thermal gradients

ndash Deck Vertical alignment mea-surements (of spans and supports) are taken Deck and air tempera-tures are measured as well as air humidity inside the box-girder Accelerometer measurements are carried out if the wind speed thresh-old is overtaken

ndash Pylons Geometric measurements are carried out with prisms and inclinometers as are accelerometer measurements at the top of pylons P2 to P4 if the wind speed threshold is overtaken

ndash Cable stays Monitoring of damp-ing in the six instrumented cable stays on the south side of P3 pylon and of the tension in strands equipped with measuring cells

ndash Displacement in expansion joints at the abutments Each expansion

378 Technical Report Structural Engineering International 42015

Fig 7 Evolution of displacements at the abutment (Units y-axis cm)

10095908580757065605550454035302520151050

ndash5ndash10ndash15

942005 3232006 1092006 4272007 11132007 5312008 12172008 752009 1212010 892010 2252011 9132011

Difference WestndashEast (cm) Displacement East (cm)

Fig 8 Legend on next page

Vaverage meteorologyVmax meteorology

50

ms

45

40

35

30

25

20

15

5

10

0447

5000

mm mm

(b) (c)(a)

4000

3000

2000

1000

0000 10 20 30

ms

Dis

plac

emen

t

Dis

plac

emen

t

935 1423 1911 2359Heures

Vaverage deckVaverage pylon 2Vmax deckVmax pylon 2 West

Deck windPylon 2 windGreisch design WestGreisch design North West

Deck windPylon 2 windGreisch design WestGreisch design North West5000

4000

3000

2000

1000

0000 10 20 30

Wind Speed

ms

joint is equipped with a pair of sen-sors to monitor deck deformation and displacement in relation to the abutments (Fig 7)

This instrumentation enables the con-tracting authority and their experts to monitor the viaductrsquos state of health

3 The third and last aim is to com-pare actual viaduct behaviour with the predictions and ensure compli-ance with the initial implementation study calculations

Wind effects

With the participation of Nantes CSTB strong wind sequences were studied during the Klaus and Xynthia windstorms (24 January 2009 and 28 February 2010 respectively)

These studies confirmed that the results of theoretical calculations car-ried out by the Greisch design office during the detailed design stage were safe when compared with the results of calculations made on the basis of recordings measured by the different sensors (Fig 8)

Temperature effects

In order to confirm the pertinence of Michel Virlogeuxrsquos calculation assumptions about the effects of tem-perature based on the analysis car-ried out on Normandy Bridge the deck was equipped at the construc-tion stage with 27 temperature sen-sors in a section located on the P2ndashP3 span This was to allow continuous

recordings from the viaductrsquos opening date in late December 2004 and there-after ( acquisition approximately every 30 min)

Analysis carried out on the basis of recordings made over a 7 year period from 2005 to 2011 enabled the deckrsquos theoretical behaviour to be accurately determined develop-ment of the average box-girder tem-perature vertical and transversal thermal gradient values for the deck and concomitance between the two phenomena when statistically ana-lyzed Similarly a correlation was established between these values and meteorological data particularly atmospheric temperature and solar radiation (Figs 9 and 10)

Structural Engineering International 42015 Technical Report 379

Fig 9 Correlation between maximum daily average deck temperatures and maximum daily atmos-pheric temperatures

6000

5000

4000

3000

2000

1000

000

ndash1000

ndash10 ndash5 0 5 10 15 20

Maximum daily atmospheric temperature (degC)

Correlation Tavmax ndash Tatmmax

Max

imum

dai

ly a

vera

ge d

eck

tem

pera

ture

(degC

) 95

95

y = 12382x ndash 04942R2 = 09485

25 30 35 4530

ndash2000

Concrete tests

Measurements of concrete drilled samples were also planned in order to monitor sustainability and ageing in the reinforced concrete of the piers simultaneously (carbonation and chlo-ride penetration) The first measure-ments carried out in 2008 and 2013 on samples taken from the foot and

at right angles to the base of pier P2 showed the following

ndash The values measured that is com-pressive strength tensile strength by concrete splitting static Youngrsquos modulus (B60) are much greater than those taken into account in the calculations 75 MPa on average in compressive strength 7 MPa in

tensile strength and an average longi-tudinal elasticity modulus of 45 GPa

ndash Oxygen permeability (according to AFPC-AFREM recommendations) is 410ndash17 m2 on average

ndash Chloride content is almost undetect-able at any depth given a detection limit equal to 0005 of concrete mass

Conclusion

The instrumentation programme deployed from the construction stage to confirm initial calculations and monitor the viaductrsquos behaviour was much more extensive than the pro-grammes usually set up for cable-stayed large structures at that time Having monitored the behaviour of all the viaductrsquos components during construction (foundations piers and temporary piers deck pylons cable-stays) the operations involved in the completion and delivery stage enabled basic values to be established which have since served as benchmarks for monitoring and maintenance during the operation of the viaduct

Since the viaductrsquos opening to traffic on 16 December 2004 the monitoring

Fig 8 Comparison of the different measurements and calculations during cyclones Klaus and Xynthia (a) Cyclone Klaus wind speed recordings (b) transversal mode 1 (c) vertical mode 6 (d) wind speeds observed during cyclone Xynthia (e) transversal mode 3 and (f) vertical mode 4 (Units Fig 8e and f y-axis cm)

50

45

40

35

30

25

20

15

10

0

Dis

plac

emen

t (cm

)

Ref PY2Greisch sud-est

5

Wind speed0 5 10 15 20 25 30

(e)

Wind speed

Ref PY2Greisch sud-est

50

45

40

35

30

25

20

15

10

00 5 10 15

Dis

plac

emen

t (cm

)

20 25 30

5

(f)

(d) 200 Vmoy_MF (kmh)

VmoyH_PY2 (kmh)Vmax_MF (kmh)

VmaxH_PY2 (kmh)VminH_PY2 (kmh)

180

160

140

120

100

80

60

40

20

0

ndash20272 1424 272 1648 272 1912 272 2136 282 000 282 224 282 448

Date and hour

380 Technical Report Structural Engineering International 42015

Fig 12Weigh-in motion for lorries (Units [ndash])

Fig 10 Vertical linear thermal gradient according to daily solar radiation

Correlation GTzmax ndash Rth

2300

1800

1300

800

300

ndash200ndash2000 2000 4000 6000

Daily solar radiation (Wh m2)

8000 10 000 12 0000

95

95

y = 00018x + 05286R2 = 08741

Ver

tica

l lin

ear

ther

mal

gra

dien

t (degC

)

Fig 11 Comparison of measured and calculated values (ORTHOPLUS Project)

yy (Measure)

yy (Finite elementmethod)xx (Measure)

xx (Finite elementmethod)

(m

m)

150

120

90

60

30

ndash30

ndash600 2 4 6 8

t (s)10 12 14

0

October 2010 in order to compare and contrast the results of meas-urements taken on site with those obtained from 3D calculations using the fi nite element method (Fig 11)

2 The LCPC (central bridges and roads laboratory) project involving weigh-in motion on instrumented bridges The aim is to ensure the capacity of systems to measure loads on orthotropic deck structures with satisfactory accuracy and reli-ability and thus to supply contract-ing authorities and operators with information about behaviour under traffi c based on detailed knowledge of the actual loads applied The data obtained is useful for the struc-turersquos monitoring and supervision (Fig 12)

Reference

[1] Virlogeux M Servant C Cremer JM Martin JP Buonomo M Millau Viaduct FRANCE Struct Eng Int 2005 15(1) 4ndash7

system has thus confirmed that the viaductrsquos behaviour has remained compliant with the detailed design calculations

The Millau Viaduct has also con-tributed to the following research programmes

1 The laquoORTHOPLUSraquo project which aims to upgrade the mechani-cal behaviour of orthotropic deck sections and their coating so as to optimize their overall lifecycle Two test campaigns were carried out on Millau Viaduct in October 2009 and

Page 3: The Millau Viaduct: Ten Years of Structural Monitoring

Structural Engineering International 42015 Technical Report 377

Since its opening to traffic measure-ments have been taken with the fol-lowing three fundamentally different aims

1 The fi rst and most important aim is to keep a permanent check on oper-ating conditions to ensure the via-duct is safe for traffi c and users The viaduct is thus equipped with sensors and specifi c devices which enable the following to be carried out

ndash Traffi c monitoring ndash Wind speed measurement ndash Detection of slippery phenomena ndash Continuous monitoring of the fol-

lowing parameters

bull opening of extension joints at the abutments

bull average air and deck temperatures

bull relative steel deck humidity (Fig 5)

bull pavement surface temperature

All these measurements can be viewed in real time in the operations control room at Saint-Germain toll station 6 km north of the viaduct (Fig 6)

Monitoring of the different values measured is displayed on the screen in digital and graphic form This dis-play enables vigilance level thresh-olds to be closely observed An alert is issued if a predefined threshold is crossed

2 The second aim is to supervise struc-tural ageing The viaduct is equipped with instrumentation that enables the following to be monitored

ndash Foundations Height measure-ments are taken by direct levelling and redundant measurements with an inclinometer enabling abso-lute foundation settlement and any

Fig 5 Deck temperature and relative humidity

5040302010

0ndash10ndash20100

H

RdegC

80

60

40

20

046

2008411 416 421 426 5651 511

Monthday

516 521 526 531 65 610 615 620 625 630

Air temperature Central box girder East box girder West box girderRelative humidity Central box girder East box girder West box girder

Fig 6Operations control room (Units [ndash])

December 2006 origin (mm)

November 2007

December 2008

January 2010

October 2010

CO s = 0 +04 +10 +14 +22

P1 s = 0 ndash13 +01 +05 ndash04

P2 s = 0 ndash02 ndash04 +07 +06

P3 s = 0 ndash15 ndash12 ndash10 ndash08

P4 s = 0 +07 +05 +12 +14

P5 s = 0 +02 ndash02 +10 +12

P6 s = 0 ndash09 ndash20 ndash08 ndash04

P7 s = 0 ndash12 ndash14 +12 +17

C8 s = 0 ndash01 ndash03 +00 +01

Origin 2007 with four guide marksOrigin 2008 with four guide marks

Table 2 Average pier and abutment settlement since 2006

differential to be assessed over time (Table 2)

ndash Piers The end piers P1 and P7 include inclinometric sensors with continuous measurement via the

monitoring system Pier deforma-tion measurements are carried out with extensometers to follow the development of creep in the concrete and the temperature is measured to assess the effects of transverse thermal gradients

ndash Deck Vertical alignment mea-surements (of spans and supports) are taken Deck and air tempera-tures are measured as well as air humidity inside the box-girder Accelerometer measurements are carried out if the wind speed thresh-old is overtaken

ndash Pylons Geometric measurements are carried out with prisms and inclinometers as are accelerometer measurements at the top of pylons P2 to P4 if the wind speed threshold is overtaken

ndash Cable stays Monitoring of damp-ing in the six instrumented cable stays on the south side of P3 pylon and of the tension in strands equipped with measuring cells

ndash Displacement in expansion joints at the abutments Each expansion

378 Technical Report Structural Engineering International 42015

Fig 7 Evolution of displacements at the abutment (Units y-axis cm)

10095908580757065605550454035302520151050

ndash5ndash10ndash15

942005 3232006 1092006 4272007 11132007 5312008 12172008 752009 1212010 892010 2252011 9132011

Difference WestndashEast (cm) Displacement East (cm)

Fig 8 Legend on next page

Vaverage meteorologyVmax meteorology

50

ms

45

40

35

30

25

20

15

5

10

0447

5000

mm mm

(b) (c)(a)

4000

3000

2000

1000

0000 10 20 30

ms

Dis

plac

emen

t

Dis

plac

emen

t

935 1423 1911 2359Heures

Vaverage deckVaverage pylon 2Vmax deckVmax pylon 2 West

Deck windPylon 2 windGreisch design WestGreisch design North West

Deck windPylon 2 windGreisch design WestGreisch design North West5000

4000

3000

2000

1000

0000 10 20 30

Wind Speed

ms

joint is equipped with a pair of sen-sors to monitor deck deformation and displacement in relation to the abutments (Fig 7)

This instrumentation enables the con-tracting authority and their experts to monitor the viaductrsquos state of health

3 The third and last aim is to com-pare actual viaduct behaviour with the predictions and ensure compli-ance with the initial implementation study calculations

Wind effects

With the participation of Nantes CSTB strong wind sequences were studied during the Klaus and Xynthia windstorms (24 January 2009 and 28 February 2010 respectively)

These studies confirmed that the results of theoretical calculations car-ried out by the Greisch design office during the detailed design stage were safe when compared with the results of calculations made on the basis of recordings measured by the different sensors (Fig 8)

Temperature effects

In order to confirm the pertinence of Michel Virlogeuxrsquos calculation assumptions about the effects of tem-perature based on the analysis car-ried out on Normandy Bridge the deck was equipped at the construc-tion stage with 27 temperature sen-sors in a section located on the P2ndashP3 span This was to allow continuous

recordings from the viaductrsquos opening date in late December 2004 and there-after ( acquisition approximately every 30 min)

Analysis carried out on the basis of recordings made over a 7 year period from 2005 to 2011 enabled the deckrsquos theoretical behaviour to be accurately determined develop-ment of the average box-girder tem-perature vertical and transversal thermal gradient values for the deck and concomitance between the two phenomena when statistically ana-lyzed Similarly a correlation was established between these values and meteorological data particularly atmospheric temperature and solar radiation (Figs 9 and 10)

Structural Engineering International 42015 Technical Report 379

Fig 9 Correlation between maximum daily average deck temperatures and maximum daily atmos-pheric temperatures

6000

5000

4000

3000

2000

1000

000

ndash1000

ndash10 ndash5 0 5 10 15 20

Maximum daily atmospheric temperature (degC)

Correlation Tavmax ndash Tatmmax

Max

imum

dai

ly a

vera

ge d

eck

tem

pera

ture

(degC

) 95

95

y = 12382x ndash 04942R2 = 09485

25 30 35 4530

ndash2000

Concrete tests

Measurements of concrete drilled samples were also planned in order to monitor sustainability and ageing in the reinforced concrete of the piers simultaneously (carbonation and chlo-ride penetration) The first measure-ments carried out in 2008 and 2013 on samples taken from the foot and

at right angles to the base of pier P2 showed the following

ndash The values measured that is com-pressive strength tensile strength by concrete splitting static Youngrsquos modulus (B60) are much greater than those taken into account in the calculations 75 MPa on average in compressive strength 7 MPa in

tensile strength and an average longi-tudinal elasticity modulus of 45 GPa

ndash Oxygen permeability (according to AFPC-AFREM recommendations) is 410ndash17 m2 on average

ndash Chloride content is almost undetect-able at any depth given a detection limit equal to 0005 of concrete mass

Conclusion

The instrumentation programme deployed from the construction stage to confirm initial calculations and monitor the viaductrsquos behaviour was much more extensive than the pro-grammes usually set up for cable-stayed large structures at that time Having monitored the behaviour of all the viaductrsquos components during construction (foundations piers and temporary piers deck pylons cable-stays) the operations involved in the completion and delivery stage enabled basic values to be established which have since served as benchmarks for monitoring and maintenance during the operation of the viaduct

Since the viaductrsquos opening to traffic on 16 December 2004 the monitoring

Fig 8 Comparison of the different measurements and calculations during cyclones Klaus and Xynthia (a) Cyclone Klaus wind speed recordings (b) transversal mode 1 (c) vertical mode 6 (d) wind speeds observed during cyclone Xynthia (e) transversal mode 3 and (f) vertical mode 4 (Units Fig 8e and f y-axis cm)

50

45

40

35

30

25

20

15

10

0

Dis

plac

emen

t (cm

)

Ref PY2Greisch sud-est

5

Wind speed0 5 10 15 20 25 30

(e)

Wind speed

Ref PY2Greisch sud-est

50

45

40

35

30

25

20

15

10

00 5 10 15

Dis

plac

emen

t (cm

)

20 25 30

5

(f)

(d) 200 Vmoy_MF (kmh)

VmoyH_PY2 (kmh)Vmax_MF (kmh)

VmaxH_PY2 (kmh)VminH_PY2 (kmh)

180

160

140

120

100

80

60

40

20

0

ndash20272 1424 272 1648 272 1912 272 2136 282 000 282 224 282 448

Date and hour

380 Technical Report Structural Engineering International 42015

Fig 12Weigh-in motion for lorries (Units [ndash])

Fig 10 Vertical linear thermal gradient according to daily solar radiation

Correlation GTzmax ndash Rth

2300

1800

1300

800

300

ndash200ndash2000 2000 4000 6000

Daily solar radiation (Wh m2)

8000 10 000 12 0000

95

95

y = 00018x + 05286R2 = 08741

Ver

tica

l lin

ear

ther

mal

gra

dien

t (degC

)

Fig 11 Comparison of measured and calculated values (ORTHOPLUS Project)

yy (Measure)

yy (Finite elementmethod)xx (Measure)

xx (Finite elementmethod)

(m

m)

150

120

90

60

30

ndash30

ndash600 2 4 6 8

t (s)10 12 14

0

October 2010 in order to compare and contrast the results of meas-urements taken on site with those obtained from 3D calculations using the fi nite element method (Fig 11)

2 The LCPC (central bridges and roads laboratory) project involving weigh-in motion on instrumented bridges The aim is to ensure the capacity of systems to measure loads on orthotropic deck structures with satisfactory accuracy and reli-ability and thus to supply contract-ing authorities and operators with information about behaviour under traffi c based on detailed knowledge of the actual loads applied The data obtained is useful for the struc-turersquos monitoring and supervision (Fig 12)

Reference

[1] Virlogeux M Servant C Cremer JM Martin JP Buonomo M Millau Viaduct FRANCE Struct Eng Int 2005 15(1) 4ndash7

system has thus confirmed that the viaductrsquos behaviour has remained compliant with the detailed design calculations

The Millau Viaduct has also con-tributed to the following research programmes

1 The laquoORTHOPLUSraquo project which aims to upgrade the mechani-cal behaviour of orthotropic deck sections and their coating so as to optimize their overall lifecycle Two test campaigns were carried out on Millau Viaduct in October 2009 and

Page 4: The Millau Viaduct: Ten Years of Structural Monitoring

378 Technical Report Structural Engineering International 42015

Fig 7 Evolution of displacements at the abutment (Units y-axis cm)

10095908580757065605550454035302520151050

ndash5ndash10ndash15

942005 3232006 1092006 4272007 11132007 5312008 12172008 752009 1212010 892010 2252011 9132011

Difference WestndashEast (cm) Displacement East (cm)

Fig 8 Legend on next page

Vaverage meteorologyVmax meteorology

50

ms

45

40

35

30

25

20

15

5

10

0447

5000

mm mm

(b) (c)(a)

4000

3000

2000

1000

0000 10 20 30

ms

Dis

plac

emen

t

Dis

plac

emen

t

935 1423 1911 2359Heures

Vaverage deckVaverage pylon 2Vmax deckVmax pylon 2 West

Deck windPylon 2 windGreisch design WestGreisch design North West

Deck windPylon 2 windGreisch design WestGreisch design North West5000

4000

3000

2000

1000

0000 10 20 30

Wind Speed

ms

joint is equipped with a pair of sen-sors to monitor deck deformation and displacement in relation to the abutments (Fig 7)

This instrumentation enables the con-tracting authority and their experts to monitor the viaductrsquos state of health

3 The third and last aim is to com-pare actual viaduct behaviour with the predictions and ensure compli-ance with the initial implementation study calculations

Wind effects

With the participation of Nantes CSTB strong wind sequences were studied during the Klaus and Xynthia windstorms (24 January 2009 and 28 February 2010 respectively)

These studies confirmed that the results of theoretical calculations car-ried out by the Greisch design office during the detailed design stage were safe when compared with the results of calculations made on the basis of recordings measured by the different sensors (Fig 8)

Temperature effects

In order to confirm the pertinence of Michel Virlogeuxrsquos calculation assumptions about the effects of tem-perature based on the analysis car-ried out on Normandy Bridge the deck was equipped at the construc-tion stage with 27 temperature sen-sors in a section located on the P2ndashP3 span This was to allow continuous

recordings from the viaductrsquos opening date in late December 2004 and there-after ( acquisition approximately every 30 min)

Analysis carried out on the basis of recordings made over a 7 year period from 2005 to 2011 enabled the deckrsquos theoretical behaviour to be accurately determined develop-ment of the average box-girder tem-perature vertical and transversal thermal gradient values for the deck and concomitance between the two phenomena when statistically ana-lyzed Similarly a correlation was established between these values and meteorological data particularly atmospheric temperature and solar radiation (Figs 9 and 10)

Structural Engineering International 42015 Technical Report 379

Fig 9 Correlation between maximum daily average deck temperatures and maximum daily atmos-pheric temperatures

6000

5000

4000

3000

2000

1000

000

ndash1000

ndash10 ndash5 0 5 10 15 20

Maximum daily atmospheric temperature (degC)

Correlation Tavmax ndash Tatmmax

Max

imum

dai

ly a

vera

ge d

eck

tem

pera

ture

(degC

) 95

95

y = 12382x ndash 04942R2 = 09485

25 30 35 4530

ndash2000

Concrete tests

Measurements of concrete drilled samples were also planned in order to monitor sustainability and ageing in the reinforced concrete of the piers simultaneously (carbonation and chlo-ride penetration) The first measure-ments carried out in 2008 and 2013 on samples taken from the foot and

at right angles to the base of pier P2 showed the following

ndash The values measured that is com-pressive strength tensile strength by concrete splitting static Youngrsquos modulus (B60) are much greater than those taken into account in the calculations 75 MPa on average in compressive strength 7 MPa in

tensile strength and an average longi-tudinal elasticity modulus of 45 GPa

ndash Oxygen permeability (according to AFPC-AFREM recommendations) is 410ndash17 m2 on average

ndash Chloride content is almost undetect-able at any depth given a detection limit equal to 0005 of concrete mass

Conclusion

The instrumentation programme deployed from the construction stage to confirm initial calculations and monitor the viaductrsquos behaviour was much more extensive than the pro-grammes usually set up for cable-stayed large structures at that time Having monitored the behaviour of all the viaductrsquos components during construction (foundations piers and temporary piers deck pylons cable-stays) the operations involved in the completion and delivery stage enabled basic values to be established which have since served as benchmarks for monitoring and maintenance during the operation of the viaduct

Since the viaductrsquos opening to traffic on 16 December 2004 the monitoring

Fig 8 Comparison of the different measurements and calculations during cyclones Klaus and Xynthia (a) Cyclone Klaus wind speed recordings (b) transversal mode 1 (c) vertical mode 6 (d) wind speeds observed during cyclone Xynthia (e) transversal mode 3 and (f) vertical mode 4 (Units Fig 8e and f y-axis cm)

50

45

40

35

30

25

20

15

10

0

Dis

plac

emen

t (cm

)

Ref PY2Greisch sud-est

5

Wind speed0 5 10 15 20 25 30

(e)

Wind speed

Ref PY2Greisch sud-est

50

45

40

35

30

25

20

15

10

00 5 10 15

Dis

plac

emen

t (cm

)

20 25 30

5

(f)

(d) 200 Vmoy_MF (kmh)

VmoyH_PY2 (kmh)Vmax_MF (kmh)

VmaxH_PY2 (kmh)VminH_PY2 (kmh)

180

160

140

120

100

80

60

40

20

0

ndash20272 1424 272 1648 272 1912 272 2136 282 000 282 224 282 448

Date and hour

380 Technical Report Structural Engineering International 42015

Fig 12Weigh-in motion for lorries (Units [ndash])

Fig 10 Vertical linear thermal gradient according to daily solar radiation

Correlation GTzmax ndash Rth

2300

1800

1300

800

300

ndash200ndash2000 2000 4000 6000

Daily solar radiation (Wh m2)

8000 10 000 12 0000

95

95

y = 00018x + 05286R2 = 08741

Ver

tica

l lin

ear

ther

mal

gra

dien

t (degC

)

Fig 11 Comparison of measured and calculated values (ORTHOPLUS Project)

yy (Measure)

yy (Finite elementmethod)xx (Measure)

xx (Finite elementmethod)

(m

m)

150

120

90

60

30

ndash30

ndash600 2 4 6 8

t (s)10 12 14

0

October 2010 in order to compare and contrast the results of meas-urements taken on site with those obtained from 3D calculations using the fi nite element method (Fig 11)

2 The LCPC (central bridges and roads laboratory) project involving weigh-in motion on instrumented bridges The aim is to ensure the capacity of systems to measure loads on orthotropic deck structures with satisfactory accuracy and reli-ability and thus to supply contract-ing authorities and operators with information about behaviour under traffi c based on detailed knowledge of the actual loads applied The data obtained is useful for the struc-turersquos monitoring and supervision (Fig 12)

Reference

[1] Virlogeux M Servant C Cremer JM Martin JP Buonomo M Millau Viaduct FRANCE Struct Eng Int 2005 15(1) 4ndash7

system has thus confirmed that the viaductrsquos behaviour has remained compliant with the detailed design calculations

The Millau Viaduct has also con-tributed to the following research programmes

1 The laquoORTHOPLUSraquo project which aims to upgrade the mechani-cal behaviour of orthotropic deck sections and their coating so as to optimize their overall lifecycle Two test campaigns were carried out on Millau Viaduct in October 2009 and

Page 5: The Millau Viaduct: Ten Years of Structural Monitoring

Structural Engineering International 42015 Technical Report 379

Fig 9 Correlation between maximum daily average deck temperatures and maximum daily atmos-pheric temperatures

6000

5000

4000

3000

2000

1000

000

ndash1000

ndash10 ndash5 0 5 10 15 20

Maximum daily atmospheric temperature (degC)

Correlation Tavmax ndash Tatmmax

Max

imum

dai

ly a

vera

ge d

eck

tem

pera

ture

(degC

) 95

95

y = 12382x ndash 04942R2 = 09485

25 30 35 4530

ndash2000

Concrete tests

Measurements of concrete drilled samples were also planned in order to monitor sustainability and ageing in the reinforced concrete of the piers simultaneously (carbonation and chlo-ride penetration) The first measure-ments carried out in 2008 and 2013 on samples taken from the foot and

at right angles to the base of pier P2 showed the following

ndash The values measured that is com-pressive strength tensile strength by concrete splitting static Youngrsquos modulus (B60) are much greater than those taken into account in the calculations 75 MPa on average in compressive strength 7 MPa in

tensile strength and an average longi-tudinal elasticity modulus of 45 GPa

ndash Oxygen permeability (according to AFPC-AFREM recommendations) is 410ndash17 m2 on average

ndash Chloride content is almost undetect-able at any depth given a detection limit equal to 0005 of concrete mass

Conclusion

The instrumentation programme deployed from the construction stage to confirm initial calculations and monitor the viaductrsquos behaviour was much more extensive than the pro-grammes usually set up for cable-stayed large structures at that time Having monitored the behaviour of all the viaductrsquos components during construction (foundations piers and temporary piers deck pylons cable-stays) the operations involved in the completion and delivery stage enabled basic values to be established which have since served as benchmarks for monitoring and maintenance during the operation of the viaduct

Since the viaductrsquos opening to traffic on 16 December 2004 the monitoring

Fig 8 Comparison of the different measurements and calculations during cyclones Klaus and Xynthia (a) Cyclone Klaus wind speed recordings (b) transversal mode 1 (c) vertical mode 6 (d) wind speeds observed during cyclone Xynthia (e) transversal mode 3 and (f) vertical mode 4 (Units Fig 8e and f y-axis cm)

50

45

40

35

30

25

20

15

10

0

Dis

plac

emen

t (cm

)

Ref PY2Greisch sud-est

5

Wind speed0 5 10 15 20 25 30

(e)

Wind speed

Ref PY2Greisch sud-est

50

45

40

35

30

25

20

15

10

00 5 10 15

Dis

plac

emen

t (cm

)

20 25 30

5

(f)

(d) 200 Vmoy_MF (kmh)

VmoyH_PY2 (kmh)Vmax_MF (kmh)

VmaxH_PY2 (kmh)VminH_PY2 (kmh)

180

160

140

120

100

80

60

40

20

0

ndash20272 1424 272 1648 272 1912 272 2136 282 000 282 224 282 448

Date and hour

380 Technical Report Structural Engineering International 42015

Fig 12Weigh-in motion for lorries (Units [ndash])

Fig 10 Vertical linear thermal gradient according to daily solar radiation

Correlation GTzmax ndash Rth

2300

1800

1300

800

300

ndash200ndash2000 2000 4000 6000

Daily solar radiation (Wh m2)

8000 10 000 12 0000

95

95

y = 00018x + 05286R2 = 08741

Ver

tica

l lin

ear

ther

mal

gra

dien

t (degC

)

Fig 11 Comparison of measured and calculated values (ORTHOPLUS Project)

yy (Measure)

yy (Finite elementmethod)xx (Measure)

xx (Finite elementmethod)

(m

m)

150

120

90

60

30

ndash30

ndash600 2 4 6 8

t (s)10 12 14

0

October 2010 in order to compare and contrast the results of meas-urements taken on site with those obtained from 3D calculations using the fi nite element method (Fig 11)

2 The LCPC (central bridges and roads laboratory) project involving weigh-in motion on instrumented bridges The aim is to ensure the capacity of systems to measure loads on orthotropic deck structures with satisfactory accuracy and reli-ability and thus to supply contract-ing authorities and operators with information about behaviour under traffi c based on detailed knowledge of the actual loads applied The data obtained is useful for the struc-turersquos monitoring and supervision (Fig 12)

Reference

[1] Virlogeux M Servant C Cremer JM Martin JP Buonomo M Millau Viaduct FRANCE Struct Eng Int 2005 15(1) 4ndash7

system has thus confirmed that the viaductrsquos behaviour has remained compliant with the detailed design calculations

The Millau Viaduct has also con-tributed to the following research programmes

1 The laquoORTHOPLUSraquo project which aims to upgrade the mechani-cal behaviour of orthotropic deck sections and their coating so as to optimize their overall lifecycle Two test campaigns were carried out on Millau Viaduct in October 2009 and

Page 6: The Millau Viaduct: Ten Years of Structural Monitoring

380 Technical Report Structural Engineering International 42015

Fig 12Weigh-in motion for lorries (Units [ndash])

Fig 10 Vertical linear thermal gradient according to daily solar radiation

Correlation GTzmax ndash Rth

2300

1800

1300

800

300

ndash200ndash2000 2000 4000 6000

Daily solar radiation (Wh m2)

8000 10 000 12 0000

95

95

y = 00018x + 05286R2 = 08741

Ver

tica

l lin

ear

ther

mal

gra

dien

t (degC

)

Fig 11 Comparison of measured and calculated values (ORTHOPLUS Project)

yy (Measure)

yy (Finite elementmethod)xx (Measure)

xx (Finite elementmethod)

(m

m)

150

120

90

60

30

ndash30

ndash600 2 4 6 8

t (s)10 12 14

0

October 2010 in order to compare and contrast the results of meas-urements taken on site with those obtained from 3D calculations using the fi nite element method (Fig 11)

2 The LCPC (central bridges and roads laboratory) project involving weigh-in motion on instrumented bridges The aim is to ensure the capacity of systems to measure loads on orthotropic deck structures with satisfactory accuracy and reli-ability and thus to supply contract-ing authorities and operators with information about behaviour under traffi c based on detailed knowledge of the actual loads applied The data obtained is useful for the struc-turersquos monitoring and supervision (Fig 12)

Reference

[1] Virlogeux M Servant C Cremer JM Martin JP Buonomo M Millau Viaduct FRANCE Struct Eng Int 2005 15(1) 4ndash7

system has thus confirmed that the viaductrsquos behaviour has remained compliant with the detailed design calculations

The Millau Viaduct has also con-tributed to the following research programmes