Software Processes i Taylors Instant Notification System
ITS 60703
Software Process
Assignment 1 Hand out Date: 26
th March 2015 (Thursday)
Hand in Date: 17th
April 2015 (Friday by 6:00p.m.)
The assignment should be attempted in group of maximum 2 students
Complete this cover sheet and attach it to your assignment this should be your first page!
Student declaration:
I declare that:
I understand what is meant by plagiarism
The implication of plagiarism have been explained to us by our lecturer
This project is all our work and I have acknowledged any use of the published or
unpublished works of other people.
Name Student ID
1. Ng Beng Han 0319496
2. Liew Soon Hen 0315575
Avoid copy and paste job in your report and it is considered as plagiarism. Plagiarism in all
forms is forbidden. Students who submit plagiarized assignment will deserve a 0 marks.
-
Software Processes ii Taylors Instant Notification System
N & L Corporation
Learning without Limit
Taylors Instant Notification System
Software Processes
04/01/2015
Document Number: DINS 301
Contact Number: +6014 967 5367 (Mr. Ng) +6013 262 2168(Mr. Liew)
-
Software Processes iii Taylors Instant Notification System
Contents
Contents ........................................................................................................................ iii
Company Background .................................................................................................. v
Vision ........................................................................................................................ v
Mission Statement ..................................................................................................... v
Processes ...................................................................................................................... 6
Project Planning Process ........................................................................................... 6
Purpose ............................................................................................................................... 6
Inputs.................................................................................................................................. 6
Entry Criteria ..................................................................................................................... 6
Process Flow Diagram ....................................................................................................... 7
Tasks .................................................................................................................................. 8
Verification ........................................................................................................................ 9
Metrics ............................................................................................................................... 9
Exit Criteria ........................................................................................................................ 9
Outputs ............................................................................................................................. 10
Recruitment Process .................................................................................................. 11
Purpose ............................................................................................................................. 11
Inputs................................................................................................................................ 11
Entry Criteria ................................................................................................................... 11
Process Flow Diagram ..................................................................................................... 12
Tasks ................................................................................................................................ 13
Verification ...................................................................................................................... 14
Metrics ............................................................................................................................. 14
Exit Criteria ...................................................................................................................... 14
Outputs ............................................................................................................................. 15
Software Maintenance Process ............................................................................... 16
Purpose ............................................................................................................................. 16
-
Software Processes iv Taylors Instant Notification System
Inputs................................................................................................................................ 16
Entry Criteria ................................................................................................................... 16
Process Flow Diagram ..................................................................................................... 17
Tasks ................................................................................................................................ 18
Verification ...................................................................................................................... 19
Metrics ............................................................................................................................. 19
Exit Criteria ...................................................................................................................... 19
Outputs ............................................................................................................................. 20
-
Software Processes v Taylors Instant Notification System
Company Background
N&L Corporation started in year 2008, when the founders Liew Soon Hen and Ng
Beng Han noticed something minor which is wrong with the education system in Malaysia.
However, they noticed that this error, however minor, is affecting the general education
system in a large way in the long run.
In the last decade, technology has flown at a ridiculous rate. A lot of new
technological wonders and gadgets have been invented in the last decade. However, little or
none of these new technological discoveries has gone into education. Most entrepreneurs
focus on profits a lot more than students welfare. Liew and Ng has noticed that all these technological wonders can do miracles if implemented into a students life in his/her education.
Therefore, the company N&L is born with a passion of seeing the world receive a
better education from young, creating better leaders for our future and creating a better world
for our future generation.
Vision
The companys vision is to have all students in the world upgrade their quality of education by utilizing the technology available in the world right now.
Mission Statement
To develop applications to help students around the world maximize their learning
capabilities from their education
To reduce unnecessary hassle from a students life so that he/she may focus better on their education
-
N & L Co. Mobile Application
Software Processes 6 Taylors Instant Notification System
Processes
Project Planning Process
Purpose
To produce and communicate effective and workable project plans.
To determines the scope of the project management and technical activities
To identify the process outputs, project tasks and deliverables
To establish schedules for project task conduct.
To analyze the technologies and resources required to accomplish project tasks
Inputs
An approved project idea
Suitable technology to carry out the project
Entry Criteria
A proper team to be assembled
The company assigned this project
-
N & L Co. Mobile Application
Software Processes 7 Taylors Instant Notification System
Process Flow Diagram
-
N & L Co. Mobile Application
Software Processes 8 Taylors Instant Notification System
Tasks
T1. Define & Collect Project Requirement
Project Manager determine the requirements and collect them from the client
Document the requirement that has been recorded and classify them into two parts, functional and non-functional requirement
T2. Identify the scope and objectives of the project, consensus with the client to avoid misunderstanding
T3. Project Planning
Project Planner plans the flow of the project
Schedule the time to complete this tasks on time
Plans the process for this project according to the requirement that has been given
T4. Requirement Analysis
Analyze and specify the requirement of the project
Analyze and identify the risk that might occurred when undergo this project
Estimate, calculate and produce a project budget and show it to the client for confirmation
Analyze the resources and technologies available and needed to complete this project
Allocate the tasks to all the managers of the company and assign the responsibilities to them
Define the operating environment and software needed to achieve this project
Request Recruiting Manager to employ human resources which is required to achieve the project
T5. Document all the reports, plans and process templates and produce a proposal
T6. Execute the process that is planned if this project is approved by the client
-
N & L Co. Mobile Application
Software Processes 9 Taylors Instant Notification System
Verification
V1. The requirement which is determined must be verified by the client and receive an approval to start the project planning
V2. The scope & objectives of the work for the project must be related to the requirement that has been verified
V3. The project schedule must be arranged in order to accomplish this project within the timeframe that has been given by the client
V4. Project processes that has been planned must be verify by the client and validated by ISO/IEEE standard
V5. Technologies, resources that are required, labor cost, revenue cost and the risk contingency plan cost must be taken into account for the project budget
V6. Project plans, reports and all the documentation must be verified by the Project Manager and approved by the client before any execution
Metrics
Accuracy of the project budget
Performance of the project plan
Exit Criteria
The resources required for the project is available, adequate and appropriate and that the timescales to completion is achievable.
The requirements for the project are clearly defined.
Proper authorization for the project has been obtained.
-
N & L Co. Mobile Application
Software Processes 10 Taylors Instant Notification System
Outputs
The following deliverables are outputs of the test execution process:
D1. The scope and objectives of the work for the project is defined.
D2. Tasks and resources necessary to complete the work are sized and estimated
D3. A plan for the execution of the project is developed.
D4. A plan for the execution of the project is activated.
The following quality records are outputs of the system test execution process:
Required Record Custodian Retention Period
Requirement of the
project
Project Manager & Client The entire project
Scope & objectives of the
work for the process
Project Manager & Project
Planner
Until all the tasks of
the process has
been accomplished
Project Schedule Project Manager The entire project
Project Process & Reports Project Planner Until it is submitted
to and approved by
Project Manager
All the documentation of
this process
Project Manager For the next related
project that might
be assigned by the
company
-
N & L Co. Mobile Application
Software Processes 11 Taylors Instant Notification System
Recruitment Process
Purpose
To provide the company with necessary human resources which are the mobile apps designers & programmers
To accomplish some tasks that cant be completed by the companys staff without the profession and expertise
To training & develop the designers and programmers who are selected and hired to work for the companys projects
Inputs
Project requirements
Job descriptions
Job qualification and requirements
Entry Criteria
Project planning process has been done
Project requirement has been analyzed and approved by the client
Received the approval to execute the project
-
N & L Co. Mobile Application
Software Processes 12 Taylors Instant Notification System
Process Flow Diagram
-
N & L Co. Mobile Application
Software Processes 13 Taylors Instant Notification System
Tasks
T1. Define Job Requirement
Project Manager define the job requirement to complete this project
Documentation of knowledge, skill, ability and other personal characteristics required for the job
Prepare the job description and job specification which is according to the project needs
T2. Sourcing
Recruiting Manager plans some sourcing strategies
Recruiting Manager do some research such as data mining and advertising job vacancy to attract experts and professional to apply for the job
Employ recruitment consultancies or agencies to find passive and potential candidates
T3. Recruiting Manager open job requisition
T4. Process of Applicants
Check and validate all the job applications, check whether the job application is filled completely
Process the applicants that has submitted a completed job application and rsums
T5. Screening & Selection
Screening rsums, job application and biographical information from the candidates
Schedule a job interview section for the applicants with recruiting manger so that recruiting manager could understand them more and recruit the right one
Filter all the potential candidates and run through a second interview which is ability and technique testing
T6. Recruiting Manager will hire the selected applicants and sent a confirmation letter to them by e-mail
T7. Recruiting Manager invite some experts to give more ideas and expose the technology available to the programmers and designers
-
N & L Co. Mobile Application
Software Processes 14 Taylors Instant Notification System
Verification
V1. The job requirement for the job requisition is related to the requirement of the project
V2. Non-related job applicants are not found and apply for the job such as sales executive and accountant
V3. Job interview session must be scheduled with project manager and recruiting manager
V4. Skills and ability testing must be related to the job specification and verified by the Recruiting Manager and Project Manager
V5. Every recruits that have been selected by the recruiting manager must be also agreed by the project manager
Metrics
Abilities, technique, skills and performance of the recruits
Efficiency of the sourcing strategy
Number of applicants for the job
Exit Criteria
Every recruits can clearly recognize their role and responsibilities
Sufficient & potential recruits are hired to accomplish the project
Recruits are trained and developed, also, can cope well with the companys environment and accepted the way to accomplish the project
-
N & L Co. Mobile Application
Software Processes 15 Taylors Instant Notification System
Outputs
The following deliverables are outputs of the test execution process:
D1. Skills required by the projects are identified
D2. Necessary human resources are provided for the project
D3. Skills and ability of personnel are developed
The following quality records are outputs of the system test execution process:
Required Record Custodian Retention Period
Job description & job
specification
Project Manager Until the recruiting
manager recruits all the
necessary human resources
Rsums, Job
Application
Recruiting Manager The entire process
Sourcing Strategy Recruiting Manager For the next recruitment
-
N & L Co. Mobile Application
Software Processes 16 Taylors Instant Notification System
Software Maintenance Process
Purpose
To provide cost-effective support to a delivered software product
To plan for the software modification and operational support
To resolve the problems that reported by the user by using the methods available
Inputs
Problems that is complained by the users
Defects that is found by the developers
Solution for the reported problems
New requirement has been given by the client
Entry Criteria
Implementation of the software product has been undergone
Request for maintenance has been approved by the client
-
N & L Co. Mobile Application
Software Processes 17 Taylors Instant Notification System
Process Flow Diagram
-
N & L Co. Mobile Application
Software Processes 18 Taylors Instant Notification System
Tasks
T1. Users will give feedback and report some problems that they faced when using the software product
T2. Operation Manager collect the feedback and reported problems
T3. Classify the suggestion and reported problems into two parts, whether its an algorithm problems or the GUI of the mobile app.
T4. Request for the software product modification approval from the client
T5. Planning & Analysis
T6. Identify the level of disturb of the problems that affected the mobile app
Prepare a software maintenance plan, list down all the problems that have to be solved and new features that are required by the client
Operation Manager conduct a meeting with Project Manager and developer to discuss the reported problems and decide the modification
Analyze the problems in different perspective and figure out the resolution for every problems
Analyze the need of implementing new features or the suggestion that has been given by the users
T7. Developer develop and design the system and GUI of the mobile apps according to the problem resolution and the technologies available (install the new features
into the mobile apps if there is any)
T8. Document the problem resolution in the knowledge database
T9. Perform testing by the developer, ensure the problems have been solved
T10. Version Control Manager will identify the version of this new patch
T11. Operation Manager will pick some users, to run through an user acceptance testing
T12. Schedule a meeting with client to present the new patch of the software product with prototype and user manual
T13. Collect the feedback from the department and request to release this patch
T14. Release the patch if approved by the client
T15. Notify the users to update the software product, list down the details and changes of the new patch and show it to the user when they open the software
product
-
N & L Co. Mobile Application
Software Processes 19 Taylors Instant Notification System
Verification
V1. Every reported problems has solutions to fix the defect
V2. Database has a record for all the reported problems and feedback
V3. Maintenance decision has been approved by the company and client
V4. Update patch of the mobile app has been tested by the developer and users
Metrics
Backlog
Exit Criteria
A completed software has been developed
Testing has been undergo by the developer and users
Mobile app can function in a good condition and receive approval for implementation
-
N & L Co. Mobile Application
Software Processes 20 Taylors Instant Notification System
Outputs
The following deliverables are outputs of the test execution process:
D1. Solution for the reported problems
D2. Maintenance Approval
D3. Prototype with the latest patch for testing
D4. An update patch for the mobile app
The following quality records are outputs of the system test execution process:
Required Record Custodian Retention Period
Feedbacks & Reported
Problems
Manager Starting until the
mobile app has
been developed
Problem Resolution Manager Until it has been
register in the
knowledge database
Maintenance approval
letter
Manager After approved by
the company
Prototype after the
patching
Manager & Developer From the design
process until
acceptance testing
-
N & L Co. Mobile Application
Software Process Improvement Plan 21 Taylors Instant Notification System
N & L Corporation
Learning without Limit
Taylors Instant Notification System
Software Process Improvement Plan
04/01/2015
Document Number: DINS 301
Contact Number: +6014 967 5367 (Mr. Ng) +6013 262 2168(Mr. Liew)
-
N & L Co. Mobile Application
Software Process Improvement Plan 22 Taylors Instant Notification System
Contents
Introduction ................................................................................................................. 23
Overview ...................................................................................................................... 23
Assumptions/Constraints/Risks ................................................................................ 24
Assumptions ............................................................................................................ 24
Constraints ............................................................................................................... 24
Risks ...................................................................................................................... 24
Process Review Background ..................................................................................... 25
Process Review Methodologys ................................................................................ 25
Process Review Findings and Recommendations ................................................... 25
SPI Approach ............................................................................................................... 26
Goals ..................................................................................................................... 26
Methodology ............................................................................................................ 27
Roles and Responsibilities ......................................................................................... 28
Acronyms ..................................................................................................................... 29
Bibliography ................................................................................................................ 30
Record of Changes ..................................................................................................... 31
Approvals ..................................................................................................................... 32
-
N & L Co. Mobile Application
Software Process Improvement Plan 23 Taylors Instant Notification System
Introduction
This Software Process Improvement Plan (SPIP) describes the approach for continued
software development process improvement during the life cycle of the Taylors INS. The document identifies the specific actions that will be taken to improve the software process, and
outlines the plans for implementing those actions.
This document is intended for developers, testers, and the client, which is Taylors University. This document will start with the overview of this document, assumptions,
constraints and risks, and will detail the process review and SPI approach for the process.
The process that this document will discuss and improve is the project planning process.
Overview
Nowadays, students are unable to manage their time wisely. A students life does not just revolve around assignments. A students life is also all about joining clubs and societies and meeting new friends and working with them. But sometimes, when a student gets too distracted
by his social life, he tends to forget about his assignments and projects that he should have done
earlier.
In this decade, technology has grown very rapidly and now almost everyone has their own
smartphone. Therefore, N&L Corporation has decided to create a mobile application that brings
a lot of benefits to the students. The company has collaborated with Taylors University to make this project a success.
This application, named the Taylors INS (Instant Notification System), serves to bring information and convenience to the students and lecturers in Taylors University. To make Taylors INS a success, the company has come up with 3 processes, the recruitment process, project planning process and risk management process.
-
N & L Co. Mobile Application
Software Process Improvement Plan 24 Taylors Instant Notification System
Assumptions/Constraints/Risks
Assumptions
In the project planning process, analysis is done of the proposed project plan. After the
analysis, the project plan will then be documented and then executed. The team assumes that an
analysis of the proposed plan alone does not properly ensure that the plan can be executed
perfectly and with minimal risk.
Constraints
The team may not have enough human resources to carry out any additional steps in this
SPIP. The team has already allocated a lot of human resources to carry out the analysis of the
plans and may not be able to afford transferring staff to carrying out the feasibility studies.
The team may also not have the technology or expertise to properly carry out these
additional steps and may cause the new improved process to produce worse results than before.
The team will need to hire additional specialized staff to carry out the feasibility studies.
Risks
Without the implementation of this SPIP, the project planning process risks a plummet in
quality of the plans proposed. The proposed plan may not be up to standard and may cause
unwanted incidents to occur in the life cycle of Taylors INS. The plans produced may be financially sound and risk-minimized, but they may not be feasible technically and operationally.
The analysis of the plan coupled with the feasibility studies will ensure that the plans produced
by this process is stronger and will be able to be implemented safely.
-
N & L Co. Mobile Application
Software Process Improvement Plan 25 Taylors Instant Notification System
Process Review Background
To make this project a success, the team has implemented 3 processes, the recruitment
process, the software maintenance process and the project planning process. To ensure that all 3
processes run smoothly, process reviews are carried out routinely. During a routine process
review, it was found that the project planning process is not perfectly as efficiently as expected.
It was found that the plans produced from the project planning process is weak and is
often unable to be implemented effectively. Although all plans is run through an analysis in the
project planning process, it was found that the plans produced lacks technicality and operational
studies.
Process Review Methodology
The process review is done using the Kaizen process, which is a process meant for
continuous and incremental self-improvement that has been applied for businesses and
management. This method focuses on teamwork, quality circles and communications to facilitate
suggestions for improvement.
More specifically, the process review uses the Gemba Kaizen method. In the project
planning process, there is multiple sub-processes that occur, such as the analysis, documentation
and requirements gathering. Teams from each sub-processes will identify wastes, inefficiencies
and underused resources and to suggest improvements to the process as a whole.
The teams from different sub-processes will have meetings at regular intervals to discuss
areas of improvement. Encountered problems will then be discussed to find a solution.
Process Review Findings and Recommendations
During the process review, it was determined that just an analysis of the plans made in
the process was not enough to ensure the quality of the plans. The analysis involves analyzing
the project budget, resources and staffing, and the risk plan for the plans made. The analyzing
process ensures that the plan has enough preparation to make it run smoothly. However, this
analysis does not ensure that the plans are truly feasible in the real working environment.
The process review team has made recommendations to create an additional step after the
plans analysis to make sure that the plans are of quality and feasible in the industry. The process
review team suggests to study the technical and operational feasibility of the plans made. The
process review team strongly believes that these feasibility studies will really significantly
improve the strength of the plans.
Once a technical feasibility and operational feasibility study has been made, it will be a
lot easier to detect problems in the plans before they are executed and documented. The plans
will be made safe to execute and guaranteed to succeed technically and operationally.
-
N & L Co. Mobile Application
Software Process Improvement Plan 26 Taylors Instant Notification System
SPI Approach
The process review team has suggested that feasibility studies should be done right after
the analysis sub-process in the project planning process. The feasibility study should make the
plans a lot more stronger and can be implemented more effectively.
The feasibility studies should include both technical and operational feasibility. These
studies should be carried out right after the analysis of the plans. Preparations for this new sub-
process will have to be made before this sub-process can be put into place. Additional human
resources will need to be allocated. Experts will need to be hired to advise and to help out. Staff
will need to be trained in this new sub-process.
Once the preparations are complete, this sub-process will be implemented into the
process immediately and without delay.
Goals
Project plans to be produced from this process that can be implemented into the company seamlessly and effectively. Proper analysis and proper feasibility studies will be carried
out and the plan will be both strong and feasible to be implemented in the company. This
will satisfy the process review teams suggestion of implementing a feasibility study after the analysis process.
-
N & L Co. Mobile Application
Software Process Improvement Plan 27 Taylors Instant Notification System
Methodology
To initiate this process improvement, the team needs to allocate human resources to carry
out the feasibility studies. The team will also need to train the staff to be able to carry out the
feasibility studies effectively. Schedule adjustments will also have to be made for the whole
project planning process.
Once training is done and the staff is ready to carry out the feasibility studies, it will be
implemented into the project planning process directly after the analysis sub-process.
The team will be measuring the effectiveness of this new implementation by measuring
the number of defects in the plans produced by this process. The effectiveness can also be
measured in process reviews of the process that will be held continuously in its first year of the
implementation.
Once the feasibility studies sub-process has been implemented, continuous monitoring
and control will be maintained by conducting several more process reviews on this process over
the next year. After each process review, the number of defects and complains the process
receives will be reduced drastically. At the end of the review year, project plans produced should
be strong and the quality significantly improved.
After every process review, proper reports will be completed and sent to the stakeholders and
the management for their perusal. For every subsequent report to be sent, the version of the
document will be incremented so that the changes can be made obvious to the readers.
Improvements to the process will also be detailed in the new version of the report.
-
N & L Co. Mobile Application
Software Process Improvement Plan 28 Taylors Instant Notification System
Roles and Responsibilities
Role Responsibility
Project Manager Determine and collect the requirements of the
project from the client
Consensus with projects client
Document the requirements and pass it down
to Project Planner
Project Planner Receive the requirements of the project
Plan the processes that will be needed for the
project
Prepare a project plan and project schedule
Recruiting Manager Recruits the human resources that is required
for the project
Operation Manager Manage the issues of the software product
Version Control Manager Control the version of the software product
Table 1 - Roles & Responsibilities
-
N & L Co. Mobile Application
Software Process Improvement Plan 29 Taylors Instant Notification System
Acronyms
Acronym Literal Translation
CMMI
Capability Maturity Model Integration
CMS Centers for Medicare & Medicaid Services
INS Instant Notification System
N&L Co. Ng & Liew Corporation
PDCA Plan-Do-Check-Act
PMP Project Management Plan
SCAMPISM
Standard CMMI Appraisal Method for Process Improvement
SDMP System Development Management Plan
SPI Software Process Improvement
SPIP Software Process Improvement Plan
Table 1: Acronyms
-
N & L Co. Mobile Application
Software Process Improvement Plan 30 Taylors Instant Notification System
Bibliography
Anderson, D. (2009, July 24). Recruiting Process Flow Map. Retrieved from Slide Share:
http://www.slideshare.net/stixnpucks/recruiting-process-flow-map
Recruitment Process. (n.d.). Retrieved April 1, 2015, from Seven Step RPO:
http://www.sevensteprpo.com/recruitment-process
Sbair, Z. (2011, July 24). Human Resource Management Process. Retrieved from Slide Share:
http://www.slideshare.net/ZeeshanSabir/human-resource-management-process
team, M. (n.d.). Processes in Human Resource Management. Retrieved from Management Study
Guide: http://www.managementstudyguide.com/processes-in-human-resource-
management.htm
The Recruitment Process. (n.d.). Retrieved August 5, 2012, from Acas:
http://www.acas.org.uk/index.aspx?articleid=748
-
N & L Co. Mobile Application
Software Process Improvement Plan 31 Taylors Instant Notification System
Record of Changes
Version
Number Date Author/Owner Description of Change
1.0 4/4/2015 Ng Beng Han
Liew Soon Hen
Changes of Project Planning Process
Table 4: Record of Changes
-
N & L Co. Mobile Application
Software Process Improvement Plan 32 Taylors Instant Notification System
Approvals
The undersigned acknowledge that they have reviewed the Software Process Improvement Plan
and agree with the information presented within this document. Changes to this Software Process
Improvement Plan will be coordinated with, and approved by, the undersigned, or their
designated representatives.
Signature: Date:
Print Name:
Title:
Role: Submitting Organizations Approving Authority
Signature: Date:
Print Name:
Title:
Role: CMS Approving Authority
Signature: Date:
Print Name:
Title:
Role: CMS Business Owner
-
Software Process Improvement Plan Error! No text of specified style in document. 0
Taylors Instant Notification System
URL of the Project
http://benghann.wix.com/instaylors