T
the connection wirefrom EPAC-AG to
BTS
-
8/14/2019 The Installation From EPAC-AG to BTS
2/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 2Huawei Conf i dent i al
EPAC Environment System
Outside TEMP sensor Smoke sensor
Door sensor TEMP&HUMD sensor
Water sensor Infrared sensor
Smoke sensor Smoke sensor
-
8/14/2019 The Installation From EPAC-AG to BTS
3/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 3Huawei Conf i dent i al
EPAC and Sensors normal Layout (just for example)
-
8/14/2019 The Installation From EPAC-AG to BTS
4/16
-
8/14/2019 The Installation From EPAC-AG to BTS
5/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 5Huawei Conf i dent i al
1.INSTALLATION of EPAC-AG & EPAC-DRV
Fix position Perforation Fix base-plate
Make sure the fix position,using the measuring tape & level bar.
Connect EPAC-AG &EPAC-DRV The length of the cable is 1m
-
8/14/2019 The Installation From EPAC-AG to BTS
6/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 6Huawei Conf i dent i al
2.INSTALLATION of INFRARED SENSOR
The lable of the wire is also INFRARED
Installation of the sensor
PS:the sensor should be about 1.7m
from the groud.
-
8/14/2019 The Installation From EPAC-AG to BTS
7/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 7Huawei Conf i dent i al
3.INSTALLATION of TEM&HUM SENSOR
The lable of the wire is also TEMP HUMD
Installation of the sensor
PS:the sensor should be about 1.6m
from the groud.
-
8/14/2019 The Installation From EPAC-AG to BTS
8/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 8Huawei Conf i dent i al
4.INSTALLATION of SMOKE SENSOR Installation of the sensor
The lable of the wire is also SMOKE
-
8/14/2019 The Installation From EPAC-AG to BTS
9/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 9Huawei Conf i dent i al
5.INSTALLATION of DOOR SENSORInstallation of the sensor
The lable of the wire is also DOOR
-
8/14/2019 The Installation From EPAC-AG to BTS
10/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 10Huawei Conf i dent i al
6.INSTALLATION of WATER SENSOR
PS:find the lower place to lay the sensor
-
8/14/2019 The Installation From EPAC-AG to BTS
11/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 11Huawei Conf i dent i al
7.INSTALLATION of SENSOR
Outside of the shelter
Use this part to fix inthe shelter
Inside of the shelter
The lable of the wire is also XS13
-
8/14/2019 The Installation From EPAC-AG to BTS
12/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 12Huawei Conf i dent i al
8. POWER CABLE
The connector XS3
And the lable also is XS3
The another end of the power cable
-
8/14/2019 The Installation From EPAC-AG to BTS
13/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 13Huawei Conf i dent i al
9. The switch setting
the switch must be on
the switch must be off
-
8/14/2019 The Installation From EPAC-AG to BTS
14/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 14Huawei Conf i dent i al
10. PS alarm wiring
brbr/wbb/ogg/woo/w
BLVDRECT FAULTLOW VOLTAC FAULT
NONCgroundNONCgroundNONCgroundNONCground
This connector
for DG
-
8/14/2019 The Installation From EPAC-AG to BTS
15/16
HUAWEI TECHNOLOGI ES CO. , LTD. Page 15Huawei Conf i dent i al
11. The connnection between EPAC-AG and BTS
Connect to MON1
-