    Ohio Department of Transportation

    Division of EngineeringOffice of Real Estate

    SynergyReal Estate Business Analysis

    Property Management System Requirements Specification

    Version 1.00

    Revision History

    Date Version Description Modified By

    2/26/13 1.00 Initial Draft Cheryl Jacino3/15/13 1.00 Define Real Estate Acquisition Process Cheryl Jacino

    4/29/13 1.00 Define Real Estate Property Management Process Cheryl Jacino

    5/22/13 1.00 Finalized Property Management SRS Cheryl Jacino

    5/24/13 1.01 Added Property Management to page headings. Cheryl Jacino

    6/10/13 1.02 Expanded on RE 5.5.5.5.2 Payment Received AndProcessed.

    Cheryl Jacino

  • 7/25/2019 SRS SYNERGY Property Management

    2/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 2 of 41 Thursday, June 13, 2013

    Table of Contents

    0 SynergyProperty Management System Requirements Specification ................................. 30.1 Purpose ....................................................................................................................... 30.2 Author(s) ...................................................................................................................... 30.3 Audience ...................................................................................................................... 30.4 Business Requirements ............................................................................................... 4

    0.5

    System Requirements Specifications Table: ................................................................ 40.6 Process Flow Chart: ..................................................................................................... 6

    5 Property Management Process ......................................................................................... 75.1 Lease Property ............................................................................................................ 85.1.1 Establish Lease ........................................................................................................ 95.1.1.3

    Establish Rental Rate and Deposit .......................................................................10

    5.1.2 Manage Lease ........................................................................................................105.1.2.4 Perform Lease Renewal ......................................................................................115.1.2.5 Perform Lease Termination as necessary ............................................................115.1.3 Resolve Lease Issues .............................................................................................135.2 Lease Property for Oil & Gas ......................................................................................145.2.4

    Lease Property for Oil & Gas ...................................................................................15

    5.2.5

    Negotiate Final Terms And Conditions And Execute Lease .....................................155.2.6 Manage Oil & Gas Lease ........................................................................................16

    5.3 License Pipeline ..........................................................................................................175.3.4 District Reviews And Approves Pipeline License Agreement ...................................185.3.5 Negotiate Final Terms And Conditions And Execute Pipeline License Agreement ..185.3.6

    Manage Pipeline License Agreement ......................................................................19

    5.4 Dispose of Structure ...................................................................................................205.4.2 Sell Structure ...........................................................................................................215.4.8 Donate to Governmental Agency .............................................................................235.5 Dispose of Excess Land..............................................................................................245.5.2

    Review and Approve Land Disposal ........................................................................26

    5.5.5

    Conduct Public Auction ...........................................................................................27

    5.5.5.4

    Prepare Sale Package .........................................................................................275.5.5.5 Process Closing with Governors Deed................................................................28

    5.5.5.5.2 Payment Received And Processed ......................................................................295.5.6

    Coordinate Direct Sale ............................................................................................30

    5.5.7

    Government Sale or Transfer ..................................................................................31

    5.5.7.7 Process Closing with Directors Deed..................................................................325.6 Vacate Roadway .........................................................................................................335.6.4 Notice To Abutting Owners ......................................................................................345.6.6 Process Claim .........................................................................................................345.6.7

    Finalize Roadway Vacation .....................................................................................36

    5.7 Modify Limited Access ................................................................................................375.7.3 District Reviews and Approves ................................................................................38

    5.7.4

    Finalize Access Modification....................................................................................39

    5.7.4.4 Conduct Closing ..................................................................................................405.8 Extinguish Easement ..................................................................................................41

  • 7/25/2019 SRS SYNERGY Property Management

    3/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 3 of 41 Thursday, June 13, 2013

    0 yn rgyProperty Management System Requirements Specification

    0.1 Purpose

    The System Requirements Specification (SRS) is to capture the business requirements for theReal Estate Right of Way System. The purpose of these requirements is three fold:

    1) used to select a system to purchase2) used to identify feature requirements during the system design phase3) assist the business with identifying change management needs

    The SRS document should also capture the non-functional requirements as well as systemconversion requirements.

    0.2 Author(s)

    The Business Analyst is the owner of this document, with assistance from the Business

    Sponsors, Business Stakeholders, Business Subject Matter Experts, District Subject MatterExperts, and Project Management Office Manager.

    0.3 Audience

    The SRS is a useful tool for Business Users requesting the system to communicate thefunctions of the system with DoIT and vendors involved in creating the software or system. Thisdocument will also serve as a reference for any future development.

  • 7/25/2019 SRS SYNERGY Property Management

    4/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 4 of 41 Thursday, June 13, 2013

    0.4 Business Requirements

    A business requirement is a specific, actionable, testable directive that is under the control of the business andsupports a business policy. Included in the document of SRS are the high-level lists of requirements that will bebroken into features during the Systems Design Phase that follows Business Analysis. There may be more than onefeature for each business requirement.

    0.5 System Requirements Specifications Table:

    Each section of system requirements specification is included in a table with the following parts:

    ID Description RequirementsSource

    Priority Change? Feature

    IDThis is a numeric ID that will be used to track the requirement through all phases of the system development toensure the requirement is designed, developed, tested, approved, and implemented.

    Descriptionincludes the title of the process and a definition of what is included in the process.

    Requirements SourceUsed to identify the source of the requirement. In this case the requirement is being trackedback to the requirements gathering session.RE-Acquisition-BA stands for Real Estate Acquisition Requirements Gathered during Business Analysis.RE-Appraisal-BA stands for Real Estate Appraisal Requirements Gathered during Business Analysis.RE-Acquisition-Type-BA stands for Real Estate Acquisition Type Requirements Gathering during Business

    Analysis.RE-Utility-BA stands for Real Estate Utility Coordination Requirements Gathering during Business Analysis.RE-Relocation-BA stands for Real Estate Relocation Requirements Gathering during Business Analysis.

    RE-Property-Mgmt-BA stands for Real Estate Property Management Requirements Gathering during BusinessAnalysis.RE-Fiscal-BA stands for Real Estate Fiscal Requirements Gathering during Business Analysis.RE-General-BA stands for Real Estate Reporting, Records Retention, & Document Handling RequirementsGathering during Business Analysis.RE-Technical-BA stands for Real Estate Technical Requirements, System Interfaces, and Non-FunctionalRequirements Gathering during Business Analysis.

  • 7/25/2019 SRS SYNERGY Property Management

    5/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 5 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    PriorityDefine the priority within the replacement New System for each requirement.

    Required - Current Paradox System Process that is required in the New System. Obsolete - Current Paradox System Process that is Obsolete and will not be present in the New System. New - Process that is not in the Current Paradox System Process but is required in the New System. Extra - Process that is not in the Current Paradox System Process and is an Unnecessary but desirable Extra

    Feature in the New System. Future - Process that is not in the Current Paradox System Process and is a desirable Feature in a future

    version of the New System. Any necessary preliminary setup to easily provide this feature in the future isadvised.

    ManualProcess that is manual and does not lend itself to a system solution. See DetailPriority is captured in a sub-process related to this process.

    Change?Does this need Change Management for implementation?

    FeatureUsed during Systems Design Phase to trace Functional Requirement related to the Business SystemRequirement.

  • 7/25/2019 SRS SYNERGY Property Management

    6/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 6 of 41 Thursday, June 13, 2013

    0.6 Process Flow Chart:

    Each Process is accompanied by a process flow chart. The legend below shows all of the shapes usedin the flow charts and the meaning of the shapes. Although the process flow represents the generalflow of the acquisition work, there is complete flexibility in the order each process is completed. Belowis a legend describing the shapes used within the flow charts.

    LEGEND

    Process

    Decision?

    Start or End

    Document

    Document

    Group Process

    ProcessA specific, actionable, testable activity that is under the control of the business and supports a

    business policy.

    DecisionThis is a point where the process splits into different processes based on the question shown in the

    diamond. Each directional arrow leaving the diamond is labeled with the answer to the question and points to

    the process that follows.

    Start or endA start or end point for the process flow that originates or ends at this point.

    Group ProcessA group of related processes that will be broken down into specific, actionable, testable

    activities. To see the breakdown of this group, an embedded link to the tab with the breakdown of processes

    is included.

    DocumentA paper copy of the named document. Documents can be input to a process or output from a

    process but it does not represent any activity related to the document.

    C

    Certified Mail

    MailMailA paper copy of the named document is mailed. Mail can be input to a process or output from a

    process but it does not represent any internal system activity, only the external activity of mailing a document.

    Continue? ContinueThis is a point where the process repeats until the answer allows the process to continue to the

    next step.

    Manual ProcessA specific, actionable, manual activity that cannot be replaced by system activity.

    1.6.1

    Search PublicRecords for

    Owner

    6.3.4Enter

    EncumbranceInto Ellis

    External ProcessAn activity that is a necessary part of the business process flow but takes place in a system

    external to this Real Estate System.

    Multi-Process Multi-ProcessMultiple distinct yet related activities are directly accessed from this entry point in the

    business process flow.

    Deliver/Receive Document in person. This can be input to a process or output from a process but it does not

    represent any activity, only the external delivery or receipt a document.

    Note: Title Process NoteThis contains notes that are important to the business process flow.

  • 7/25/2019 SRS SYNERGY Property Management

    7/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 7 of 41 Thursday, June 13, 2013

    5 Property Management Process

    This section contains the requirements for the property management process related toDepartment of Transportation projects.

    5.0 PROPERTY MANAGEMENT

    Property Management

    5.1

    Lease Property

    5.4

    Dispose Of

    Structure

    5.2

    Lease Property

    For Oil & Gas

    5.3License Pipeline

    5.7

    Modify Limited

    Access

    5.6

    Vacate Roadway

    5.8

    Extinguish

    Easement

    5.5Dispose OfExcess Land

    ID Description

    Requirements

    Source

    Priority Change? Feature

    RE 5.1 Lease PropertyAll properties ownedby ODOT that are suitable for lease willfollow this process.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.2 Lease Property for Oil & Gas - Allproperties owned by ODOT that aresuitable for Oil & Gas lease will followthis process.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.3 License PipelinePipeline companiesthat request the right of way foroccupancy follow this process.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.4 Dispose of StructureDistrict followsthis process on all structures that needto be removed.

    RE-Prop-Mgmt-BA See Detail

    RE 5.5 Dispose of Excess LandDistrictfollows this process on all excess landsto be disposed.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.6 Vacate RoadwayDistrict follows thisprocess on roadway that is to beremoved from service.

    RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    8/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 8 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.7 Modify Limited AccessDistrict followsthis process when a property ownerrequests new or improved access tothe roadway.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.8 Extinguish EasementDistrict followsthis process when excess easementcontrolled ROW is transferred to theunderlying owner.

    RE-Prop-Mgmt-BA

    See Detail

    5.1 Lease Property

    All properties owned by ODOT that are suitable for lease will follow this process.

    5.1 LEASE PROPERTY

    5.1.2

    Manage Lease

    5.1.3

    Resolve Lease

    Issues

    5.1.1

    Establish Lease

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.1.1 Establish LeaseDistrict followsthis process to setup a newlease.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.1.2 Manage LeaseDistrict followsthis process to manage anexisting leased property.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.1.3 Resolve Lease IssuesDistrictfollows this process to manageissues that arise in the normallease management process asnecessary.

    RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    9/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 9 of 41 Thursday, June 13, 2013

    5.1.1 Establish Lease

    District follows this process to setup a new lease.

    5.1.1 ESTABLISH LEASE

    5.1.1.2

    Negotiate And Close

    Holdover Tenants AsNeeded

    5.1.1.4

    Process

    Application ToLease

    5.1.1.5Accept

    Application ToRent?

    5.1.1.3

    Establish Rental

    Rate And Deposit

    5.1.1.6

    Finalize Lease

    Agreement

    YES

    5.1.1.1

    Determine

    Feasibility ToLease Property

    NO

    5.1.1.7

    Collect Rents

    And Deposits

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.1.1.1 Determine Feasibility to LeasePropertyDistrict considerscurrent and future projects todetermine if the property isavailable for leasing. Districtthen evaluates the structure for

    safety, and economic feasibilityof rental.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.1.1.2 Negotiate and Close HoldoverTenants as neededHoldovertenants are original siteoccupants during acquisitionthat remain on the premisesfollowing closing. Prior toclosing, holdover tenants mustenter into an ODOT propertylease.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.1.1.3 Establish Rental Rate and

    DepositConduct a marketrent analysis to determine theRental Rate and Deposit.

    RE-Prop-Mgmt-

    BA

    See Detail

    RE 5.1.1.4 Process Application to LeaseAccept application and performcredit check as necessary.

    RE-Prop-Mgmt-BA

    New

    RE 5.1.1.5 Accept Application to Rent?Monitor for an approved leaseagreement.

    RE-Prop-Mgmt-BA

    RE 5.1.1.6 Finalize Lease AgreementComplete and execute leaseagreement.

    RE-Prop-Mgmt-BA

    Required

    RE 5.1.1.7 Collect Rents and DepositsProcess original rent paymentsand deposits.

    RE-Prop-Mgmt-BA

    Required

  • 7/25/2019 SRS SYNERGY Property Management

    10/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 10 of 41 Thursday, June 13, 2013

    5.1.1.3 Establish Rental Rate and Deposit

    Conduct a market rent analysis to determine the Rental Rate and Deposit.

    5.1.1.3 ESTABLISH RENTAL RATE AND DEPOSIT

    5.1.1.3.1Obtain Market

    Rent Analysis

    5.1.1.3.2

    DetermineSecurity Deposits

    Per Lease

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.1.1.3.1 Obtain Market Rent AnalysisComplete rental evaluation todetermine market rental rate.

    RE-Prop-Mgmt-BA

    New

    RE 5.1.1.3.2 Determine Security DepositsPer LeaseCalculate deposit

    based on rental rate.

    RE-Prop-Mgmt-BA

    Required

    5.1.2 Manage Lease

    District follows this process to manage an existing leased property.

    5.1.2 MANAGE LEASE

    5.1.2.1

    Receive and

    Process Rent

    5.1.2.2

    Maintain

    Property

    5.1.2.3

    Conduct

    Inspections

    5.1.2.6

    Pay Property

    Taxes

    5.1.2.4Perform Lease

    Renewal

    5.1.2.5Perform LeaseTermination as

    Necessary

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.1.2.1 Receive and Process RentWhen rentis received, process payment.

    RE-Prop-Mgmt-BA

    Required

    RE 5.1.2.2 Maintain PropertyComplete periodicfixes and maintenance updates asnecessary. Rent reduction needs to beprocessed when tenant makes repair.

    RE-Prop-Mgmt-BA

    Required

    RE 5.1.2.3 Conduct InspectionsDistrict conductsannual property inspections.

    RE-Prop-Mgmt-BA

    Required

    RE 5.1.2.4 Perform Lease RenewalAt the end ofthe lease term, District determinesfeasibility of rental renewal and renewslease as necessary.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.1.2.5 Perform Lease Termination as necessaryAt normal termination of lease, inspectcondition of property and return securitydeposit according to the terms of thelease.

    RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    11/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 11 of 41 Thursday, June 13, 2013

    RE 5.1.2.6 Pay Property TaxesPay property taxeswhen tax bill received.

    RE-Prop-Mgmt-BA

    Required

    5.1.2.4 Perform Lease Renewal

    At the end of the lease term, District determines feasibility of rental renewal and renews lease as

    necessary.

    5.1.2.4 PERFORM LEASE RENEWAL

    5.1.2.4.1

    Obtain Market

    Rent Analysis As

    Needed

    5.1.2.4.2

    Process Lease

    Renewal

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.1.2.4.1 Obtain Market Rent Analysis asneededEvaluate Lease termsand conditions and conductmarket rent analysis asnecessary.

    RE-Prop-Mgmt-BA

    Required

    RE 5.1.2.4.2 Process Lease RenewalExecute new lease.

    RE-Prop-Mgmt-BA

    Required

    5.1.2.5 Perform Lease Termination as necessary

    At normal termination of lease, inspect condition of property and return security depositaccording to the terms of the lease.

    5.1.2.5 PERFORM LEASE TERMINATION AS NECESSARY

    5.1.2.5.1

    Inspect

    Condition Of

    Property

    5.1.2.5.2

    Return Security

    Deposit

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE

    5.1.2.5.1

    Inspect Condition of PropertyWhen

    terms of the lease have been fulfilledand lease renewal is not offered or isoffered and not accepted, Districtconducts an inspection of the conditionof the property and determines anydamages and makes depositadjustments as necessary.

    RE-Prop-Mgmt-

    BA

    Required

  • 7/25/2019 SRS SYNERGY Property Management

    12/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 12 of 41 Thursday, June 13, 2013

    RE5.1.2.5.2

    Return Security DepositDistrictprocesses release of funds for depositreimbursement less damageadjustments as necessary.

    RE-Prop-Mgmt-BA

    Required

  • 7/25/2019 SRS SYNERGY Property Management

    13/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 13 of 41 Thursday, June 13, 2013

    5.1.3 Resolve Lease Issues

    District follows this process to manage abnormal issues that arise in the normal leasemanagement process as necessary.

    5.1.3 RESOLVE LEASE ISSUES

    5.1.3.3

    Give Notice to

    Leave Premises

    5.1.3.2

    Terminate Lease

    5.1.3.1

    Process NSF and

    Delinquent

    Payments

    NOTE: These processes are performed as necessary by the issue that needs to be resolved.

    5.1.3.4

    Process Eviction Resolve Lease Issues

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.1.3.1 Process NSF and Delinquent PaymentsIf payment is late or funds are notsufficient, follow lease terms andconditions to resolve issue.

    RE-Prop-Mgmt-BA

    Required

    RE 5.1.3.2 Terminate LeaseIf tenant violatesterms and conditions sufficiently toterminate proceed with leasetermination.

    RE-Prop-Mgmt-BA

    Required

    RE 5.1.3.3 Give Notice to Leave PremisesWhentenant violates terms and conditions anotice to vacate must be deliveredaccording to the terms of the lease.

    RE-Prop-Mgmt-BA

    New

    RE 5.1.3.4 Process EvictionAs necessary,engage Attorney General to evicttenant according to the terms of thelease.

    RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    14/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 14 of 41 Thursday, June 13, 2013

    5.2 Lease Property for Oil & Gas

    All properties owned by ODOT that are suitable for Oil & Gas lease will follow this process.

    5.2 LEASE PROPERTY FOR OIL & GAS

    5.2.1

    Receive Lease

    Request FromO&G

    5.2.2

    Provide Package

    Checklist ToO&G

    5.2.4

    CO And District Review

    And Approve Lease

    5.2.5Negotiate Final

    Terms & ConditionsThen Execute Lease

    5.2.6

    Manage O&G

    Lease

    5.2.3

    Receive Completed

    Package From O&G

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.2.1 Receive Lease Request from O&GAgency receives request from Oil &Gas Company for lease rights.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.2.2 Provide Package checklist to O&GCO sends checklist for O&G leaserequest package to company.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.2.3 Receive Completed Package fromO&GCO receives completed O&Glease request package and recordsbasic information.

    RE-Prop-Mgmt-BA New

    RE 5.2.4 CO and District review and approveLease - Review Deeds, Plans, LegalDescription, Etc. for O&G lease requestand work to approve lease.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.2.5 Negotiate Final Terms & ConditionsThen Execute Lease

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.2.6 Manage O&G LeaseEnsurecompliance to lease terms and

    conditions and process paymentsreceived.

    RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    15/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 15 of 41 Thursday, June 13, 2013

    5.2.4 Lease Property for Oil & Gas

    Review Deeds, Plans, Legal Description, Etc. for O&G Lease Request and work to approve lease.

    5.2.4 CO AND DISTRICT REVIEW AND APPROVE OIL & GAS LEASE

    5.2.4.1Review O&G Lease

    Request

    5.2.4.2Send to District

    for Review and

    Approval

    5.2.4.3Receive District

    Approval

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.2.4.1 Review O&G Lease RequestReviewDeeds, Plans, Legal Description, Etc.from O&G Lease Request Package.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.2.4.2 Send to District for Review and

    Approval - Upon acceptance of lease,send to district for review and approval.

    RE-Prop-Mgmt-

    BA

    New

    RE 5.2.4.3 Receive District Approval RE-Prop-Mgmt-BA

    New

    5.2.5 Negotiate Final Terms And Conditions And Execute Lease

    All properties owned by ODOT that are approved for Oil & Gas lease will follow this process.

    5.2.5 NEGOTIATE FINAL TERMS AND CONDITIONS AND EXECUTE LEASE

    5.2.5.1

    Review Offer

    5.2.5.2

    ResearchMarket Data

    5.2.5.3

    Accept Offer or

    Make Counter

    Offer

    5.2.5.4

    Finalize

    Agreement And

    Draft Lease

    5.2.5.5

    Send Lease to O&G

    for Execution and

    Recording

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.2.5.1 Review OfferReview proposed leaseterms and conditions.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.2.5.2 Research Market DataCompareexisting oil & gas lease marketinformation in relation to proposedoffer.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.2.5.3 Accept Offer Or Make Counter Offer RE-Prop-Mgmt-BA

    Manual

    RE 5.2.5.4 Finalize Agreement And Draft Lease RE-Prop-Mgmt-BA

    Required

    RE 5.2.5.5 Send Lease To O&G For ExecutionAnd Recording

    RE-Prop-Mgmt-BA

    Required

  • 7/25/2019 SRS SYNERGY Property Management

    16/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 16 of 41 Thursday, June 13, 2013

    5.2.6 Manage Oil & Gas Lease

    All properties owned by ODOT that are suitable for Oil & Gas lease will follow this process.

    5.2.6 MANAGE OIL & GAS LEASE

    5.2.6.1

    Obtain recordedcopy of lease

    5.2.6.2Verify Insurance

    Certificateconforms to Lease

    Agreement

    5.2.6.4

    Track InitialTerm and

    Production

    5.2.6.6

    Monitor LeaseCompliance

    5.2.6.3Receive and

    Process BonusPayment

    5.2.6.5Track and

    process royaltypayments

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.2.6.1 Obtain Recorded Copy Of LeaseO&G required to send a copy of therecorded lease.

    RE-Prop-Mgmt-BA

    New

    RE 5.2.6.2 Verify Insurance Certificate ConformsTo Lease AgreementDistrict or CO

    reviews insurance certificate to makesure it complies with lease terms andconditions of the lease.

    RE-Prop-Mgmt-BA

    Required

    RE 5.2.6.3 Receive And Process Bonus PaymentProcess payment received fromO&G. Follow-up on late bonuspayments as necessary.

    RE-Prop-Mgmt-BA

    Required

    RE 5.2.6.4 Track Initial Term And ProductionTrack the initial term as the O&G well isdrilled and then track the time until itgoes into production.

    RE-Prop-Mgmt-BA

    New

    RE 5.2.6.5 Track And Process Royalty Payments

    Track and process the monthly O&Gproduction statement in conjunctionwith royalty payment. Follow-up on lateroyalty payments as necessary.

    RE-Prop-Mgmt-

    BA

    Required

    RE 5.2.6.6 Monitor Lease ComplianceOngoingmanagement of the lease.

    RE-Prop-Mgmt-BA

    Manual

  • 7/25/2019 SRS SYNERGY Property Management

    17/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 17 of 41 Thursday, June 13, 2013

    5.3 License Pipeline

    Pipeline companies that request the right of way for pipeline occupancy follow this process.

    5.3 LICENSE PIPELINE

    5.3.1

    Receive Request

    From Pipeline

    Company

    5.3.2District Sends

    Checklist ToPipeline

    Company

    5.3.3Pipeline

    CompanySubmits License

    Package

    5.3.4District Reviews And

    Approves PipelineLicense Agreement

    5.3.5Negotiate And

    Execute PipelineLicense Agreement

    5.3.6Manage

    Pipeline LicenseAgreement

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.3.1 Receive Request From PipelineCompany - Pipeline Company requestslicense rights.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.3.2 District Sends Checklist To PipelineCompany - District sends checklist forPipeline License Package to company.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.3.3Pipeline Company Submits LicensePackage - District receives completedPipeline License Package and recordsbasic information.

    RE-Prop-Mgmt-BA New

    RE 5.3.4 District Reviews And Approves PipelineLicense AgreementDistrict reviewsDeeds, Plans, Legal Description, Etc.for pipeline license request and worksto approve license.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.3.5 Negotiate and execute Pipeline LicenseAgreementDistrict works withPipeline Company to negotiate PipelineLicense Terms and Conditions andexecutes the License Agreement.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.3.6 Manage Pipeline License Agreement -Ensure compliance to license termsand conditions. Receive and processpayments.

    RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    18/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 18 of 41 Thursday, June 13, 2013

    5.3.4 District Reviews And Approves Pipeline License Agreement

    District Reviews Pipeline License Package Deeds, Plans, Legal Description, Etc. for Request toLicense Pipeline and works to approve license.

    5.3.4 DISTRICT REVIEWS AND APPROVES PIPELINE LICENSE AGREEMENT

    5.3.4.1

    Review Pipeline

    License Request

    5.3.4.4

    District Reviews

    And Approves

    5.3.4.5District Notifies

    PipelineCompany Of

    Decision

    5.3.4.2Evaluate

    Potential ROWImpact From

    Pipeline

    5.3.4.3

    Conduct Field

    Review As

    Necessary

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.3.4.1 Review Pipeline License RequestDistrict reviews Pipeline LicensePackage which includes Deeds, Plans,& Legal Description, Etc. to Support the

    License Request.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.3.4.2 Evaluate Potential ROW Impact fromPipelineDistrict reviews proposal forROW impacts.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.3.4.3 Conduct Field Review as necessary RE-Prop-Mgmt-BA

    Manual

    RE 5.3.4.4 District Reviews and Approves RE-Prop-Mgmt-BA

    New

    RE 5.3.4.5 District Notifies Pipeline Company ofdecision to License.

    RE-Prop-Mgmt-BA

    New

    5.3.5 Negotiate Final Terms And Conditions And Execute Pipeline License AgreementDistrict works with Pipeline Company to negotiate Pipeline License Terms and Conditions andexecutes the License Agreement.

    5.3.5 NEGOTIATE FINAL TERMS AND CONDITIONS AND EXECUTE PIPELINE LICENSE AGREEMENT

    5.3.5.1District Obtains

    Appraisal OfPipelineCorridor

    5.3.5.4Finalize

    Agreement AndDraft LicenseAgreement

    5.3.5.5

    Send For

    Execution And

    Recording

    5.3.5.2Approve Pipeline

    Plans AndConstructionSpecifications

    5.3.5.3

    Notify Pipeline

    Company Of

    Final Agreement

    ID Description RequirementsSource

    Priority Change? Feature

    RE 5.3.5.1 District Obtains Appraisal Of PipelineCorridor

    RE-Prop-Mgmt-BA

    New

    RE 5.3.5.2 Approve Pipeline Plans AndConstruction Specifications

    RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    19/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 19 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.3.5.3 Notify Pipeline Company of FinalAgreementDistrict notifies pipelinecompany of final adjustments andannual cost.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.3.5.4 Finalize Agreement And Draft LicenseAgreement

    RE-Prop-Mgmt-BA

    Manual

    RE 5.3.5.5 Send For Execution And RecordingSend License Agreement to PipelineCompany for Execution and Recording.

    RE-Prop-Mgmt-BA

    New

    5.3.6 Manage Pipeline License Agreement

    Ensure compliance to license terms and conditions. Receive and process payments.

    5.3.6 MANAGE PIPELINE LICENSE AGREEMENT

    5.3.6.1

    Obtain Recorded

    Copy Of License

    Agreement

    5.3.6.2Verify Insurance

    CertificateConforms To

    License Agreement

    5.3.6.4

    Monitor License

    Agreement For

    Compliance

    5.3.6.3Receive And

    Process InitialPayment

    5.3.6.5

    Process Annual

    Payment

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.3.6.1 Obtain Recorded Copy Of LicenseAgreement

    RE-Prop-Mgmt-BA

    New

    RE 5.3.6.2 Verify Insurance Certificate Conforms

    To License Agreement

    RE-Prop-Mgmt-

    BA

    New

    RE 5.3.6.3 Receive And Process Initial Payment RE-Prop-Mgmt-BA

    New

    RE 5.3.6.4 Monitor License Agreement ForCompliance

    RE-Prop-Mgmt-BA

    Manual

    RE 5.3.6.5 Process Annual Payment RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    20/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 20 of 41 Thursday, June 13, 2013

    5.4 Dispose of Structure

    District follows this procedure to dispose of a structure on ROW property and ensure removal iscompleted.

    5.4 DISPOSE OF STRUCTURE

    SELL

    5.4.1

    How Will Structure

    Be Disposed?

    5.4.6

    CommunicateNeed For District

    MaintenanceRemoval

    5.4.5Communicate

    Need To IncludeIn Construction

    Plans

    5.4.7Communicate

    Need For StandAlone Demo

    Plans

    5.4.4Communicate

    Need ForAsbestos

    Abatement

    5.4.3

    CoordinateAsbestos Testing

    As Necessary

    DEMOLISH

    5.4.2

    Sell Structure

    DEMOLISH

    5.4.8Donate To

    GovernmentalAgency

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.4.1 How will structure be Disposed?Based on age, condition, and projecttiming; decide if the structure will besold or demolished.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.4.2 Sell StructureDistrict will proceedwith sale of structure to be removedfrom ROW Property.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.4.3 Coordinate Asbestos Testing asNecessaryEvery structure needs tobe tested for Asbestos prior todemolition.

    RE-Prop-Mgmt-BA

    Required

    RE 5.4.4 Communicate Need For AsbestosAbatementNotify District constructionproject manager of need to abateAsbestos.

    RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    21/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 21 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.4.5 Communicate Need to Include inConstruction Plan - Notify Districtconstruction project manager of needto Demolish structure(s) as a 202

    removal item in the projectsconstruction plans.

    RE-Prop-Mgmt-BA

    New

    RE 5.4.6 Communicate need for DistrictMaintenance Removal - Notify DistrictMaintenance staff of need to demolishstructure.

    RE-Prop-Mgmt-BA

    New

    RE 5.4.7 Communicate need for Stand AloneDemo Plans - Notify Districtconstruction project manager of needto Demolish structure(s) via a set ofstand-alone demolition project plans.

    RE-Prop-Mgmt-BA

    New

    RE 5.4.8 Donate to Governmental Agency

    Local government agency, like Fire orPolice Department will request to usestructure for training purposes. Onoccasion there is a request to salvagematerial prior to demolition.

    RE-Prop-Mgmt-

    BA

    See Detail

    5.4.2 Sell Structure

    District follows this procedure to sell a structure on ROW property and ensure removal iscompleted.

    5.4.2 SELL STRUCTURE

    5.4.2.3Post Ad On

    Website & Run

    Newspaper Ad

    5.4.2.2Advertise

    Based On FMVE=> $1,000

    YES

    5.4.2.4

    Post Ad On

    Website

    NO

    5.4.2.1

    Create List Of

    Structures And

    Plans

    5.4.2.5

    Receive And

    Open Bids Then

    Award Sale

    5.4.2.6

    Issue Letter

    Of Award

    5.4.2.9Release

    PerformanceGuarantee AsAppropriate

    5.4.2.8

    Manage

    Removal

    Process

    5.4.2.7

    Collect

    Performance

    Guarantee

    ID DescriptionRequirements

    Source

    Priority Change? Feature

    RE 5.4.2.1 Create List Of Structures And PlansCreate a list of all structures for saleand plans for project.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.4.2.2 Advertise Based On FMVE => $1,000Select method of advertisement for saleof structure based on FMVE beinggreater than or equal to the thresholdamount for newspaper advertising.

    RE-Prop-Mgmt-BA

  • 7/25/2019 SRS SYNERGY Property Management

    22/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 22 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.4.2.3 Post Ad on Website & Run NewspaperAdPost ad on website & runnewspaper ad at least thepredetermined number of days that

    Structure Sales with FMVE greater thanor equal to the threshold amount fornewspaper advertising need advertisedprior to sale.

    RE-Prop-Mgmt-BA

    Requiredand New

    RE 5.4.2.4 Post Ad On WebsitePostadvertisement on website at least thepredetermined number of daysStructure Sales with FMVE less thanthe threshold amount for newspaperadvertising need advertised prior tosale.

    RE-Prop-Mgmt-BA

    New

    RE 5.4.2.5 Receive And Open Bids Then AwardSale.

    RE-Prop-Mgmt-BA

    New

    RE 5.4.2.6 Issue Letter of Award - Letter of award(or sale agreement) is sent to allBidders to notify them of the SaleAward.

    RE-Prop-Mgmt-BA

    New

    RE 5.4.2.7 Collect Performance GuaranteeCollect performance guarantee which isa deposit required to insure compliancewith sale agreement.

    RE-Prop-Mgmt-BA

    New

    RE 5.4.2.8 Manage Removal Process RE-Prop-Mgmt-BA

    Manual

    RE 5.4.2.9 Release Performance Guarantee As

    Appropriate

    RE-Prop-Mgmt-

    BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    23/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 23 of 41 Thursday, June 13, 2013

    5.4.8 Donate to Governmental Agency

    District follows this procedure to donate structure on ROW property to a government agency,such as fire department or police department; and ensure removal is completed.

    5.4.8 DONATE TO GOVERNMENTAL AGENCY

    5.4.8.1

    District Receives

    Request From

    Governmental Agency

    5.4.8.2

    District Reviews

    And Approves

    Request

    5.4.8.3

    District Issues Letter Of

    Award For Removal

    Without Cost

    5.4.8.4

    Collect Performance

    Guarantee As

    Necessary

    5.4.8.5

    Monitor Removal for

    Compliance to Terms

    and Conditions

    5.4.8.6

    Return Performance

    Guarantee as

    Appropriate

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.4.8.1 District Receives Request FromGovernmental Agency - DistrictReceives Request From GovernmentalAgency wanting to receive a Structurefor less than FMVE or as a Donation.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.4.8.2 District Reviews and Approves Request RE-Prop-Mgmt-BA

    New

    RE 5.4.8.3 District Issues Letter of Award forRemoval without Cost

    RE-Prop-Mgmt-BA

    New

    RE 5.4.8.4 Collect Performance Guarantee asNecessary

    RE-Prop-Mgmt-BA

    Manual

    RE 5.4.8.5 Monitor Removal for Compliance toTerms and Conditions

    RE-Prop-Mgmt-BA

    New

    RE 5.4.8.6 Return Performance Guarantee asAppropriate

    RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    24/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 24 of 41 Thursday, June 13, 2013

    5.5 Dispose of Excess Land

    District follows this procedure to dispose of excess land.

    5.5 DISPOSE OF EXCESS LAND

    5.5.3

    Public Sale or

    Government Sale or

    Transfer?

    PUBLIC SALE

    5.5.4Public Auction

    or DirectSale?

    PUBLIC AUCTION

    GOVERNMENT

    SALE OR

    TRANSFER

    5.5.7

    Government

    Sale Or Transfer

    5.5.5

    Conduct PublicAuction

    5.5.6

    Coordinate

    Direct SaleDIRECT SALE

    5.5.1

    District Receives

    Request For

    Land Disposal

    5.5.2Review And

    Approve LandDisposal

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.1 District Receives Request For ExcessLand Disposal

    RE-Prop-Mgmt-BA

    Manual

    RE 5.5.2 Review And Approve Land DisposalDistrict reviews and approves proposedland disposal sale, conducts anappraisal, and coordinates with othergovernment agencies as necessary. IfFederal Money is Involved, obtain

    Federal Highway Approval.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.5.3 Public Sale or Government Sale orTransfer?Determine which method ofland disposal is appropriate; publicsale, government sale, or governmenttransfer.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.5.4 Public Auction or Direct Sale?Forpublic sales, determine if a publicauction or direct sale will be used.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.5.5 Conduct Public AuctionSelect anAuctioneer, advertise auction, monitorauction, and complete sale and closingon land to be disposed.

    RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    25/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 25 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.6 Coordinate Direct SaleDetermineoffer and mail to abutting owner(s). Ifthere is one abutting owner, receive thesigned purchase contract with deposit.

    If there are multiple abutting owners,conduct a sealed bid auction, awardsale, and notify all bidders. Completesale and closing on land to bedisposed.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.5.7 Government Sale or TransferCoordinate sale or transfer of excessland to local government agency, likeMunicipalities, Counties, and otherState or Federal Agencies.

    RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    26/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 26 of 41 Thursday, June 13, 2013

    5.5.2 Review and Approve Land Disposal

    District reviews and approves proposed land disposal sale, conducts an appraisal, andcoordinates with other government agencies as necessary. If Federal Money is involved, obtainFederal Highway Approval.

    5.5.2 REVIEW AND APPROVE LAND DISPOSAL

    5.5.2.1

    Conduct District

    Review And

    Approval

    5.5.2.5

    Is Federal Money

    Involved?YES

    5.5.2.6

    Obtain Federal

    Highway

    Approval

    5.5.2.3

    Coordinate With

    Facilities As

    Necessary

    5.5.2.4

    Coordinate With

    ODNR As

    Necessary

    5.5.2.2

    Perform 2.0

    Appraisal

    NOTHING

    NO

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.2.1 Conduct District Review andApprovalDistrict reviewsproposed land disposal saleand approves as indicated byreview.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.5.2.2 Perform 2.0 AppraisalConduct an appraisal using thesame methods outlined in RE-SynergyAcquisitiondocument.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.5.2.3 Coordinate with Facilities asNecessaryWork with facilitieson disposal of land.

    RE-Prop-Mgmt-BA

    Manual

    RE 5.5.2.4 Coordinate with ODNR asNecessaryWork with ODNRon disposal of land asnecessary.

    RE-Prop-Mgmt-BA

    New

    RE 5.5.2.5 Is Federal Money Involved?Determine if federal money isinvolved.

    RE-Prop-Mgmt-BA

    RE 5.5.2.6 Obtain Federal HighwayApprovalWork with FHWA toobtain approval on disposal ofland if Federal Money isinvolved.

    RE-Prop-Mgmt-BA

    Required

  • 7/25/2019 SRS SYNERGY Property Management

    27/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 27 of 41 Thursday, June 13, 2013

    5.5.5 Conduct Public Auction

    Select an Auctioneer, advertise auction, monitor auction, and complete sale and closing on landto be disposed.

    5.5.5 CONDUCT PUBLIC AUCTION

    5.5.5.1

    Advertise Public

    Auction

    5.5.5.2

    Choose Staff Or

    Consultant For

    Auctioneer

    5.5.5.3

    Conduct Auction

    5.5.5.5Process Closing

    With GovernorsDeed

    5.5.5.4

    Prepare Sale

    Package

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.5.1 Advertise Public AuctionAdvertisePublic Auction according to existingpolicy and laws.

    RE-Prop-Mgmt-BA New andRequired

    RE 5.5.5.2 Choose Staff or Consultant forAuctioneer

    RE-Prop-Mgmt-BA New

    RE5.5.5.3 Conduct Auction RE-Prop-Mgmt-BA New

    RE 5.5.5.4 Prepare Sale PackagePrepare allclosing documents for sale and requestGovernors Deed.

    RE-Prop-Mgmt-BA See Detail

    RE 5.5.5.5 Process Closing with Governors DeedDistrict conducts closing, processespayment, and conveys GovernorsDeed. Buyer records deed andsupplies District with a copy of therecorded deed. District updates the

    plans and inventory to reflect the sale.

    RE-Prop-Mgmt-BA See Detail

    5.5.5.4 Prepare Sale Package

    Prepare all closing documents for sale and request Governors Deed.

    5.5.5.4 PREPARE SALE PACKAGE

    5.5.5.4.1

    Process Down

    Payment

    Deposit

    5.5.5.4.2

    Prepare

    Chronology Of

    Events

    5.5.5.4.3

    Send Sale

    Package And

    Request Deed

    5.5.5.4.4Receive

    ExecutedGovernors

    Deed

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.5.4.1 Process Down Payment Deposit RE-Prop-Mgmt-BA

    Required

    RE 5.5.5.4.2 Prepare Chronology of EventsDistrict prepares Chronology of Eventswhich is a summary of all activities inconjunction with the auction.

    RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    28/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 28 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.5.4.3 Send Sale Package And Request DeedSend Sale Package to Auditor of Stateand Request Governors Deed.

    RE-Prop-Mgmt-BA

    New

    RE 5.5.5.4.4 Receive Executed Governors Deed RE-Prop-Mgmt-BA

    New

    5.5.5.5 Process Closing with Governors Deed

    Conduct closing, process payment, convey Governors Deed, Buyer records deed and suppliesDistrict with a copy of the recorded deed. District updates the plans and inventory to reflect thesale.

    5.5.5.5 PROCESS CLOSING WITH GOVERNORS DEED

    5.5.5.5.1

    Conduct Closing

    And ConveyDeed

    5.5.5.5.3

    Buyer Records

    Deed

    5.5.5.5.5District Updates

    Plans And

    Inventory ToReflect Sale

    5.5.5.5.4District

    Receives Copy

    Of RecordedInstrument

    5.5.5.5.2Payment

    Received And

    Processed

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.5.5.1 Conduct Closing And Convey Deed RE-Prop-Mgmt-BA

    Manual

    RE 5.5.5.5.2 Payment Received And ProcessedDistrict receives payment at closing andsends check and RE24-1 to Accountingand copies CO on RE24-1.

    RE-Prop-Mgmt-BA

    See Detail

    Required

    RE 5.5.5.5.3 Buyer Records Deed RE-Prop-Mgmt-BA

    Manual

    RE 5.5.5.5.4 District Receives Copy Of RecordedInstrument

    RE-Prop-Mgmt-BA

    Required

    RE 5.5.5.5.5 District Updates Plans And InventoryTo Reflect Sale

    RE-Prop-Mgmt-BA

    Manual

  • 7/25/2019 SRS SYNERGY Property Management

    29/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 29 of 41 Thursday, June 13, 2013

    5.5.5.5.2 Payment Received And Processed

    District receives payment at closing and sends check and RE24-1 to Accounting and copies COon RE24-1.

    5.5.5.5.2 PAYMENT RECEIVED AND PROCESSED

    5.5.5.5.2.1

    Receive

    Payment From

    Closing

    5.5.5.5.2.3Send Form To

    CO

    5.5.5.5.2.2Complete

    MiscellaneousReceipts Form

    (RE24-1)

    5.5.5.5.2.4Update MasterInventory List

    RE24-1 is used to Report Quarterly excess

    land disposals for accounting to prepare the

    GASB-34 Report.

    Miscellaneous

    Receipts Form

    RE24-1

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE5.5.5.5.2.1

    Receive Payment from Closing RE-Synergy-BA Manual

    RE5.5.5.5.2.2

    Complete Miscellaneous ReceiptsForm (RE24-1)

    RE-Synergy-BA See Detail

    Required

    RE5.5.5.5.2.3

    Send Form to CO RE-Synergy-BA Manual

    RE5.5.5.5.2.4

    Update Master Inventory ListRemoveexcess land that was sold from ODOT sMaster Inventory List.

    RE-Synergy-BA Required

  • 7/25/2019 SRS SYNERGY Property Management

    30/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 30 of 41 Thursday, June 13, 2013

    5.5.6 Coordinate Direct Sale

    Determine offer and mail to abutting owner(s). If there is one abutting owner, receive the signedpurchase contract with deposit. If there are multiple abutting owners, conduct a sealed bidauction, award sale, and notify all bidders. Complete sale and closing on land to be disposed.

    5.5.6 COORDINATE DIRECT SALE

    NOTE FOR DIRECT SALE: Can only be conducted if the appraised value is $20,000 or less, and the Process is dictated by

    the number of abutting owners [ORC 5501.34(C)]

    5.5.6.1How ManyAbuttingOwners?

    5.5.6.2

    Send Offer

    Letter By

    Registered Mail

    ONE

    5.5.6.4

    Conduct SealedBid Auction

    TWO

    OrMore

    5.5.6.3

    Receive Signed

    Purchase Contract

    And Deposit

    5.5.6.5

    Notify All

    Bidders Of

    Results

    5.5.5.5Process Closing

    With Governors

    Deed

    5.5.5.4

    Prepare Sale

    Package

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.6.1 How Many Abutting Owners? RE-Prop-Mgmt-

    BARE 5.5.6.2 Send Offer Letter by Registered Mail RE-Prop-Mgmt-

    BANew

    RE 5.5.6.3 Receive signed purchase contract anddeposit

    RE-Prop-Mgmt-BA

    Required

    RE 5.5.6.4 Conduct Sealed Bid Auction RE-Prop-Mgmt-BA

    New

    RE 5.5.6.5 Notify All Bidders of Results RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    31/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 31 of 41 Thursday, June 13, 2013

    5.5.7 Government Sale or Transfer

    Coordinate sale or transfer of excess land to local government agency, like Parks Department,Municipalities, or Subdivisions.

    5.5.7 GOVERNMENT SALE OR TRANSFER

    5.5.7.2

    CO Approves

    Disposal For

    Less Than FMVE

    5.5.7.3

    Execute

    Contract Of

    Purchase

    5.5.7.4

    Create

    Directors Deed

    5.5.7.1Offer < FMVE

    ?

    < FMVE

    => FMVE

    5.5.7.5

    Execute

    Contract Of

    Purchase

    5.5.7.6

    Create

    Directors Deed

    5.5.7.7Process ClosingWith Directors

    Deed

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.7.1 Offer < FMVE? - Is the offer less thanfull FMVE?

    RE-Prop-Mgmt-BA

    RE 5.5.7.2 CO Approves Disposal for Less thanFMVE

    RE-Prop-Mgmt-BA New

    RE 5.5.7.3 Execute Contract of Purchase RE-Prop-Mgmt-BA New

    RE 5.5.7.4 Create Directors Deed RE-Prop-Mgmt-BA New

    RE 5.5.7.5 Execute Contract of Purchase RE-Prop-Mgmt-BA New

    RE 5.5.7.6 Create Directors Deed RE-Prop-Mgmt-BA New

    RE 5.5.7.7 Process Closing with Directors DeedDistrict conducts closing, processespayment, and conveys DirectorsDeed. Buyer records deed andsupplies District with a copy of therecorded deed. District updates theplans and inventory to reflect the sale.

    RE-Prop-Mgmt-BA See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    32/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 32 of 41 Thursday, June 13, 2013

    5.5.7.7 Process Closing with Directors Deed

    District conducts closing, processes payment, and conveys Directors Deed. Buyer recordsdeed and supplies District with a copy of the recorded deed. District updates the plans andinventory to reflect the sale.

    5.5.7.7 PROCESS CLOSING WITH DIRECTORS DEED

    5.5.7.7.1

    Conduct Closing

    And Convey

    Deed

    5.5.7.7.2

    Payment

    Received And

    Processed

    5.5.7.7.3

    Buyer Records

    Deed

    5.5.7.7.5District Updates

    Plans AndInventory ToReflect Sale

    5.5.7.7.4District

    Receives CopyOf RecordedInstrument

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.5.7.7.1 Conduct Closing And Convey Deed RE-Prop-Mgmt-BA Manual

    RE 5.5.7.7.2 Payment Received And Processed RE-Prop-Mgmt-BA Required

    RE 5.5.7.7.3 Buyer Records Deed RE-Prop-Mgmt-BA Manual

    RE 5.5.7.7.4 District Receives Copy Of RecordedInstrument

    RE-Prop-Mgmt-BA New

    RE 5.5.7.7.5 District Updates Plans And InventoryTo Reflect Sale

    RE-Prop-Mgmt-BA Manual

  • 7/25/2019 SRS SYNERGY Property Management

    33/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 33 of 41 Thursday, June 13, 2013

    5.6 Vacate Roadway

    District follows this process on roadway that is to be removed from service.

    5.6 VACATE ROADWAY

    5.6.6

    Process Claim

    5.6.7

    Finalize RoadwayVacation

    5.6.1

    Request Received

    From Abutting Or

    Underlying Owner

    5.6.8Perform 5.8ExtinguishEasement

    YES

    5.6.3

    Negative Impact

    On Abutting

    Owner?

    NO5.6.2

    District

    Determines To

    Vacate Roadway

    5.6.5

    Is there aClaim?

    YES

    NO

    5.6.4

    Notice To AbuttingOwners

    ID Description RequirementsSource Priority Change? Feature

    RE 5.6.1 Request received from Abutting orunderlying Owner

    RE-Prop-Mgmt-BA

    Manual

    RE 5.6.2 District Determines to VacateRoadway

    RE-Prop-Mgmt-BA

    Manual

    RE 5.6.3 Negative Impact On Abutting Owner?Determine if there will be negativeimpact on the abutting owners.

    RE-Prop-Mgmt-BA

    RE 5.6.4 Notice to abutting ownersDistrictgives notice of Roadway to beremoved from service through certified

    mail and advertisement.

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.6.5 Is there a Claim?If claims arereceived they will need to beprocessed.

    RE-Prop-Mgmt-BA

    RE 5.6.6 Process ClaimDistrict examinesclaim and follows acquisition processfor appraisal, relocation, negotiation,and parcel possession to settle claim

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.6.7 Finalize Roadway Vacation - Districtterminates roadway by finalizing theinstrument, recording the instrument,and updating the plans and inventory

    to reflect the roadway removed fromservice

    RE-Prop-Mgmt-BA

    See Detail

    RE 5.6.8 Perform 5.8 Extinguish Easement RE-Prop-Mgmt-BA

    See Detail

  • 7/25/2019 SRS SYNERGY Property Management

    34/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 34 of 41 Thursday, June 13, 2013

    5.6.4 Notice To Abutting Owners

    District gives notice of Roadway to be removed from service through certified mail andadvertisement.

    5.6.4 NOTICE TO ABUTTING OWNERS

    5.6.4.1

    Notice To

    Vacate

    5.6.4.2

    Notice To

    Vacate Sent By

    Certified Mail

    5.6.4.3

    Advertise Notice

    To Vacate

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.6.4.1 Notice To VacatePrepare notice tovacate.

    RE-Prop-Mgmt-BA Manual

    RE 5.6.4.2 Notice To Vacate Sent By Certified

    MailNotice sent by certified mail toAbutting owners and ODNR.

    RE-Prop-Mgmt-BA New

    RE 5.6.4.3 Advertise Notice to VacateAdvertiseNotice to Vacate two consecutiveWeeks Ending 20 days prior byNewspaper.

    RE-Prop-Mgmt-BA New

    5.6.6 Process Claim

    District examines claim and follows acquisition process for appraisal, relocation, negotiation,and parcel possession to settle claim.

    5.6.6 PROCESS CLAIM

    5.6.6.1

    District Records

    And Examines

    Claim

    5.6.6.2

    Perform 2.0

    Appraisal

    5.6.6.7

    Complete

    Settlement And

    Release Claims5.6.6.9

    Process

    Payment Of

    Funds

    5.6.6.6

    Is Settlement

    Negotiated?

    YES

    NO

    5.6.6.4Perform 1.7NegotiatePurchase

    5.6.6.5Perform 1.8

    Obtain ParcelPossession

    5.6.6.8Perform 1.11 TrackPost Certification

    Activities As Needed

    5.6.6.3

    Perform 3.0

    Relocation

    ID Description RequirementsSource

    Priority Change? Feature

    RE 5.6.6.1 District Records And Examines Claim -Receive and log claim for damages andevaluate claim.

    RE-Prop-Mgmt-BA

    New

  • 7/25/2019 SRS SYNERGY Property Management

    35/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 35 of 41 Thursday, June 13, 2013

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.6.6.2 Perform 2.0 Appraisal - Conduct anappraisal using the same methodsoutlined in RE-SynergyAcquisitiondocument.

    RE-Prop-Mgmt-BA

    SeeDetail

    RE 5.6.6.3 Perform 3.0 RelocationConduct fullrelocation using the same methodsoutlined in RE-SynergyRelocationdocument.

    RE-Prop-Mgmt-BA

    SeeDetail

    RE 5.6.6.4 Perform 1.7 Negotiate PurchaseConduct full negotiations using thesame methods outlined in RE-SynergyAcquisition document.

    RE-Prop-Mgmt-BA

    SeeDetail

    RE 5.6.6.5 Perform 1.8 Obtain Parcel PossessionConduct parcel possession using thesame methods outlined in RE-SynergyAcquisition document.

    RE-Prop-Mgmt-BA

    SeeDetail

    RE 5.6.6.6 Is Settlement Negotiated?Determineif negotiations are settled prior toproceeding.

    RE-Prop-Mgmt-BA

    RE 5.6.6.7 Complete Settlement and ReleaseClaims

    RE-Prop-Mgmt-BA

    New

    RE 5.6.6.8 Perform 1.11 Track Post CertificationActivities As Necessary using the samemethods outlined in RE-SynergyAcquisition document.

    RE-Prop-Mgmt-BA

    SeeDetail

    RE 5.6.6.9 Process Payment of FundsGo to RE6.4 Generate Warrant For PaymentsOwed as outlined in SRS-Synergy-

    Fiscal document.

    RE-Prop-Mgmt-BA

    Required

  • 7/25/2019 SRS SYNERGY Property Management

    36/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 36 of 41 Thursday, June 13, 2013

    5.6.7 Finalize Roadway Vacation

    District terminates roadway by finalizing the instrument, recording the instrument, and updatingthe plans and inventory to reflect the roadway removed from service.

    5.6.7 FINALIZE ROADWAY VACATION

    5.6.7.4District Updates

    Plans And InventoryTo Reflect Vacated

    Roadway

    5.6.7.1

    Finalize Vacated

    Roadway

    Instrument

    5.6.7.2

    Record Vacated

    Roadway

    Instrument

    5.6.7.3Send Copy Of

    RecordedInstrument To

    Abutting Owners

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.6.7.1 Finalize Vacated Roadway Instrument RE-Prop-Mgmt-BA

    Manual

    RE 5.6.7.2 Record Vacated Roadway Instrument RE-Prop-Mgmt-

    BA

    New

    RE 5.6.7.3 Send copy of Recorded instrument toAbutting Owners

    RE-Prop-Mgmt-BA

    New

    RE 5.6.7.4 District updates plans and inventory toreflect Vacated Roadway

    RE-Prop-Mgmt-BA

    Manual

  • 7/25/2019 SRS SYNERGY Property Management

    37/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 37 of 41 Thursday, June 13, 2013

    5.7 Modify Limited Access

    District reviews and approves access modification.

    5.7 MODIFY LIMITED ACCESS

    5.7.1.Request Received

    From Abutting

    Owners

    5.7.2Determine

    Existing Access

    Rights

    5.7.3District Reviews

    And Approves

    5.7.4Finalize Access

    Modification

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.7.1. Request Received From AbuttingOwnersDistrict receives a requestfor change in property access from anowner with property that abuts existingROW.

    RE-Prop-Mgmt-BA Manual

    RE 5.7.2 Determine Existing Access RightsResearch the deeds, easements, andrestrictions for the property access.

    RE-Prop-Mgmt-BA Manual

    RE 5.7.3 District Reviews And ApprovesReview and approve the AccessModification Request.

    RE-Prop-Mgmt-BA SeeDetail

    RE 5.7.4 Finalize Access ModificationDistrictfinalizes access modification. Buyerrecords the instrument and provides acopy of the recorded instrument to theDistrict. District updates the plans andinventory to reflect the access

    modification.

    RE-Prop-Mgmt-BA SeeDetail

  • 7/25/2019 SRS SYNERGY Property Management

    38/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 38 of 41 Thursday, June 13, 2013

    5.7.3 District Reviews and Approves

    Review and approve the Access Modification Request.

    5.7.3 DISTRICT REVIEWS AND APPROVES

    5.7.3.1

    Conduct District

    Review And

    Approval

    5.7.3.3

    Is Federal Money

    Involved?

    YES

    5.7.3.2

    Perform 2.0

    Appraisal

    5.7.3.4

    FHWA Reviews

    And Approves

    As Necessary

    NOTHING

    NO

    ID Description RequirementsSource Priority

    Change?

    Feature

    RE 5.7.3.1 Conduct District Review and Approval RE-Prop-Mgmt-BA Manual

    RE 5.7.3.2 Perform 2.0 Appraisal - Conduct anappraisal using the same methodsoutlined in RE-SynergyAppraisaldocument.

    RE-Prop-Mgmt-BA See Detail

    RE 5.7.3.3 Is Federal Money involved? RE-Prop-Mgmt-BA

    RE 5.7.3.4 FHWA Reviews and Approves AsNecessary

    RE-Prop-Mgmt-BA New

  • 7/25/2019 SRS SYNERGY Property Management

    39/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 39 of 41 Thursday, June 13, 2013

    5.7.4 Finalize Access Modification

    District finalizes access modification. Buyer records the instrument and provides a copy of therecorded instrument to the District. District updates the plans and inventory to reflect theaccess modification.

    5.7.4 FINALIZE ACCESS MODIFICATION

    5.7.4.5

    Buyer Records

    Instrument

    5.7.4.7

    District Updates Plans

    & Inventory With

    Access Modification

    5.7.4.1

    Notify Owner Of

    Terms And

    Conditions

    5.7.4.3

    Prepare Grant

    Of Access

    Instrument

    5.7.4.2

    Is Offer Accepted? YES

    5.7.4.8

    Make Note And

    Close File

    NO

    5.7.4.4

    Conduct Closing5.7.4.6

    District Receives

    Copy Of Recorded

    Instrument

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.7.4.1 Notify Owner of Terms and Conditions RE-Prop-Mgmt-BA Manual

    RE 5.7.4.2 Is Offer Accepted? RE-Prop-Mgmt-BA

    RE 5.7.4.3 Prepare Grant of Access Instrument RE-Prop-Mgmt-BA Manual

    RE 5.7.4.4 Conduct Closing - District closes withproperty owner for granted accessmodification.

    RE-Prop-Mgmt-BA See Detail

    RE 5.7.4.5 Buyer Records Instrument RE-Prop-Mgmt-BA Manual

    RE 5.7.4.6 District Receives Copy Of RecordedInstrument

    RE-Prop-Mgmt-BA New

    RE 5.7.4.7 District Updates Plans & InventoryWith Access Modification

    RE-Prop-Mgmt-BA Manual

    RE 5.7.4.8 Make Note and Close File RE-Prop-Mgmt-BA New

  • 7/25/2019 SRS SYNERGY Property Management

    40/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    Page 40 of 41 Thursday, June 13, 2013

    5.7.4.4 Conduct Closing

    District closes with property owner for granted access modification.

    5.7.4.4 CONDUCT CLOSING

    5.7.4.4.2Receive

    Payment

    5.7.4.4.4Convey

    Instrument

    5.7.4.4.5Issue Maintenance

    Permit

    5.7.4.4.3Process

    Payment

    5.7.4.4.1Is Access Payment

    Required?YES

    NO

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.7.4.4.1 Is Access Payment Required?Doterms and conditions of accessmodification include payment from

    buyer?

    RE-Prop-Mgmt-BA

    RE 5.7.4.4.2 Receive PaymentReceive paymentat closing on Access Modification.

    RE-Prop-Mgmt-BA Required

    RE 5.7.4.4.3 Process Payment RE-Prop-Mgmt-BA Required

    RE 5.7.4.4.4 Convey InstrumentFinalize Permitto Convey Property associated withAccess Modification.

    RE-Prop-Mgmt-BA New

    RE 5.7.4.4.5 Issue Maintenance PermitIssueupdated maintenance permit andconstruction instructions to owner.

    RE-Prop-Mgmt-BA New

  • 7/25/2019 SRS SYNERGY Property Management

    41/41

    Real Estate Business Analysis SRS Synergy Property Management v. 1.00

    5.8 Extinguish Easement

    District follows this process when excess easement controlled ROW is transferred to theunderlying owner.

    5.8 EXTINGUISH EASEMENT

    5.8.1

    Request Received

    From Underlying

    Owner

    5.8.4

    FHWA Reviews

    And Approves

    5.8.3

    District Reviews

    And Approves

    5.8.9

    Perform 5.6

    Vacate Roadway

    NO

    5.8.2

    Will Extinguishment

    Negatively Impact

    An Abutting

    Owner?

    YES

    5.8.6

    Underlying

    Owner Records

    Instrument

    5.8.8

    District Updates

    Plans &

    Inventory

    5.8.7

    District Receives

    Copy Of Recorded

    Instrument

    5.8.5

    Prepare

    Extinguishment

    Instrument And

    Send To Owner

    ID DescriptionRequirementsSource

    Priority Change? Feature

    RE 5.8.1 Request Received From UnderlyingOwner

    RE-Prop-Mgmt-BA Manual

    RE 5.8.2 Will Extinguishment Negatively ImpactAn Abutting Owner?Evaluate the realand financial impacts of theextinguished easement.

    RE-Prop-Mgmt-BA

    RE 5.8.3 District Reviews And ApprovesDistrict reviews and approves the

    easement extinguishment.

    RE-Prop-Mgmt-BA Manual

    RE 5.8.4 FHWA Reviews And ApprovesIfFederal lands are involved, FHWAreviews and approves easementextinguishment.

    RE-Prop-Mgmt-BA Required

    RE 5.8.5 Prepare Extinguishment InstrumentAnd Send To Owner

    RE-Prop-Mgmt-BA New

    RE 5.8.6 Underlying Owner Records Instrument RE-Prop-Mgmt-BA Manual

    RE 5.8.7 District Receives Copy Of RecordedInstrument

    RE-Prop-Mgmt-BA New

    RE 5.8.8 District Updates Plans & Inventory

    District updates plans & inventory witheasement extinguishment.

    RE-Prop-Mgmt-BA Manual

    RE 5.8.9 Perform 5.6 Vacate Roadway RE-Prop-Mgmt-BA Manual