www.stomo.com.om 28 | Interviews 2 | HSE 44 | Did you Know Our Plants 10 | Quarterly Newsletter for the staff of SUEZ-Tractebel Operation and Maintenance Oman LLC 4th Quarter 2014 Dear all this Q4 Gazette in many ways closes off an excellent 2014 for STOMO and the following pages highlight a few of these successes and fun activities that we have been part of. But firstly the STOMO Board have asked me to pass on their appreciation and thanks as they clearly recognise the hard work, commitment and the STOMO team spirit that has delivered a very good safety performance across the year but has also managed to continually improve the Safety Standards further. They are also extremely pleased with the excellent plant reliability and performance across the period which has delivered to GDF Suez very pleasing year-end financial results. Q4 is obviously a period of focus on maintenance activities with many planned outages across the fleet and with this it brings its own risks and challenges all of which I believed have been managed extremely well, notwithstanding the frustration that each plant experiences when confronted with the “unexpected” issues. From the photos on the following pages we can also see that there has also been fun and laughter and I commend all sites for their continued commitment to their local communities, there are so many great and effective initiatives that you have been part of which shows our real commitment to the communities that we operate and live in. The excellent 2014 results now set some very high standards and goal to achieve for 2015 which I am sure that you will maintain and strive to improve even further our Zero harm culture and high plant performance. Welcome note from the GM Mike Maudsley

Upload: stomo

Post on 08-Apr-2016

237 views

Category:

Documents


6 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Stomo 4th quarter gazette 2014

www.stomo.com.om

28| Interviews2 | HSE 44| Did you Know Our Plants10 |

Quarterly Newsletter for the staff of SUEZ-Tractebel Operation and Maintenance Oman LLC

4th Quarter 2014

Dear all this Q4

Gazette in many ways

closes off an excellent

2014 for STOMO and

the following pages

highlight a few of

these successes and

fun activities that we

have been part of. But firstly the STOMO Board

have asked me to pass on their appreciation and

thanks as they clearly recognise the hard work,

commitment and the STOMO team spirit that

has delivered a very good safety performance

across the year but has also managed to

continually improve the Safety Standards

further. They are also extremely pleased with

the excellent plant reliability and performance

across the period which has delivered to GDF

Suez very pleasing year-end financial results.

Q4 is obviously a period of focus on

maintenance activities with many planned

outages across the fleet and with this it brings

its own risks and challenges all of which I

believed have been managed extremely well,

notwithstanding the frustration that each

plant experiences when confronted with the

“unexpected” issues.

From the photos on the following pages

we can also see that there has also been fun

and laughter and I commend all sites for

their continued commitment to their local

communities, there are so many great and

effective initiatives that you have been part

of which shows our real commitment to the

communities that we operate and live in.

The excellent 2014 results now set some very

high standards and goal to achieve for 2015

which I am sure that you will maintain and

strive to improve even further our Zero harm

culture and high plant performance.

Welcome note from the GM

Mike Maudsley

Page 2: Stomo 4th quarter gazette 2014

HSE  Gazette  Q4,  2014  

 

 

 

 

Plants   LTI  Free  Days    

AL  MANAH   6,788  

AL  RUSAIL   2,142  

SOHAR  1   701  

BARKA  2   2,618  

SOHAR  2   1,274  

BARKA  3   1,278  

Annual HSE review, 2014Overview;

Proactive HSE;Incidents;

We have now completed the year with all of sites including Fleet Maintenance (FM) team having no

Lost Time Incidents. We have also had some of our sites and teams like Rusail, Barka 3, Sohar 1 & FM

that have achieved our ultimate goal / vision of Zero Harm, with not even a first aid incident all year.

Well done to all, as this is a fantastic achievement.

We can now clearly see in the chart below our Frequency Rate & Severity Rate steadily fall over the

last few years and now to zero. We must now continue to maintain this record as a team effort and this

can only be achieved by your full support.

Our pro-active programs have clearly taken a hold now and this can be seen in our leading indicator

triangle below. Yet we must further concentrate on our fresh eyes observations more so in 2015 and root

out these ongoing behavioral problems.

Several incidents did occur over the last few months and year and many of these related to unsafe

acts / behaviors by simply not following or working to our rules and procedures:

The Site observations for 2014 have worked very well again since their implementation but we do

still need to improve on the number of fresh eyes going into 2015 as you can see within the graph.

Now let’s continue going forward and improve on all our programs in 2015 and lets further eliminate

and reduce even more incidents. Let’s try to reach our ultimate goal of Zero Harm at STOMO level.

Several major LTI free day milestones were

achieved by the sites over the last period as

listed below:

HSE  Gazette  Q4,  2014  

 

 

Plants LTI Free Days AL MANAH 6,788

AL RUSAIL 2,142

SOHAR I 701

BARKA II 2,618

SOHAR II 1,274

BARKA III 1,278

Q 4 - 2014 www.stomo.com.om2 3

Did you know that...

Health and Safety Environment

Ian AgnewHSE Manager

The Board of Directors of GDF SUEZ, chaired by Gérard Mestrallet, met on 21 October and received the unanimous recommendations made by the Nomination and Compensation Committee in preparation for the Group’s leadership transition. With the exception of a Director who did not take part in the vote, the Board co-opted unanimously Isabelle Kocher as a Director and Board Member and appointed her as Deputy CEO of GDF SUEZ, replacing Jean-François Cirelli.

Page 3: Stomo 4th quarter gazette 2014

Yahya Al Zakwani Training Manager

Training

For the last quarter of the year,

the majority of the external

training programs have

been completed. The staff

performed well on their online

HSE and INSTINCT training

program i.e the majority

completed their assigned

programs by the end of the

year. As 2014/2015 outage

plans have commenced in

most of the STOMO assets,

it was a good chance for the

O&M trainees to focus on their

on-the-job training. They

have intensely participated

on many different activities

which are normally carried

out by operation and

maintenance teams.

A continuous assessment

programs have been carried

out to all of the O&M trainees

and the well performed been

regularized whereas some who

did not perform well have been

notified and given a chance

to improve their skills as the

gaps have been identified

and communicated to each

individual accordingly. By the

end of the 2014, one local

operator was regularized at

Rusail, two local operators and

one Technician at Sohar II and

three technicians at Sohar I.

As STOMO is preparing for

the safety rules conversion

project, a training program

has been established for the

O&M staff as well as HSE team

and will be commenced by the

last week of January 2015. The

plan has been communicated

to the GDF SUEZ regional HSE

Manager who has circulated

it to the entire GDF SUEZ

assets where they may have

some interest to participate

accordingly.

The i-connect training

program i.e “A management

skills and leadership

development approach” for a

group of senior engineers has

been re-scheduled and put in

place for the New Year 2015.

This program is targeting about

16 local Omani employees,

with a plan to expand the

program to other employees

upon a successful launch.

Q 4 - 2014 www.stomo.com.om4 5

Technical Support

Naveen C. Jha, Technical Support Manager

The plants have completed

half of the winter period

operations. The fourth quarter

performance is the best for

2014.

For STOMO fleet during the

fourth quarter, the availability

is higher than budget, the

forced outage is lower than

the budget and the power &

water export is higher than

the budget.

STOMO KPI and Monthly

report is circulated every

month. Implementation of

the INCOME scope of 2014

is completed. Procedure for

Business Continuity Plan and

Crisis Management Plan of

STOMO is under approval

process.

After the completion of

Operational Excellence gap

analysis, OPERA (Operational

Plant Engineering Risk

Assessment) exercise for

Barka II and Sohar I plant was

completed during the period

of October 27th to 30th, 2014

under the guidance of experts

from GDF SUEZ London office.

This exercise is to be done

for all other plants of STOMO

in 2015. The risk summary

report for Barka II and Sohar I is

produced below:

After the follow up audit by GDF SUEZ corporate team in May-2014, STOMO had total 35 findings as

outstanding (including 4 new items). By the end of Q4, 14 items are closed and 21 are in progress.

 

                                         

Mohammed Khalaf AL Hinai - Manah Daughter - 26.10.2014

Ahmed Said AL HinaiManah Daughter - 20.10.2014

Hilal Ali Al Tamimi Manah Daughter - 29.12.14

Said Ali Salim Ambu Saidi Rusayl Daughter - 31.10.2014

New

Born

Page 4: Stomo 4th quarter gazette 2014

The upgrade of datacenter

VMware was completed,

installed two new windows

2012 server and SQL 2014 for

Nisoft and handed over to the

project team.

SAP AMC support for

2015 agreement finalization

completed and handover

completed for the new vendor.

SAP review report submitted

by the support vendor and

management meeting is

scheduled on the last week of

February for presentation and

discussions to move forward to

achieve efficient and affective

ERP system.

Head Office firewall upgrade

with the latest firmware

completed.

Mange engine Server

upgrade completed and

applied support license key.

All IT request work flow and

reports configured in Manage

engine.

Interview conducted and

selected Omani IT engineer

for Head Office and will join on

February 1st.

There were a total of 550 IT

service request for the fourth

quarter and out of that 515

service requests has been

closed which include previous

month pending calls.

I appreciate the entire IT

team for their dedication and

cooperation to achieve our IT

objective for the company.

Q 4 - 2014 www.stomo.com.om6 7

Did you know that...

Information Technology

Mirza Jawad, Musa Al Balushi, Shageen Prabhakaran and Yasir Qazi Majid

The budget for 2015 was

submitted to the Board of

Directors and approved. The

financial result of 2014 has

been reported in SMART

Package.

The third quarter 2014

Financial reports have been

submitted to the Board of

Directors.

Income Tax Assessment of

STOMO /SOMC for the period

2010 to 2012 is in progress.

I appreciate the finance team

and all other departments’

staffs for their cooperation and

efforts to attain the STOMO

objectives.

Finance

Back row: Rithesh Suseela Raj, Ravi Chandran, Gexon george and Saif SalehFront row: Maitha Al Burtomani, Nasra Al Harrasi and Zayana Al yahmadi

Gérard Mestrallet, Chairman and CEO of GDF SUEZ, signed a cooperation agreement with Wu Jianxiong, CEO of Shenergy Group, to develop cooperation in energy sector, and joint exploration and sharing of development opportunities in Shanghai.

Technical Support - contd.

Stomo Q2 Operation Data: Availability* Forced Outage* Export**

Power Water Power Water Power(MW) Water(M3)Actual 89.3% 94.5% 0.4% 0.3% 3,091,268 23,930,174Budget 85.5% 91.4% 2.6% 1.4% 2,592,005 22,240,240Variance 3.8% 3.1% -2.3% -1.1% 19.3% 7.6%

* STOMO plants quarterly average. **STOMO plants quarterly cumulative.

Internal Audits points are being closed by the respective departments. Below is the status at the end of Q4:

Income:The INCO-ME implementation scope for 2014 is achieved.

Entity Process Frame work Due Date CommentsSTOMO Industrial Safety (Operations) IND2 Dec-14 Completed

STOMO Industrial safety (Maintenance) IND3 Dec-14 Completed

STOMO Sourcing PRO0 Dec-14 Completed

STOMO Supplier’s Base PRO1 Dec-14 Completed

Internal Audit:Below is the table for new findings:

Plant/ Department Total In progress Closed Level 3 Level 2 Level 1 ObservationFinance 6 5 1 0 2 3 1

Procurement 4 3 1 0 3 1 0

IT 4 2 2 2 1 1 0

HR 5 5 0 0 4 1 0

B2 O&M 7 4 3 1 4 1 1

S1 O&M 5 0 5 0 2 1 2

B2S1 HSE 4 2 2 1 1 2 0

Cumulative total 35 21 14 4 17 10 4

 

 

6

5

4 4

5

7

5

0%  

10%  

20%  

30%  

40%  

50%  

60%  

70%  

80%  

90%  

100%  

0  

1  

2  

3  

4  

5  

6  

7  

8  

May  

Aug  

Nov  

Feb  

May  

Aug  

Nov  

Feb  

May  

Aug  

Nov  

Feb  

May  

Aug  

Nov  

Feb  

May  

Aug  

Nov  

Feb  

May  

Aug  

Nov  

Feb  

May  

Aug  

Nov  

Feb  

Finance   Procurement   IT   HR   B2  O&M   S1  O&M   B2S1OM&HSE  

%  Co

mpletion  

No.  of  Findings  

Internal  Audit  Findings  Status  after  followup  audit  (in  Apr-­‐May  2014)  

Closed   Total   %  Completion  

Page 5: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om8 9

The Year 2014 ended with a

positive note for the Purchase

Department as we have

achieved an overall +89% PR

to PO conversion KPI against

the target of 85%. There

are several initiatives have

been undertaken during the

second half of this eventful

year. To name them – regular

monthly meetings of the

Purchase Department with

the plants helped in bridging

the communication gap

between the plants to the

Purchase Department. New

methodology of Min, Max,

ROL, ROQ levels was presented

to the management and

awaiting the SAP Consultant to

conduct some modifications in

the SAP. New SAP Contractor

tendering was carried out in

a most transparent manner

and M/s. Kaar Technologies

was awarded the Consultation

Services Contract. 100%

inventory physical audit was

carried out by an external

auditing company KPMG at

3 stores – Barka II, Sohar I

and Rusail in the month of

December. A special exercise

of identifying the items to be

disposed-off from the non-

moving inventory was also

carried out in the months

of November-December

2014. Winter maintenances

at all plants have been well

supported with material and

services from the purchase

department.

The New Year 2015 is full

of challenges as different

activities planned for more

centralization & tendering of

several commonly required

activities like different analysis

(gas, liquid fuel, water,

air, Transformer DG Gas,

effluents etc.), annual testing,

certifications (lifting tools and

tackles, cranes etc.) regularly

used services like portable

master equipment calibrations,

PD tests, thermography, hotline

washing, diving activities etc.

All these kind of tendering

would be possible with the

cooperation from different

sites. Wishing everyone a

Happy New Year 2015

Purchasing

Back row: Hanees, Mohammed Iqbal, Prabhakar and Ali BhattiFront row: Abdul Rahman, Ivan D’Souza, Paulson and Mahmood

The Fourth quarter completed with

the hectic activities associated with

the winter maintenance jobs. Major

jobs undertaken during the period

being GT7 major inspection and GT3

transformer replacement. Significant

events, which contributed to forced

outage rate during the period Q4

2014, were;

� GT7 was under planned outage for 6 hours to fix generator

PD sensor before the planned major inspection. The work

completion required further 7 hours extension as forced outage.

� GT2 was on forced outage for 7 hours unit failed to excite at

FSNL after dispatched start.

� GT6 for 18 hours when unit tripped on control card ground

fault, due to control cable.

� GT5 for 5 hours when unable to start the unit due to jacking

oil pressure low alarm.

� GT8 for 8 hours load restriction to 75 MW on DLN transfer

valve servo valve failure.

I thank all the maintenance team in completion of GT7 major

jobs, which had many additional jobs like the removal of the bus

duct and the generator rotor. The HSE team kept a good vigil

during the entire heavy lift process.

Environment, Health and Safety There was no Lost Time Accidents during the period and Rusayl

Power plant achieved 2,139 days without LTA as of the 31st

August 2014.

The team had good control over the activities especially with

over 40 contractors working at one time.

Plant  Operation:  The  Fourth  quarter   completed  with   the  hectic  activities  associated  with   the  winter  maintenance   jobs.  Major  jobs  undertaken  during  the  period  being  GT7  major  inspection  and  GT3  transformer  replacement.  Significant  events,  which  contributed  to  forced  outage  rate  during  the  period  Q4  2014,  were  

• GT7  was  under  planned  outage  for  6  hours  to  fix  generator  PD  sensor  before  the  planned  major  inspection.  The  work  completion  required  further  7  hours  extension  as  forced  outage.      

• GT2  was  on  forced  outage  for  7  hours  unit  failed  to  excite  at  FSNL  after  dispatched  start.    • GT6  for  18  hours  when  unit  tripped  on  control  card  ground  fault,  due  to  control  cable    • GT5  for  5  hours  when  unable  to  start  the  unit  due  to  jacking  oil  pressure  low  alarm.    • GT8  for  8  hours  load  restriction  to  75  MW  on  DLN  transfer  valve  servo  valve  failure.  

 

 I  thank  all  the  maintenance  team  in  completion  of  GT7  major  jobs,  which  had  many  additional  jobs  like  the  removal  of  the  bus  duct  and  the  generator  rotor.  The  HSE  team  kept  a  good  vigil  during  the  entire  heavy  lift  process.  

Environment,  Health  and  Safety    There  was  no  Lost  Time  Accidents  during  the  period  and  Rusayl  Power  plant  achieved  2,139  days  without  LTA  as  of  the  31st  August  2014.    

The  team  had  good  control  over  the  activities  especially  with  over  40  contractors  working  at  one  time.    

 

 

 

 

Rusail Power Plant Business Summary Rusail News

2,000 LTA Free Days Rusail Power Plant reached 2,000 LTA free days on the 13th August

and were rewarded with a celebration party at the Holiday Inn on the

24th November. Well done the Rusail team!!

Mock Drill On the 19th November, Rusail power plant organised an emergency mock drill with Civil Defense which was a success. The HSE Engineer Amur Al Harthi has requested that the next drill be a rescue drill to give the ERT team some practice.

 

 

 

 

 

 

 

 

 

 

 

 

Srinivas VandlamaniSite Manager

 

550   515  

0  150  300  450  600  750  900  1050  1200  1350  1500  

Service  Request  4th    Quarter    

Opened  Service  Requests     Closed  Service  requests  

Finance - contd.

Page 6: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om10 11

Did you know that...

GDF SUEZ launches OpenInnov a collaborative innovation platform to invent tomorrow’s services. Unveiled at the GDF SUEZ Innovation Day in Lille, in the presence of 35 regional startups, this platform enables the development of concrete collaborations between project developers and GDF SUEZ: calls for projects, skills and patents proposals, etc.

 

 

Barka II News

Send OffOn the 15th December, we

celebrated Matt York’s leaving

party with a lunch with the

majority of Barka II, Barka III

and HO staff were speeches

and gifts were given. Then in

the evening the managers

took Matt and his wife Lindsey

for dinner at the Hyatt. Matt

had worked at STOMO since

January 2008 and is now

working at Al Tawaleh in the

UAE. STOMO wishes you all the

best in your new role.

 

 

 

 

 

 

 

 

Matt York Site Manager

Overall our EH&S

performance was positive

during the last year with a few

near misses being reported.

The investigation reports

are available in intelex, it

is advisable to review the

lessons learned from these

incidents. By year end, the

plant completed 2,617 days

without a lost time accident.

There were lots of near

misses during the last

year because of wrong/

missing equipment KKS

identifications; therefore it

is decided to procure high

quality KKS identifications

tags which should resist the

sea water climate.

The Site Management

pushing hard to increase the

proactive activities of the

staff, the activities increased

a lot during the last quarter.

These activities are our

barriers from the incidents;

therefore it is the duty of all

staff to contribute actively on

it. See the chart below.

The Power Plant had no forced

outages during the last quarter

of 2014; therefore the plant

reliability was 100%.

The desalination plant

forced outages are due to

miscellaneous reasons, which

affected the dispatched hourly

production. The Desalination

reliability was 99.92%

GT3 minor inspection was

carried out during the period

from the 20th to 31st October.

The inspection went well with

only a few minor findings

detailed in the maintenance

section of this report.

Barka II Power and Desalination Plant Business Summary

1.49   1.36  0.84  

1.58   1.40  1.01  

1.31   1.45  1.75  

0.90  

4.79  

8.78  

0.00  

1.00  

2.00  

3.00  

4.00  

5.00  

6.00  

7.00  

8.00  

9.00  

10.00  

Jan   Feb   Mar   Apr   May   Jun   Jul   Aug   Sep   Oct   Nov   Dec  

Ac#v

ity  per  Person  

Proac#ve  Ac#vi#es  per  Empoyee  Barka  II      

Page 7: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om12 13

R. Asokan Site Manager

Manah Power Plant Business Summary

Manah has achieved 6,789 safe days at the end of the fourth quarter 2014. One emergency mock drill

conducted for gas leakage. No near misses reported in this quarter.

Environment, Health and Safety:

Plant Safety Statistics

01/10/2014 - 31/12/2014Number of ‘Safety walks’(observations) 12(49)Number of ‘Safety inductions(contractors)’ 8Number of ‘Safety inductions(visitors)’ 22Number of ‘Tool box talks’ 218Number of ‘Near Miss’ reports 0Number of ‘Safety committee meetings’ 1Number of ‘Environmental Incidents’ 0Number of First aid cases 0Number of ‘Hot Work’ permits 17Number of ‘Confined space’ permits 10Number of ‘Work at Height’ permits 0Number of Risk assessments 140Number of safety observations 85Number of fresh eyes observations 11

Plant operation and Maintenance:The reliability of the plant was 99.70%. The availability was 89.98% The load factor was only 35.73% The

forced outage was 0.30% against the contractual allowance of 8.33%.The reliability of the plant was 99.70%, the availability was 89.98%, the load factor was only 35.73% and the forced outage was 0.30% against the contractual allowance of 8.33%.

Forced outage

 

 

The reliability of the plant was 99.70%, the availability was 89.98%, the load factor was only 35.73% and the forced outage was 0.30% against the contractual allowance of 8.33%.

 

 

   

 

 

   

Page 8: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om14 15

Did you know that...

Manah News

GDF SUEZ announces the signature of a Heads of Agreement providing for the sale of LNG to Chubu Electric of Japan (Chubu). Under the terms of the agreement, GDF SUEZ will deliver 20 cargoes (around 1.2 million tons) of Liquefied Natural Gas (LNG) to Chubu for a 27-month period starting in the 1st quarter of 2015. LNG will be sourced from GDF SUEZ global supply portfolio.

FootballAs of the 29th October, Manah

has officially set up their

own football team. STOMO

wishes you good luck for your

upcoming matches.

GM Visit Mike Maudsley, General Manager visited Manah Power Plant on the 18th November.

National DayManah celebrated National

Day on the 25th November

with a team lunch.

 

 

 

 

 

 

 

 

 

 

 

Unavailability Equipment Date Hours Remarks GT1B(Frame 6B) 16-10-2014 29.50 Pre-winter inspection & TIL implementation outage. GT1C(Frame 6B) 19-10-2014 70.83 Pre-winter inspection & TIL implementation outage. GT2B(Frame 9E) 22-10-2014 87.50 Pre-winter inspection & TIL implementation outage. GT2A(Frame 9E) 26-10-2014 106.17 Pre-winter inspection & TIL implementation outage. GT1A(Frame 6B) 10-11-2014 62.00 Pre-winter inspection & and performance test

preparations. GT1B(Frame 6B) 17-11-2014 9.00 Performance test preparation outage. GT1C(Frame 6B) 18-11-2014 12.00 Performance test preparation outage. GT2A(Frame 9E) 19-11-2014 12.00 Performance test preparation outage. GT2B(Frame 9E) 20-11-2014 10.50 Performance test preparation outage. GT2B(Frame 9E) 07-12-2014 372.00 CI maintenance and Overhauling of 52G breaker.

 

Forced outage

 

 

Equipment Date Hours RemarksGT1B(Frame 6B) 16-10-2014 29.50 Pre-winter inspection & TIL implementation outage.GT1C(Frame 6B) 19-10-2014 70.83 Pre-winter inspection & TIL implementation outage.GT2B(Frame 9E) 22-10-2014 87.50 Pre-winter inspection & TIL implementation outage.GT2A(Frame 9E) 26-10-2014 106.17 Pre-winter inspection & TIL implementation outage.GT1A(Frame 6B) 10-11-2014 62.00 Pre-winter inspection & and performance test preparations.GT1B(Frame 6B) 17-11-2014 9.00 Performance test preparation outage.GT1C(Frame 6B) 18-11-2014 12.00 Performance test preparation outage.GT2A(Frame 9E) 19-11-2014 12.00 Performance test preparation outage.GT2B(Frame 9E) 20-11-2014 10.50 Performance test preparation outage.GT2B(Frame 9E) 07-12-2014 372.00 CI maintenance and Overhauling of 52G breaker.

Manah Power Plant Business Summary - contd.

Page 9: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om16 17

Rajesh Srinivasan,Maintenance ManagerMike Mosley, Site ManagerSaud Al Waili, Operations Manager

At Sohar 1 Power and Water

Plant, during the fourth

quarter of 2014, team

members participated

enthusiastically with safety

as supreme priority in the

day to day business activities

and Intelex. Sohar I team

members participated at

instinct training, GPI, fresh

eyes, safety walks and tool

box talks. There was no LTA

and no near misses were

reported during this fourth

quarter. The plant has

completed implementing

the recommendations of the

audits which were identified.

On the 28th October, the

Emergency response drill

carried out involving the

SIPC /ROP at site. On the

31st December, a similar

drill was carried out by ERT

members at site.

Winter maintenance

activities carried out in

full swing in the month of

November & December

2014. GT #1, 2 & 3 along

with HRSG #1, 2 & 3 annual

maintenance and MSF #2

& 3 maintenance work was

completed.

In the past two years

Sohar I team members made

1,000 HSE observations,

and in 2014 1,030 were

made. The management

appreciates the time and

effort for identifying these

observations and taking

corrective action along with

tool box talk to address the

same in order to have lessons

learned approach.

Sohar Power Company

arranged beach clean-up

activity at Shinas beach

on the 13th November

and SOMC staff actively

participated in that event.

On STOMO organised a

beach clean-up program

at Majis beach on the 4th

December and local people

including enthusiastic

children participation was

highly appreciated.

This fourth quarter, the

plant power production,

availability achieved was less

than budgeted value. The

availability was 86.2% less

than the budgeted 88.1%

for power and production

clocked 767,317MW less

than budgeted 897,425

MW. Reliability achieved was

better than budgeted value.

The reliability was 98.98%

higher that the budgeted

98.5%.

The availability of water

plant was higher than

budgeted value during this

quarter. The availability

was 90.9% higher than

the budgeted 88.4%. The

water production clocked

12,611,095m3 higher than

budgeted 11,752,240m3.

Reliability achieved was

better than budgeted value.

The reliability was 99.57%

higher than budgeted

98.26%.

The Site Management

appreciates the extraordinary

and disciplined team effort

for the year 2014 and highly

appreciates the professional

approach by one and

all at Sohar I plant. As a

professional and dedicated

team we would wish to

continue with conscious

participation in health,

safety and environmental

programs to enhance and

enrich us towards the goal

of operational excellence

with zero harm at the plant

site, as part of the STOMO

organisation. We as sohar

team extend our heartiest

wishes all STOMO family &

readers a very Happy, safe

and healthy New Year 2015.

Sohar I Power and Desalination Plant Business Summary

Load  Factor  2014  (Power  and  water)    

   

   

                                                                                                                                                                                                                                                                                                                                                   

   

                                                                                                                                                                                                                                                                                                                                           

 

                                     

0.00%  

10.00%  

20.00%  

30.00%  

40.00%  

50.00%  

60.00%  

70.00%  

80.00%  

90.00%  

100.00%  

Jan-­‐14   Feb-­‐14  Mar-­‐14  Apr-­‐14  May-­‐14  Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14  Dec-­‐14  

Power  Load  Factor  (Actual)   Power  Load  Factor  (Budget)  

0.00%  

20.00%  

40.00%  

60.00%  

80.00%  

100.00%  

120.00%  

Jan-­‐14   Feb-­‐14  Mar-­‐14  Apr-­‐14  May-­‐14  Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14  Dec-­‐14  

Water  Load  Factor  (Actual)   Water  Load  Factor  (Budget)  

Planned  Outage  2014      

   

                                                                                                                                                                                                                                                                                                                               

   

                                                                                                                                                                                                                                                                                                                                                           

         

 

                                                           

                                     §                    

                     

                                       

                 

0.00%  

5.00%  

10.00%  

15.00%  

20.00%  

25.00%  

30.00%  

35.00%  

40.00%  

45.00%  

Jan-­‐14   Feb-­‐14  Mar-­‐14   Apr-­‐14  May-­‐14   Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14  Dec-­‐14  

Planned  Outage  (Actual)   Planned  Outage  (Budget)  

0.00%  

5.00%  

10.00%  

15.00%  

20.00%  

25.00%  

Jan-­‐14   Feb-­‐14  Mar-­‐14   Apr-­‐14  May-­‐14   Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14  Dec-­‐14  

Planned  Outage  (Actual)   Planned  Outage  (Budget)  

 

Forced  Outage  2014  (Power  and  water)  

     

   

                                                                                                                                                                                                                                                                                                                                                   

   

                                                                                                                                                                                                                                                                                                                                                                       

                     

                   

     

                                 

0.00%  

0.50%  

1.00%  

1.50%  

2.00%  

2.50%  

Jan-­‐14   Feb-­‐14   Mar-­‐14   Apr-­‐14   May-­‐14   Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14   Dec-­‐14  

Forced  Outage  Rate  (Actual)   Forced  Outage  Rate  (Budget)  

0.00%  

0.50%  

1.00%  

1.50%  

2.00%  

2.50%  

Jan-­‐14   Feb-­‐14   Mar-­‐14   Apr-­‐14   May-­‐14   Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14   Dec-­‐14  

Forced  Outage  Rate  (Actual)   Forced  Outage  Rate  (Budget)  

Load  Factor  2014  (Power  and  water)    

   

   

                                                                                                                                                                                                                                                                                                                                                   

   

                                                                                                                                                                                                                                                                                                                                           

 

                                     

0.00%  

10.00%  

20.00%  

30.00%  

40.00%  

50.00%  

60.00%  

70.00%  

80.00%  

90.00%  

100.00%  

Jan-­‐14   Feb-­‐14  Mar-­‐14  Apr-­‐14  May-­‐14  Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14  Dec-­‐14  

Power  Load  Factor  (Actual)   Power  Load  Factor  (Budget)  

0.00%  

20.00%  

40.00%  

60.00%  

80.00%  

100.00%  

120.00%  

Jan-­‐14   Feb-­‐14  Mar-­‐14  Apr-­‐14  May-­‐14  Jun-­‐14   Jul-­‐14   Aug-­‐14   Sep-­‐14   Oct-­‐14   Nov-­‐14  Dec-­‐14  

Water  Load  Factor  (Actual)   Water  Load  Factor  (Budget)  

Page 10: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om18 19

Did you know that...

Sohar I News

GraduationOn the 25th December, Ibrahim

Al Balushi graduated as a

Mechanical Technician from

Shinas College of Technology.

Congratulations!!!

Sohar AluminumOn November 11th, STOMO visited Sohar Aluminium and

met with the instructors to view the technical training center.

Attendees from STOMO included Mike Mosley Site Manager

Sohar, Mike Maudsley

General Manager, Yahya Nasser Al Zakwani Training

Manager, S. Hariharan Training Coordinator, Juma Balushi HR

Manager, and Geetesh Tamse HR Consultant.

Completed JobsHere are some photos of work being completed on Sohar I site during the month of December.

Sohar College of Applied ScienceSohar College of applied

science, visited Sohar I power

plant on the 2nd December.

SOMC training coordinator,

Mr. Hariharan explained the

engineering fundamentals of

the plant processes and design

to the students while providing

a plant tour.

 

 

   

   

 

On the 14th November, Lord Deighton KBE, the Treasury Minister, and Jean-Claude Depail, Executive Vice-President in charge of the Infrastructures Business Line of GDF SUEZ, have opened the Stublach Gas Storage Facility in Cheshire (United Kingdom), representing an investment of £500 million by GDF SUEZ subsidiary Storengy.

Completed  Jobs    Here  are  some  photos  of  work  being  completed  on  Sohar  I  site  during  the  month  of  December.      MSF-­‐BBDP  Overhauling:  

 

Lime  stone  Conveyer:    

 

   

HRSG-­‐Duct  Burner-­‐1:    

 

HRSG-­‐Duct  Burner  :  

 

 

MSF-BBDP Overhauling: HRSG-Duct Burner-1:

Completed  Jobs    Here  are  some  photos  of  work  being  completed  on  Sohar  I  site  during  the  month  of  December.      MSF-­‐BBDP  Overhauling:  

 

Lime  stone  Conveyer:    

 

   

HRSG-­‐Duct  Burner-­‐1:    

 

HRSG-­‐Duct  Burner  :  

 

 

HRSG-Duct Burner :Lime stone Conveyer:

HRSG-­‐Desuperheater  spray  valve  rectified:  

   HRSG  Painting-­‐1:  

 

HRSG  Painting:  

 

   Degassifier  Tank  Project:  

 

HRSG Painting:HRSG-Desuperheater spray valve rectified:HRSG-­‐Desuperheater  spray  valve  rectified:  

   HRSG  Painting-­‐1:  

 

HRSG  Painting:  

 

   Degassifier  Tank  Project:  

 

Degassifier Tank Project:HRSG Painting-1:

Page 11: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om20 21

Shinas Beach On the 13th November, 24 of Sohar plant staff helped support the plant owner SPC in the Shinas

beach clean-up at the Shinas village beach. A BIG thank you to all those who participated in the

sponsored activity.

Shinas CollegeSTOMO training coordinator

S. Hariharan organised visitors

from the Shinas College to

come to site on the 19th

November, for a plant tour and

a process description on how

the plant works.

   

 

   

 

   

 

 

 

   

 

 

 

 

 

 

Sohar I News

Page 12: Stomo 4th quarter gazette 2014

 

 

Chemical Safety All Barka III and STOMO contractors attended

the Chemical Safety Awareness training

which was held on the 30th December.

Q 4 - 2014 www.stomo.com.om22 23

Did you know that...

Kanchan Shere and Tomaz GuadagninMaintenance and Operations Managers

With the end of the fourth

quarter, Barka III Power Plant

completed the calendar

year achieving the Company

objective of “Zero Harm”.

Congratulations to all staff

and EPCC personnel in

achieving the milestone

and continual focus on

safety whilst at work.

Operation and Maintenance

of Barka III Power Plant

was recommended for

ISO14001 and OHSAS18001

Certification during

the second stage audit

performed by the external

accreditation party Velosi.

Barka III Power Plant closed

the fourth quarter with

1,278 days without any lost

time accident which is equal

to the number of days that

the Barka III team has been

mobilized to site.

The last quarter of 2014

started off with GT11/

HRSG11 scheduled annual

outage. GT11 minor

inspection was completed.

EPCC team and STOMO

personnel are preparing

for upcoming ST/HRSG and

GT12/HRSG12 scheduled

annual outage during the

first quarter of 2015.

On the 28th November

at 03:38AM, a fault (High

DC Voltage) on DC supply

system of the ST resulted in

an automatic disconnection

of GT12 and ST10 from the

power grid while the plant net

load was 220MW. Failure of

high DC voltage due to faulty

controller card in one of the

ST rectifiers (10BTL20), led

to ST DC system overvoltage

resulting in Interruption of

the power supply to both

HRSGs and ST I&C control

system and initiating trip

of ST and HRSG. Power loss

of HRSG panel while GT in

operation resulted HRSG/GT

protection trip. STG H2 got

discharged automatically.

Later GT12 and ST10

were resynchronized after

ensuring healthiness of all

control blocks on HMI screen

and electrical system.

GT12 tripped off load due to

diverter damper system seal

air fan differential pressure

switch malfunction on the

15th December at 01:03hrs.

On the 27th December, the

same unit tripped again

due to malfunction of

temperature transmitter on

the turbine outlet.

The Management of

Change (MOC) module

was presented to the

management team and some

recommendations were noted

down. The recommendations

are getting implemented and

the module shall be LIVE by

end of Jan 2015.

As the temperature went

down during end of the

quarter, the grid demand

drastically reduced resulting

in only one gas turbine in

open cycle mode. The plant

was taken out of combined

cycle during middle of

November as per the Load

Dispatch Center request.

Though, the load factor was

higher than the budgeted.

The reliability of the plant

during the fourth quarter was

maintained at 99.18%.

Barka III Power Plant Business Summary

 

   

   

   

 

Barka III news

On the 27th November 2014, GDF SUEZ and the European trade union federations EPSU and IndustriALL signed an agreement on the improvement of working conditions. This agreement attests to GDF SUEZ’s continuing strong social drive, as it has demonstrated since 2010 by signing five agreements at the European and worldwide levels.

Page 13: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om24 25

STOMO staff completed 1,274 days at site without a lost time accident by the end of December. Four near misses were reported in the fourth quarter. Most notable was a significant NaOH spillage which happened due to a failure to close of the automatic transfer valve (transfer from storage tank to dosing tank). Sohar II Power Plant was audited and recommended for ISO14001 and OHSAS18001 certification in December. Sohar II Power Plant Final Environmental Permit was received. Several BARS (Behavioral Attitude Recommendations and Standards) were studied and implemented. Laborelec’s alarms management service was performed. Two Shift Charge Engineers attended

Safety Controller training. This quarter was good regarding HSE, which was much needed after the two serious medical treatment cases earlier this year. A prudent *thank you* to all staff. Let’s continue this road and complete the year 2015 with zero harm!

The year 2014 has been very successful for O&M. Sohar II Power Plant exported 3,613,655 MW hours of net electrical energy in the year 2014, corresponding to a load factor of 55.6%, to be compared with a budgeted value of 37.7%. The 2013-2014 winter outages did not consume more than the winter allowance. Expectations are that the 2014-2015 winter outages will neither consume more than the winter allowance.

Commercial availability has been 99.96%, to be compared with a budgeted value of 97.89%. Find attached graphs. *Big thanks to all staff for these excellent results!*

October was a challenging month. Combustion dynamics re-tuning was carried out on GT11 on 1-2-3 October. The steam turbine tripped during mentioned tuning due to abnormal operating conditions while tuning. GT12 tripped twice due combustion chamber acceleration events on 14 and 16 October. GT12 combustion chamber inspection was consequently performed on 19-21 October under a short notice outage. Combustion dynamics re-tuning was carried out on GT12 on 30-31 October.

Ganesh Gandhi and Frederik BaertsMaintenance and Operations Manager

Sohar II Power Plant Business Summary

Sohar II News

Circulating water pump 11 and 12 were completely overhauled in the fourth quarter after they became unavailable due to high vibrations. Repairs are temporary and a plan for another complete overhaul of all four circulating water pumps in January, February, March and April 2015 was submitted. This plan foresees re-grouting and changing impeller, baseplate, inner casings, bearings and sleeves (design change).

A steam turbine outage is scheduled in January 2014. A complete plant outage is scheduled during part of the steam turbine outage to allow Siemens to upgrade T3000. The gas turbines minor inspections are scheduled in February and March 2015. Corrective

measures for several major issues are scheduled during mentioned outages.

Sohar II Power Plant was tested to operate under Automatic Generation Control.

STOMO Board gave green light to proceed with a Request for Quotation for the installation of hydrogen generation facilities at Sohar II and Barka III Power Plant. A Request for Expression of Interest was sent to potential suppliers of hydrogen generation facilities in December.

Woman’s  Day  

On  the  31st  October,  Raya  Al  Maqbali  and  Ibtisam  Al  Akhzami  from  Sohar  I  and  Sohar  II  attended  the  Omani  Womans’  Day  which  was  organised  at  the  Crowne  Plaza  Hotel  in  Sohar.  There  were  185  participants  and  by  all  accounts  a  very  successful  day.    

 

 

Woman’s DayOn the 31st October, Raya Al

Maqbali and Ibtisam Al Akhzami

from Sohar I and Sohar II attended

the Omani Womans’ Day which

was organised at the Crowne

Plaza Hotel in Sohar. There

were 185 participants and by all

accounts a very successful day.

Donate BloodOn the 12th November, many of

the Sohar I & Sohar II employees,

contractors and visitors participated

in donating their blood. We will be

looking to arrange this at all sites in

the near future.  

 

 

 

 

 

 

 

Fleet Maintenance closed

2014 with a perfect HSE

record: no LTE, no medical

attention, and no unsafe

action=ZERO HARM, which

was the high standard

STOMO objective. The

entire team reached

a good experience

and adheres strictly

to safety rules and

regulations, so, with

all intensive maintenance

program managed to perform

all activities in perfect safety

for people and environment.

With winter maintenance

season ongoing, tight schedule

and additional inspections

(Barka II steam turbines), Fleet

Maintenance is also looking

into the preparation of future

major activities, as Barka II Gt1

major inspection and possible

steam turbine “C” inspections

also in Barka II and Meenakshi/

India. Season ahead looks

extremely busy, with Sohar I ST

inspections and additional work

on GT1 generator vibrations,

in this respect only perfect

discipline and good behavior

could lead to efficient

solutions, successful

repairs in perfectly

safe conditions for all

personnel. This is what

Fleet Maintenance

is always trying

to maintain, a dedicated

professional attitude towards

all members, plant operators,

contractors and all others

involved in their activities.

Daniel PeteanuFM Manager

Fleet Maintenance Business Summary

Page 14: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om26 27

Did you know that...

GDF SUEZ, via its subsidiary Cofely South East Asia, announced today the purchase of Keppel FMO, a subsidiary of Keppel Infrastructure Holdings Private Ltd. Keppel FMO (KFMO) is one of the strongest providers of integrated facilities management (FM), property management, operation and maintenance, and FM consultancy services

I ConnectOn the 7th December, Ms. Lois and a few of her colleagues from Modern Gulf Institute (MGI)

did a presentation on I Connect for a few of the STOMO HO members followed by a speech of

encouragement from STOMO General Manager, Mike Maudsley.

 

 

 

Happy Birthday Everyone !!

Birthdays September – October Head office celebrated Shageen, Samson, Saif Al Salmi and Matt Yorks birthdays on the 16th

October. Happy Birthday!!!

Birthdays  September  –  October    

Head  office  celebrated  Shageen,  Samson,  Saif  Al  Salmi  and  Matt  Yorks  birthdays  on  the  16th  October.  Happy  Birthday!!!

Birthday

 

Birthdays  November  –  December    

Head  office  celebrated  Rithesh,  Ali  Bhatti,  Mahmood  Al  Rawahi,  Gexon,  Prabhakar,  Naveen,  Abdullah  Al  Rawahi  and  Basma  Al  Burtomani  birthdays  on  the  17th  December.  Happy  Birthday!!!  

 

 

Birthdays November – December Head office celebrated Rithesh, Ali Bhatti, Mahmood Al Rawahi, Gexon, Prabhakar, Naveen, Abdullah

Al Rawahi and Basma Al Burtomani birthdays on the 17th December. Happy Birthday!!!

Birthdays  September  –  October    

Head  office  celebrated  Shageen,  Samson,  Saif  Al  Salmi  and  Matt  Yorks  birthdays  on  the  16th  October.  Happy  Birthday!!!

Birthday

 

Birthdays  November  –  December    

Head  office  celebrated  Rithesh,  Ali  Bhatti,  Mahmood  Al  Rawahi,  Gexon,  Prabhakar,  Naveen,  Abdullah  Al  Rawahi  and  Basma  Al  Burtomani  birthdays  on  the  17th  December.  Happy  Birthday!!!  

 

 

Head Office News

Ho  Ho  Ho    

Throughout  the  year  we  have  celebrated  Iftar  and  Onam  therefore;  on  the  16th  December,  the  last  managers  meeting  of  2014  we  surprised  the  Managers  with  a  customized  Christmas  dinner  hosted  by  the  Hormuz  Hotel.  This  was  a  great  experience  for  some  as  they  had  never  had  a  traditional  Christmas  dinner  before.  The  effort  the  Hormuz  Hotel  had  gone  to  with  the  preparation,  service  and  scenery  for  the  meal  was  outstanding.    

 

Ho Ho Ho Throughout the year we

have celebrated Iftar and

Onam therefore; on the 16th

December, the last managers

meeting of 2014 we surprised

the Managers with a

customized Christmas dinner

hosted by the Hormuz Hotel.

This was a great experience

for some as they had never

had a traditional Christmas

dinner before. The effort the

Hormuz Hotel had gone to

with the preparation, service

and scenery for the meal was

outstanding.

Ho  Ho  Ho    

Throughout  the  year  we  have  celebrated  Iftar  and  Onam  therefore;  on  the  16th  December,  the  last  managers  meeting  of  2014  we  surprised  the  Managers  with  a  customized  Christmas  dinner  hosted  by  the  Hormuz  Hotel.  This  was  a  great  experience  for  some  as  they  had  never  had  a  traditional  Christmas  dinner  before.  The  effort  the  Hormuz  Hotel  had  gone  to  with  the  preparation,  service  and  scenery  for  the  meal  was  outstanding.    

 

Ho  Ho  Ho    

Throughout  the  year  we  have  celebrated  Iftar  and  Onam  therefore;  on  the  16th  December,  the  last  managers  meeting  of  2014  we  surprised  the  Managers  with  a  customized  Christmas  dinner  hosted  by  the  Hormuz  Hotel.  This  was  a  great  experience  for  some  as  they  had  never  had  a  traditional  Christmas  dinner  before.  The  effort  the  Hormuz  Hotel  had  gone  to  with  the  preparation,  service  and  scenery  for  the  meal  was  outstanding.    

 

Ho  Ho  Ho    

Throughout  the  year  we  have  celebrated  Iftar  and  Onam  therefore;  on  the  16th  December,  the  last  managers  meeting  of  2014  we  surprised  the  Managers  with  a  customized  Christmas  dinner  hosted  by  the  Hormuz  Hotel.  This  was  a  great  experience  for  some  as  they  had  never  had  a  traditional  Christmas  dinner  before.  The  effort  the  Hormuz  Hotel  had  gone  to  with  the  preparation,  service  and  scenery  for  the  meal  was  outstanding.    

 

Fun Zone On the 13th October, the managers met at

Fun Zone and played 3 games of Laser Blast.

Overall the Blue team one… better luck next

time Red team!!

 

 

 

Page 15: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om28 29

In yet another initiative towards demonstrating our commitment to the community and environment

on the 4th December, Sohar I and II organised a comprehensive effort to clean the beach in Majis,

located near Sohar Industrial Estate, just a kilometre from Sohar I & Sohar II plant.

Mike Mosley, Site manager of the Sohar I & Sohar II Power and Desalination plants commented,

“The Sultanate boasts some of the most beautiful beaches in the region, and we feel it a responsibility

to help the community during clean-up. As a socially conscious organisation, STOMO has constantly

been involved in initiatives that benefit the environment as well as bringing together its employees

and member of the community towards a common goal.”

Participants in the half-day clean up were STOMO staff, members of Sohar Power Company (SPC)

as well as Al Batinah Power Company (ABPC), Majis Municipality personnel and public officials, and

Majis middle school students – totalling to around 150 people. Through the morning, in a joined

effort, the volunteers picked up litter from the beach on the Al Batinah coast, in order to make the

area cleaner for everyone to enjoy. Much rubbish and trash was collected over the course of three

hours, with the majority of the litter being comprised of discarded food containers and drink cans,

broken glass pieces and fishing equipment.

With a coastline of over 3,000km, Oman offers some of the most stunning beaches in the region.

However, with increasing visitors to the area, these coastal regions have become collecting spots for

litter and debris which can be harmful and even fatal, to all manners of marine wildlife. This initiative

from STOMO not just highlights the need for action, but also engages its employees in protecting

the ecosystem.

Saud Al Waili, Operations Manager from STOMO also added, “It was exceedingly satisfying to

be able to contribute to make our neighbourhood’s Majis beach spick and span. We were very

encouraged by the large number of staff and their families who volunteered for this activity and

spent half a day, preserving the marine environment of Oman.”

Litter was found scattered along the vast stretch of the beach. The volunteers enjoyed socializing

and a small drink and snack offered by STOMO during the clean-up campaign.

STOMO manages the operations and maintenance at both Sohar I & Sohar II plants, and is actively

involved in community related initiatives in the Sohar area. The beach clean-up drive took place as

part of the larger STOMO social programme, which demonstrates a commitment towards corporate

social responsibility, with the aim to use its own assets and human resources to benefit the local

environment and the community at large.

STOMO Organises Majis Beach Clean-Up

       

 

     

 

 

 

   

 

   

 

 

 

More STOMO News

Events

Name Designation LocationShift Charge Engineer Ali Awadh Al Mandhari Sohar IITrainee Maint Manager Yousuf Juma Salim Al Rabani ManahControl Room Operator Khamis Ali Mohammed Al Rajhi Barka IIMechanical Technician Anjum Ifteqar Barka IISite Manager Matt York Barka IITr.Control Room Operator Hazim Al Balushi Barka IITrainee Local Opeator Said Sulaiman Said Al Mahrouqi Barka IIIT Engineer Musa Karim Baksh Al Balushi Head OfficeHSE Engineer Yousuf Said Shamis Al Hadi Rusail

LeaversBelow is everyone who left in

the fourth quarter; we would

like to wish them all the best in

their future.

Name Designation LocationArul Rajadurai Jaganathan Lead Electrical Engineer Sohar IIMazin Nasser Shaikhan Al Rubei Trainee Local Operator Sohar IIIbrahim Mohd. Nasser Al Bahri Trainee Local Opeator Barka IISaid Sulaiman Said Al Mahrouqi Trainee Local Opeator Barka IIMohammed Khalfan Al Badi Trainee Local Opeator Barka IIMusab Sulaiman Said Al Jadidi Local Operator Barka IIMohammed Khalaf salim Al Khatri Trainee Control Room Operator Barka IIAhmed Mohammed Saif AL Maawali Control Room Operator Barka IIYousuf Said Shamis Al Hadi HSE Engineer Barka IIIWaleed Said Saif Nasser Al Maqbali Trainee Local Operator Sohar I

JoinersBelow is the newest joiners in

STOMO and we would like to

wish them all the best.

Page 16: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om30 31

Did you know that...

 

 

 

 

 

 

 

 

 

Did you Know

in Singapore, operating across a wide spectrum of industries and markets, including airport, rail, healthcare, education, government, mission-critical commercial facilities. Keppel FMO employs around 1,000 people and generates annual revenues of around 55 million Euros.

Strengthening ties within the vocational

training sector, Suez-Tractebel Operation and

Maintenance Oman (STOMO) recently welcomed

students from the International Maritime

College of Oman, conducting a comprehensive

site tour of the Sohar I Independent Power and

Desalination Plant. A group of 40 students

completing their Bachelor’s Degree in Maritime

Course visited the plant in two batches and

received a comprehensive overview of site

operations and procedures, together with a

detailed presentation on the desalinisation

technology used at the plant.

Welcoming the students, Mike Mosley, Site

Manager of Sohar I Power and Desalination Plant

began the tour with a presentation of STOMO’s

role in managing and maintaining the plant

as well as explaining the processes involved

for efficient power generation and water

desalination. The students were then escorted

by STOMO staff to receive a behind the scenes

tour of the plant, including the control room,

power generating gas turbines and the reverse

osmosis (RO) plant. Sohar I is a 585MW electricity

generation and 33 million imperial gallons a day

(MIGD) seawater desalination plant. The site is

located in the Sohar Industrial Port Area in the

northern Al Batinah region of the Sultanate. The

visit was coordinated by Hamid Soltani, Senior

Marine Engineering Teacher of the college and

two teachers accompanied the students on site.

Commenting on the first ever visit of students

from the International Maritime College of

Oman, Mike Mosley noted, “The tour of Sohar

I provided students with a comprehensive

overview of the massive plant and its operations,

comprising a very in-depth technical

presentation and a behind the scenes tour of

operations. We also highlighted many unique

interesting features around the site. Receiving a

first-hand understanding of the functioning of

the plant gives students a clearer idea of what

they have been studying in classrooms.”

The International Maritime College of Oman

is located in Sohar, adjacent to the Sohar Port

and offers Diploma and Degree Courses, and

Short Courses for the Maritime, Shipping,

Port, Transport and Petro-Chemical Process

Industries.

The maritime curriculum includes the

process of desalination of water and production

of electricity within a ship, and the site visit

helped students get first-hand knowledge of

the actual process behind the theory taught

in classrooms. They had the opportunity to

further understand how boilers, steam turbines

worked along with an overview of feed water

and condensate system, thermal desalination

plant, remineralisation plant, and ejectors and

deaerators.

“The organisation of site visits with institutes

like International Maritime College of Oman

gives us as employers an opportunity to meet

future potential recruits passionate about this

industry.” Added Mike.

Henrik Petersen, Acting Head of Maritime

Department of the International Maritime

College of Oman (IMCO) said, “The students were

fascinated to witness the plant’s equipment

that they have been seeing in miniature form

on ships. IMCO is a leading learning institution

in the fields of maritime, logistics and process

operations, that is committed to providing Oman,

the region and beyond with professionals ready

to face the emerging challenges of industry. Our

aim is to provide high quality education and

practical training, and this visit served as a great

opportunity to help students understand the

workings of power and desalination plants.”

STOMO Operates and Maintains the Sohar

I Independent Power and Desalination Plant

owned by Sohar Power Company (SAOG),

located in the Sohar Industrial Port Area in the

northern Al Batinah region of the Sultanate.

STOMO welcomes International Maritime College of Oman with visit to Sohar I Power and Desalination Plant

More STOMO News - contd.

Walkathon For 11 years Muscat has been supporting a walkathon for the Oman Cancer Association and each year the participation and awareness is getting larger and larger. STOMO showed their support by attending the walkathon on the 28th October at 3pm. It was really incredible to see how many thousands of people turned up to show their support. Hopefully STOMO can make a bigger presence next near.

He loves to play with colors on the faces of children. And he makes all persons who he meets smile.

When you meet him for the first time you find that he has the spirit of a small child in the form of a man.

He has a small company called Friends Company for masquerade, his company covers the

celebrations for children, schools, charities and many other occasions.

Ibrahim AL-Balushi - Sohar I

Talent

He loves to play with colors on the faces of children

Page 17: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om32 33

Glossary

AEPC Al Ezzel Power Company - Bahrain

AER Authority for Electricity Regulations

Al Batinah Owner of Sohar II Power Plant

Al Ezzel Al Ezzel Power Company - Bahrain

Al Suwaidi Owner of Barka III Power Plant

Barka II Barka II Power and Desalination Plant

Barka III Barka III Power Plant

CAT Certified Accounting Technician

CCR Central Control Room

CEMS Continuous Emission Monitoring System

CI Combustion Inspection

CO Carbon monoxide

COVALA software for reporting internal control measures

DCS Distributed Control System

Demin/DM Demineralisation

DR Disaster Recovery

EPC Engineering Procurement and Construction

EPCCEngineering Procurement and Construction Contractor

ERP Enterpuener Resource Planning

EtaPROA software for monitoring power plant plant efficiency

FM Fleet Maintenance

GPiLEARNAn online technical training program offered by GP Strategies U.S.A.

GPRS Gas Pressure Reducing Station

GT Gas Turbine

GTG Gas Turbine Generator

GW Giga Watt

HO Head Office

HRMSHuman Resources Management System - a software application for automating Human Resources functions

HRSG Heat Recovery Steam Generator (Boiler)

HSE Health Safety & Environment

IBC Intermediate Bulk Container

I&C Instrumentation & control

INSTINCT An online Health & Safety Training Program

IPP Independent Power Producer

ISOInternational Organization for Standardization

Kg Kilogram

KPI Key Performance Indicators

LDC Load Dispatch Centre

Lit Litre

LTA Lost Time Accident

LTE Life Time Extension

Manah Manah Power Plant

MAX Maximum

MCC Motor Control Centre

META Middle East Turkey and Africa

MRMEMinistry of Regional Municipalities and Environment

mg/I Milligram per litre

mS/cm Milli Siemens per Centimeter

mV Millivolt

MW Mega Watt

No. Numbers

NTU Nephelometric Turbidity Unit

O&M Operation & Maintenance

OEM Original Equipment Manufacturer

OETC Oman Electricity Transmission Company

OMR Omani Rial

OPWPOman Power & Water Procurement Company

ORP Oxidation Reduction Potential

PRO Public Relations Officer

RCA Root Cause Analysis

RO Reverse Osmosis

Rusail Rusail Power Plant

SAPSoftware supporting Cumputorised Maintenance Management

SCADA Supervisory Control and Data Acquisition

SDI Silt Density Index

SMART Package

A software tool for reporting financial parameters

SMNSMN Power Holding Company (Owner of Barka II and Rusail Power Plant)

Sohar I Sohar I Power & Desalination Plant

Sohar II Sohar II Power Plant

SOMC Sohar Operation & Maintenance Company

SPCSohar Power Company (Owner of Sohar I Power and Desalination Plant)

ST Steam Turbine

STG Steam Turbine Generator

STOMOSuez Tractebel Operation & Maintenance Oman LLC

T&A Time & Attendance

t/h Tons per hour

UPCUnited Power Company (Owner of Manah Power Plant)

UPS Uninterrupted Power Supply

USD United States Dollars

% Percentage

Birthdays

Name DoB

Sulayim Rashid Amur Al Darei 1-Oct

Adil Obaid Hadher Al Badri 2-Oct

Swaraj Krishna 2-Oct

Thabit Mohammed Mubarak Al Nahadi 10-Oct

Mohammed Shakir Raza 10-Oct

Saleh Mohammed Said Al Suqry 11-Oct

Mudhad Mohammed Rashid Al Essai 12-Oct

Mohammed Said Shaghail Al Abri 12-Oct

Talal Habib Mohammed Al Subhi 14-Oct

Matthew York 15-Oct

Saif Saleh Marhoon Al Salmi 15-Oct

Abdullah Nasser Ahmed Al Kiyumi 15-Oct

Khalfan Hamad Amer Al Saadi 16-Oct

Hussam Khalaf Nasser Al Maghaizawi 16-Oct

Asim Ali Salim Al Rashdi 23-Oct

Roy Yohannan 23-Oct

Prashant Yadav 26-Oct

Abdallah Mohammed Abdallah Al Maqbali 27-Oct

Ibrahim Salim Ali Al Balushi 4-Nov

Thankachan N M 4-Nov

Yasir Sahloof Qarshoob Al Habsi 4-Nov

Rithesh Suseela Raj 5-Nov

Ahmed Khamis Howaikem Al Hinai 8-Nov

Ahmed Salim Juma Al Mukhaini 9-Nov

Abdullah Mubarak Hedem Al Quraini 9-Nov

Khalid Ali Hafidh Al Durai 10-Nov

Khalid Salem Abdullah Al Hadidi 11-Nov

Issa Sulaiman Said Al Maqbali 12-Nov

Barket Ali 12-Nov

Balakrishna Pillai 14-Nov

Khalid Salim Nasser Al Rawahi 15-Nov

Muhammad Ali Bhatti 15-Nov

Basim Al Aabed Obaid Al Shukaili 16-Nov

Abdullah Khalifa Abdullah Hamed Al Jahwari 17-Nov

Ibrahim Mohammed Rashid Obaid Al Rubkhi 17-Nov

Sultan Hamood Mohammed Al Saaidi 19-Nov

Sultan Saif Ali Al Amri 19-Nov

Anwar Ali Al Saba Al Siyabi 22-Nov

Waheed Rasool Bakhsh Murad Al Balushi 23-Nov

Name DoB

Ghanim Khamis Fadhil Al Mushaifri 26-Nov

Mohammed Khamis Said Al Saadi 26-Nov

Kanchan Bhaskar Shere 28-Nov

Waleed Sulaiman Al Mahrooqi 28-Nov

Syam Rajagopal 29-Nov

Mazin Salim Al Siyabi 30-Nov

Salim Said Mohammed Al Kindi 1-Dec

Mohammad Atikur Rahman 1-Dec

Masood Said Saliym Al Sheikali 1-Dec

Varughese Oommen 1-Dec

Tomaz Henrique Guadagnin 2-Dec

Muhammad Haseen Sadique 3-Dec

Madre Iqbal Ahmed 4-Dec

Saif Mohammed Nasser Al Sinawi 4-Dec

Barakat Khalifa Mohammed Al Ismaili 6-Dec

Hussein Ali Obaid Al Sheyadi 8-Dec

Mahmood Mohammed Mattar Al-Rawahi 9-Dec

Syed Mohammed Karim 10-Dec

Gexon George 11-Dec

Jasim Obaid Saleem Al Jaradi 12-Dec

Khalid Khalfan Fadhil Al Badi 14-Dec

Mahmood Khamis Salim Al Balushi 14-Dec

Mohammed Ali Sultan Al Shamsi 15-Dec

Hilal Abdullah Dhohi Al Sinani 16-Dec

Saud Saif Saud Al Musharfi 17-Dec

Othman Said Rashid Al Mamari 18-Dec

Hilal Ali Mohammed Al Isaee 19-Dec

Ganesh Dharmalingam 20-Dec

Thaer Musabah Ali Al Musalami 21-Dec

Ismail Abdullah Mohammed Al Rawahi 22-Dec

Basma Khamis Salim Al Bartamani 23-Dec

Ibtisam Khamis Salim Al Bartamani 23-Dec

Javed Iqbal 27-Dec

Mahmoud Nasser Al Nabhani 27-Dec

Naveen Chandra Jha 27-Dec

Abdullah Juma Mohammed Al Araimi 29-Dec

Abdullah Mohammed Salim Al Rawahi 30-Dec

Hyder Ali Khan 31-Dec

N M Sivakumar 31-Dec

Page 18: Stomo 4th quarter gazette 2014

Q 4 - 2014 www.stomo.com.om34 35

Q1) What is the name of this

castle?

A1) Bran Castle

Q2) This is a national

monument and landmark in

which country?

A2) Romania

Q3) Which two boarders is

the castle situated between?

A3) 1. Transylvania

2. Wallachia

Azzan Khamis – Manah

Azhar Al Mahrooqi – Manah

Yasir Majid Qazi – HO

Jothi Kumar – HO

Sathanesan Gopi – Barka III

STOMO would like to thank everyone who attempted.

Good Effort!!

Q4) What is this castle

commonly known as –

nickname?

A4) Dracula’s Castle

Q5) What is the name of the

titular character thought to

have lived here?

A5) Bram Stocker’s Dracula

Q6) What is the name of the

capital of the country this

castle is located?

A6) Bucharest

Q7) The country in which this

castle is located is on which

continent?

A7) Europe (South-Eastern Central)

Q8) What is the official

language of this country?

A8) Romanian

Q9) Name a famous football

player from this country who

plays center back and was

named their footballer of the

year in 2013?

A9) Vlad Chiriches

Q10) This footballer joined

an English football club in

2013, what is the name of

the club?

A10) Tottenham Hotspur

Solutions for the second and third quarter

Winners

 

Quiz

Please fill out your name, plant (or office) and

contact details and tear the page out. Either

hand your solutions to the plant secretary who

will arrange for it to get to the editor or scan a

copy of the page and email it to editorial@stomo.

com.om by the 30th April 2015. (Please send

your answers one of the two ways mentioned

and only send it once). The winners (max 10) will

be announced in the following quarterly Gazette

and will each receive a gift! Please note that only

English solutions will be taken in consideration.

Good Luck !

Name:

Plant/Office:

STO No:

Email:

Mobile:

Football Quiz…Name the players

Name: _____________________________________________

Position: __________________________________________

Club: ______________________________________________

Country: __________________________________________

Name: _____________________________________________

Position: __________________________________________

Club: ______________________________________________

Country: __________________________________________

Name: _____________________________________________

Position: __________________________________________

Club: ______________________________________________

Country: __________________________________________

 

 

 

 

 

 

 

 

 

 

 

 

Name: _____________________________________________

Position: __________________________________________

Club: ______________________________________________

Country: __________________________________________

Name: _____________________________________________

Position: __________________________________________

Club: ______________________________________________

Country: __________________________________________

Name: _____________________________________________

Position: __________________________________________

Club: ______________________________________________

Country: __________________________________________

 

 

 

 

 

 

 

 

 

Name: _____________________________________________

Position: __________________________________________

Club: ______________________________________________

Country: __________________________________________

 

 

 

 

Asim Al Rashdi – Barka III

Hilal Al Harthy – Barka II

John Rose Rajan – Sohar II

Sujithkumar Padmakaran – Sohar II

Ibtisam Khamis Salim – Rusail

Congratulations !Congratulations !