slide 1 shulamit moed vertex 2004, como, september 20041page endcap module production of the atlas semiconductor tracker (sct) atlas sct layout and specifications module…
atlas sct powering issues total power is 50 kw of which 50% are dissipated in cables slhc tracker will require even more channels and thus more cables, more cooling and more…
atlas sct status report overview of major production issues silicon sensors & fe asic procurement power & readout power supplies readout daq & dcs barrel barrel…
atlas id - sct status report highlights from sct week valencia 13-18 june procurement of sensors & fe asics power & readout optical harness power supplies readout…
jeremy cook the hatfield sct lunar atlas photographic atlas for meade, celestron and other sct telescopes with 216 figures jeremy cook, bsc (eng) british library cataloguing…
slide 1construction of the atlas sct endcap modules steve snow manchester university on behalf of the atlas sct collaboration context - atlas, inner detector, silicon strip…
uk atlas sct module quality assurance joe foster, manchester university 04 jan 2005 all results compiled in time for christmas⦠last year i ⦠was responsible for quality…
atlas sct rod fdr implementation model august 20, 2002 atlas wisconsin group khang dao, damon fasching, douglas ferguson, owen hayes, richard jared, john joseph, krista marks,…
slide 1 serial power update atlas barrel sct mitch newcomer representing work at ral, liverpool, bnl and penn stave module â electrical performance aces 2011 2 measurements…
atlas sct rod fdr implementation model august 20, 2002 atlas wisconsin group khang dao, damon fasching, douglas ferguson, owen hayes, richard jared, john joseph, krista marks,…
slide 1atlas sct endcap detector modules lutz feld university of freiburg for the atlas sct collaboration vertex 2002 5.6m slide 2 vertex 2002lutz feld, freiburg university2…
atlas sct module performance: beam test results josé e. garcía sct modules operation and characteristics beam test beam test results study with 25 ns beam reconstructing…
system performance of sct detector modulespeter w phillips rutherford appleton laboratory peter w. phillips overview this presentation aims to give an introduction to activities
construction of the atlas sct endcap modules steve snow manchester university on behalf of the atlas sct collaboration context - atlas, inner detector, silicon strip tracker…
update on the time dependence of the inter-strip capacitance a.chilingarov lancaster university presented by j.patera.chilingarov, lancaster university, uk
wirebondscheme.fm55modified: page: distribution list 13/10/2000 abstract blockbold rev. no.: 2 of 4 atl-xx-xx-xxxx b a 13/10/2000 all first version b 08/03/2001 figures added
slide 1atlas sct barrel parm. tyndel 114-may-2003 atlas sct barrel par - introduction uover-view of the barrel sct Õ modules Õ lm tapes & optical harnesses Õ cooling…
slide 1x-ray survey of the atlas sct slide 2 the atlas semi-conductor tracker slide 3 alignment requirements error in track parameter measurements should not exceed 20% miss-alignment…
atlas: sct detector alignment and b field map. steve snow new year 2005 this title describes work that has been growing from low priority at the start of 2004 to become my…
gridpix/gossip for atlas sct upgrade ilc clic …….insulators in strong e- fields………. …….the frustration of innovation……….. harry van der graaf nikhef,…