    Sometime after the termination of World War I, the War

    Department, in conjunction with the Class I railroads,

    formed paper organizations of Railway Operating Battalionswhich were designated reserve elements under the Corps of

    Engineers. Until the beginning of World War II, however,

    the Battalions remained on paper; but then the WarDepartment called on the railroads to supply officer

    personnel for the formation of Units, the enlisted personnel

    to be drawn from inductees who had had civilian railroadexperience.

    The Chesapeake and Ohio Railway Company was called on

    in summer of 1942 to supply qualified men for filling the

    positions of officers, but it was not until April of 1943 that

    appointment began coming through. The first officer wascalled for active duty on 10 August 1943 and the others on

    28 and 29 October. All positions had not been filled and

    men from other railways were assigned to the organization,which had been designated the 740th. In the meantime,

    military railway units had been transferred from the

    Engineers to the Transportation Corps, and all officers wererequired to undergo a basic military training course at the

    Transportation Corps Officer's Training School at Fort

    Slocum, New York. The 740th-to-be- officers graduated on2 December.

    The next duty station was the Transportation Corps, Army

    Charles W. HEFFNER

    740th Raiwlay

    Operating Battalion

    http://www.criba.be/index.php?option=com_content&task=view&id=148&Itemid=4http://www.criba.be/index.php?option=com_content&task=view&id=148&Itemid=4
  • 8/14/2019 The 740th Railway Operating Battalion

    2/14

    Service Forces, and Unit Training Center at Camp Plauche,

    New Orleans, Louisiana, where the Battalion was activated

    on 14 December 1943 Completing basic training at CampPlauche, the Battalion departed on 23 January 1944 for

    Camp William C. Reid, Clovis, New Mexico, to take

    technical training on the Santa Fe Railroad, where it arrivedon 25 January. The training territory was from Amarilla,

    Texas, on the east, to Belen, New Mexico, on the west, and

    on the branch line from Clovis south to Carlsbad. Operatorswere assigned, track gangs, bridge and building forces and

    telegraph and signalmen were scattered over the line with

    the Santa Fe workers. Shopman were placed in the engine

    houses at Clovis, New Mexico and Amarillo, Texas, andtrain and engine crews assigned to road and yard service.

    Technical training was completed on 30 April and the

    Battalion began marking time pending receipt of overseas

    orders. The interim was filled in by an intensified militarytraining program, recreation, etc. Finally, on 20 May 1944

    the advance party of two officers and one enlisted man

    departed for the New York Port of Embarkation, fromwhere they sailed on 29 May, arriving at Liverpool on 5

    June and debarking on 7 June. The Battalion left Camp Reid

    on 2 July and sailed from New York on 18 July, arriving atLiverpool on the 29th and debarking on the 30th. From there

    it proceeded to St. Mellons, near Cardiff, Wales, where it

    was split up into twenty detachments for work in the various

    General Depots throughout midland and southern England.

    Battalion Headquarters were established at Egginton,Derbyshire, on 1 August. On 5 August orders were received

    to call in the Detachments and assemble at St. Mellons formovement overseas. Reaching St. Mellons on the 7th, the

    Battalion remained until the 9th when it left for the

    Marshalling Area in Nightingale Woods at Eastleigh, justnorth of Southampton. 13th of August saw the Unit

    embarking for the continent; Battalion Headquarters, and

    Headquarters, "A" and "B" Companies, loading on one

    transport and Company "C" on another. The convoy arrivedoff Utah Beach the next day and while Company "C"

    debarked immediately, the other Companies did not landuntil 16th. On landing of Company "C", one detachmentwas sent to Cherbourg to run engines east to Mayenne; truck

    on the 14th, and the balance on the 15th sent one to

    Mayenne.

    When the other Companies landed they spent the night in abivouac area, with part leaving the area at noon on the 17th

  • 8/14/2019 The 740th Railway Operating Battalion

    3/14

    and arriving at Mayenne that night, and the remainder

    leaving about midnight and arriving at Mayenne the

    afternoon of the 18th.

    As of this time, tracks had been restored from the beaches

    and Cherbourg through Coutances, Folligny, Avranches,Pontaboult, Mayenne, La Chapelle and Sille Le Guillaume

    to Le Mans, the railhead. The line from Pontaboult throughMayenne to La Chapelle was a secondary single-track

    railroad, the selection of which was made necessary because

    the high bridge at Laval, just west of La Chapelle, on thedouble track Rennes-Le Mans line, had been blown up. The

    718th Railway Operating Battalion, which crossed the

    channel in the same convoy with the 740th, had its eastern

    terminus at Mayenne.

    When the Battalion arrived at Mayenne, it was withoutsupplies or equipment, insufficient time having been

    allowed in the United Kingdom to accumulate them, and

    found trains waiting to be run east, only one track open, allbuildings severely damaged by bombing, no communication

    lines to the east, and the one to the west inoperative; very

    little water in the tank and the pump broken; only 15 tons ofcoal on hand with the nearest supply 65 kilometers away; no

    roundhouse facilities available, and no flagging equipment.

    Information was received that 31 trains of ammunition,rations and gasoline that General Patton said was required to

    enable him to take Paris in 20 days, were on the waythrough. Three of these trains had passed Mayenne by the

    17th of August, but on the afternoon of that day, crews ofBattalion relieved at Mayenne, all crews of other Battalions

    to the west.

    From this beginning, trains were operated to the east on

    manual block system; then lenemen opened a circuit to theeast, and assisted in the repair of the line west to Fougeres;

  • 8/14/2019 The 740th Railway Operating Battalion

    4/14

    track laborers, with a motley and inadequate collection of

    tools, restored three yard tracks at Mayenne and started on

    the removal of slow orders between that point and LaChapelle; and old reciprocating steam pump that had not

    been used for years was repaired and used for pumping

    water to the tank from the river; a small open air engineterminal was established; a supply of very poor coal was

    sent in, and an additional water pint was provided at Erne

    as the pump at Mayenne continually gave trouble.

    An officer to take charge of the railhead operations was sentto Le Mans on 19 August, but as this was the scene of our

    principal operations, Battalion Headquarters were moved

    there on 22 August, leaving a detachment at Mayenne.

    Le Mans, one of the largest rail terminals in France, wasfound to have been given a severe bombing and was almost

    completely demolished. As of the 22nd of August, only onemain line into the terminal and two yard tracks had beenrestored. Orders were received to begin the rehabilitation of

    the yard for increased unloading. This was a stupendous

    task. The terminal was a twisted mass of wrecked

    locomotives, cars, rails, ties, buildings, etc. The work wasplanned and started and continued under the supervision of

    this Battalion, but on arrival at Le Mans of the 712th and

    722nd Railway Operating Battalions, their trackmen werealso assigned to this work. While operations of Le Mans

    terminal was assigned to the 712th Railway Operating

    Battalion effective 31 August, the SuperintendentMaintenance of Way of this Battalion remained in charge of

    the rehabilitation on request of the Commanding Officer of

    the 706th Railway Grand Division. To 15 September, when

    the Battalion was transferred from this territory, 20 yardtracks, the 'loop' tracks and five engine house tracks had

    been restored for service.

  • 8/14/2019 The 740th Railway Operating Battalion

    5/14

    When the Maintenance of Equipment Company moved into

    the engine terminal on 20 August, they found it deserted.

    One roundhouse had been completely destroyed, the otherbadly damaged and the machine shop about two thirds

    wrecked. Bomb craters, collapsed walls and beams, wrecked

    locomotives and machinery proved a great obstacle tosetting up shop. Men were assigned the job of clearing a

    working space, and a survey was made of the tracks to

    determine what would be necessary to get engines into theshop. This revealed that one track could be used with a little

    repair work. When a search failed to locate tools,

    blacksmiths were assigned the task of making wrenches,

    hammers, screw drivers, punches, chisels, etc., so that theother crafts could go to work. Oil was no problem The

    Germans had left a large quantity. The mechanism of the

    turntable had been damaged and had to be manually

    operated, requiring the services of eight to ten men eachtime an engine left the roundhouse. Despite these handicaps,

    engines were serviced and light repairs made and there wasno delay to movements due to lack of power. While the

    764th Railway Shop Battalion moved into Le Mans and

    took over the back shop about 1 September and jurisdiction

    of the entire terminal was assigned to the 712th RailwayOperating Battalion on 30 August, shopmen of this Unit

    continued to work in the shops until the Battalion was

    assigned to another sector on 15 September.

    The Car Platoon also suffered from lack of tools with a

    tremendous job facing it. Soon after arriving at Le Mans, acall was made for every available empty car for the ports.

    Great numbers of cars, of all European nationalities and inall states of condition were in the yard. Many were

    completely wrecked, some required minor repairs and a

    large number were serviceable but on tracks that had hadswitches or leads blown out. To get out these cars, track

    repair was necessary and then frequently the use of an old

    French 'tea kettle' hook that had been resurrected, was

    required to clear out damaged cars and locomotives thatwere blocking exits. The car shop was completely wrecked.

    On arriving a search was made for tools, brasses, and otherequipment. Baling wire was used to make repairs to cars intransit. Journal brass was a problem until a Frenchman

    informed the car force that some American brasses were

    stored in an old warehouse uptown. On investigation, it wasfound this brass had been sent over in 1918 for use on

    World War I equipment. It was collected and immediately

  • 8/14/2019 The 740th Railway Operating Battalion

    6/14

    put to use.

    For the first few days of operation between Mayenne and Le

    Mans, the very crudest of operating conditions prevailed.

    On the completion of the communication circuit dispatchersand operators were placed. At night, absolute blocking was

    in force, with both permissive and absolute blocking,

    depending on conditions, prevailing in the daytime. Trainswere operated and switching performed at night by thetrainmen using personal flashlights, cigarettes lighters and

    lighted cigarettes for flagging. Crews were on the road as

    long as 96 hours, catching catnaps in cabs and cabooses.The Germans that had been bypassed at Mayenne by the

    combat forces, cut the wires night after night, and sniped at

    passing trains, and at yard and engine house men.

    Until the end of August, no civilian traffic was permitted onthe railroad. The food situation in Paris was so acute,

    however, that the French were finally permitted to move so

    much tonnage per day over the road. By this time the linehad been restored through Chartres and Dreux to the

    outskirts of Paris.

    In reassignment of territory effective 30 August, the 740th,

    which was under the 708th Railway Grand Division, gaveup the Le Mans terminal and the line to Paris, retaining the

    line from Mayenne to the west switch of the Mans yard, and

  • 8/14/2019 The 740th Railway Operating Battalion

    7/14

    being assigned the double track road from Surdon to Le

    Mans. Only one track on this latter line was open, but

    trackmen sent to Alenon opened for traffic 15 miles ofsecond track to 14 September. Effective 31 August, the

    bridge at Laval was completed and traffic was then routed

    through Rennes; the first train over the bridge being loadedwith potatoes destined for Paris. All operation over the

    secondary railroad from Mayenne to La Chapelle was

    discontinued effective 4 September.

    In the meantime, the Engineers were engaged inrehabilitating the northerly and more direct rail route from

    the beaches and Cherbourg to Paris; and one completion

    thereof on 14 September the roundabout line from Follignyto Rennes, thence through Laval, Le Mans, Chartres and

    Dreux to Paris was discontinued as the main supply route

    and it's operation turned over to the French.

    The Battalion had been well baptized. It had learned underwhat conditions it was expected to perform; conditions that

    in civilian life would have been deemed impossible, testing

    the intelligence, ingenuity and physical stamina of every

    officer and enlisted man. Suffice it to say that without GIsupplies of any kind until 30 August (when our supplies and

    equipment started catching up), the road, yard, motive

    power and communication facilities and operating practiceshad been improved to the extent that from the handling of

    36 trains in the first six days, 45 trains were handled on 13

    September.Concurrently with turning over the Rennes Le Mans linephase III operation, the Battalion received orders to move to

    Laon, France, for operation of the railroad from there to

    railheads in Belgium. West of Paris we had served the ThirdArmy, but with arrival at Laon on 17 September, we began a

    service to the First Army that continued without interruption

    until after V-E day.

    As the Army rapidly advanced until it reached the defensesof the Siegfried Line, the Engineers restored a single track

    line, and as that was done, the Battalion moved in and

    established railheads; then improved the roadbed for

    operation at higher speeds, opened yard tracks for increasedtraffic, and constructed additional communication lines. As

    of 17 September, one track had been restored to Liege,

    Belgium, the most advanced railhead. A circuitous routereached this over secondary roads, mainly, from Laon

    through Liart, Hirson and Anor, France; and Mariembourg,

  • 8/14/2019 The 740th Railway Operating Battalion

    8/14

    Charleroi, Gembloux, Ramillies, Namur and Huy, Belgium.

    On 25 September, however, restoration of the bridge over

    the Meuse River into the Liege Guillemins passenger stationwas completed. While this station was a bottle neck, trains

    having to pull in, the engines run around the cars and then

    coupled on again and run east, it re-opened Liege as the hubof railroad supply lines to the east, north and south, and

    Advance Section, Communications Zone, and Air Corps

    Units to the West. One of these lines ran north to Vise,another through Chenee to Pepinster, and the other from

    Chenee to Herve.

    While the combat forces were butting against the Siegfried

    Line, restoration of the lines east of Liege were in progress,and continued so until finally railheads were established

    only a few kilometers behind the line. On 2 October 1944,

    rail territory was reassigned giving to the 740th all lines

    from Namur to the railheads. This brought the Headquartersup to Liege on 4 October.

    LiegeLiege, Incidentally, is also a province, not only a city;

    although Guillemins, Ans, Longdoz, Bressoux, Tilleur,Kinkempois, Renory, etc, are so closely grouped they

    appear to be one big city. Effective 5 October, the road east

    from Vise through Remersdael and Montzen to Herbesthalwas opened, and later in the month, the track was restored

    from Herbesthal to the Belgian-German border town of

    Raeren. The opening of operation of the Vise-Herbesthalline was just another case of getting a supply road opened

    quickly. It was a circuitous route from Liege to Herbesthal,

    but was the more feasible of the two that could be quicklyrestored while work was in progress on the bomb-damaged

    bridge just east of Pepinster. Outside of distance, another

    objection was that at Remersdael, the road was on an

    ascending grade in the direction of loads through a tunnel,from the lining of which seepage caused slippery rails. With

    the completion on 21 October of the bridge east of

    Pepinster, traffic for Herbesthal and east was routed over

    this line.

    On 15 October, the Gembloux Landen Ans Liege Line

    was opened to relieve traffic conditions on the one through

    Namur Huy Liege. To ever come some of the difficultiesat the Liege-Guillemins station, Company "B" and

    Company "C" were moved to Ans so that engines and crews

    could be changed there.

    Ninth Army units began moving into Holland in the early

  • 8/14/2019 The 740th Railway Operating Battalion

    9/14

    There were no changes in assigned territory during the first

    half of November, but improvements to track and structures

    were still in progress. Company "A" track forces restoredthe track into Germany as far as Walheim, which had been

    chosen as a prospective railhead. No heavy work was

    involved except where the line runs through the 'DragonsTeeth' at Smithoff, and there it was found the work was not

    only heavy but also dangerous. The first swipe of the

    bulldozer blade raked up four mines. Before completion ofthe job, a total of twenty-five were removed. The work was

    completed on 7 November and on that day a work train of

    Company "A" passed through the Siegfried line; followed

    on 14 November by the first of two trains of Engineer

    supplies and equipment for Walheim. While the track wasready for operation, First Army authorities refused to grant

    permission to establish a railhead at Walheim, giving as thereason that it was too close to the front line.

    To overcome the objectionable operation through Liege-

    Guillemins passenger station, construction of a bridge at

    Flemalle-Grande over the Meuse and the restoration oftracks in Kinkempois yard had been started in October.

    With the completion of the bridge on 14 November, the bulk

    of the traffic was routed over the Namur Huy Kinkempois line. Kinkempois yard was another Le Mans

    and Laon. Concurrently with the completion of the bridge,three tracks on the Maastricht side of the yard, five on theHerbesthal side and three stub tracks were ready for use.

    This brought a reassignment of operating territory effective

    as of 15 November, whereby the 740th gave up all lines

    west of the Meuse River and took over all east of the Meusein Belgium and Holland; i.e.:

  • 8/14/2019 The 740th Railway Operating Battalion

    10/14

    Flemalle-Grande to Raeren, via Kinkempois, Chenee,

    Pepinster and Herbesthal.

    Chenee to Battice.

    Chenee to Herbesthal, via Vise and Montzen

    Vise, through Maastricht to Schinnen and Wylra Gulpen.

    The line in Holland was extended during November andDecember eastward to Kerkrade and Kerkrade-Rolduc. The

    lines east and north of Maastricht resembled a crude figure

    '8', with Maastricht and Sittard on the west, Schinop-Gueland Heerlen in the middle, and Kerkrade and Kerkrade-

    Rolduc on the east. Except for the short stretch between the

    last named two stations, the line was in operating condition,although after Sittard had been shelled by artillery several

    times, the section north from Maastricht was discontinued.

    The only other extension of note in December was fromPepinster to Malmedy where a gasoline railhead wasestablished on the 14th. This operation was short-lived. The

    German break-through in the Ardennes swept quickly into

    Malmedy and the last train in on 16 December was turned

    around and brought it's load right back, out. At that, thecrew had to locate a track gang to replace a rail length that

    had been blown out by an aerial bomb between the up and

    down trips. Besides abandonment of this line, all supplieseast of Pepinster on the road to Herbesthal and Raeren were

    evacuated to depots west of the Meuse, and traffic east of

    Pepinster practically ceased until after the enemy was drivenback across the border.

    Again on 1 January 1945 the Battalion relinquished the lines

    in Holland. This time for good. The 734th Railway

    Operating Battalion arrived just after Christmas and wasassigned the territory north from the east switch at Liege

    Bressoux. The only other changes to the end of January

    were the opening up of the branch out of Angleur south toTrois-Ponts on 17 January, and resumption of service on the

    Malmedy line to Sart-lez-Spa on 25 January. Repairs to this

    line continued through January and most of February until

    the entire loop (a scenic route through the northern part ofthe Ardennes) Pepinster Stavelot Malmedy Waimes

    Weywertz Roetgen Raeren was in operation.

  • 8/14/2019 The 740th Railway Operating Battalion

    11/14

    Reconstruction work was in progress on the line throughRaeren and Walheim to Stolberg, and on 7 February the first

    freight railhead in Germany was established at Walheim.

    This was not the first train operation into Germany;

    however, as the Battalion had run trains into Walheim andAachen as far back as November. While the road was

    opened to Stolberg by the 8th of February, further extensionof rail service was stopped until the first part of March thebridge and tunnel work necessary between that point and

    Eschweiler. Extension of the line east necessarily caused a

    reassignment of territory. Effective 1 March, the Battaliongave up line except the one from the east switch at Chenee,

    through Pepinster, Herbesthal and Raeren, Belgium, to

    Stolberg, Germany; and the loop Pepinster Stavelot Malmedy Weywertz Raeren. There was assigned the line

    from Aachen West (exclusive) to Stolberg to connect up

    with the Maastricht Aachen line. Battalion Headquarters

    was moved from Liege and opened at Aachen on 8 March.On completion of the bridge and tunnel work just east of

    Stolberg, rapid progress was made in restoring a single-track

    line through to Duren, then Zulpich, then Euskirchen, then

    Bonn and then Urmitz Again on 19 March a reassignmentof territory was announced. Under this, the 740th

    relinquished the line from Chenee to Herbesthal, and of the

    loop, retained only that part between Raeren and Weywertz.

  • 8/14/2019 The 740th Railway Operating Battalion

    12/14

    A complete account of the activities of the various

    Companies and sections of the 740th Battalion would fill

    several books Beginning with the operation at Laon, ournotes include the following:

    Arriving on 17 September the railroad was in a very

    disorganized state. Through communications did not exist.

    Railway maps were hard to find and the average Frenchrailway employee did not know anything about general

    conditions. While we were operating in Phase II, due to lack

    of communications, we actually had no centralized control.Trains were blocked and operated by the French

    stationmasters. G.I. operators were placed at the more

    important stations, and by various methods ofcommunications, managed to maintain some sort of train's

    records. When the Battalion moved to Liege, we found

    conditions not much improved. This area was directly in the

    rear of the First Army and we were faced with the problemof establishing and supervising a large number of railheads.

    The Belgian soon set up a system of centralized dispatching.

    Our dispatchers kept joint records with them, and operatorswere placed in their block offices.

    . When the assigned territory was changed on 2 October,

    Company "A" was sent to Herbesthal due to the fact this

    was German territory prior to 1918 and there was very littlenative labor to rely on for maintenance. In addition to

    performing normal maintenance around Herbesthal, men

    from this Company acted as guards for bridges and tunnelsbetween St. Martin and Remersdael and at Berneau until

    relieve by the Belgian F.I. A track gang was also sent to

    Maastricht to open additional tracks. The Telephone and

    Signal section found some communication lines to the frontalready installed by Signal Corps, had to install others, and

    patched up German cables when found and suitable for use.

    At Laon switchboards were installed in the Headquarters ofthe 740th and 708th Railway Grand Division; and from the

    740th board, lines were run to all companies, dispatcher's

    office, motor pool, the towers, sand house, roundhouse, etc.

    One dispatcher's circuit and a message circuit were patchedup between Laon and Hirson. When the railroad from

    Namur to the railheads was taken over, lines were installed

    from Liege to Tilleur; at Ans from station to Company "C"engine house and to each end of the yard; from switchboard

    at Liege to dispatcher, Chief Dispatcher; yard office; Tower

    2; roundhouse; barracks; motor pool, 741st Headquarters;two trunks to the 708th; yard office to Tower 2; roundhouse,

  • 8/14/2019 The 740th Railway Operating Battalion

    13/14

    and from 708th switchboard to the Belgian board in Liege.

    From Liege to Namur, and Liege to Herve Verviers

    Herbesthal, German cables were used. From Liege toPepinster, through Chenee and Trooz; Liege to Maastricht,

    Holland, via Vise; and from Liege to Landen via Ans,

    German circuits were rehabilitated. In one instance whenwire ran out, a wire fence along the right of way was used.

    At Laon, messes were established for all companies, and in

    addition, a 24-hour mess was opened at the passenger

    station. On moving to Liege, 24-hour messes wereestablished at Liege, Ans, Pepinster, Herbesthal and

    Maastricht, with regular messes at Headquarters Company,

    Company "B" and Office's Quarters. Rations weredistributed by truck to all men yardmen; telegraph

    operators, car inspectors, switching and pusher crews, and

    linemen.

    For one period while Headquarters were at Liege, theBattalion served a total of 31 railheads. The table of

    organization allowed three yardmasters. Because the

    number of railheads, conductors and brakemen were utilized

    as yardmasters. Officers from other companies were detailedto duty with Company "C" as railhead commanders.

    Although Belgian and Dutch crews were utilized, and crews

    were reduced to four, and sometimes three men, a shortage,

    and a crew that spent less than four continually plagued fivedays or us on the road without rest was the exception.

    Company "C" of the 741st Railway Operating Battalion,newly arrived from the States was attached about the middleof October and this helped to ease the situation. A few days

    later, the main body of the 741st reached Maastricht, and the

    line in Holland was turned over to it

    The numbers of individual acts of heroism are toonumerous to attempt to record here, and this is true also of

    the men who put in long, arduous hours of toil in all

    companies and sections. The Battalion has ample reason tobe proud of its men individually and collectively; and higher

    headquarters, as well as the First Army have commanded its

    achievements, and the Traffic Regulating Station with

    which it was longest associated. Some of the achievementsof special note are:

    During the period 20 November 1944 to 28 January 1945,

    when Liege and vicinity were subjected to an intensive

    barrage of robot bombing (V-1 and V-2), and, in addition,during the period 16 December 1944 to the end of the month

  • 8/14/2019 The 740th Railway Operating Battalion

    14/14

    to aerial bombing and strafing attacks, the Battalion suffered

    casualties of eight killed and thirty-three wounded, besides

    damage to tracks and equipment and constant interruption tocommunication lines. The 'Battle of the Bulge' caused the

    Battalion to cease operations entirely on the Malmedy

    branch and the line east of Herbesthal. All supplies andmaterial from railheads at Malmedy, Eupen, and Herbesthal

    were evacuated and moved west of the Meuse River. All

    guards were doubled and men of Company "A" spent theirnights in foxholes south of the town of Herbesthal.

    Although conditions in Liege and environs at times

    approximated from line conditions, the Battalion (to borrow

    from a letter from the Commander of the 708th RailwayGrand Division) did not "back up inch or lose one ounce of

    supplies entrusted to its charge." "Buzz Bomb Alley" will

    long remain in the memories of the veterans of this Unit.