the eu framework programme for research and …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf ·...

34
Rules for Participation and Dissemination – Elements of the H2020 Model Grant Agreement Alexandros IATROU DG RTD – Deputy Head of Unit G.6 HORIZON 2020 THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND INNOVATION 1

Upload: others

Post on 31-May-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Rules for Participation and Dissemination – Elements of the H2020 Model Grant Agreement

Alexandros IATROU DG RTD – Deputy Head of Unit G.6

HORIZON 2020

THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND INNOVATION

1

Page 2: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Innovation,

Simplification

and Coherence

Rules for participation: Three main objectives

RfP Horizon

2020

Coherence Simplification

Innovation

Page 3: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

• A single set of rules • A single funding rate • A single indirect cost model • Further simplification efforts

I. Simplification and Coherence – Main Principles

Page 4: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Keeping flexibility where needed.

A single set of rules

etc.

EU Financial Regulation

Specific rules for participation

Covering all H2020 research and innovation actions

EU Financial Regulation

Specific rules for participation

Presenter
Presentation Notes
Based on the new Financial Regulation and its Rules of Application; Coherent with the rules of the other EU programmes (CIP, art.185 initiatives, art. 187 initiatives, EIT, Euratom);
Page 5: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

One project = One rate For all beneficiaries and all

activities in the grant.

Defined in the Work Programme:

‒ Up to 100 % of the eligible costs;

‒ but limited to a maximum of 70 % for innovation projects (exception for non-profit organisations - maximum of 100%)

‒ Specific reimbursement rates for programme co-fund actions

(*) Research and technological development includes scientific coordination. (**) For beneficiaries that are non-profit public bodies, secondary and higher education establishments, research organisations and SMEs (***) The reimbursement of indirect eligible costs, in the case of coordination and support actions, may reach a maximum 7% of the direct eligible costs, excluding the direct eligible costs for subcontracting and the costs of resources made available by third parties which are not used on the premises of the beneficiary. (****) Including research for the benefit of specific groups (in particular SMEs)

Maximum reimbursement

rates

Research and technological development activities (*)

Demonstration activities

Other activities

Network of excellence

50% 75% (**)

100%

Collaborative project(****)

50% 75% (**)

50% 100%

Coordination and support action

100% (***)

A single funding rate

FP7

Page 6: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Single indirect cost model

20% ? 60% ?

Real ?

Simplified?

Single model: 25 % Flat Rate

FP7

Presenter
Presentation Notes
Simplifying project management and reducing recurrent errors. Combined with practical guidance for large research infrastructures on how costs can be accepted as direct costs
Page 7: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Time to grant: speeding up the process

A maximum TTG of 8 months

5 months for informing all applicants

on scientific evaluation But likely earlier

up to 8 months for signature of GA

Some exceptions apply, including complex actions or where requested by applicants

Presenter
Presentation Notes
ERC, duly justified cases (complex actions) or where requested by applicants
Page 8: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Time to grant: speeding up the process cont'd

How to speed up the process Preparation rather than

negotiation: - Each proposal evaluated 'as it is', not as 'what

could be'

- Final GA based to maximum extent possible on Part B of the proposal

Legal entity and LEAR validated in parallel

No more paper: e-communication & e-signature of grants.

Presenter
Presentation Notes
Based GAs to the maximum extent possible on the Description of Work proposed by the applicant;
Page 9: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

• Excellence – Impact – Quality and efficiency of the action

Similar evaluation criteria with FP7

• No time-sheets for personnel working full time on a single project

Simpler time-recording requirements

• CFS only if total amount of the grant for the beneficiary as reimbursement of actual costs or average personnel costs is ≥ EUR 325.000 at the time of the payment of the balance

• Audit strategy focused on risk and fraud prevention

Fewer Certificates on Financial Statements and fewer but targeted audits

Other Simplification Efforts

Page 10: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Controls and Audits

Financial viability

Restricted to coordinators for projects ≥ €500 k€

Audit certificates

Only for final payments/per beneficiary /for actual costs ≥ €325 000 €

Optional Certificates on average personnel costs

Ex-post audits

Provisions in Horizon 2020 Regulations!

Commission's audits up to two years after payment of the balance

Audit strategy focused on risk and fraud prevention

Continuity with FP7 – 5% withheld from pre-financing

Guarantee Fund

Presenter
Presentation Notes
details in the MGA
Page 11: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

• Importance of Work Programme • Types of actions and forms of funding • International Participation and IPR

II. Innovation = What is new?

11

Page 12: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

The full legal framework of a H2020 action

Rules for Participation

+

WP General Annexes

+

Possible Specific Conditions of Call or Topic

+

Model Grant Agreement

The importance of the Work Programme

Page 13: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

According to the RfP, Work Programme may: • Restrict eligibility of participants from third countries (e.g. security concerns,

reciprocity)

• Introduce additional eligibility criteria

• Number of participants, type of participant and place of establishment

• Lay down further details for the application of the award criteria, and specify weighting and thresholds

• Specify third countries that are eligible for funding

• Specify the funding rate for an action

• Specify that lump sums or unit costs (other than average personnel costs) can be used for an action, subject to prior separate Commission Decision

• Identify beneficiaries for grants without a call for proposals

The importance of the Work Programme

Page 14: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

General Annexes: A. LIST OF COUNTRIES ELIGIBLE FOR FUNDING

B. STANDARD ADMISSIBILITY CONDITIONS AND RELATED REQUIREMENTS

C. STANDARD ELIGIBILITY CONDITIONS

D. TYPES OF ACTION: SPECIFIC PROVISIONS AND FUNDING RATES

E. SPECIFIC REQUIREMENTS FOR INNOVATION PROCUREMENT (PCP/PPI)

F. MODEL RULES OF CONTEST (ROC) FOR PRIZES

G. TECHNOLOGY READINESS LEVELS (TRL)

H. EVALUATION RULES

I. BUDGET FLEXIBILITY

J. ACTIONS INVOLVING CLASSIFIED INFORMATION

K. ACTIONS INVOLVING FINANCIAL SUPPORT TO THIRD PARTIES

The importance of the Work Programme cont'd

Page 15: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Research and Innovation Actions v. Innovation Actions (through collaborative projects)

Coordination and Support Actions (through calls for proposals or to identified beneficiaries)

Programme Co-fund Actions • ERA-NET

• PCP-PPI

• Marie Skłodowska-Curie (separate Work Programme)

• European Joint Programme (not in current Energy WPs)

Other Types of Actions • SME Instrument

• Financial Instruments

• Prizes

• Procurement (studies, conferences, specific services)

Types of Actions

Page 16: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Research and Innovation Actions – NO RfP definition but description in the WP annexes They are actions with Research and Development activities as the core of the project intending to establish new scientific and technical knowledge and/or explore the feasibility of a new or improved technology, product, process, service or solution

• 100% funding rate

"Pure" Innovation Actions – RfP definition "'Innovation action' means an action primarily consisting of activities directly aiming at producing plans and arrangements or designs for new, altered or improved products, processes or services. For this purpose they may include prototyping, testing, demonstrating, piloting, large-scale product validation and market replication"

• 70% funding rate (100% for non-profit legal entities)

At least three legal entities each established in a different Member State or an Associated Country

Types of Actions – Research/Innovation

Presenter
Presentation Notes
A ‘demonstration or pilot’ aims to validate the technical and economic viability of a new or improved technology, product, process, service or solution in an operational (or near to operational) environment, whether industrial or otherwise, involving where appropriate a larger scale prototype or demonstrator. A ‘market replication’ aims to support the first application/deployment in the market of an innovation that has already been demonstrated but not yet applied/deployed in the market due to market failures/barriers to uptake. 'Market replication' does not cover multiple applications in the market of an innovation that has already been applied successfully once in the market. ‘First’ means new at least to Europe or new at least to the application sector in question. Often such projects involve a validation of technical and economic performance at system level in real life operating conditions provided by the market
Page 17: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Coordination and Support Action

Actions consisting primarily of accompanying measures such as standardisation, dissemination, awareness-raising and communication, networking, coordination or support services, policy dialogues and mutual learning exercises and studies, including design studies for new infrastructure and may also include complementary activities of strategic planning, networking and coordination between programmes in different countries.

100% funding rate

One legal entity established in a Member State or in an Associated Country • Please check additional eligibility under Energy Efficiency call

Types of Actions – Coordination and Support

Page 18: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Programme co-fund: 'programme co-fund action' means an action funded through a grant the main purpose of which is supplementing individual calls or programmes funded by entities, other than Union bodies, managing research and innovation programmes. A programme co-fund action may also include complementary activities of networking and coordination between programmes in different countries'

•ERA-NET Cofund • 33% funding rate - at least three Programme Owners/Managers

•Pre-Commercial Procurement and Public Procurement of Innovative Solutions ('PCP'-'PPI') • PPI topic at 35% funding rate – at least three participants including two public

procurers in consort

•Marie Skłodowska-Curie (separate stand-alone H2020 WP)

•European Joint Programme ('EJP') Cofund – Not in Energy WP

Specific types of action – Programme co-fund

Page 19: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

SME Instrument

Fast Track to Innovation Pilot Referring to other parts of the H2020 Work Programme

Specific types of action - Instruments

Page 20: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Inducement and recognition prizes Three main aims: • Stimulate groundbreaking technologies

• Mobilize private research and innovation investments

• Generate public enthusiasm for new technologies

Subject to contests: • Directly foreseen in the Work Programme and organized by the Commission

• Organized by a beneficiary of a CSA

Prizes may be announced in the Work Programme and published (full rules of contest) at a later date

Specific types of actions - Prizes

20

Page 21: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Examples of specific eligibility criteria

21

EE-19-2017

PPI at 35% funding rate (instead of 20%)

EE-02-2017, EE-06-2016-2017, EE-09-2016-2017, EE-11-2016-2017, EE-13-2016, EE-15-2017, EE-18-2017, EE-23-2017, EE-24-2016-2017, EE-25-2016

CSA but three minimum participants

EE-16-2016-2017

CSA but three minimum participants Market surveillance authorities included

LCE-22-2016 Coordination with Brazil

LCE-23-2016 Coordination with Mexico

LCE-20-2016-2017 Off-take agreement requirement

SCC-1-2016-2017 SCC-02-2016-2017

Minimum "front-runner"/"follower" and "lighthouse"/"follower" cities

Page 22: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Participation

Open for all legal entities established in third countries and for international organisations.

International Cooperation

Restrictions only possible if introduced in the work programme.

For reciprocity reasons

For security reasons/sanctions

Funding

Third country identified in the Work Programme or

participation deemed by the Commission essential in the action or

when provided under a bilateral scientific and technological agreement

Page 23: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Ownership for the participant

Protection where appropriate

Exploitation

Dissemination

Intellectual Property Rights

We keep Transfer and exclusive

licences outside the EU/Euratom/Associated Countries

• the grant agreement may foresee right to object if a participant has received Union funding

Access rights

• for implementation and for exploitation purposes (also for affiliated entities established in MS/AC)

Tailor-made provisions in the MGA for EURATOM

Page 24: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

What is Additional exploitation/dissemination obligations

(in the work programme)

Open access:

• obligatory for scientific publications and,

• to research data (in appropriate areas and when foreseen in the work programme)

Access rights:

• for the Union/Euratom under all parts of the programme and,

• for MS under 'Secure societies',

Specific provisions:

• for pre-commercial public procurement and

• for procurement of innovative solutions

Intellectual Property Rights cont'd

NEW

Page 25: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

• Single article: subject of the agreement

Chapter 1: General

• Action, duration and budget

Chapter 2: Action

• Amount, reimbursement rates, eligible costs

Chapter 3: Grant

• To implement the action: resources, in-kind contributions, subcontracts • Grant administration: reporting, payments, audits • Background and results: access rights, protection of results, exploitation, dissemination • Others: gender equality, ethics, confidentiality

Chapter 4: Rights and obligations

• Roles and responsibilities, internal arrangements

Chapter 5: Division of roles

• Rejection, reduction, recovery and penalties • Suspension and termination of the action

Chapter 6: Rejection, reduction, penalties, termination, etc

• Accession, entry into force, amendments, applicable law

Chapter 7: Final provisions

III. The H2020 Model Grant Agreement

Page 26: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Annex 1: Description of the action

Annex 2: Estimated budget

Annex 3: Accession Forms, 3a & 3b

Annex 4: Financial statements

Annex 5: Certificate on the financial statements

Annex 6: Certificate on the methodology

Disclaimer: Information not legally binding

MGA – Annexes to the grant

Page 27: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Wider acceptance of average personnel costs Broadening the acceptance of usual cost accounting practices

(including cost-centre approaches) as unit costs.

Less requirements for time records Example: No time records for researchers working exclusively on the

project.

Acceptance of additional remuneration → Limited to non-profit legal entities → Up to 8000 Euro/year/person working full-time exclusively in

the action → Subject to specific conditions

MGA - Personnel costs: novelties

Page 28: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

MGA - Implementation The beneficiaries must have the appropriate

resources to implement the action If it is necessary to implement the action, they may however: • purchase goods, works and services – best value for money basis

• Public authorities subject to procurement rules • use subcontracting to implement action tasks – best value for money basis

• Public authorities subject to procurement rules • call upon "Linked Third Parties" to implement action tasks • use in-kind contributions (resources) provided by third parties against

payment or free of charge In principle, all major costs, third party involvement and subcontracting to be indicated in the Description of Work

Page 29: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Ben

efic

iary

Affiliated entities

Third parties with a legal link

Subcontractors

MGA - Third Parties carrying out work in the action – Linked Third Parties

• Equivalent to FP7 Special Clause 10

• Must be identified in the GA

• Same cost eligibility criteria than beneficiaries

• NEW: COM or Agency may request them to accept joint and several liability for their EU contribution

• Article 14 MGA

Linked third parties

!

Page 30: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Ben

efic

iary

Affiliated entities

Third parties with a legal link

Subcontractors

MGA - Third Parties carrying out work in the action - Subcontractors

• Ensure best value for money and avoid any conflict of interests

• Estimated costs and tasks must be identified in the budget and Annex 1

• NEW: if not identified in Annex 1, Commission may still approve them (beneficiary bears the risk of rejection)

• Article 13 MGA

Linked third parties

!

Page 31: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

MGA – Other Third Parties B

enef

icia

ry

Contracts necessary for the implementation

Contributions in kind

• For the purchase of goods, works or services

• Ensure best value for money and avoid any conflict of interests

• Article 10 MGA

• Free of charge or against payment are eligible costs if they meet the eligibility conditions

• Must be set out in Annex 1

• NEW:if not identified in Annex 1, Commission may still approve them (beneficiary bears the risk of rejection)

• Articles 11 & 12 MGA

!

Page 32: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Income generated by the action

(except for action´s results)

Income generated from the sale of assets purchased in the

GA

In-kind contributions: -specifically for the action -received free of charge

Financial contributions specifically assigned by the donors to finance

the eligible costs

Receipts

Receipts

No-profit rule applied at project level, not per beneficiary!

Page 33: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

Further Information

Questions? Research Enquiry Service http://ec.europa.eu/research/enquiries

Participant Portal - http://ec.europa.eu/research/participants/portal/desktop/en/home.html

Horizon 2020 On-line Manual http://ec.europa.eu/research/participants/portal/desktop/en/funding/guide.html#

Horizon 2020 Documents http://ec.europa.eu/research/participants/portal/desktop/en/funding/reference_docs.html

Page 34: THE EU FRAMEWORK PROGRAMME FOR RESEARCH AND …ec.europa.eu/inea/sites/inea/files/a_iatrou_0.pdf · ppi) f. model rules of contest (roc) for prizes g. technology readiness levels

HORIZON 2020

Thank you very much for your attention!