targets and potentials in leading wind power markets

11
Targets and potentials in leading wind power markets Jacopo Moccia Member State Liaison European Wind Energy Association 21 April 2010

Upload: kyle-dennis

Post on 30-Dec-2015

27 views

Category:

Documents


0 download

DESCRIPTION

Targets and potentials in leading wind power markets. Jacopo Moccia Member State Liaison European Wind Energy Association. 21 April 2010. Outline. 2009 installations Cumulative analysis Targets and potentials in France Spain Sweden. 2009 installations. 2009 installations. - PowerPoint PPT Presentation

TRANSCRIPT

Targets and potentials in leading wind power markets

Jacopo MocciaMember State LiaisonEuropean Wind Energy Association 21 April 2010

Outline

• 2009 installations• Cumulative analysis• Targets and potentials in

– France– Spain– Sweden

2009 installations

2009 installations

Biggest EU markets:

Cumulative:n°1 Germanyn°2 Spainn°3 Italyn°4 Francen°5 United Kingdomn°6 Portugaln°7 Denmarkn°8 Swedenn°9 Ireland

Annual (2009):n°1 Spainn°2 Germanyn°3 Italyn°4 Francen°5 United Kingdomn°6 Portugaln°7 Swedenn°8 Denmarkn°9 Ireland

2009 installations

Cumulative analysis

Cumulative analysis

2000 2001 2002 2003 2004 2005 2006 2007 2008 20090%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2740

3815

5234

4272

4112

3595

3840

5178

3277 47

11

469

613

739

1238

1727

2608

3752

3358

4985 54

53

Rest of EUDK-DE-ES

Targets and potentials in France

Annual installations:2006: 810 MW2007: 888 MW2008: 950 MW2009: 1,088 MW

Government 2020 target: 25 GW (19 GW onshore 6 GW offshore)Annual growth required: 1,319 MW onshore – 545 MW offshore

EWEA 2020 forecast: 23 GW – 26 GW(of which 4 GW – 6 GW offshore)Annual growth required: 1,680 MW– 1,950

MW(of which 364 MW – 545 MW offshore)

Targets and potentials in Spain

Annual installations:2006: 1,595 MW2007: 3,508 MW2008: 1,609 MW2009: 2,459 MW

Government 2020 target: 40 GW (35 GW onshore 5 GW offshore)Annual growth capped to: +/- 1,5 GW onshore up to 2020

EWEA 2020 forecast: 40 GW – 42.5 GW(of which 1 GW – 1.5 GW offshore)Annual growth required: 1,9 GW– 2.1 GW

Targets and potentials in Sweden

Annual installations:2006: 62 MW2007: 217 MW2008: 262 MW2009: 512 MW

Forecast:2010: 350 MW2011 to 2015: 450 MW per year

Government 2020 target: Increase by 10 TWh

(increase of 4 to 6 GW installed capacity)

EWEA 2020 forecast: 9 GW – 11 GW(of which 3 GW offshore)

Thank You

www.ewea.org

RENEWABLE ENERGY HOUSE63-65 RUE D’ARLONB-1040 BRUSSELS

T: +32 2 546 1940F: +32 2 546 1944E: [email protected]