Schedule
•Behavior of the clamp and Zerodur bar in the cold condition
•Sine low level (check the numerical analysis)
•Qualification sine test and random test (after optical test)
•Implementation for the cold test
•Conclusions
}done
Star the test Check the parameters
Specimen in the liquid nitrogen view from outside
Temperature probe
Clamp
Dummy mirror line
Vibration test
•Sine low level (check the numerical analysis) done
•Qualification sine test and random test (after optical test)
Dummy (aluminum) stack
Shaker interface
4 x 3 screw M4
Dummy (zerodur) mirror line
X
Z
Displacement probe
Displacement probe Y
Driver 1
Driver 2
Driver 3
Dummy (aluminum) mirror line
Hz
g
0,5g
20Hz 2000Hz2oct/mn = 3’19"
Hz
g
20g
20Hz 100Hz2oct/mn = 2’10"
5Hz
1g
Sine low level (on each axis) done
Qualification sine (on each axis)
-15dB
-12dB
-9dB
-6dB
-3dB
0dB
s
dB
30s 30sTiming = 3 mn
1,86g RMS
10,5g RMS
2 mn
2,63g RMS
3,72g RMS
5,26g RMS
7,43g RMS
Hz
g2/Hz
0,15g2/Hz
100Hz 400HzTiming = 2’
20Hz
0,03g2/Hz
2000Hz
0dB
3dB/oc
t -5dB/oct
10,5g RMS
0,01g2/Hz
Random(on each axis)
Vacuum chamber
Radiation shield 500 x 460 (aluminum)
Cold plate 500 (aluminum)
Entrance window150
Exit window 150
Cryostat of the university of Durham
Cryogenic cooler (2)
Implementation forthe cold test
Cold plate 500
(aluminum)
Ring interface (aluminum)
Foot (aluminum)
Bipod arm (G10)
Screw
Bipod node(Stainless steel or invar)
Isostatic 3 point mount
Bracket(invar)
Conclusions
• Test of the clamping done Nothing broken so the result is OK
•Sine low level doneI haven’t enough time to give an conclusion (see the report)
•Vibration test (qualification sine and random)in accordance to our shaker, we suggest this profile (qualification sine and random) to test the prototype
•Implementation status (in progress)