    COMPANY PROFILE

    Thrillium International is a Dubai based company, expertise in the field

    of consultancy, construction and management. Trillium specializes in bringing outstanding design to all areas of

    interior and exhibition design. We are a close-knit team able to translateclients' ideas into successful projects, which work both aestheticallyand commercially.

    We work with clients and their brand managers from concept to

    completion to create effective solutions for both individual and roll-outidentities

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    3/22

    Every project we do is bespoke: interior design projects should always be

    unique

    Our key services includes: -

    Initial design consultation

    Conceptual design

    Space planning

    Schematic design (Scheming and Visioning)

    Character and theme development

    Lifestyle space planning

    Residential / retail / office / hotel / restaurant

    Furniture, fabric, color and accessory selection

    Fixed finishes planning, design and selection

    Electromechanical works Kitchen and bath design

    Construction documentation and administration

    General and Technical Specifications

    Value engineering

    Additions, renovations and retrofits

    Removals, reinstallations and disposal of unwanted items

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    4/22

    SETTING UP A RESTAURANT

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    5/22

    Brand Name: Toast n Grill

    Location: Sky Courts Towers

    Dubai Land Residence

    Area Sq. Ft: 1314.49 sq. ft

    Fit-out Period: 10th May 12 to 10th July12

    Owner : Abdulla Omer

    Project Manager: Mr. Raghu . M

    Total Cost: 1,95,972.00AED

    PROJECT OVER VIEW

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    6/22

    STATEMENT OF WORK

    Project scope

    Design, Material selection & Procurement, Installations, Testing &commissioning, Maintenance of all types of MEP works , and interiordesigning for setting up of new restaurant.

    This operates strictly under the applicable technical and safetyrequirements.

    Design

    The 3D design will be done accordance with the owners specificationsand requirements and will be sent to the owner and the landlord to theirapprovals. Both Interior and Exterior design has to be considered

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    7/22

    STATEMENT OF WORK

    Drawings

    Detailed out let plan will be drawn according to UAE law. The drawingstates the kitchen specifications , dining space, counter area MEPpoints, gas line etc and this has to be approved from owner and as

    well as the concerned authorizes like DM

    Warranties

    we are liable to replace or do maintenance work in case of any damage

    or destruction with in a period of 1one year. And later after a year it willbe owners concern

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    8/22

    STATEMENT OF WORK

    Quality Assurance

    All materials used on the project shall be of standard quality and underapproval from the owner

    Inspection & Tests

    It should carried on to all MEP works

    Acceptance & PaymentsSuccessful completion of total project over a period of 90 days, Frequentvisit to the site during the fit out works to ascertain that the work isexecuted in reasonable conformity with all plans specifications

    All payments to be made in AED and payable at sight on variousstages against submission of documents

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    9/22

    BOQ BILL OF QUANTITY

    Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT

    A Kitchen

    1 Screeding 21 sqm 65.00 1365.00

    2 Water proofing 1 Item LS 2500.00

    3 Ceiling Works (60 X 60 ceiling) 21 Sqm 50.00 1050.00

    4 Supply & installation of tiles (PC rate 30) 21 Sqm 90.00 1890.00

    5 Supply & installation of ceramic tile skirting 36 LM 45.00 1620.00

    6 Supply & installation of wall tiles 50 Sqm 110.00 5500.00

    7 Supply & installation of paint on existing wall 95 Sqm 22.00 2090.00

    8 Supply & installation of block wall 22 sqm 300.00 6600.00

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    10/22

    BOQ BILL OF QUANTITY

    Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT

    B Servery Counter Area

    1 Screeding 18 sqm 65.00 1170.00

    2 Ceiling Works (plain ceiling with painting) 18 sqm 125.00 2250.00

    3 Ceiling bulkhead with cove formation 20 LM 80.00 1600.00

    4 Supply & installation of tiles (PC rate 90) 18 sqm 150.00 2700.00

    5 Supply & installation of ceramic tile skirting 9 LM 45.00 405.00

    6 Supply & installation of cabinet behind the counterwith cladding

    1 Item LS 20000.00

    7Supply & installation of counter with veneer finshoutside & melamine finish inside

    1 Item LS 50000.00

    8 Supply & installation of paint on existing wall 6 sqm 22.00 132.00

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    11/22

    BOQ BILL OF QUANTITY

    Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT

    C Seating Area

    1 Screeding 74 sqm 65.00 4810.00

    2 Ceiling Works (painting) 74 sqm 35.00 2590.00

    3 Supply & installation of tiles (PC rate 90) 74 sqm 150.00 11100.00

    4 Supply & installation of ceramic tile skirting 32 LM 45.00 1440.00

    5Supply & installation of paint on the walls (stucopaint)

    96 sqm 100.00 9600.00

    13 Finishes for freezer unit 1 Item LS 3500.00

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    12/22

    BOQ BILL OF QUANTITY

    Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT

    D Common

    1 Drawing preparation 1 Item LS 2500.00

    2Laison work for the approval process (All fees paid byclient)

    1 Item LS 2000.00

    3 Scafolding & other provisions 1 Item LS 1000.00

    4 Cleaning the site 1 Item LS 1000.00

    8 SIGNAGE (provisional Sum) 1 Item LS 8000.00

    9 Supply & installation of the blinds 1 Item LS 3500.00

    10 MEP Works (breakdown below) 1 Item LS 43880.00

    Total195792.00

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    13/22

    BOQ BILL OF QUANTITY (MEP)Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT

    1 Supply & installation of 60 X 60 lights 5 Nos 250.00 1250.00

    2 Supply & installation of down lights 3 Nos 300.00 900.00

    3 Supply & installation of cove lights 18 LM 60.00 1080.00

    4 Supply & installation of track lights 3 Nos 250.00 750.00

    5 Supply & installation of emergency light 3 Nos 450.00 1350.00

    6 Supply & installation of exit light 2 Nos 450.00 900.00

    7 Wiring for the light points 23 Nos 150.00 3450.008 Supply & installation of sockets 15 Nos 350.00 5250.00

    9 Supply & installation of floor boxes 3 Nos 600.00 1800.00

    10 Allow cost for IT work (provisional) 1 Item LS 2500.00

    11 Supply & installation of smoke detector 3 Nos 500.00 1500.00

    12 Supply & installation of heat detector 1 Nos 650.00 650.00

    13 Supply & installation of sprinkler 15 Nos 500.00 7500.00

    14 Allow for Exhaust system 1 Item LS 5000.00

    15 Sprinkler system testing & commissioning 1 Item LS 3500.00

    16 Fire Alarm system testing & commissioning 1 Item LS 5000.00

    17 DB modification 1 Item LS 1500.00

    18 Allow cost for plumbing work (provisional) 1 Item LS 4000.00

    Sub Total 43880.00

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    14/22

    PROJECT TEAM

    Project Manager

    Civil Mechanical Electrical Designer Decorator

    Purchasing

    Manager Accountant Administration

    Secretary

    Supervisor Supervisor Supervisor 3D visualiser Supervisor Store keeper Office assistant

    Mason AC techncian electricin Draftman Carpenter

    Labours Plumber Helper helper

    Driver helper

    Cleaner

    consultancy | construction | management

    Cafeteria Set Up

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    15/22

    WORK BREAKDOWN STRUCTURE

    S.No Activity List DaysStart

    DateEnd date

    w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4Project start - End

    1 Ini tial Conce pt Design 2

    2 L ice ns e appro val 1

    3 Tende ring and award 4

    4 Mobi li sati on 7

    5 Approval from authorities 7

    6 De tai le d de si gn 5

    7 Final approval from cleint 2

    8 Mate rial Approva ls 21

    9 De mol it io n w orks 2

    10 Underground services 2

    11 Scre ed ing works 3

    12 Concealed conduits 5

    13 AC equipment installation 20

    14 AC ducting works 3

    15 Plumbing installation 15

    16 Ventilation and Hoods 5

    17 Sprinkler pipe works 20

    18 Fire alalrm works 20

    19 Wal l p laster ing 15

    20 Cei l ing grids 15

    21 Wal l pan inting 10

    22 Authority Inspection 1

    23 wiring and DB installation 15

    24 Counter installation 40

    25 Light fixture installation 5

    26 kitchen equipment installation 30

    27 Final paini tng 3

    28 Authority Inspection 1

    29 Authority certificate 1

    30 Final C le an ing 1

    31 Testing and Commissioing 2

    32 Cle int inspe ct ion 1

    33 Handing over to cleint 1

    34 project close out Documents 1

    35 Pro je ct close out 1

    MONTH -1 MONTH -2 MONTH -3Cafeteria Set Up

    Work Break Down Strcuture

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    16/22

    COMPLETION CERT FORMALITIES (DEPENDS ON

    AUHTORITIES)

    Approach civil defense for inspection

    Receive civil def. certificate [depends on auth]

    Approach tecom for completion certificate

    Receive completion certificate [depends on auth]

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    17/22

    DEMOBILIZATION

    Completion of contracted services for the Company and removal of allour facilities, equipment and materials from the property.

    Like

    Scaffoldings

    Mobile equipment removed from site

    Fixed equipment removed from site

    Equipment spares/parts removed from site

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    18/22

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    19/22

    KITCHEN

    Screeding

    Water proofingCeiling Works (60 X 60 ceiling)

    Supply & installation of tiles (PC rate 30)

    Supply & installation of ceramic tile skirting

    Supply & installation of wall tiles

    Supply & installation of paint on existing wall

    Supply & installation of block wall

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    20/22

    SERVEY COUNTER AREA

    Screeding

    Ceiling Works (plain ceiling with painting)Ceiling bulkhead with cove formation

    Supply & installation of tiles (PC rate 90)

    Supply & installation of ceramic tile skirting

    Supply & installation of cabinet behind the counter with cladding

    Supply & installation of counter with veneer finish outside & melaminefinish inside

    Supply & installation of paint on existing wall

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    21/22

    SEATING AREA

    Screeding

    Ceiling Works (painting)Supply & installation of tiles (PC rate 90)

    Supply & installation of ceramic tile skirting

    Supply & installation of paint on the walls (stuco paint)

    Finishes for freezer unit

    consultancy | construction | management

  • 7/31/2019 Restuarent PPT Final - Naseem Musthafa

    22/22

    COMMON

    Drawing preparation

    Liaison work for the approval process (All fees paid by client) Scaffolding & other provisions

    Cleaning the site

    SIGNAGE

    Supply & installation of the blinds

    MEP Works

    consultancy | construction | management