Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Upload: dylan-cross

Post on 16-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Seneca Overview & Generator Rewind

Ron Kovach/Tom Groff

Asia Pacific PartnershipUnited States of AmericaPower Generation Task ForceAugust 13 – 17, 2007

Page 2: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Seneca OverviewSeneca Overview

2

Page 3: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Seneca – View of Upper Reservoir

1/2 mi. dia.60 ft deep

800 ft above plant

asphalt lined

1/2 mi. dia.60 ft deep

800 ft above plant

asphalt lined

3

Page 4: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Seneca – View of Plant & Lower Reservoir

4

Page 5: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Seneca Plant

Pumped Storage Facility

3 Units – Unit 1 218MW; Unit 2 195 MW; Unit 3 30 MW

Role of Plant– Provide generation, regulation and spinning reserve during

on-peak hours– Provide an energy sink off-peak (11 P.M. – 7 A.M.) to allow

Fossil and Nuclear plants to remain more fully loaded (Base-Load Strategy)

– Black Start capability

5

Page 6: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Priorities

Safety

Environmental and Regulatory Compliance– Federal Energy Regulatory Commission (FERC)– Pennsylvania Department of Environmental Protection

(PADEP)

Reliability

Cost effective operations

6Seneca: Generator Rewind

Page 7: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Staffing

On-site staffing– 6 Operators / 3 Maintenance– 1 Administrative– 2 Management

Corporate Support– Engineering– Environmental– Administrative– IT– Legal

Other– Contract labor services

7Seneca: Generator Rewind

Page 8: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

View of Motor/Generator

1. Exciter

2. Upper Guide Bearing

3. Motor/Generator Rotor

4. Motor/Generator Stator

5. Thrust and Guide Bearing

6. Main Shaft

8

Page 9: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

View of Pump/Turbine

7. Wicket Gate Servomotor

8. Wicket Gate Operating Ring

9. Lower Guide Bearing

10. Turbine Head Cover

11. Stay Ring12. Wicket Gate

13. Runner

14. Spiral Case15. Draft Tube Cone

16. Draft Tube Man Door

17. Spherical Valve

9

Page 10: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Typical Spherical Valve(also called High Head Guard Valve)

10

Page 11: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Equipment Suppliers

Newport News Pump-turbines – Voith Runners

L & S Governors

Westinghouse motor – generators / National Electric coil rewinds

Westinghouse voltage regulators

BLH spherical valves

ABB 230kv GCB’s

Allis Chalmers 220MVA Step-up transformers

Pascor Atlantic 230kv Phase reversal switches

400kva Emergency generator

11Seneca: Generator Rewind

Page 12: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Significant Projects

Pump-Turbine Upgrades– Unit No. 1 – 1992– Unit No. 2 – 1991

Motor-generator rewinds– Unit No. 1 – 1971, 1985, 2006– Unit No. 2 – 1977, 1981, 2007– Unit No. 3 – original

Upper Reservoir side slope paving – 2000

12Seneca: Generator Rewind

Page 13: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Generating Operation

#1 generates to LowerReservoir only

#1 generates to LowerReservoir only

#3 generates to Allegheny River only

#3 generates to Allegheny River only

#2 can generateto Lower Res orriver

#2 can generateto Lower Res orriver

#1 218 MW

#2 195 MW

#3 30 MW

21' diameter pipe, 3200' long

Upper Reservoir

Upper Reservoir

2 31

321Motor/Generator

Pump/Turbine

13

Page 14: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Penstock Rendering

Unit No. 1 – 218MW Unit No. 2 – 195MW Unit No. 3 – 30MW

14Seneca: Generator Rewind

Page 15: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Pumping Operation

Units 1 & 2 draw water from the Lower Reservoir

Units 1 & 2 draw water from the Lower Reservoir

#1 220 MW

#2 220 MW

#3 Does not pump - used for starting #1 & #21 2 3

Upper Reservoir

Upper Reservoir

2 31

15

Page 16: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Operation

Upgraded Pump-Turbines – Efficiency Gain– 3% Pumping– 5 % Generating

700,000 + MWH Annual Generation

Equivalent Forced Outage Rate (EFOR) < 2%

High starting reliability– 8 minute generate starts– 30 minute pump starts

16Seneca: Generator Rewind

Page 17: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Seneca Plant Available Generation& Upper Reservoir Elevation

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

19:53- 01 -

21:53- 01 -

23:53- 01 -

01:53- 02 -

03:53- 02 -

05:53- 02 -

07:53- 02 -

09:53- 02 -

11:53- 02 -

13:53- 02 -

15:53- 02 -

17:53- 02 -

19:53- 02 -

21:53- 02 -

23:53- 02 -

01:53- 03 -

03:53- 03 -

05:53- 03 -

07:53- 03 -

MWH

2010

2020

2030

2040

2050

2060

2070

2080

ELEV. FT.

Total Available MW Hrs Net Available MW Hrs

MINIMUM RESERVE 600 MWH

MAXIMUM UPPER RES. CAP. 4500 MWH

(Black Start Reserve)

17

Page 18: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Seneca Pumping Effect on Total Load

2000

3000

4000

5000

6000

7000

8000

9000

10000

19:53- 01 -

21:53- 01 -

23:53- 01 -

01:53- 02 -

03:53- 02 -

05:53- 02 -

07:53- 02 -

09:53- 02 -

11:53- 02 -

13:53- 02 -

15:53- 02 -

17:53- 02 -

19:53- 02 -

21:53- 02 -

23:53- 02 -

01:53- 03 -

03:53- 03 -

05:53- 03 -

07:53- 03 -

System Load

Less Seneca Pumping

18

Page 19: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Generator RewindGenerator Rewind

19

Page 20: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Decision to Rewind

Last rewind occurred 20 years ago

Tax Credit– Upgrade (8MW)– Extra copper – 7%

Coil replacement– End-of-life– Proactive– Partial Discharge (PD) / Corona

Rotor Pole refurbishment– Asbestos removal

20

Page 21: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Generator Rewind

Unit #1 – Core Iron Continuous Restack

Unit #2 – Core Repairs– Loop test criteria max– 10°C Hot Spots– Repair techniques– Thin mica sheets, between laminations– Grind and electro-mechanical etching

New Air Coolers - #1 & #2

Crane– Engineered lift

21

Page 22: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Stator Lifting Beams

Bolted to Stator

Pinned to(2) crane hooks

Stator weighs232 tons

22

Page 23: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Stator Lift over Unit #3

Seneca: Generator Rewind

23

Page 24: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

W Nameplate Info

336 Coils

Seneca: Generator Rewind

24

Page 25: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Loop Test Cables

16x3 Turns

2400 Volts

300/Loop Amps

Stator Iron in3 Sections

IR Camera tolook for hot spots

10°C or lessacceptancecriteria

Seneca: Generator Rewind

25

Page 26: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Coil Wedges

Top view of slot wedges with ripple springs behind

26

Page 27: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Brazing

Brazing done using anInduction Machine

264 Series Joints

50 Jumper Joints

50 Phase Joints

Seneca: Generator Rewind

27

Page 28: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Pole Keys

2 per Pole

225 RPM

32 Poles

Seneca: Generator Rewind

(( ))225 Revolutions

1 Minute

225 Revolutions

1 Minute (( ))1 Minute

60 Seconds

1 Minute

60 Seconds (( ))32 Poles

1 Revolution

32 Poles

1 Revolution (( ))1 Cycle

2 Poles

1 Cycle

2 Poles == 60hz60hz(Cycles/second)(Cycles/second)

28

Page 29: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Pole ShipmentFixture

Seneca: Generator Rewind

Bottom fixture rounded to allow horizontal placement

29

Page 30: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Thrust Bearing Shoes

Thrust Bearing Shoes in place

Oil supply hoses installed

30

Page 31: Seneca Overview & Generator Rewind Ron Kovach/Tom Groff Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007

Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation

Seneca: Generator Rewind

Wear Pattern on Thrust Bearing Shoes

Removed from Unit #1

Units No. 1 and No. 2– 12 shoes each

Unit No. 3– 8 shoes

31