Synchrophasor : Implementation,Testing & Operational Experience. Uttam Mishra. Doble Engineering Company. Presentation Topics. Phasor Measurement Unit. Definition : Phasor Phasor is a vector which has magnitude and angle Corresponds to a sinusoidal waveform . θ. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/1.jpg)
©2012 Doble Engineering Company. All Rights Reserved
Synchrophasor: Implementation,Testing & Operational Experience
Doble Engineering Company
Uttam Mishra
![Page 2: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/2.jpg)
Presentation Topics
What is SynchroPhasor
Applications
Testing PMUsOperational ExperienceConclusion
![Page 3: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/3.jpg)
Phasor Measurement Unit
• Definition : Phasor– Phasor is a vector which has magnitude and angle – Corresponds to a sinusoidal waveform
θ
![Page 4: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/4.jpg)
Phasor Measurement Unit
PMU typical configuration:
![Page 5: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/5.jpg)
Phasor and Synchro Phasor
• Time aligned Phasor : Synchro Phasor• GPS satellites provides time stamp• Time aligning helps to analyze system events
G GZs
21 21
θ θ
![Page 6: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/6.jpg)
Total Vector Error
=
Actual Phasor
Expected Phasor
Error
Ref
1% TVE ≈ .573 degrees (.01 * 360 / 2π)≈ 26.5 μs (at 60 Hz)
![Page 7: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/7.jpg)
Back up applications
• Power system stability• Two ended fault location algorithm• System diagnostics• Distributed Busbar protection• Load shedding• Wide area frequency monitoring
![Page 8: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/8.jpg)
Power Swing Detection
• Protections settings done with known max and/or min operating conditions of power system events
• Actual operation of power system events may not be optimal for the setting of the protection
• PMU provides Phasors in real time• Better decision can be made on load shedding
and system stability• Real time Phasor value helps to fine tune State
estimation
8
![Page 9: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/9.jpg)
PMU : Power Swing
• Calculate the angle difference due to disturbance• Apply equal area criteria• Make stability decision • Angle between will vary due to disturbance• Algorithm determines if diverging or settling• Blocking or tripping decision to be made
9
G GZs
21 21
θ θ
![Page 10: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/10.jpg)
Distance to Fault
• Single ended fault location algorithm inaccuracy– Fault resistance, load flow & non homogenous system
• PMU enables double ended fault location• PMU data from both end of the line provides very
accurate fault location– Reclose decision can be made for mixed overhead and
cable transmission line– Improved line patrolling :Better productivity & Reliability – Fault location algorithm is based on positive sequence
system parameters
10
![Page 11: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/11.jpg)
CFE Network
11
![Page 12: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/12.jpg)
Automatic Generation Shedding • CFE implemented AGSS scheme• CFE has generation in southeast part of the
country while the large load is in the center• If the angle between generation & load bus
exceeds certain value, generation can be tripped• Loss of 400kV transmission capacity can cause
system out of step condition– One line out of service : 70 Phase shift – Both line out of service : 140 Phase shift
• CFE chose 100 to be setting for load shedding
12
![Page 13: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/13.jpg)
CFE Network
13
Local Phasor
Remote Phasor
ƩThreshold
+-
PU Cyc
0
Trip SelectedGenerators
![Page 14: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/14.jpg)
Europe System Disturbance: November 4, 2006
![Page 15: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/15.jpg)
Grid Islanding
10 GW surplus51.4 Hz
0.8 GW deficit49.7 Hz
8.9 GW deficit49 Hz
![Page 16: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/16.jpg)
Resynchronisation
• A number of uncoordinated unsuccessful attempts made without knowledge of the overall UCTE situation
• Full resynchronisation after 38 minutes
Source: UCTE
![Page 17: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/17.jpg)
UCTE root cause analysis
• Main points:
– (N-1) security rule, inadequate inter-TSO coordination
– Lack of situational awareness
– Other factors (wind farms, lack of coordination)
![Page 18: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/18.jpg)
Improvements since 2006:Situational awareness• Web-based visibility of cross-border flows in
Europe, • RAAS – real-time awareness and alarming
systemCoordinated (N-1) security analysis• All national files are merged into one common CE
load flow file. • each TSO downloads the complete system and
perform complete (n-1) calculation.
![Page 19: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/19.jpg)
PMU Testing Concepts
Goal: under various conditions, make sure that the reported each PMU data message matches the expected values for each Phasor Vector, Frequency Deviation and ROCOF.
![Page 20: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/20.jpg)
PMU Testing Standard
• Defined in IEEE C37.118.1• Specifies quantities to vary, ranges to vary over,
and required accuracies under different conditions.
• Includes steady state tests, dynamic tests, and transient tests
![Page 21: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/21.jpg)
IEEE C37.118.1 Requirements• Steady state tests
– Frequency– Voltage– Current– Phase (discrete or continuous)– Harmonic Distortion– Out of band interference
• Dynamic tests– Phase and Amplitude Modulation– Phase Modulation– Linear Frequency Ramp
• Transient tests (NYI in Protection Suite)– Magnitude step– Phase step
![Page 22: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/22.jpg)
Setting up a test - Hardware
(PC, F6150 and PMU each have IP addresses)
Protection Suite F6150 : Waveform definitions, start timeProtection Suite PMU : Request config, start transmissionF6150 PMU : Generated waveformsPMU Protection Suite : Config response, phasor data stream
![Page 23: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/23.jpg)
Summary
• Synchrophasors can be put as following in power system protection and control.
Main Protection
Back up Protection
SCADA
PMU’s Protection
msec sec minute Time
Wide Area
Local Area
Local Point
![Page 24: Synchrophasor : Implementation,Testing & Operational Experience](https://reader036.vdocuments.mx/reader036/viewer/2022062410/56816354550346895dd3fd43/html5/thumbnails/24.jpg)
Summary
• PMUs and WAMS enable a new dimension of monitoring power grid operation.
• Synchrophasors solve the problem of time incoherency required for wide-area power system control.
• situational awareness and alarming system will help to avoid unwanted disturbance
24