Status and Strategies for COSMIC-II Planning

Oct 10, 2008

Page 2: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Outline

Status of NSPO/NSC planning efforts Status of NOAA planning efforts Strategy to bring the COSMIC-II project together New Receiver Developments Missions of Opportunity

Page 3: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Status at NSPO• NSPO is currently working on three projects:

– FORMOSAT-5 (a FORMOSAT-2 follow-on, a remote sensing project)

– FORMOSAT-6 (a microsat project, payload to be defined)

– Development of a small launcher (designed for FORMOSAT-6)

• Currently NSPO does not have funding for COSMIC-II• NSPO is hoping to secure special funds from NSC for COSMIC-II• An Executive Board will meet in November and review all current

NSPO activities, and make recommendations to NSC. Reprogramming is necessary to make funds available for COSMIC-II

• NSPO would like U.S. to help their FORMOSAT-6 program, including payloads (prototype TriG?) and launcher. This may become a “risk reduction” project for COSMIC-II (if an agreement can be reached)

Page 4: Status and Strategies for COSMIC-II Planning Oct 10, 2008

NSC

• Lou Lee’s (NSC Chairman) position:– Like to have a mission that represents significant advancement over

COSMIC (e.g., more satellites, better receiver, better antenna gain, lower latency, …etc)

– NSPO needs to contribute resources (e.g., funds and people) toward COSMIC-II (should not expect NSC to pay 100%)

– Needs to stress new sciences made possible with COSMIC-II (NSC is not responsible for operation)

– Needs to demonstrate 50-50 share between U.S. and Taiwan (Taiwan should not pay more than 50%)

– Needs to have significant societal impact for Taiwan (e.g., improve typhoon prediction) – key factor to get approval by Taiwan congress

Page 5: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Near Term Strategy

• What we need NSC/NSPO to do:– Authorize Nick Yen (and his team) to work with NOAA to develop a

preliminary program plan in October 2008.

– Establish a “COSMIC-II Planning Project” – allow NSPO and NOAA to work on a detailed program plan (for 1-2 years)

– Establish an oversight board to oversee COSMIC-II program development

– Establish a clear chain of commands for COSMIC-II planning (whom does Nick report to?)

– Identify “decision point” for moving forward with COSMIC-II (need to be synchronized with NOAA decision making)

– Identify science team to work with U.S. science team

Page 6: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Other Considerations for COSMIC-II Planning

Stick to name ‘COSMIC-II’ Target Launch for 2013

– Need to start development of TriG or similar payload

Develop appropriate contractual and legal vehicles (e.g., AIT-TECRO Agreements, TAAs)

Need to continue to promote COSMIC and its science applications Need to strengthen research, education and out reach Need to build connections with other international missions

Page 7: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Status of NOAA planning efforts

Submit a preliminary budget plan (for 2011 budget) for an RO mission by November 15, 2008 – Few details needed here, identify roles for various partners, develop funding

profile

DAVE?

Page 8: Status and Strategies for COSMIC-II Planning Oct 10, 2008

New Receiver Developments

Pyxis by BRE– GPS/Galileo, 1X4 HF patch antenna?

– ROM cost $1M/unit?

– Some funding/schedule risk (2011 Cicero launch), low technical risk

TriG by JPL/BRE– GPS/Galileo/GLONASS(CDMA), large antenna w/ beem steering

– ROM cost, $7M+$1M/unit (no I&T, no data processing)

– 30-month effort, Need funding NOW

ROSA by Italian Space Agency– Few details known, OL tracking

– Launch 2008-9

GRAS by Saab/Erickson– High gain antenna, expensive, massive, power hungry

JAVAD/GFZ– Few details known

Page 9: Status and Strategies for COSMIC-II Planning Oct 10, 2008

IGOR vs. IGOR+ vs. Pyxis

IGOR/IGOR+

Pyxis

Page 10: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Pyxis Specification Highlights

– 3 Frequencies Required: L1, L2 and L5• L5 is difficult to process w/ current direct sampling design

– 2-bit Sampler Desired: ~1dB increase in SNR• 2-bit RF samplers difficult to find and relatively power-hungry and large in

size

– Noise floor reduction• Dominated by antenna filter/LNA >30dB Gain, <0.5dB NF LNA

– Size reduction• Work to incorporate the current DIP/AMP/Sampler functionalities all within

the volume of a current DIP/AMP box

– Maintain or reduce power consumption of current• Including addition of higher-power LNA, OCXO, and new L5 signal

– Elimination of commercial grade components– Attitude Determination Capability– API

Page 11: Status and Strategies for COSMIC-II Planning Oct 10, 2008

RF Front EndL1 / L2

JCA LNA's(x4)

Diplexer Modules(x4)

Amplifier Modules(x4)

RF Sampler Signal Prcocessing Hardware

JPLTurboRogue

ASICs (L1/L2)(x4)

48 Tracking Channels

Computing Platform

PPC603

8MB SDRAM

8MB Flash

RS422 Interface'BitGrabber' Xilinx

Downconverter Baseband Processing (x2 Redundant)

IGOR

RF Front EndL1 / L2

RF Sampler

Signal Prcocessing Hardware

XilinxXQR2V6000

FPGA

VHDL of x4TurboRogue

ASICs (L1/L2) & BitGrabber

48 Tracking Channels

Computing Platform

PPC603

8MB SDRAM

12MB Flash

RS422 Interface

Downconverter Baseband Processing (x2 Redundant)

IGOR +

Sample Clock

MTI OCXOSample Clock38.6556MHz

PECL-based Clock Dist.

Sample Clock

PECL-based Clock Dist. (x2)

Tellurian VC-TCXOSample Clock

38.656MHz (x2)

1-bit PECL Sampling Ckts. (x8)

RF Sampler

RF Front EndL1 / L2 / L5

MiteqLNA's(x4)

Signal Prcocessing Hardware

Xilinx FPGA orCustom ASIC

VHDL-based withGPS L1-L2-L5

andGalileo L1-E5a

Capability

96+ Tracking Channels

Computing Platform

BRE440 SoC

512MB DDR-DRAM

8MB+ CRAM / Flash

RS422 / Spacewire /Ethernet /Interface

Downconverter Baseband Processing

Pyxis

Sample Clock

MTI (???)OCXO

Sample Clock20.456 or

40.912MHz

RF to IFMixers / Amps

(x12)

LO Synthesizers(x3) or (x12)

RF Sampler

2-bit Comparator/FFSamplers (x12)

Custom RF-IC or Discrete Implementation

JCA LNA's(x4)

Diplexer Modules(x4)

Amplifier Modules(x4)

1-bit PECL Sampling Ckts. (x8)

Page 12: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Size Comparison

2-Channel Sampler

3.0” x 1.5” x 0.5”

Dual Channel (L1 and L2) Discrete

Modules with 1-bit Samplers:

Triple Channel (L1, L2, and L5) RFIC with Integrated 2-bit Samplers:

3.0” x 1.5” x 0.5”

0.35” x 0.35”, Plus supporting filters

2.0” x 1.25”

GNSS RF-IC

Page 13: Status and Strategies for COSMIC-II Planning Oct 10, 2008

TriG GPS RO Receiver JPL/BRE submitted whitepaper/proposal (30-month) to NOAA Currently first choice in NOAA GPS RO plans GPS + Galileo + GLONASS Space hardened electronics (radiation tolerant CPU and RF down

converters) Tracks new signals:

– GPS L2C and L5– Galileo Open Signal– GLONASS’ CDMA Upgrade

4-6 antennas, with identical RF-hybrid chips Digital beam steering from 4-6 antennas Dedicated CPU for science processing BlackJack based real-time GNSS processing (reliable, flexible)

Page 14: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Missions of Opportunity“Poor Man’s ” Constellation

We should do this anyway for science - less useful for operations Pros

– Lowest cost (to US/NOAA)– Some science to be done– Demonstrate truly receiver, platform independence– Supplement COSMIC, METOP, COSMIC-II data

Cons– Not optimized for global observations– Not an operational system – Degradation compared to COSMIC– Multiple platforms, receivers, software challenges– Significant efforts required for coordination and management– Need a center to serve as data repository (UCAR?) and to ensure conformity

to uniform data format and processing software

Page 15: Status and Strategies for COSMIC-II Planning Oct 10, 2008

Future RO MissionsMission Launch-

DurationDuration

(years)

GPS RO

Payload

# Soundings/day

(# SC)

Remarks

COSMIC 4/2006 ~5 IGOR, HF antennas 2500 (6) Real time-ops

METOP-A 5/2007 10 GRAS 600 Real time-ops

TerraSAR-X 7/2005 5 IGOR, HF antennas 400 RT?

Megha-Tropiques

2008-9 3 Italian ROSA 600 Equatorial, RT?

Ocean-Sat2 2008 5 Italian ROSA 300 Polar, Setting only, RT?

TanDEM-X 2009 Q2 IGOR 500

KOMPSAT-5 2009 Q2 IGOR+ 500 Limited Mem, RT?

AQUARIUS/SAC-D

5/2010 3 ROSA 600

METOP-B 2011 10 GRAS 600

CICERO 2011 5+ Pyxis/TriG 600 X 2 X (12/24)

Planned

COSMIC-II 2012 5+ Pyxis/TriG 600 X 2 X (12/24)

EQUARS 2012 IGOR+ 500

Iridium 2013 10 Pyxis/TriG 600 X 2 X 66 Proposal