six sigma project
TRANSCRIPT
1LEAN SIX SIGMA PROJECT
By:Hossam Mostafa
LEAN SIX SIGMA PROJECT 3
Hikma Pharma is a pharmaceutical company. Its plant is located in 6th of October city. It produces and markets a wide range of innovative products covering the main therapeutic areas.The products are classified as shown in the pie chart below:
AnalgesicAntibioticsAntifungalsGIT Prep.Paediatric Prep .VitaminsMiscellaneousHeart Prep .Topical Prep .
LEAN SIX SIGMA PROJECT 4
There are two main blistering and packing lines in the packaging area in Hikma plant, these lines are named Line I and Line II.Line II available working hours per month are 180 hours. These hours are divided between setup, run, clean, change over, breakdown and no schedule.Every month the utilization of line one is calculated by using the following formula: (total setup + total run + total clean + total change over) *(100/180)
5
Evaluation of projects for selection:
Strategic impact
Financial revenue Expenses Potential
Resistance Duration Sum Weight
Strategic impact 1 0.5 0.25 3 0.33 5.08 0.12
Financial revenue 1 1 0.25 3 0.25 5.5 0.13
Expenses 4 4 1 4 4 17 0.40Potential
Resistance 0.33 0.33 0.25 1 0.25 2.16 0.05
Duration 3 4 0.25 4 1 12.25 0.2941.99 1.00
LEAN SIX SIGMA PROJECT
LEAN SIX SIGMA PROJECT 6
Criteria Weight ↑ Utilization % ↑ Productivity % ↓ Rework
1 Strategic impact 0.12 4 4 32 Financial revenue 0.13 4 4 23 Expenses 0.40 4 2 2
4 Potential Resistance 0.05 4 4 2
5 Duration 0.29 2 2 2
Total project score (Without weight)
18 16 11
Total project score (With weight)
3.42 2.61 2.12
7
Mission Statement:Our company's major packaging line (CAM II) is utilized by 56.2% in the year 2013. Increase utilization percentage in the year 2014.
Six Sigma Improvement Project Charter Project name
Improve machine utilization
Mission Statement
Our company's major packaging line (CAM II) is utilized by 56.2% in the year 2013. Increase utilization percentage in the year 2014.
Team Members
1. QA Supervisor2. Production Supervisor3. Production technician4. Maintenance technician5. QC analyst6. Purchasing specialist
Resources
•The team is authorized to collect relevant data, discuss the problem with those involved with it.•Team members should have 4 hours per week available for the project.•The team has access to the resources it needs to carry out the mission.•Arrangements are spelled out for obtaining additional resources and policy support if the project proves to be beyond the resources already at the team disposal.
LEAN SIX SIGMA PROJECT
LEAN SIX SIGMA PROJECT 9
Utilization percentage of blistering line II in the year 2013:
1- Operational definitions:
•"Utilization percent": after discussion team members agreed that utilization percent means number of hours of run, clean, change over and setup hours divided by theoretical hours that the machine supposed to work in case of no defect status (180 hours).
•"Labor overtime hours": these are working hours that are performed at non official time, e.g. in vacancies or after official leave hours.
•"Day hours": these are the actual working hours during day time (i.e. 8:00 – 12:00 & 12:30 - 16:30).
LEAN SIX SIGMA PROJECT 10
Month Utilization percentJanuary 56.9%
February 31.8%March 50.7%April 43.8%May 87.0%June 63.6%July 26.3%
August 70.3%September 54.0%
October 74.0%November 44.4%December 71.0%
2- Symptoms identification & measure:•The team decided to use production monthly output report and data posted on SAP in order to measure utilization percent per month.•Collective data of utilization percent for each month during year 2013 was viewed, the following trend shows the results obtained.
LEAN SIX SIGMA PROJECT 11
Utilization percent year 2003
56.9%
31.8%
50.7%43.8%
87.0%
63.6%
26.3%
70.3%
54.0%
74.0%
44.4%
71.0%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Month
Util
izat
ion
perc
ent
Utilization percent 2013
LEAN SIX SIGMA PROJECT 12
PLANNING MATERIALS AND
RESOURCES
ORDER ISSUEING
PROCESS ORDER PRODUCTION
PRODUCTION PROCESS ORDER
MATERIALS PREPARATION
PACKAGING COMPONENTS W.H
LEAN SIX SIGMA PROJECT 13
Issue work order
Plan
ning
Revise work order, check
validity
Receive work order
Prepare needed materials
Receive & revise lot no.
& qty.
Machine run and setup
FN Product
QA
Prod
uctio
nW
HPr
oduc
tion
Production
Process map
LEAN SIX SIGMA PROJECT 14
Month Utilization percent January 0.6
February 0.3March 0.5April 0.4May 0.9June 0.6July 0.3
August 0.7September 0.5
October 0.7November 0.4December 0.7
MIN 0.3MAX 0.9
AVERAGE 0.6σ 0.2
AV-3σ 0.0AV+3σ 1.2
LEAN SIX SIGMA PROJECT 15
Serial ContributorsNumber of breakdown
hoursPercentage Cumulative
percentage1 PVC 27.4375 20.591% 20.591%2 Air 21.75 16.323% 36.914%3 Carton m/c 20.9375 15.713% 52.627%4 Sorting 16 12.008% 64.634%5 m/c setting 13.4375 10.084% 74.719%6 Waiting material 6.75 5.066% 79.784%7 Aluminum 6.25 4.690% 84.475%8 Sealing 4.1875 3.143% 87.617%9 Blister m/c 4 3.002% 90.619%
10 Others 3.75 2.814% 93.433%11 Maintenance 2.5 1.876% 95.310%12 Administrative 2.5 1.876% 97.186%13 Calibration 2.25 1.689% 98.874%14 electricity 1.5 1.126% 100.000%
Pareto analysis was constructed to show the contributors of Break down hours of Line II and the vital few contributors that affect Line II breakdown
LEAN SIX SIGMA PROJECT 16
PVC Air Carton m/c Sorting m/c setting Waiting material Aluminum Sealing Blister m/c Others Maintenance Administrative Calibration electricity
LEAN SIX SIGMA PROJECT 17
Pareto Analysis
0
20
40
60
80
100
120
PVC Air Carton m/c Sorting meshwar Waitingmaterial
Aluminum Sealing Blister m/c Others Maintenance Administrative Calibration electricity
Contributors
Num
ber o
f hou
rs
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Cum
ulat
ive
perc
enta
ge
Vital Few
As shown from the analysis the first three contributors shared by 52.6% of the problem (i.e. Vital Few contributors).
The team suggested to concentrate on the first 2 problems – PVC & Compressed Air – that contribute with 36.9% of the problem.
After argument we agreed to take the first two contributors in our consideration.
LEAN SIX SIGMA PROJECT 19
The project sponsor suggested the segregation of compressed air problem in a separate improvement subproject since the company will install a new compressor after 2 months.
The team now had reached a common understanding of the process and had known that the major factor that increases the breakdown time is the PVC problems.
LEAN SIX SIGMA PROJECT 20
MONTH PVCStoppage hours UTILIZATION
JAN 2 56.90%FEB 4 31.80%
MAR 2.5 50.70%APR 2 43.80%MAY 0.5 87.00%JUN 2 63.60%JUL 5 26.30%
AUG 1.5 70.30%SEP 2.5 54.00%OCT 1 74.00%NOV 3 44.40%DEC 1.5 71.00%
LEAN SIX SIGMA PROJECT 21
0 1 2 3 4 5 60.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
R² = 0.881735717225589
UTILIZATION
UTILIZATIONLinear (UTILIZATION)
LEAN SIX SIGMA PROJECT 22
SUMMARY OUTPUT
Regression StatisticsMultiple R 0.939007837
R Square 0.881735717
Adjusted R Square 0.869909289
Standard Error 0.064849747
Observations 12
ANOVA
df SS MS F Significance F
Regression 1 0.313546103 0.313546103 74.55638309 5.99727E-06
Residual 10 0.042054897 0.00420549
Total 11 0.355601
Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Lower 95.0%
Intercept 0.870650544 0.040402482 21.54943194 0.0000000 0.780628204 0.960672884 0.780628204
PVC -0.134902056 0.015623422 -8.634603818 0.0000060 -0.169713208 -0.100090903 -0.169713208