The Future of Electric Generating Units Under the EPA’s New NSR Rules Cross State Air Pollution Rules, Cross-State Air Pollution Rules, and New Clean Air Act Regulations Brought to you by Winston & Strawn LLP and l Environmental Resources Management.

Upload: others

Post on 18-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

The Future of Electric Generating Units Under the EPA’s New NSRRules Cross State Air Pollution Rules, Cross-State Air Pollution Rules, and New Clean Air Act Regulations

Brought to you by Winston & Strawn LLP and lEnvironmental Resources Management.

Page 2: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Today’s Speakers

Jay HollowayKen WeissLiz WilliamsonPeter BelmontePeter BelmonteGeorge Holder

2

Page 3: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Ken Weiss, ERMLiz Williamson Winston & StrawnLiz Williamson, Winston & StrawnGeorge Holder, ERM

12:00 p.m. – 1:15 p.m. (PST)

1:00 p.m. – 2:15 p.m. (MST)

2:00 p.m. – 3:15 p.m. (CST)

3:00 p.m. – 4:15 p.m. (EST)3 p 4 5 p ( )

3

Page 4: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Ken Weiss, ERM

4

Page 5: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

NSR Reform—Regulatory Scorecard

Scorecard in Effect

10 yr Baseline Emissions Look back NA for Utilities

Actual to Future Actual Methodology Netting a New Issue

Actual PALS

Clean Unit Test Abandoned, Stayed, or Revoked

Pollution Control Project Exclusion Abandoned, Stayed, or Revoked

Flexible Permitting and NSR Green Groups Abandoned, Stayed ,or Revoked

RMRR Bright-Line Test Abandoned, Stayed, or Revoked

Aggregation Rule Abandoned, Stayed, or Revoked

Hourly Test for EGU’s Abandoned, Stayed, or Revoked

5

Page 6: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Utility Impacts

• RMRR remains a WEPCO Test• Pollution Control Projects (i.e., SCR) may be

bj Ssubject to NSR• NSR Reform was no help

GHG i th i• GHGs are in the mix

6

Page 7: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Thank you!

• Ken Weiss, ERM+1 (610) [email protected]

7

Page 8: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

PSD Applicability Calculations and Title V ConsiderationsConsiderations

Liz Williamson, Winston & Strawn

8

Page 9: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

New Source Review ProgramNew Source Review ProgramSignificant Emission Rates • Once a source is determined to be major the significance of the • Once a source is determined to be major, the significance of the

emission increase must be evaluated.• The CAA establishes Significant Emission Rates for the six original

criteria pollutants plus any pollutant with a NAAQS standard The criteria pollutants plus any pollutant with a NAAQS standard. The SERs for the six criteria pollutants are as follows:▫ Carbon monoxide (CO): 100 tons/year▫ Nitrogen oxides (NOx): 40 tons/yearNitrogen oxides (NOx): 40 tons/year▫ Sulfur dioxide (SO2): 40 tons/year▫ Ozone: 40 tons of volatile organic compounds (VOCs)/year▫ Lead: 0.6 tons/year/y▫ PM10: 25 tons/year

• Other Pollutants that must be considered in an NSR analysis: H2SO4, H2S, Municipal Waste organics and metals, Municipal Solid 2 4 2 p g pWaste emissions, GHGs (Defined in 40 CFR 52.21 as “significant”).

9

Page 10: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

NSR Emissions Increases at New NSR Emissions Increases at New Sources• At a new source, if the potential to emit for

any one of the six criteria pollutants is at a rate l t hi h th th l t Si ifi t equal to or higher than the relevant Significant

Emissions Rate threshold specified in the CAAfor that pollutant the control of that pollutant is for that pollutant, the control of that pollutant is subject to NSR.

• Potential to emit is calculated as the Potential to emit is calculated as the emissions that would occur if the source operated 24 hours a day for 365 days a year (8760 hours).

10

Page 11: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

NSR Emissions Increases at Existing NSR Emissions Increases at Existing Sources• An existing source will not be evaluated under NSR

unless there is a major modification at the source.

• A modification is a physical or operational change• A modification is a physical or operational change.

• A modification is major if the proposed physical or operational change results in a significant emissions operational change results in a significant emissions increase and a significant net increase.▫ Whether an emissions increase is significant is

determined by comparing the baseline actual determined by comparing the baseline actual emissions of the pollutant to the projected actual emissions of the pollutant. “Netting” takes into account contemporaneous increases and account contemporaneous increases and decreases in emissions.

11

Page 12: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

PSD NSR Permits

• If the project results in a significant net emissions increase at an existing source of a criteria pollutant, the source is subject to PSD and must obtain a the source is subject to PSD and must obtain a permit for the project.

• The PSD permit will require the following:The PSD permit will require the following:▫ Installation of Best Available Control Technology

(BACT)

▫ Air Quality Analysis

▫ Additional Impacts Analysis

P bli I l▫ Public Involvement

12

Page 13: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Performing an Emissions Analysis Under Performing an Emissions Analysis Under the Reasonable Possibility Rule• Analyze high two of five-year baseline compared to

conservative projection of five years following the project

• If projection shows more than 50% of the significance • If projection shows more than 50% of the significance threshold for an NSR pollutant, analyze whether the increase is as a result of emissions that could have been accommodated in the baseline period and that are accommodated in the baseline period and that are unrelated to the particular change

• If reasonable possibility (50%) threshold is triggered, then pre-project emissions submission required

• EGUs must follow up with five years of annual emissions data non-EUSGUs only report significant post-project data, non-EUSGUs only report significant post-project annual actual emissions increases

13

Page 14: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

The Final Tailoring Rule

• Issued on May 13, 2010 – Published in Federal Register on June 3, 2010

• “Tailors” the requirements to focus PSD and Title V • Tailors the requirements to focus PSD and Title V permit requirements on the largest emitting facilities

• Subjects facilities responsible for nearly 70% of the national GHG emissions from stationary sources to CAApermitting requirements

▫ This includes the nation’s largest GHG emitters—power This includes the nation s largest GHG emitters power plants, refineries, and cement production facilities

▫ Small farms, restaurants, and commercial facilities are shielded by this ruleshielded by this rule

Source: EPA

14

Page 15: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Pollutants Covered• Sets thresholds for GHG emissions addressing • Sets thresholds for GHG emissions, addressing

emissions from six GHGs:▫ Carbon dioxide (CO2)▫ Methane (CH4)▫ Nitrous oxide (N2O)▫ Hydrofluorocarbons (HFCs)y b ( )▫ Perfluorocarbons (PFCs)▫ Sulfur hexafluoride (SF6)

• The aggregate sum of these six GHGs is the • The aggregate sum of these six GHGs is the identified air pollutant in EPA’s Light-Duty Vehicle Rule, and the associated Endangerment Finding and C C ib Fi diCause or Contribute Finding

Source: EPA15

Page 16: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

GHG Pollutants Covered

• To determine applicability, a source’s GHG emissions are calculated as the sum of the six

CO i l t (CO ) b i d gases on a CO2 equivalent (CO2e) basis and compared against the relevant threshold

Source: EPA16

Page 17: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Phase-In Steps: Step 1• January 2 2011 to June 30 2011• January 2, 2011 to June 30, 2011• No new permitting actions due solely to GHG emissions during this

time period; only sources undertaking permitting actions anyway for other pollutants will need to address GHGfor other pollutants will need to address GHG▫ PSD permitting applicability:

“Anyway” sources will be subject to the PSD requirements only if they increase GHG emissions by 75,000 tpy CO2e or morey py 2

▫ Title V permitting applicability: Only those sources currently with Title V permits will address GHGs, and

only when applying for, renewing, or revising their permits

ill b bj i i i b d• No sources will be subject to CAA permitting requirements based solely on GHG emissions

• Covers sources responsible for 65% of total national stationary GHG i isource GHG emissions

Source: EPA17

Page 18: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Phase-In Steps: Step 2• July 1 2011 to June 30 2013• July 1, 2011 to June 30, 2013• Sources subject to GHG permitting requirements under step 1 will

continue to be subject to GHG permitting requirements• In addition sources that emit or have the potential to emit GHGs at • In addition, sources that emit or have the potential to emit GHGs at

or above 100,000 tpy CO2e will also be subject to GHG permitting requirements as follows

• PSD permitting applicability – triggered with construction that • PSD permitting applicability – triggered with construction that increases emissions▫ A newly constructed source (which is not major for another pollutant)

will not be subject to PSD unless it emits 100,000 tpy or more on a CO2ej , py 2

basis ▫ A modification project at a major stationary source will not be subject to

PSD unless it results in a net GHG emissions increase of 75,000 tpy or CO b imore on a CO2e basis

Source: EPA18

Page 19: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Phase-In Steps: Step 2 (cont’d.)• Title V permitting applicability• Title V permitting applicability▫ A GHG emission source (which is not already subject

to Title V) will not be subject to Title V unless it emits t CO b i100,000 tpy or more on a CO2e basis

▫ These newly subject sources must apply within one year after becoming subject to the program, unless the

i i h i li d dlipermitting authority sets an earlier deadline▫ This means that newly subject sources must apply for

a Title V permit on or before July 1, 2012 (which is one p yyear from July 1, 2011)

• Covers sources responsible for nearly 70% of total national stationary source GHG emissionsnational stationary source GHG emissions

Source: EPA19

Page 20: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Phase-In Steps: Step 3• The rule establishes an enforceable commitment to complete The rule establishes an enforceable commitment to complete

another rulemaking no later than July 1, 2012

• We will propose or solicit comment on a possible step 3 of the phase-in plan ▫ EPA will consider, during the implementation of step 2, whether it will

be possible to administer GHG permitting programs for additional sources.

▫ EPA will establish that step 3 would take effect on July 1, 2013, so that EPA will establish that step 3 would take effect on July 1, 2013, so that permitting authorities and sources can prepare for any additional GHGpermitting action.

• Step 3, if different from step 2, will not require permitting of sources with GHG emissions below 50 000 tpy CO ewith GHG emissions below 50,000 tpy CO2e

• We also commit to explore a wide range of streamlining options on which we plan to take comment in the step 3 proposal

• In addition we plan to solicit comment on a permanent exclusion of • In addition, we plan to solicit comment on a permanent exclusion of certain sources from PSD, Title V, or both

Source: EPA20

Page 21: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Phase-in Steps: Further ActionA ill i i f ll il A il • EPA will not require permits for smaller sources until April

30, 2016, or later • The rule establishes an enforceable commitment for EPA to

complete a stud ithin fi e ears projecting the complete a study within five years projecting the administrative burdens that remain for small sources after EPA has had time to develop (and states have had time to adopt) streamlining measures to reduce the permitting p ) g p gburden for such sources

• We will use this study to serve as the basis for an additional rulemaking that would take further action to address small

i t W ki f bl sources, as appropriate. We are making an enforceable commitment to complete this rulemaking by April 30, 2016

• We plan to solicit comment on a permanent exclusion of certain sources from PSD Title V or bothcertain sources from PSD, Title V, or both

Source: EPA21

Page 22: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Permitting Steps Under the Tailoring Rule 2011 2012 2013 2014 2015

• Step 1: Source already subject to PSD “anyway” 

2016

(tpy CO2e) New source: 75,000 tpyCO2e and 100/250 tpy GHGs on a mass basisModification: 75,000

• Step 2: Continue step 1 sources plus other large GHG emissions sources New source: 100,000 tpyCO2e and 100/250 tpy GHGs on a mass basis Modification: 75,000

• Step 3: Implementation f t ti l dditi lof potential additional phase‐in and streamlining options

• 5­year study: To examine GHG permitting

Study Completeexamine GHG permitting for smaller sources

• Implementation of rule based on 5‐year study

Source: EPA

22

Page 23: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Biogenic Sources

• CO2 emissions from biomass-fired and other biogenic sources are generated during the combustion or decomposition of biologically based materialdecomposition of biologically based material▫ Includes facilities that emit CO2 as a result of burning forest

or agricultural products for energy, wastewater treatment and livestock management facilities landfills and and livestock management facilities, landfills, and fermentation processes for ethanol production

• EPA will complete a rulemaking that will defer f b f d d hpermitting requirements for biomass fired and other

biogenic CO2 emissions for three years• (This was to be completed in July, but has been delayed.)(This was to be completed in July, but has been delayed.)

Source: EPA22

Page 24: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

New Source Review Summary

• Analyze Projects Critically to Avoid NSRLiability

j hi h fil ? • Is my project high profile? • Is project routine?

D I d t f i i l i ?• Do I need to perform an emissions analysis?• Is my emissions increase due to demand

growth? growth? • How do I add GHGs to my NSR emissions

analysis?analysis?

24

Page 25: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Reasonable Possibility Analyses for Reasonable Possibility Analyses for GHGs• Challenge: Need to develop five year baseline

GHGs and CO2e PTE for all existing units C id • Issues to Consider:

▫ Analyze causes of GHG fluctuations▫ Focus on potential new sources of GHGs like ▫ Focus on potential new sources of GHGs like

chemical processes such as FGDs (CO2) and new transmission equipment (SF6)q p ( 6)

▫ Analyze efficiency increases and potential contemporaneous creditable reductions in GHGs

25

Page 26: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Reasonable Possibility Analyses for Reasonable Possibility Analyses for GHGs: Closer Look• Baseline is not one size fits all• Options to develop baseline:▫ Is there any direct emissions data for the GHG at the Is there any direct emissions data for the GHG at the

plant▫ Formulas used in GHG Reporting Rule

AP 42 Factors for GHGs▫ AP-42 Factors for GHGs▫ Adjustments due to control equipment on unit▫ Leak rates of GHGs that are held in containers at plant

• Essential to develop a baseline using calculations that will be used in future projections (Apples to Apples comparison)Apples comparison)

26

Page 27: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Reasonable Possibility Analyses for Reasonable Possibility Analyses for GHGs: Closer Look

Carbon Dioxide COCarbon Dioxide CO22

• Good news: Many plants have CEMS data, easy d l b lito develop a baseline

• Bad news: The top GHG constituent of concernE l S bb d (CO t d d • Example: Scrubber upgrades (CO2 created due to limestone use in scrubber)

• Result: Must perform actual to projected actual • Result: Must perform actual to projected actual analysis and carefully consider CO2 significant net emissions increases

27

Page 28: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Reasonable Possibility Analyses for Reasonable Possibility Analyses for GHGs: Closer Look

Nitrous Oxide (Nitrous Oxide (NN22OO))• Unlikely to have actual emissions data• Evaluate how to calculate – GHG Reporting Rule

formula, AP-42C id SCR SNCR d l t f l t • Consider SCR, SNCR, and apply to formula to show impact of NOx reduction

28

Page 29: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Reasonable Possibility Analyses for Reasonable Possibility Analyses for GHGs: Closer Look

Methane (Methane (CHCH44))• Unlikely to have actual emissions data• Evaluate how to calculate – GHG Reporting Rule

formula, AP-42P b bl t i f l fi d b ti • Probably not an issue for coal-fired combustion units

• Requires consideration of other projects at the • Requires consideration of other projects at the major stationary source, e.g., landfill expansions

29

Page 30: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Reasonable Possibility Analyses for Reasonable Possibility Analyses for GHGs: Closer Look

Sulfur Hexafluoride (SFSulfur Hexafluoride (SF--6)6)• Unlikely to have actual emissions data

Issue for transmission system Is there • Issue for transmission system – Is there equipment at the stationary source that contains SF-6?

• Probably not an issue for coal-fired combustion unitsR i id ti f l k t f thi • Requires consideration of leak rate of this gas and whether it can be measured

• Isolate as unaffected by the project being Isolate as unaffected by the project being evaluated at the plant

30

Page 31: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Reasonable Possibility Analyses for Reasonable Possibility Analyses for GHGs: Closer Look

The Fluorocarbons (The Fluorocarbons (HFCsHFCs and and PFCsPFCs))• Unlikely to have actual emissions data

I d i f l i i d • Industries of concern are not electric power industry (chemical processing, air conditioners, fire fighting)

• Is there equipment at the stationary source that Is there equipment at the stationary source that contains HFCs or PFCs?

• Not an issue for coal-fired combustion units• Requires consideration of leak rate if any is found on

site• Isolate as unaffected by the project being evaluated at • Isolate as unaffected by the project being evaluated at

the plant31

Page 32: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Sample Typical NSR Actual to Projected Actual Analysis Formatp yp j y

32

Page 33: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

How do GHGs fit into the Typical NSR Actual How do GHGs fit into the Typical NSR Actual to Projected Actual Analysis Format?

• Some GHG pollutants fit (actual or calculated) and some do notO h i f h h d fi• Other options for those that do not fit:▫ In written NSR analysis, explain lack of

relationship to the project in accompanying relationship to the project in accompanying memorandum

▫ To do this, must have enough facts about those , ggases to make this case

▫ Calculate your COe based on numbers only for th th t t l l l t dthose that are actual or calculated

33

Page 34: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Title V Under GHG Tailoring Rule

• EPA’s guidance takes the position that GHGReporting Rule Requirements should not be i l d d Titl V it ditiincluded as Title V permit conditions

• Title V Petitions to Object Potential to accelerate BACT sooner than July • Potential to accelerate BACT sooner than July 2011 NSPS proposal deadline

• State GHG requirements are a wild card• State GHG requirements are a wild card• Potential impact of EPA’s delay on biomass

rules?

34

Page 35: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Thank you!

• Liz Williamson+1 (202) 282-5747 [email protected]

35

Page 36: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

GHG BACT ReviewMore than a case study…what the limit should look likeMore than a case study…what the limit should look like

George Holder, ERM

36

Page 37: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

BACT Definition“ i i li i i (i l di i ibl i i “an emissions limitation (including a visible emission

standard) based on the maximum degree of reduction for each pollutant subject to regulation under the Clean Air Act which would be emitted from any proposed major

i j difi i hi h h stationary source or major modification which the Administrator, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such facility through

li i f d i d il bl application of production processes and available methods, systems, and techniques, including fuel cleaning, clean fuels, or treatment or innovative fuel combustion techniques for control of each such pollutant….”

37

Page 38: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Guidance

• EPA guidance document “PSD and Title V Permitting Guidance for Greenhouse Gases” released November 2010; Revised March 2011released November 2010; Revised March 2011▫ Heavy reliance on energy efficiency▫ Add-on controls must be considered including CCS▫ No “Redefining” the source▫ No Redefining the source

• Additional EPA guidance documents also released for seven sectors, including coal-fired EGU with more specific discussions of how to address BACT▫ Documents focus on techniques to be considered as

opposed to defining BACT (i.e., information source)pp g ( , )

38

Page 39: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Experience to Date

EPA Comment Letters on Proposed GHGPermitting Actions at: ghttp://www.epa.gov/nsr/ghgcomment.html

As of December 2011 – 24 permits issuedAs of December 2011 24 permits issued

39

Page 40: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

GHG BACT Issues

• Need a TPY limit?• What averaging time? • How do you demonstrate compliance?• What does efficiency really mean?

Wh i h ld d d i h S d • What in the world do we do with Startup and Shutdown efficiency?What happens to efficiency over time?• What happens to efficiency over time?

• If I perform maintenance on my unit to keep the efficiency up is that RMRR?efficiency up, is that RMRR?

40

Page 41: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Project Purpose

• “Provide reliable and affordable power”• Defined power generation modes (Baseload, Core Load

Following, Seasonal Load, Peaking, Reserve)g, , g, )• Must maintain flexibility - A highly efficient unit that may be

fully utilized, but operational capability to perform in a load following mannerfollowing manner

“The business case for this unit depends on the flexibility to be bl t d t b th i Th f th itti able to respond to both scenarios. Therefore, the permitting

case must account for the most conservative scenario for the deployment of the unit which includes the less efficient core l d f ll i d d l d d f i ”load following or reduced load mode of operation”

41

Page 42: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Project Overview• Entergy Ninemile Point Unit 6• Entergy Ninemile Point Unit 6• Combined Cycle, Gas Turbine• 2 x 1, 7FA Class• Duct Firing• Supplemental ULSD Firing• Other GHG Sources:• Other GHG Sources:▫ Natural Gas Auxiliary Boiler▫ Diesel Emergency Generator▫ Diesel Emergency Firewater Pump

• Decommissioned two existing natural gas fired boilersboilers

42

Page 43: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

BACT Overview

• CCS considered, available, technically infeasible, eliminated Step 2 (Note EPA has made clear that CCS is now considered feasible)

• Initially used Step 4 to further argue against CCS using other adverse environmental impacts, logistical issues, and relative expense but that approach was rejected without a cost expense, but that approach was rejected without a cost effectiveness number. Today – that is the path forward. Note – Wolverine Power used $5/ton

E Effi i• Energy Efficiency▫ Because of 2 x 1 configuration, power from steam turbine

generator cannot be individually attributed to either GT – capped h dapproach used.

43

Page 44: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

… And, The Limit

7,630 BTU/kWHr7,630 BTU/kWHr

44

Page 45: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

The Actual Permit Language

• From the PSD Permit:

“BACT for control of Greenhouse Gas emissions from the Ninemile CCGT project shall be to properly operate and perform necessary routine maintenance repair and replacement routine maintenance, repair, and replacement at Unit 6 to maintain heat efficiency so that the gross heat rate shall be at or below 7,630 gross heat rate shall be at or below 7,630 BTU/kWHr (HHV) based on an annual average.”

45

Page 46: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Monitoring?

• For mass based limits, CO2 CEMS doesn’t address other pollutants.

d h l ll f i d • Need the long term average to allow for periods of less efficient operation – core load following, maybe wintertime operationmaybe wintertime operation.

46

Page 47: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

The TV Monitoring Language“Permittee shall measure and record both the total fuel input of Natural Gas and ultra low sulfur diesel (ULSD) (0.0015 wt%) fed to RLP025, CCGT-6A– Combined Cycle Unit 6A, and RLP026 CCGT-6B – Combined Cycle Unit 6B using fuel flow meters certified in accordance with 40 CFR Part 75 The 6B, using fuel flow meters certified in accordance with 40 CFR Part 75. The total gross power generation shall be directly measured at the units, RLP025 and RLP026. The total gross heat rate shall be determined by dividing the total gross power generation by the total fuel input. Total gross heat rate, gross power generation, and the fuel input data recordkeeping by electronic or hard copy monthly. Keep records of the total gross heat rate, gross power generation, and the fuel input each month, as well as the total gross heat rate, gross power generation, and the fuel input for the last gross heat rate, gross power generation, and the fuel input for the last twelve months. Submit report: Due annually, by the 31st of March. Report the total annual gross heat rate for the preceding calendar year.”

47

Page 48: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

How We Got There…Gross Heat Annual

Design Heat Balance Operating Case

Gross Power (kW)

Gross Heat Rate

(Btu/kWHr) (HHV) 1

Annual Operating

Time (Hours) 2

Annual Fuel Input

(MMBtu)Annual Gross

Power (kW-Hr)Gas Fired Operation w/Gas Fired Operation w/ HRSG Duct Firing 564,103 6,766 3,500 13,357,747 1,974,360,500Oil Fired Operation 575,878 7,079 500 2,038,311 287,939,000Reduced Load Gas Fired Operation 3 303 160 7 949 4 237 10 209 423 1 284 397 972Operation 303,160 7,949 4,237 10,209,423 1,284,397,972Startup and Shutdown 4 0 - 523 165,559 0Subtotal - - 8,760 25,771,059 3,546,697,472Total Annual Gross Heat Rate (Btu/kWHr) (HHV) 7,266Degradation Penalty (5%) 5 363Total Annual Gross Heat Rate (Btu/kWHr) (HHV) 7,630

48

Page 49: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Footnotes/Assumptions

1. Gross Heat Rate Preliminary2. DB Operation is inconsistent between this calcuation and

the criteria pollutant calculation; Hours are not a limitationp ;3. Reduced load is greater than 60% operation but less and

full load4 SU/SD from typical vendor supplied curves and includes SU 4. SU/SD from typical vendor supplied curves and includes SU

hold times5. “The degradation penalty envisions a natural decrease in

it ffi i ti ” I l d d id d d t unit efficiency over time.” Includes vendor provided data on the GT and engineering judgment for other equipment including the HRSG and steam generator

49

Page 50: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Wh t SWhat Says…

59345934

50

Page 51: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

How We Got There…G

Gross Heat Rate

Annual Operating A l l

Design Heat Balance Operating Case

Gross Power (kW)

Rate (Btu/kWHr)

(HHV) 1

Operating Time

(Hours) 2

Annual Fuel Input

(MMBtu)Annual Gross

Power (kW-Hr)Gas Fired Operation w/ HRSG Duct Firing 564 103 6 766 3 500 13 357 747 1 974 360 500HRSG Duct Firing 564,103 6,766 3,500 13,357,747 1,974,360,500Oil Fired Operation 575,878 7,079 500 2,038,311 287,939,000Reduced Load Gas Fired Operation 3 303,160 7,949 4,237 10,209,423 1,284,397,972

4Startup and Shutdown 4 0 - 523 165,559 0Subtotal - - 8,760 25,771,059 3,546,697,472Total Annual Gross Heat Rate (Btu/kWHr) (HHV) 7,266Degradation Penalty (5%) 5 363g y ( ) 363Total Annual Gross Heat Rate (Btu/kWHr) (HHV) 7,630

51

Page 52: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

BACT for Other Sources40 CFR Part 98 Tables C-1 and C-2

Source CO2 (lb/MMBtu) CH4 (lb/MMBtu) N2O (lb/MMBtu)

Aux Boiler 117 0.0022 0.0002

E Gen 163 0.0061 0.0014

FW Pump 163 0.0061 0.0014p 3 4

• Avoids a TPY limit• Natural Gas fired Auxiliary Boiler – “Proper operation and good combustion

i d ff Th fi i i i i l f l practices produces two effects. The first is to minimize natural gas fuel consumption by reducing energy waste as much as possible. The second is to lower the GWP effect by converting more CH4 into CO2.”

52

Page 53: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

EPA’s Comments

EPA Comment Letters on GHG Permitting Actionshttp://www.epa.gov/nsr/ghgcomment.html

It’s not there…

08/10/2011 Crawford Renewable Energy (PDF) (2pp 70k)08/10/2011 Crawford Renewable Energy (PDF) (2pp, 70k)08/16/2011 Showa Denko (PDF) (2pp, 87k)

09/12/2011 Abengoa Bioenergy (PDF) (8pp, 402k)09/12/2011 Abengoa Bioenergy (PDF) (8pp, 402k)

53

Page 54: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Why it worked?

• Collaboration▫ Team with LDEQ with EPA

Q i h d i h d kfl ▫ Two LDEQ meetings; hand-in-hand workflow through the approval process

• Preplanning• Preplanning• Managing expectations• Educating the Project Team• Educating the Project Team• Inherently green project• Early?Early?

54

Page 55: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Takeaways — Universal Comments

• EPA except in very unusual circumstances will insist on CO2eemissions limits

• Averaging time for GHG should be 12-month rolling averageg g g g• The Agency will require consideration of CO2 continuous

emission monitors and documented approach to other GHGs• Don’t forget to specify test methods for all pollutants • Don t forget to specify test methods for all pollutants

including GHGs• Address emissions during startup and shutdown

S b id d b i lik l i l• CCS must be considered but is likely not economical• EPA must have a check-list for review

55

Page 56: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Takeaways (2) — The Unusual• NSCR may be preferable to SCR due to N2O reductions – See U.S. Nitrogen

Permit• Don’t forget non-traditional sources such as:

Fi d t S C f d R bl E▫ Fire pumps and emergency generators – See Crawford Renewable Energy▫ Circuit Breakers which may be fugitive source of SF6 - See Hoosier Energy and

TEC (draft IDEM permit)

• For uncertain GHG emissions, include a “conservative” emissions limit as ,BACT and adjust downwards based on stack testing – See Elizabethtown Energy

• Permits should have ton per year and ton/megawatt-hour limits – See K tt R i P j tKennecott Repowering Project

• Carbon Capture is commercially available for low concentration streams (8 to 12%, such as gas turbines) – See University of Wisconsin

56

Page 57: The Future of Electric Generating Units Under the EPA’s ... · Thank you! • Ken Weiss, ERM +1 (610) 524-3897 ken.weiss@erm.com 7. PSD Applicability Calculations and Title V Considerations

Hopeful Recommendations

• Don’t accept everything you hear• With a little planning you can negotiate• A good technical argument helps• Work with your regulators (hopefully )