Seneca Overview & Generator Rewind
Ron Kovach/Tom Groff
Asia Pacific PartnershipUnited States of AmericaPower Generation Task ForceAugust 13 – 17, 2007
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Seneca OverviewSeneca Overview
2
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Seneca – View of Upper Reservoir
1/2 mi. dia.60 ft deep
800 ft above plant
asphalt lined
1/2 mi. dia.60 ft deep
800 ft above plant
asphalt lined
3
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Seneca – View of Plant & Lower Reservoir
4
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Seneca Plant
Pumped Storage Facility
3 Units – Unit 1 218MW; Unit 2 195 MW; Unit 3 30 MW
Role of Plant– Provide generation, regulation and spinning reserve during
on-peak hours– Provide an energy sink off-peak (11 P.M. – 7 A.M.) to allow
Fossil and Nuclear plants to remain more fully loaded (Base-Load Strategy)
– Black Start capability
5
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Priorities
Safety
Environmental and Regulatory Compliance– Federal Energy Regulatory Commission (FERC)– Pennsylvania Department of Environmental Protection
(PADEP)
Reliability
Cost effective operations
6Seneca: Generator Rewind
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Staffing
On-site staffing– 6 Operators / 3 Maintenance– 1 Administrative– 2 Management
Corporate Support– Engineering– Environmental– Administrative– IT– Legal
Other– Contract labor services
7Seneca: Generator Rewind
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
View of Motor/Generator
1. Exciter
2. Upper Guide Bearing
3. Motor/Generator Rotor
4. Motor/Generator Stator
5. Thrust and Guide Bearing
6. Main Shaft
8
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
View of Pump/Turbine
7. Wicket Gate Servomotor
8. Wicket Gate Operating Ring
9. Lower Guide Bearing
10. Turbine Head Cover
11. Stay Ring12. Wicket Gate
13. Runner
14. Spiral Case15. Draft Tube Cone
16. Draft Tube Man Door
17. Spherical Valve
9
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Typical Spherical Valve(also called High Head Guard Valve)
10
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Equipment Suppliers
Newport News Pump-turbines – Voith Runners
L & S Governors
Westinghouse motor – generators / National Electric coil rewinds
Westinghouse voltage regulators
BLH spherical valves
ABB 230kv GCB’s
Allis Chalmers 220MVA Step-up transformers
Pascor Atlantic 230kv Phase reversal switches
400kva Emergency generator
11Seneca: Generator Rewind
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Significant Projects
Pump-Turbine Upgrades– Unit No. 1 – 1992– Unit No. 2 – 1991
Motor-generator rewinds– Unit No. 1 – 1971, 1985, 2006– Unit No. 2 – 1977, 1981, 2007– Unit No. 3 – original
Upper Reservoir side slope paving – 2000
12Seneca: Generator Rewind
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Generating Operation
#1 generates to LowerReservoir only
#1 generates to LowerReservoir only
#3 generates to Allegheny River only
#3 generates to Allegheny River only
#2 can generateto Lower Res orriver
#2 can generateto Lower Res orriver
#1 218 MW
#2 195 MW
#3 30 MW
21' diameter pipe, 3200' long
Upper Reservoir
Upper Reservoir
2 31
321Motor/Generator
Pump/Turbine
13
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Penstock Rendering
Unit No. 1 – 218MW Unit No. 2 – 195MW Unit No. 3 – 30MW
14Seneca: Generator Rewind
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Pumping Operation
Units 1 & 2 draw water from the Lower Reservoir
Units 1 & 2 draw water from the Lower Reservoir
#1 220 MW
#2 220 MW
#3 Does not pump - used for starting #1 & #21 2 3
Upper Reservoir
Upper Reservoir
2 31
15
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Operation
Upgraded Pump-Turbines – Efficiency Gain– 3% Pumping– 5 % Generating
700,000 + MWH Annual Generation
Equivalent Forced Outage Rate (EFOR) < 2%
High starting reliability– 8 minute generate starts– 30 minute pump starts
16Seneca: Generator Rewind
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Seneca Plant Available Generation& Upper Reservoir Elevation
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
19:53- 01 -
21:53- 01 -
23:53- 01 -
01:53- 02 -
03:53- 02 -
05:53- 02 -
07:53- 02 -
09:53- 02 -
11:53- 02 -
13:53- 02 -
15:53- 02 -
17:53- 02 -
19:53- 02 -
21:53- 02 -
23:53- 02 -
01:53- 03 -
03:53- 03 -
05:53- 03 -
07:53- 03 -
MWH
2010
2020
2030
2040
2050
2060
2070
2080
ELEV. FT.
Total Available MW Hrs Net Available MW Hrs
MINIMUM RESERVE 600 MWH
MAXIMUM UPPER RES. CAP. 4500 MWH
(Black Start Reserve)
17
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Seneca Pumping Effect on Total Load
2000
3000
4000
5000
6000
7000
8000
9000
10000
19:53- 01 -
21:53- 01 -
23:53- 01 -
01:53- 02 -
03:53- 02 -
05:53- 02 -
07:53- 02 -
09:53- 02 -
11:53- 02 -
13:53- 02 -
15:53- 02 -
17:53- 02 -
19:53- 02 -
21:53- 02 -
23:53- 02 -
01:53- 03 -
03:53- 03 -
05:53- 03 -
07:53- 03 -
System Load
Less Seneca Pumping
18
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Generator RewindGenerator Rewind
19
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Decision to Rewind
Last rewind occurred 20 years ago
Tax Credit– Upgrade (8MW)– Extra copper – 7%
Coil replacement– End-of-life– Proactive– Partial Discharge (PD) / Corona
Rotor Pole refurbishment– Asbestos removal
20
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Generator Rewind
Unit #1 – Core Iron Continuous Restack
Unit #2 – Core Repairs– Loop test criteria max– 10°C Hot Spots– Repair techniques– Thin mica sheets, between laminations– Grind and electro-mechanical etching
New Air Coolers - #1 & #2
Crane– Engineered lift
21
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Stator Lifting Beams
Bolted to Stator
Pinned to(2) crane hooks
Stator weighs232 tons
22
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Stator Lift over Unit #3
Seneca: Generator Rewind
23
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
W Nameplate Info
336 Coils
Seneca: Generator Rewind
24
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Loop Test Cables
16x3 Turns
2400 Volts
300/Loop Amps
Stator Iron in3 Sections
IR Camera tolook for hot spots
10°C or lessacceptancecriteria
Seneca: Generator Rewind
25
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Coil Wedges
Top view of slot wedges with ripple springs behind
26
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Brazing
Brazing done using anInduction Machine
264 Series Joints
50 Jumper Joints
50 Phase Joints
Seneca: Generator Rewind
27
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Pole Keys
2 per Pole
225 RPM
32 Poles
Seneca: Generator Rewind
(( ))225 Revolutions
1 Minute
225 Revolutions
1 Minute (( ))1 Minute
60 Seconds
1 Minute
60 Seconds (( ))32 Poles
1 Revolution
32 Poles
1 Revolution (( ))1 Cycle
2 Poles
1 Cycle
2 Poles == 60hz60hz(Cycles/second)(Cycles/second)
28
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Pole ShipmentFixture
Seneca: Generator Rewind
Bottom fixture rounded to allow horizontal placement
29
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Thrust Bearing Shoes
Thrust Bearing Shoes in place
Oil supply hoses installed
30
Asia Pacific Partnership • Aug 13 - 17, 2007FirstEnergy Corp. & Duke Energy Corporation
Seneca: Generator Rewind
Wear Pattern on Thrust Bearing Shoes
Removed from Unit #1
Units No. 1 and No. 2– 12 shoes each
Unit No. 3– 8 shoes
31