naseem ameer ali cv

23
PAGE 1 OF 23 ONE-PAGE SUMMARY OF CURRICULUM VITAE (Mr) Noushad Ali Naseem Ameer Ali FCIOB, FCIArb, PPRISM, FRISM, MNZIQS, MRICS, AIQS (Affil), ICECA, MAPM, Reg QS (M’sia), BSc (Hons) QS (Reading, UK), CDipAF, Cert Adjudication (KLRCA), MSc Arch (Univ College London), MSc Construction Law & Arb (Kings College London) Chartered Quantity Surveyor (UK), Chartered Construction Manager (UK), Registered Quantity Surveyor (M’sia), Accredited Mediator (M’sia), Panel Adjudicator (KLRCA) Senior Lecturer School of Engineering and Advanced Technology, Massey University, Room 106.8, Building 106, Albany Highway, Auckland 0745, New Zealand Phone: +64 9 – 414 0800 extn: 43562; Mobile: +64 21 – 260 2520 E-mail: [email protected]; Private email: [email protected]; Skype: naseem6864 Summary of experience I have over 28 years combined experience in the construction industry and academia from the United Kingdom, Malaysia, and New Zealand. My construction industry experience is in construction project management, construction contracts consultancy, dispute resolution, quantity surveying, and commercial management. My academic experience includes teaching and supervising students at Bachelors and Masters degrees. Academic and professional qualifications I have academic and professional qualifications from the UK, Malaysia, and New Zealand. This includes Fellowship of the Chartered Institute of Arbitrators, Chartered Institute of Building, and Royal Institution of Surveyors Malaysia, and professional membership of the New Zealand Institute of Quantity Surveyors and Royal Institution of Chartered Surveyors. I have two Masters degrees – one in Construction Law and Arbitration from Kings College London and the other in Architecture specializing in Building Economics and Management from University College London. I am now doing a PhD in the area of statutory adjudication at Auckland University. Current teaching at Massey University I supervise students doing the Construction Research and Report paper. I developed, as a team, and am now programme leader on New Zealand’s first Master of Construction degree with a construction law specialization. I coordinate and teach the following papers: Masters level: 218.763 Construction Law I, 218.764 Construction Law 2, 218.765 Construction Adjudication Bachelors level: 218.211 Construction Economics and Estimating, 218.311 Construction Contracts and Financial Administration, 218.315 Construction Law Research interests My research and professional interests are in construction law, construction contracts, drafting contracts, professional negligence, alternative dispute resolution including arbitration, adjudication, and mediation, construction project management, procurement, and aspects of quantity surveying and commercial management. Among the specific areas of research include studying various legislation in commonwealth jurisdictions governing payment and adjudication in the construction industry with a focus on the New Zealand Construction Contracts Act 2002 and the Malaysian Construction Industry Payment and Adjudication Act 2012. I am also working on increasing efficiency in adjudication including developing a web-based e-adjudication system. I have also done research on increasing efficiency through drafting construction contracts in modern plain English. I authored the ‘Model Terms of Construction Contract for Subcontract Work’ available at: <http://tinyurl.com/ModelTerms>. It was endorsed by 15 construction related bodies in Malaysia. I also authored the Standard Terms of Construction Contract for Renovation and Small Projects [STCC-RSP 2015] facilitated by the Construction Development Board Malaysia. This will be published in December 2014. This contract is accredited with the ‘Clear English Standard’ by the Plain Language Commission, United Kingdom. Continuing professional development I keep up-to-date with new developments in my area and share my views on them. See for example my submission to the New Zealand Commerce Select Committee on some of the proposals in the Construction Contracts Amendment Bill 2013 here: http://www.parliament.nz/en- nz/pb/sc/documents/evidence/50SCCO_EVI_00DBHOH_BILL11975_1_A348553/naseem-ameer-ali

Upload: naseem-ameer-ali

Post on 13-Jan-2017

664 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Naseem Ameer Ali CV

PAGE 1 OF 23

ONE-PAGE SUMMARY OF CURRICULUM VITAE (Mr) Noushad Ali Naseem Ameer Ali FCIOB, FCIArb, PPRISM, FRISM, MNZIQS, MRICS, AIQS (Affil), ICECA, MAPM, Reg QS (M’sia), BSc (Hons) QS (Reading, UK), CDipAF, Cert Adjudication (KLRCA), MSc Arch (Univ College London), MSc Construction Law & Arb (Kings College London) Chartered Quantity Surveyor (UK), Chartered Construction Manager (UK), Registered Quantity Surveyor (M’sia), Accredited Mediator (M’sia), Panel Adjudicator (KLRCA) Senior Lecturer School of Engineering and Advanced Technology, Massey University, Room 106.8, Building 106, Albany Highway, Auckland 0745, New Zealand Phone: +64 9 – 414 0800 extn: 43562; Mobile: +64 21 – 260 2520 E-mail: [email protected]; Private email: [email protected]; Skype: naseem6864 Summary of experience I have over 28 years combined experience in the construction industry and academia from the United Kingdom, Malaysia, and New Zealand. My construction industry experience is in construction project management, construction contracts consultancy, dispute resolution, quantity surveying, and commercial management. My academic experience includes teaching and supervising students at Bachelors and Masters degrees. Academic and professional qualifications I have academic and professional qualifications from the UK, Malaysia, and New Zealand. This includes Fellowship of the Chartered Institute of Arbitrators, Chartered Institute of Building, and Royal Institution of Surveyors Malaysia, and professional membership of the New Zealand Institute of Quantity Surveyors and Royal Institution of Chartered Surveyors. I have two Masters degrees – one in Construction Law and Arbitration from Kings College London and the other in Architecture specializing in Building Economics and Management from University College London. I am now doing a PhD in the area of statutory adjudication at Auckland University. Current teaching at Massey University I supervise students doing the Construction Research and Report paper. I developed, as a team, and am now programme leader on New Zealand’s first Master of Construction degree with a construction law specialization. I coordinate and teach the following papers: • Masters level: 218.763 Construction Law I, 218.764 Construction Law 2, 218.765 Construction Adjudication • Bachelors level: 218.211 Construction Economics and Estimating, 218.311 Construction Contracts and

Financial Administration, 218.315 Construction Law Research interests My research and professional interests are in construction law, construction contracts, drafting contracts, professional negligence, alternative dispute resolution including arbitration, adjudication, and mediation, construction project management, procurement, and aspects of quantity surveying and commercial management. Among the specific areas of research include studying various legislation in commonwealth jurisdictions governing payment and adjudication in the construction industry with a focus on the New Zealand Construction Contracts Act 2002 and the Malaysian Construction Industry Payment and Adjudication Act 2012. I am also working on increasing efficiency in adjudication including developing a web-based e-adjudication system. I have also done research on increasing efficiency through drafting construction contracts in modern plain English. I authored the ‘Model Terms of Construction Contract for Subcontract Work’ available at: <http://tinyurl.com/ModelTerms>. It was endorsed by 15 construction related bodies in Malaysia. I also authored the Standard Terms of Construction Contract for Renovation and Small Projects [STCC-RSP 2015] facilitated by the Construction Development Board Malaysia. This will be published in December 2014. This contract is accredited with the ‘Clear English Standard’ by the Plain Language Commission, United Kingdom. Continuing professional development I keep up-to-date with new developments in my area and share my views on them. See for example my submission to the New Zealand Commerce Select Committee on some of the proposals in the Construction Contracts Amendment Bill 2013 here: http://www.parliament.nz/en-nz/pb/sc/documents/evidence/50SCCO_EVI_00DBHOH_BILL11975_1_A348553/naseem-ameer-ali

Page 2: Naseem Ameer Ali CV

PAGE 2 OF 23

FULL CURRICULUM VITAE 1 Academic Qualifications 2 2 Professional Qualifications 2 3 Career History 3 4 Industry And Academic Experience 4

4.1 Construction Industry 4.2 Academia - Teaching And Supervision 4.3 Academia - Course Development And Advisory 4.4 Academia - External Examiner

5 Professional, Industry, Government, Editorial and Other Appointments 5 6 Membership Of Other Professional Organisations 6

Appendix A - Publications And Presentations 7

A.1 Research Dissertations (Unpublished) A.2 Publications - Reports A.3 Publications - Book Chapter A.4 Publications - Papers In Journals And Conference Proceedings A.5 Presentations - A Representative Selection Of Presentations At Conferences And Seminars

Appendix B - Selection Of Dispute Resolution Experience Without Confidential Details 12

Appendix C - Details On Construction Project Experience Including Project Management, 13 Contract Management, And Cost Management Experience 1 ACADEMIC QUALIFICATIONS • Currently doing a PhD at the Department of Civil and Environmental Engineering, University of Auckland.

Area of research: Statutory Adjudication in Commonwealth Jurisdictions with Focus on Adjudication under the New Zealand Construction Contracts Act 2002 and the Malaysian Construction Industry Payment and Adjudication Act 2012. Supervisor: Associate Professor Dr Suzanne Wilkinson.

• MSc Construction Law & Arbitration. Dissertation classification: Merit. Title: The Professional Liability of the Project Manager, supervised by John Powell QC. Kings College London, University of London, UK. [Part-time, completed 1992]

• MSc Architecture – Building Economics and Management. Dissertation classification: Distinction. Title: Professional Responsibility in the Building Industry: A Critical Analysis in a Malaysian Context, supervised by Professor John Andrews. University College London, University of London, UK. [Full-time, completed 1989]. Won British High Commissioner’s Award (Chevening Scholar)

• Certificate in Adjudication, Kuala Lumpur Regional Centre for Arbitration [2012]

• Certified Diploma in Accounting and Finance, Chartered Association of Certified Accountants [Part-time,

completed 1988]

• BSc (Hons) Quantity Surveying, University of Reading, UK [Full-time, completed 1986] 2 PROFESSIONAL QUALIFICATIONS

• Past President of the Royal Institution of Surveyors Malaysia [PPRISM]

• Fellow of the Royal Institution of Surveyors Malaysia [FRISM]

• Fellow of the Chartered Institute of Building, UK [FCIOB]

Page 3: Naseem Ameer Ali CV

PAGE 3 OF 23

• Fellow of the Chartered Institute of Arbitrators, UK [FCIArb] • Professional Member of the New Zealand Institute of Quantity Surveyors [MNZIQS]

• Professional Member of the Royal Institution of Chartered Surveyors, UK [MRICS]

• Registered Quantity Surveyor, Board of Quantity Surveyors Malaysia [Reg QS]

• Member of the Association for Project Management, UK [MAPM]

• Affiliate, Australian Institute of Quantity Surveyors [Affil AIQS]

• Accredited Mediator, Panel on Construction Industry Development Board, Malaysia

• Panel Adjudicator, Kuala Lumpur Regional Centre for Arbitration

3 CAREER HISTORY June 2010 - Senior Lecturer School of Engineering and Advanced Technology, Massey University, Albany, Auckland 2007 - Director CIC-QS Services, Kuala Lumpur, Malaysia (quantity surveying, project management

and construction contracts consultancy) 1995 - 2006 Managing Director (Concurrent with below) CIC-QS Services, Kuala Lumpur, Malaysia (quantity surveying, project management

and construction contracts consultancy) 1998 - 2006 Director HPRC Consulting Group, Kuala Lumpur, Malaysia (off-shoot of the High-Point Rendel

International Group, of British origin – project management, cost management, and construction contracts consultancy)

1997 Director High-Point Rendel Consultants, Kuala Lumpur, Malaysia (part of the High-Point Rendel

International Group, of British origin – project management, cost management, and construction contracts consultancy)

1996 Deputy Technical Director (Contracts & Commercial) High-Point Rendel Consultants, Kuala Lumpur, Malaysia 1995 General Manager (Technical Services) High-Point Rendel Consultants, Kuala Lumpur, Malaysia 1994 - 1995 Executive Director Beard Dove (Malaysia) Kuala Lumpur, Malaysia (part of the Beard Dove International

Group, of British origin – project management, cost management, and construction contracts consultancy)

1993 - 1994 Project Manager Beard Dove (Malaysia), Kuala Lumpur Malaysia 1991 - 1993 Senior Lecturer Leeds Metropolitan University, Leeds, United Kingdom 1989 - 1991 Quantity Surveyor

Page 4: Naseem Ameer Ali CV

PAGE 4 OF 23

Francis Graves Ltd, Quantity Surveyors and Project Managers, London, United Kingdom

1986 - 1988 Quantity Surveyor Basar & Harun, Quantity Surveyors, Petaling Jaya, Malaysia 1985 Trainee Quantity Surveyor Jurukur Bina, Kuala Lumpur, Malaysia 4 INDUSTRY AND ACADEMIC EXPERIENCE 4.1 Construction Industry I have over 28 years professional experience. My experience includes the areas of project management, quantity surveying, construction contracts consultancy, and dispute resolution services including arbitration, adjudication, and mediation. I have also acted as expert witness in arbitration and the courts. I have acted as consultant for both client organizations and construction companies. The range of types of projects I have been involved in include offices, hotels, banks, apartments and condominiums, housing developments, mixed developments, university campuses, sports complexes (including the National Sports Complex project for the 1998 Kuala Lumpur Commonwealth Games), factories, hospitals, interior fitting out works, refurbishment works, infrastructure projects and some oil and gas sector work. See Appendix B for a selection of dispute resolution experience without confidential details and Appendix C for details on construction project experience including experience on project management, contract management, and quantity surveying. 4.2 Academia - Teaching And Supervision

• School of Engineering and Advanced Technology, Massey University, Auckland. Senior Lecturer in the

Bachelors of Construction (majors in Construction Management and Quantity Surveying) since June 2010. Programme leader for Master of Construction degree with specialisations in Construction Law, Construction Project Management, and Quantity Surveying. Currently teaching the following papers: Masters degree level: 218.763 Construction Law I, 218.764 Construction Law 2, 218.765 Construction Adjudication. Bachelors degree level: 218.211 Construction Economics and Estimating, 218.311 Construction Contracts and Financial Administration, 218.315 Construction Law, and supervising students on the Construction Research and Report paper.

• Sydney Law School, The University of Sydney, guest lecturer on the LLM programme on the ‘Plain English

in Legal Writing’ course delivered at Robinson College, University of Cambridge, United Kingdom. • Technology University Malaysia (part time) for one year as Adjunct Associate Professor on the MSc course

in Construction Contract Management.

• Leeds Metropolitan University, UK (full time) for two years as Senior Lecturer on the Quantity Surveying and Construction Management courses.

• University Malaya, Malaysia (part time) over eight years lecturing on the undergraduate Quantity Surveying

degree, Masters in Law (LLM) degree, and MSc in Construction Management degree. • MARA Technology University, Malaysia (part time) for one year lecturing on the Architecture course.

Subjects taught and supervised were primarily in the areas of construction law and practice, construction contracts and contract administration, construction dispute resolution, construction project management, construction economics, feasibility studies, cost planning, procurement, tendering, and estimating. I have supervised over 30 students’ dissertations at: final year undergraduate degree level and at Masters degree level and I have been technical adviser to a few PhD students.

Page 5: Naseem Ameer Ali CV

PAGE 5 OF 23

4.3 Academia - Course Development and Advisory • Member of the College Academic Board, College of Science, Massey University, New Zealand.

• Member of the Construction degree programme committee – reviewed the Bachelors in Construction

(Construction Management and Quantity Surveying majors) degree, enhanced and refined the Bachelors degree. Degree now accredited by the Pacific Association of Quantity Surveyors and the Royal Institution of Chartered Surveyors.

• Part of a team that developed a new Master of Construction degree with specialisations in Construction Project Management, Construction Law, and Quantity Surveying. Developed three new papers in my areas of specialization, which includes construction law, contract administration, and dispute resolution including construction adjudication. When the degree was approved, I was appointed Programme Leader.

• Initiated and developed (with two colleagues) the Masters degree in Construction Law and Arbitration for Leeds Metropolitan University, UK in 1992.

• Adviser on the MSc Construction Contract Management degree at Technology University Malaysia. • Adviser at the proposal stage of the MSc in Construction Procurement Management degree planned by

MARA Technology University, Malaysia. • Adviser during the formative stages of the BSc degree in Quantity Surveying at University Malaya,

Malaysia. 4.4 Academia – External Examiner

• Examiner – thesis submitted for a Masters-by-research degree at Massey University. Research topic on

improving productivity through off-site manufacturing in the New Zealand construction industry.

• External examiner for a Masters-by-research student at Technology University Malaysia. Research topic on professional negligence.

• External examiner for degree and diploma courses in Quantity Surveying at MARA Technology University,

Malaysia for several years. • Examiner and tutor, Chartered Institute of Arbitrators’ Arbitration Entry Level Courses held in Malaysia.

• Panel of professional interview examiners for the Chartered Institute of Building, United Kingdom.

5 PROFESSIONAL, INDUSTRY, GOVERNMENT, EDITORIAL, AND OTHER APPOINTMENTS

• Member of the New Zealand Institute of Quantity Surveyors Auckland branch board.

• President, The Royal Institution of Surveyors Malaysia 2006. Also held several other positions earlier including Deputy President, Secretary-General, Treasurer, Editorial Board member, Quantity Surveying Division Chair (three sessions), and Divisional Committee Member between 1993 and 2005.

• Vice-President, The Chartered Institute of Arbitrators (UK) Malaysia Branch 2000-2001. Held several

other positions including Honorary Secretary and Honorary Auditor prior to 2000.

• Vice-President, The Chartered Institute of Building (UK) Malaysia Branch 1997-2001. Held several other positions including Vice-President (Finance), and Honorary Auditor between 1997 and 2005.

• Member of the Board of Quantity Surveyors Malaysia appointed by the Minister of Works 2003-2008.

Page 6: Naseem Ameer Ali CV

PAGE 6 OF 23

• Chair – Malaysian Construction Industry Working Group on Payment and Adjudication (WG 10).

• Author of the Construction Industry Contracts Committee’s subcontract ‘CICC Model Terms of

Construction Contract for Subcontract Work’. First published by the Construction Industry Development Board, Malaysia in 2006 and second edition expected in 2015.

• Author of the Construction Industry Contracts Committee’s Standard Terms of Construction Contract for

Renovation and Small Projects [STCC-RSP 2015]. To be published by the Construction Industry Development Board, Malaysia in December 2014.

• Member of the drafting committee – Standard Terms of Construction Contract for Design and Build

Work. Leader of team re-drafting traditional draft into modern plain English.

• Member of the Master Builders Association Malaysia’s Contracts & Practice committee.

• Member of the Malaysian Advocates and Solicitors’ Disciplinary Committee – sat and judged as a three-member tribunal in more than a dozen cases with oral hearings.

• Member of the Board of PLAIN – Plain Language Association International

• Editorial Board member, The Surveyor, Journal of the Institution of Surveyors Malaysia (1986 – 1999).

• Reviewer for the Journal of International Real Estate and Construction Studies, Nova Science Publishers Inc, USA.

• Member of the College Academic Board, College of Science, Massey University, New Zealand.

• Member of the Rangitoto College Board of Trustees

• Member of the North Shore Swimming Club 6 MEMBERSHIP OF OTHER PROFESSIONAL ORGANISATIONS

• Member of the Society of Construction Law, United Kingdom

• Member of the Society of Construction Law, New Zealand

• Member of the Society of Construction Law, Malaysia

• Member of the Adjudication Society, United Kingdom

• Associate member of the Commonwealth Association of Legislative Counsel

Page 7: Naseem Ameer Ali CV

PAGE 7 OF 23

APPENDIX A - PUBLICATIONS AND PRESENTATIONS I have over 20 publications – as journal articles, conference proceedings, or industry reports. See below for a selection of some of my publications and presentations. I have also presented at over 100 conferences and seminars primarily in the areas of construction law, construction contracts, construction contracts drafting, dispute resolution, project management, and cost management in the United Kingdom, Malaysia, Singapore, Brunei, Indonesia, Hong Kong, Japan, Australia, and New Zealand for various organizations and professional bodies including:

• The Pacific Association of Quantity Surveyors

• The New Zealand Institute of Quantity Surveyors

• The Arbitrators’ and Mediators’ Institute of New Zealand

• The Adjudication Society UK

• The Commonwealth Association of Legislative Counsel

• Plain Language Association InterNational

• The Chartered Institute of Arbitrators (UK) Malaysia Branch

• The Malaysian Institute of Arbitrators

• The Bar Council States of Malaya

• The Chartered Institute of Building (UK) Malaysia branch

• The Royal Institution of Surveyors Malaysia

• The Malaysian Institute of Architects

• The Institution of Engineers Malaysia

• The Master Builders Association Malaysia

• The Construction Industry Development Board Malaysia

• Projacs International

• The Promis-Group, and

• Various other private organizations including companies listed on Stock Exchanges. A.1 Research Dissertations (Unpublished) 1. N A N Ameer Ali (1992) The Professional Liability of the Project Manager, MSc Dissertation (classified

merit), Kings College London, University of London, 1992, London. 2. N A N Ameer Ali (1989) Professional Responsibility in the Building Industry: A Critical Analysis in a

Malaysian Context, MSc Dissertation (classified distinction), University College London, University of London, 1989, London.

A.2 Publications - Reports 1. N A N Ameer Ali and C F Lim (2007, 2008) A Report on the Proposal for a Malaysian Construction

Industry Payment and Adjudication Act. A report for industry and government. Editors: S A Karib, N Shaffii, and N Muhamad Nor, Construction Industry Development Board Malaysia. November 2007, revised August 2008, revised December 2008, Kuala Lumpur.

A.3 Publications – Book Chapter 1. N A N Ameer Ali. Mediation in the Malaysia Construction Industry. Chapter in a book on Mediation in the

Construction Industry: An International Review (Editors: P Brooker and S Wilkinson). Taylor & Francis Ltd. July 2010.

Page 8: Naseem Ameer Ali CV

PAGE 8 OF 23

A.4 Publications – Papers in Journals and Conference Proceedings 1. N A N Ameer Ali and S Wilkinson (2010) Modern Legal Drafting of Construction Contracts – A Plea for

Good Sense. Proceedings of the CIB World Congress 2010, 11 – 13 May 2010, Salford. 2. N A N Ameer Ali and S Wilkinson (2009) The Ideal Construction Dispute Resolver. Proceedings of the

Pacific Association of Quantity Surveyors’ 13th Annual Congress, 17 – 18 August 2009, Kuala Lumpur. 3. N A N Ameer Ali and S Wilkinson (2009) Rethinking Or Tinkering Contract Management? Proceedings

of the Pacific Association of Quantity Surveyors’ 13th Annual Congress, 17 – 18 August 2009, Kuala Lumpur.

4. N A N Ameer Ali (2009) Adjudication – Competition or Complementary to Arbitration? Proceedings of

the Bar Council of Malaysia Conference on Transforming Construction Justice, 7 August 2009, Kuala Lumpur.

5. N A N Ameer Ali and S Wilkinson (2009) Statutory Adjudication Under Nine Commonwealth

Jurisdictions – A User’s Perspective on Legislative Drafting Style. In: Proceedings of the Commonwealth Association of Legislative Counsel Conference, 1-4 April 2009, Hong Kong.

6. N A N Ameer Ali (2008) Modernising Construction Contracts, Incorporating A Case Study - The CICC

Model Terms Of Construction Contract For Subcontract Work 2007 - Master Builders Journal, 3rd Quarter 2008, Master Builders Association Malaysia.

7. N A N Ameer Ali (2008) Applying Modern Drafting Guidelines in Construction Contracts Incorporating A

Case Study - ‘The CICC Model Terms Of Construction Contract For Subcontract Work 2007’. In: Proceedings of the International Conference on Modern Legal Drafting, July 2008, Kuala Lumpur.

8. N A N Ameer Ali (2008) Unique Plain Language Contract A Success, New Zealand Building

Subcontractors Federation UPDATE, May 2008, Wellington. 9. N A N Ameer Ali (2008) Modern Plain English Drafting And Construction: The Malaysian Subcontract

Model Terms. Society of Construction Law, April 2008, London. 10. N A N Ameer Ali (2007, 2008) One Step at a Time - An Overview of Alternative Dispute Resolution in

Malaysia Including Proposals for a Construction Industry Payment and Adjudication Act. RICS Construction Journal, Nov/Dec 2007, London; and The Australian ADR Reporter – The Quarterly Bulletin of The Chartered Institute of Arbitrators (Australia) Limited - Issue No 6 - March 2008, Sydney.

11. N A N Ameer Ali (2007) The Proposed Malaysian Construction Industry Payment and Adjudication Act.

In: Proceedings of the Adjudication Society’s Sixth Annual Conference on International Adjudication and Dispute Resolution, November 2007, London.

12. N A N Ameer Ali (2007) Accessibility Of Legal Documents In The Construction Industry – A Plea For

Sanity. In: Proceedings of the Pacific Association of Quantity Surveyors International Conference, June 2007, Auckland.

13. N A N Ameer Ali (2007) The Arbitration Act 2005 – The Relationship Between Arbitration and Statutory

Adjudication. In: Proceedings of the Lexis-Nexis Conference, January 2007, Kuala Lumpur. 14. N A N Ameer Ali (2006) A Construction Industry Payment And Adjudication Act: Reducing Payment-

Default And Increasing Dispute Resolution Efficiency In Construction, Master Builders Journal, Part One in 3rd Quarter 2006, Part Two in 4th Quarter 2006, Kuala Lumpur.

15. N A N Ameer Ali (2006, 2007) Model Terms of Construction Contract for Subcontract Work. Author of

industry standard form of construction contract for subcontract work. Contract endorsed by 15

Page 9: Naseem Ameer Ali CV

PAGE 9 OF 23

construction industry organisations led and published by the Construction Industry Development Board, Malaysia. September 2006. Revised reprint May 2007, Kuala Lumpur.

16. N A N Ameer Ali (2006) Model Terms of Construction Contract. In: Proceedings of the Construction

Industry Development Board’s Annual International Construction Conference, 13 – 15 September 2006, Kuala Lumpur.

17. N A N Ameer Ali (2006) Adjudication, An End to Cash Flow Problems in the Construction Industry. In:

Proceedings of the Kuala Lumpur Regional Centre for Arbitration – Construction Industry Development Board Conference on Adjudication, 26 April 2006, Kuala Lumpur.

18. N A N Ameer Ali (2005) A Construction Industry Payment and Adjudication Act – Reducing Payment

Default and Increasing Dispute Resolution Efficiency. In: Proceedings of the International Conference and Forum on Construction Industry Payment and Adjudication Acts. September 2005. Kuala Lumpur.

A.5 Presentations – A Representative Selection of Presentations at Conferences and Seminars 1. N A N Ameer Ali (2014) The Malaysian Construction Industry Payment and Adjudication Act 2012

(CIPAA) and Construction Contracts - Strategies for Moving Forward, 13-14 August 2014, Kuala Lumpur via Skype from Auckland.

2. N A N Ameer Ali (2014) Construction Contracts and Dispute Resolution 2020. Presentation at the New Zealand Institute of Quantity Surveyors Auckland Branch Annual General Meeting, 30 April 2014.

3. N A N Ameer Ali (2012) Modernising Construction Contracts. Presentation at the New Zealand Institute of

Professional Engineers – Massey University CPD Evening Talk, November 2012. 4. N A N Ameer Ali and S Wilkinson (2009) Case Studies On Plain Language Construction Contracts –

‘Greenfield’ Drafting v Re-Drafting. Presentation at the Plain Language Association InterNational’s Seventh International Biennial Conference on Raising the Standard, 15 – 17 October 2009, Sydney.

5. N A N Ameer Ali (2009) The Different Ways Commonwealth Countries Have Dealt With Dispute

Resolution In The Construction Industry. Presentation at the Arbitrators’ and Mediators’ Institute of New Zealand’s monthly luncheon talk, 21 April 2009, Dunedin.

6. N A N Ameer Ali (2006) Model Terms Of Construction Contract For Sub-Contract Work 2006.

Presentation at the Construction Industry Development Board and the Institution of Surveyors Malaysia Roadshow Seminar, December 2006, Johor Baharu.

7. N A N Ameer Ali (2006) Communication in Project Management. Presentation at the Institution of

Engineers Malaysia Seminar, August 2006, Kuala Lumpur. 8. N A N Ameer Ali (2006) Contemporary Issues In Construction Contracts. Presentation at The Institution

Of Surveyors Malaysia Sarawak Branch Seminar, Feb 2006, Kuching. 9. N A N Ameer Ali (2005) Mediating Construction Disputes. Presentation at the 13th Malaysian Bar

Council’s Malaysian Law Conference, November 2005, Kuala Lumpur. 10. N A N Ameer Ali (2005) Effectively Developing and Managing the Outsourcing Contract for Facilities

Management. Presentation at The Asia Business Forum Facilities & Maintenance Management Conference, September 2005, Kuala Lumpur.

11. N A N Ameer Ali (2003) Marketing Quantity Surveying Services - Opportunities & Challenges: Extracting

the USP (Unique Selling Proposition) from Quantity Surveyors Through Effective Presentation – ‘Selling Refrigerators to Eskimos’. Presentation at the Institution of Surveyors Malaysia’s Annual Convention, August 2003, Subang Jaya, Selangor.

Page 10: Naseem Ameer Ali CV

PAGE 10 OF 23

12. N A N Ameer Ali (2003) X-Files in the Construction and Property Industries Unraveled. In: Proceedings of the Institution of Surveyors Malaysia’s 5th Malaysian Surveyors’ Congress, June 2003, Kuala Lumpur.

13. N A N Ameer Ali (2002) Construction Contracts. Presentation at the Centre for Management Technology’s

Seminar on Business Contracts - Latest Legal & Commercial Issues, July 2002, Kuala Lumpur. 14. N A N Ameer Ali (2002) Completion, Non-Completion And Extension Of Time. Presentation at the

Chartered Institute Of Building Malaysia’s Seminar on 48 Common Contractual Problems & Their Solutions, May 2002, Petaling Jaya.

15. N A N Ameer Ali (2002) Construction Project Management- Principles And Methodologies. Presentation

at the Malaysian Institute of Architects’ course on Project Management, April 2002, Kuala Lumpur. 16. N A N Ameer Ali (2001) Construction Contracts Claims Including Provisions Under The PAM, CIDB 2000

And JKR Contracts. Presentation at the Centre for Management Technology’s Seminar, September 2001, Kuala Lumpur.

17. N A N Ameer Ali (2000) Reengineering Turnkey Projects - Improving Cost, Quality & Speed. Presentation

at the Centre for Management Technology’s Seminar, July 2000, Kuala Lumpur. 18. N A N Ameer Ali (2000) Project & Contract Management. Presentation at the EMC Management Centre’s

Seminar, June 2000, Kuala Lumpur. 19. N A N Ameer Ali (2000) Construction Project Management: Effective On –Time And Within Budget

Techniques. Presentation at the Centre for Management Technology’s 4th Annual Conference on Construction Project Management, March 2000, Kuala Lumpur.

20. N A N Ameer Ali (1999) Turnkey Construction Projects. Presentation at the Centre for Management

Technology’s Seminar, September 1999, Kuala Lumpur. 21. N A N Ameer Ali (1999) Effective Project Feasibility Studies. Presentation at the IPA Training’s Seminar,

September 1999, Kuala Lumpur. 22. N A N Ameer Ali (1999) Construction Procurement And Contract Strategies For The New Millennium.

Presentation at the Board Of Quantity Surveyors Malaysia & Institution of Surveyors Malaysia’s Convention, August 1999, Petaling Jaya, Selangor.

23. N A N Ameer Ali (1999) Challenges Of The New Millennium. Presentation at the Annual Malaysian

Surveyors Congress, June 1999, Kuala Lumpur. 24. N A N Ameer Ali (1998) Construction Contracts. Presentation at the Centre for Management

Technology’s 3rd Annual Program on Turnkey Construction Projects, September 1998, Kuala Lumpur. 25. N A N Ameer Ali (1998) A Comparison Of The PAM (JCT 63), JKR & IEM Forms of Construction

Contracts. Two-day presentation at the Power Mind Consultancy Seminar On Construction Contracts, March 1998, Kuala Lumpur.

26. N A N Ameer Ali (1998) Variations in Construction Contracts. Presentation at the Centre for Management

Technology’s Seminar, March 1998, Kuala Lumpur. 27. N A N Ameer Ali (1997) Contractual Claims And Settlement. A Series of presentations at the Chartered

Institute Of Building Malaysia’s Seminar Series on Construction Management, November 1997-May 1998, Kuala Lumpur.

28. N A N Ameer Ali (1997) A Critical Comparison of the PAM, JKR & IEM Forms of Construction Contracts.

Presentation at the Institution Of Surveyors Malaysia’s Seminar, December 1997, Kota Kinabalu, Sabah.

Page 11: Naseem Ameer Ali CV

PAGE 11 OF 23

29. N A N Ameer Ali (1997) Claims & Counterclaims Within the Construction Industry. Presentation at the Asia Pacific Diligence’s Seminar, December 1997, Kuala Lumpur.

30. N A N Ameer Ali (1997) A Critical Comparison of the PAM, JKR & IEM Forms of Construction Contracts.

Presentation at Althea Consultancy’s two-day seminar on Construction Contracts, November 1997, Kuala Lumpur.

31. N A N Ameer Ali (1997) Legal Aspects Of Design & Build contracts. Presentation at the Centre for

Management Technology’s Conference on Turnkey Construction Projects, November 1997, Kuala Lumpur.

32. N A N Ameer Ali (1997) Pitfalls To Avoid In The PAM 69 Construction Contract. Presentation at the Asia

Pacific Diligence’s Seminar on Construction Claims And Standard Forms of Construction Contracts, September 1997, Kuala Lumpur.

33. N A N Ameer Ali (1997) The Rights And Obligations Of Employers, Consultants And Contractors.

Presentation at Althea Consultancy’s two-day seminar on Construction Contract Management & Administration, August 1997, Kuala Lumpur.

34. N A N Ameer Ali (1996) Managing Time, Quality & Monetary Claim To Avoid Disputes. Presentation at the

Power Mind Consultancy’s Seminar on Construction Contract And Project Management, October 1996, Kota Kinabalu, Sabah.

35. N A N Ameer Ali (1996) Claims for Variations From Contract And Extension Of Time. Presentation at the

Centre For Management Technology’s Seminar on Contract Management, March 1996, Kuala Lumpur. 36. N A N Ameer Ali (1995) Effective Contract Administration. Presentation at Power Mind Consultancy’s

Seminar on Construction Claims Management, October 1995, Kuala Lumpur. 37. N A N Ameer Ali (1995) Construction Contracts: Current Development in Construction Claims, Monetary

Claims, Payments, and Certificates And Disputes Settlement. Presentation at the Legend Communiques’ Seminar, October 1995, Kuala Lumpur.

38. N A N Ameer Ali (1995) The Legal Liability Of The Project Manager. Presentation at the Centre for

Management Technology’s Conference on Construction Project Management, August 1995, Kuala Lumpur.

Page 12: Naseem Ameer Ali CV

PAGE 12 OF 23

APPENDIX B – SELECTION OF DISPUTE RESOLUTION EXPERIENCE WITHOUT CONFIDENTIAL DETAILS 1. Disputes between a manufacturing company and a contractor on a factory project on issues relating to alleged

non-payment and termination. 2. Disputes between a developer and main contractor on a high-rise apartment project on issues relating to payment,

liquidated damages, alleged improper certification and some issues on quality of construction. 3. Disputes between a factory owner and contractor on a factory extension on issues relating to payment, liquidated

damages and challenges to the liquidated damages amount. 4. Disputes and differences between a main contractor and a sub-contractor on a golf course project on issues

relating to variations, alleged double handling, loss and expense claims and challenges on certificates. 5. Disputes between a main contractor and a USA based sub-contractor on a gas compressor plant project on issues

relating to alleged delays, liquidated damages and performance bonds. 6. Disputes between a housing developer and main contractor on a housing project on issues relating to payment,

setting-off, alleged defective works, liquidated damages, challenges on extension of time issued and alleged negligence.

7. Disputes between a developer and contractor on a housing project on issues relating to extensions of time and

challenging of the liquidated damages amount. 8. Disputes between a subsidiary of a quasi-government body and contractor on payment and set-off issues. 9. Disputes between a quasi-government body and a main contractor on an office complex development on issues

relating to delayed payment, delayed completion, loss and expense claims and issues pertaining to alleged delays by sub-contractors.

10. Disputes between a funding organization and professional accounting firm acting as developer cum administrator

on a housing project on issues relating to significant cost overruns, variations, delays and alleged negligence. 11. Disputes between a funding organization and a developer on a housing project on issues relating to claims on

alleged variations. 12. Differences between a developer and an insurance loss adjusting company on a shopping complex project on

issues pertaining to quantum of rectification works incurred following a fire. 13. Disputes between an academic institution and a main contractor on a hostel project on issues relating to delays,

extension of time and possible termination. 14. Disputes between a developer and a contractor on an office and residential complex on issues pertaining to

entitlement and quantum of variations. 15. Disputes between a developer and contractor on a land reclamation project on issues relating to monetary claims. 16. Disputes between a developer and a contractor on a road project on issues relating to variations. 17. Disputes between a main contractor and a sub-contractor on plumbing works contract on issues relating to claims

for loss and expense, variations and general damages. 18. Disputes between developer and contractor on an apartment project on issues relating to rates and profit margins. 19. Disputes between a quasi-government body and a contractor on an earthworks project on issues relating to claims

for variations, loss and expense, and royalties. 20. Disputes between a developer and an architect on a condominium project on issues relating to construction costs

and professional fees. 21. Acted in a three-person tribunal in over a dozen cases dealing with disciplinary issues relating to the conduct of

practicing advocates and solicitors admitted to the Malaysian Bar.

Page 13: Naseem Ameer Ali CV

PAGE 13 OF 23

APPENDIX C – DETAILS ON CONSTRUCTION PROJECT EXPERIENCE INCLUDING PROJECT MANAGEMENT, CONTRACT MANAGEMENT, AND COST MANAGEMENT EXPERIENCE

PROJECT TITLE

CLIENT

APPROXIMATE VALUE (NZD)

PROFESSIONAL SERVICES PROVIDED

Police Complex at Shah Alam, Malaysia

Eastern Access Sdn Bhd

20 Million

Ad hoc advisory project & construction management and commercial & contracts consultancy services during post contract stage.

Pearl Palace Residential Development, Kuala Lumpur, Malaysia

Seri Damai Residence Sdn Bhd

100 Million

Development & Project Management and Contracts & Commercial services starting from land issues, market study, feasibility study and appointment of consultants.

Seberang Prai Local Authority Office Complex, Malaysia

Seberang Perai Local Authority

35 Million

Full project management and commercial & contracts consultancy services.

Integrated Residential School, Hulu Terengganu, Malaysia

Ministry of Education Malaysia

20 Million

Project management and commercial & contracts consultancy services starting from negotiation of prices.

Integrated Residential School, Jempol, Negeri Sembilan, Malaysia

Ministry of Education Malaysia

20 Million

Project management and commercial & contracts consultancy services starting from negotiation of prices.

Bukit Larut Mixed Development, Taiping, Malaysia

Teachers Cooperative Holdings Sdn Bhd

135 Million

Development & project management services commencing from market study, feasibility study and appointment of other consultants.

Office Tower and Complex, Bandar Meru Raya, Ipoh, Malaysia

Perak State Economic Development Corporation

35 Million

Full project management including value engineering studies and commercial & contracts consultancy services.

Mixed Development, Bandar Meru Raya Township, Ipoh, Malaysia

Perak State Economic Development Corporation

800 Million

Development management including coordinating preparation of masterplan.

Masterplanning Medical Campus and conversion of Kuantan General Hospital into a Teaching Hospital, Malaysia

International Islamic University

400 Million

Partial project management involvement during early stages of Masterplanning.

Mixed redevelopment of 80 acre Brickfields site including new Kuala Lumpur Railway Station, railway requirements, relocation, commercial, offices and residential development, Kuala Lumpur, Malaysia

Malayan Railways

1.25 Billion

Full pre-contract project management services including preparing brief for development and railway requirements, strategic requirement on relocation, review of existing tenancies, preparing evaluation criteria, evaluation of developer’s proposals including commercial viability, technical railway requirements, company financial and technical background, joint venture proposals, time and quality parameters and technical back-up team.

Page 14: Naseem Ameer Ali CV

PAGE 14 OF 23

Office Fitting Out, Menara IMC, Kuala Lumpur, Malaysia

British Telecom

Undisclosed

Full inception to completion project management services including establishing Singapore-based end-user requirements, establishing the brief and preparing agreements for Kuala Lumpur-based consultants, establishing cost plan in conjunction with the London-based Client, preparing coordinated drawings, call for tender, evaluation of tenders, recommendation, award, implementation at site, coordinating purchase of loose furniture and equipment and producing close-out report.

Kuala Selangor Floating Hotel, Malaysia

BGH Leisure Sdn Bhd

Undisclosed

Project management services up to pre-contract stage including liaison with international consultants.

Bertam Sports Complex, Sebarang Prai, Malaysia

Seberang Perai Local Authority

7.5 Million

Full project management and contracts & commercial consultancy services.

Various Venues for South East Asian games XXI, Malaysia

Ministry of Youth & Sports Malaysia

10 Million

Project management support and contracts & commercial consultancy.

100 units of teachers accommodation quarters at Bandar Baru Serting, Jempol, Negeri Sembilan, Malaysia

Ministry of Education Malaysia

6 Million

Full project management and contracts & commercial consultancy services.

University campus development for International Islamic University (Phase 1), Malaysia

International Islamic University

175 Million

Full project management and contracts & commercial management services starting August 1995 including trouble shooting significantly delayed project with cost overrun. Role included preparing project brief, coordinating end users, preparing monthly management report, cash flow projections, cost reports, managing consultants fees, ensuring valuations and certificates are properly issued in accordance with construction contracts, evaluation of extensions of time, setting up and implementing change control, cost, quality and time control systems.

University campus development International Islamic University (Phase 2), Malaysia

International Islamic University

325 Million

Full project management and contracts & commercial management services starting March 1995. Role includes preparing project brief, coordinating end users, preparing monthly management report, cash flow projections, cost reports, managing consultants fees, ensuring valuations and certificates are properly issued in accordance with the contract, evaluation of extensions of time, setting up & implementing change control, cost, quality and time control systems.

Page 15: Naseem Ameer Ali CV

PAGE 15 OF 23

University campus for Asian Institute of Medicine, Science & Technology, Kedah, Malaysia

MIED 300 Million Project management support and ad hoc contracts advisory services.

National Sports Complex for the 1998 Commonwealth Games, Bukit Jalil, Malaysia

Ministry of Youth & Sports Malaysia

500 Million

Project management support and contracts & commercial consultancy services including cost monitoring and reviewing of rates and ad hoc contracts advisory service.

Additional Facilities at National Sports Complex for the 1998 Commonwealth Games, Bukit Jalil, Malaysia

Ministry of Youth & Sports Malaysia

1.5 Million

Project management support and contracts & commercial consultancy.

Infrastructure development and computerisation of 500 schools, Malaysia

Comtrac Sdn Bhd

Confidential

Contracts consultancy including preparing preliminary review and report, extension of time claims, loss and expense claims and on-going contract advisory services including advising on issues relating to completion, partial occupation, extension of time, loss and expense and deductions for liquidated damages.

Infrastructure development and computerisation of 200 schools, Malaysia

TimeCom Holdings Sdn Bhd

Confidential

Contracts consultancy including preparing preliminary review and report, extension of time claims, loss and expense claims and on-going contract advisory services including advising on issues relating to completion, partial occupation, extension of time, loss and expense and deductions for liquidated damages.

Aerotrain and aerobridges at Kuala Lumpur International Airport, Malaysia

Ara Consortium

Undisclosed

Advising on contractual risks and assisting in the drafting of main concession agreement and sub-contract agreements including operations and maintenance and construction obligations - at proposal stage.

Electrified Double Track Project Rawang – Ipoh, Malaysia

Emrail Sdn Bhd

125 Million

Contract management consultancy services including drafting and negotiating main and subcontracts and contracts advisory services.

Selayang General Hospital, Malaysia

Obayashi Corporation

265 Million

Ad hoc contract advisory services

NSC Hockey Stadium, Bukit Jalil, Malaysia

Ministry of Youth & Sports Malaysia

44 Million

Ad hoc contract advisory services

KLIA project Western Access and Salak Tinggi Link, Malaysia

Sungei Way Builders Sdn Bhd

60 Million

Contracts consultancy services including preparation of preliminary review and report.

PVC Plant, Kertih

Industrial Resin Sdn

125 Million

Partial contracts & commercial review and report

Page 16: Naseem Ameer Ali CV

PAGE 16 OF 23

Malaysia Bhd (Subsidiary of Land & General)

on tender bid documents submitted by tenderer and risk analysis of contract.

Marine Village Development, Pulau Besar, Melaka, Malaysia

Comtrac Sdn Bhd

22.5 Million

Contracts consultancy services including preparation of preliminary review and report, preparation of extension of time claims, loss and expense claims and contract administration.

Mixed Building and Infrastructure Development, Bukit Katil, Melaka, Malaysia

Intria Bina Sdn Bhd

23 Million

Contracts consultancy services including preparation of preliminary review and report, preparation of extension of time claims, loss and expense claims and contract administration services including advising on issues relating to issuance of CPC, deductions for LAD, non-payment by Employer and set-offs between contracts.

Renovation and Refurbishment Works of Offices for UMBC Harta Sdn Bhd, Malaysia

Atlanta Resources Sdn Bhd

2.5 Million

Preparation of variations & final accounts and claims consultancy services including preliminary assessment of extension of time claims, loss and expense claims and contract administration services.

Construction and Completion of piping work Area A of PSR-2 Melaka Refinery Project Stage 1, Malaysia

Tepat Teknik Sdn Bhd

23 Million

Contracts consultancy services including preparation of preliminary review and report, preparation of extension of time claims, loss and expense claims and contract administration services.

Earthworks, demolition, retaining walls, drainage and building works for Fettes Villa Development, Penang, Malaysia

S & P Project Management Sdn Bhd

9 Million

Contracts consultancy services including preparation of preliminary review and report, preparation of extension of time claims, loss and expense claims and contract administration services.

Condominium Blocks at Jalan Jelatek, Kuala Lumpur, Malaysia

Ambangan Puri Sdn Bhd (Subsidiary of E & O Berhad)

24 Million

Preliminary review and report and contracts advisory services on extension of time issues, completion certificate and defective works.

Mixed Development, Seremban, Malaysia

Tempo Rekaan Sdn Bhd

Undisclosed

Contractual risk analysis and drafting modifications to main contract.

Investigation, Design Construction, Completion and Maintenance of land reclamation works, coastal protection and other marine works, Tanjong Tokong, Penang, Malaysia

Tidalmarine - Seri Meraga Joint Venture

60 million

Contract risk analysis

374 Room Evergreen Laurel 5 Star Hotel, Gurney Drive, Penang,

Kajima (Malaysia) Sdn Bhd

44.5 Million

Ad hoc contracts & commercial consultancy advisory service.

Page 17: Naseem Ameer Ali CV

PAGE 17 OF 23

Malaysia Piling Works for Distribution Warehouse at Shah Alam, Malaysia

Comtrac Sdn Bhd

1 Million

Director providing partial input in claims consultancy services including preparation of preliminary review and report, preparation of extension of time claims, loss and expense claims and contract administration services.

Central Complex Building at Universiti Islam Antarabangsa, Gombak, Selangor, Malaysia

Asaztera Sdn Bhd

12.5 Million

Director in charge of lost and expense claims submission.

Several schools throughout Malaysia, Malaysia

Industrialised Housing Management Sdn Bhd

Undisclosed

Claims consultancy services.

Luxury 3-storey Bungalow, Shah Alam, Malaysia

Phoenix AZ Design

1.5 Million

Independent review and assessment of value of works.

The Ascott Serviced Apartments and Kirana Condominium Block, Kuala Lumpur, Malaysia

Kajima (M) Sdn Bhd

1.5 Million

Contracts advisory service as and when required

Construction of submarine water pipelines, watermains at Road R2 and other contingency waterworks for Pusat Pentadbiran Kerajaan Persekutuan Putrajaya (Package WS-6A), Malaysia

Contrail Sdn Bhd

Confidential

Independent opinion & report and negotiation on contractual issues.

Segamat Compressor Plant, Gas Utilisation Pipeline, Malaysia

MMC Oil & Gas Sdn Bhd

50 Million

Contract administration services including acting as mediator between Malaysian main contractor and sub-contractor from the USA.

Mixed Development including Commercial Development at Seberang Perai Utara, Pulau Pinang, Malaysia

Motif Era Sdn Bhd

17.5 Million

Post contract commercial & contracts advisory service including acting as mediator.

Final Account Claims for 18-holes Golf Course in Bandar Kinrara, Puchong, Malaysia

I & P Landscaping Sdn Bhd

Confidential

Independent review and assessment and acting as mediator.

Miri Resort City Reclamation, Malaysia

MMCE/UDL Joint Venture

Confidential

Arbitration support services.

Page 18: Naseem Ameer Ali CV

PAGE 18 OF 23

40 Storey Hotel / Apartments, Kuala Lumpur, Malaysia

Martego Sdn Bhd

59 Million

Arbitration technical support services for respondent’s counsel including preparation of technical points of defence, attending meetings, providing technical support to Counsel acting on behalf of respondent up to hearing.

Apartment Development at Sungei Besi, Selangor, Malaysia

Seloga Jaya Sdn Bhd

Confidential

Expert witness services for plaintiff in court case on claims for loss of profit and providing expert opinion on procurement systems. Subsequently, by consent, role continued in arbitration.

Condominium Development, Kuala Lumpur, Malaysia

CS Chew Chartered Architect & Town Planners

Confidential

Expert witness services for plaintiff in court case on claims for default on professional fees.

Earthworks, Ipoh, Perak, Malaysia

Perbadanan Kemajuan Negeri Perak

Confidential

Full range of arbitration services as representative for respondent including preparation of points of defence, attending all meetings and making all non-financial decisions on behalf of the respondent.

Mechanical and Electrical Works for Traditional Herbal Factory at Kawasan Perindustrian Darul Aman, Jitra, Kedah, Malaysia

Sukitronics (Penang) Sdn Bhd

Confidential

Arbitration technical support services for claimant’s Counsel including preparation of technical points of defence, attending meetings, providing technical support to Counsel acting on behalf of Claimant up to award.

Arbitration between contractor and government of Malaysia

Contractor and Government of Malaysia

Confidential

Arbitrator on disputes on variations, work done and other issues.

Arbitration between main contractor and developer

Intria Bina Bhd

Disputed amount: RM 5 million

Arbitration support services

Arbitration between Silveron Builders Sdn Bhd and Sin Soon Lee Realty (M) Sdn Bhd

Silveron Builders Sdn Bhd

Confidential

Expert witness services appointed by claimant in arbitration.

Two major packages in Putrajaya, Malaysia

Putrajaya Holdings Sdn Bhd

Disputed amount: RM 20 million

Independent opinion and expert evaluation to settle major disputes on variations. Subsequently represented the respondent in adjudication.

Renovation of Petronas Laboratory, Hulu Klang (Phases 1,2, & 3) , Malaysia

Petronas

2 Million

Full range of commercial & contracts and quantity surveying services including preparation of cost plans, budgets, preliminary estimates, complete tender and contract documents, evaluation of tenders, recommendations, post contract administration including preparing monthly financial statements, interim valuations, negotiating and agreeing variations and final

Page 19: Naseem Ameer Ali CV

PAGE 19 OF 23

accounts.

Low Cost Apartments in Tirana, Albania

Penang Shipbuilding Corporation (Sub-consultant to project Consultant QS)

25 Million

Pre-contract commercial & contracts advise to appointed project consultant QS including advising on drafting of design and build contracts and cost planning.

Major refurbishment of St Thomas’ Hospital, London, UK

South East Thames Regional Health Authority

30 Million

Contracts & commercial management services. Project let out on a management contracting procurement route.

Extension works to existing Hospital, Ashford, Kent including addition of new Psychiatric and Rehabilitation departments, UK

South East Thames Regional Health Authority

12.5 Million

Contracts & commercial management and quantity surveying services.

Proposed Restoration Works to Sunway Pyramid Shopping Complex, Malaysia

Maphilindo International / The People’s Insurance Co (M) Sdn Bhd

Confidential

Independent evaluation and report on value of restoration work following fire.

Redevelopment of Lloyds Bank, London, UK

Lloyds Bank

20 Million

Full range of quantity surveying and contracts & commercial services and project management support services.

Petronas Management Training Centre Package 2 comprising Teaching Block, Library, Lecture Theatre, Hostel units, Package 3 comprising multi purpose hall, gymnasium, squash courts, tennis centre, rugby and hockey fields and Package 4 comprising running tracks, spectators’ stand, ancillary works and swimming pool, Bangi, Selangor, Malaysia

Petronas

10 Million

Full range of commercial & contracts and quantity surveying services including preparation of cost plans, budgets, preliminary estimates, tender and contract documents, evaluation of tenders, recommendations, post contract administration including preparing monthly financial statements, interim valuations, negotiating and agreeing variations and final accounts.

Mixed Development and Resettlement of Squatters at Bukit Antarabangsa, Hulu Klang, Selangor, Malaysia

Abrar Corporation Berhad

200 Million

Director in charge of preparation of financial feasibility studies including generating cash flow projections and undertaking sensitivity analysis and other pre contract quantity surveying and contracts & commercial services.

28 units Double Storey Semi-detached Housing at Bandar Kinrara, Kuala

Perumahan Kinrara Berhad (Associated with Island &

2.5 Million

Director in charge providing the full range of pre and post contract quantity surveying services.

Page 20: Naseem Ameer Ali CV

PAGE 20 OF 23

Lumpur, Malaysia

Peninsular Berhad)

Emerald Coast Marina Resort and Mixed Development Lukut, Negeri Sembilan, Malaysia

Goldbridge Engineering & Construction Berhad

400 Million

Director in charge of preparation of financial feasibility studies including generating cash flow projections and undertaking sensitivity analysis and other pre contract quantity surveying services.

Hotel Development in Mid Valley City, Kuala Lumpur, Malaysia

Dwi Koleksi Sdn Bhd

60 Million

Director in charge preparing preliminary estimates and providing other pre contract quantity surveying services.

2 Office Towers in Mid Valley City, Kuala Lumpur, Malaysia

Acespear (M) Sdn Bhd

40 Million

Director in charge preparing preliminary estimates and providing other pre contract quantity surveying services

Office Tower Block, Jalan Mahkamah, Kuala Lumpur, Malaysia

G-Two Holdings Berhad

30 Million

Director in charge providing full range of pre contract quantity surveying services.

Projek Pintu Ke Asia, Malaysia

Symonds Travers Morgan (Malaysia)

650 Million

Director in charge of preparation of preliminary estimates.

Business Hotel, Kuala Lumpur, Malaysia

Janaf Sdn Bhd

10 Million

Director in charge providing pre contract quantity surveying services.

TNB headquarters and Administration Building, Malaysia

Tenaga Nasional Properties Sdn Bhd

7.5 Million

Director in charge providing the full range of pre and post contract quantity surveying services.

Factory Construction at Senawang Industrial Park, Seremban, Malaysia

Fizwah Pembinaan Sdn Bhd

9 Million

Director in charge of post contract quantity surveying services.

Mixed Low and Medium Cost Housing Development in Gombak, Selangor, Malaysia

Mardzi Properties Sdn Bhd

12.5 Million

Director in charge of pre contract quantity surveying services.

Shopping Complex development Lumut, Perak, Malaysia

Perbadanan Perwira Harta Malaysia

2 Million

Preparation of cost analysis and tender price index.

Negeri Sembilan Technology Corridor (Phase 1), Negeri Sembilan, Malaysia

TH-NSTC Sdn Bhd

250 Million

Director in charge of preparation of feasibility study and value engineering studies.

Kajima Oil and Gas Petro Chemical Plant Pasir Gudang, Malaysia

Kajima (M) Sdn Bhd

7.25 Million

Director in charge of post contract quantity surveying services.

Page 21: Naseem Ameer Ali CV

PAGE 21 OF 23

Construction and Renovation of Mawar Art Gallery in Johor Bahru, Malaysia

Majlis Wanita Johor

0.5 Million

Director in charge of pre and post contract quantity surveying services.

Detailed Engineering and Costing for Taman Beringin Optimization Work at Mukim Batu, Kuala Lumpur, Malaysia

Alam Flora Sdn Bhd

0.75 Million

Director in charge of pre and post contract quantity surveying services.

Privatisation scheme of 720 units in 3 Blocks of 16 storey apartments at Mukim Batu, Kuala Lumpur, Malaysia

Fadason Holdings Sdn Bhd

20 Million

Director in charge of pre contract quantity surveying services.

Putrajaya Workers Camp 1 at Putrajaya, Malaysia

Firama Engineering Berhad

12.5 Million

Director in charge of post contract quantity surveying services.

Mixed Residential and Commercial development in Mukim Rawang, Selangor, Malaysia

Auzplex Sdn Bhd

150 Million

Director in charge of preliminary estimates.

Construction of one unit VIP Resort at P.T Multigambut Industries, Riau, Indonesia

TH-Plantation Sdn Bhd

0.5 Million

Director in charge of pre contract quantity surveying services.

Low Cost Houses at Bandar Sultan Sulaiman Daerah Klang, Selangor, Malaysia

Superscope Development Sdn Bhd

15 Million

Director in charge of post contract quantity surveying services.

Mixed Housing and Commercial Development at Padang Besar, Perlis, Malaysia

Sonati Development Corporation Sdn Bhd

4 Million

Director in charge of pre and post contract quantity surveying services.

“Top Down” Construction of Substructure Contract for Telekom Exchange Building at Jalan Tun Razak, Kuala Lumpur, Malaysia

Langkah Harta Sdn Bhd

4 Million

Director in charge of post contract quantity surveying services

Warehouse Complex, Petaling Jaya, Malaysia

Cosway (M) Sdn Bhd (via Project QS)

5 Million

Director in charge of production of full bills of quantities.

158 Room Budget Hotel, Klang, Malaysia

Value Inn Sdn Bhd (via Project Consultant

6 Million

Director in charge of production of full bills of quantities.

Page 22: Naseem Ameer Ali CV

PAGE 22 OF 23

QS)

Hotel and Restaurant development, Birmingham, UK

Private Client

15 Million

Pre contract quantity surveying services including preparing bills of quantities.

Renovation of State Home, UK

Private Client

Undisclosed

Post contract quantity surveying services including finalisation of variations and final accounts.

Accommodation Units for the USAF, England

USAF

Undisclosed

Post contract quantity surveying services including preparation and negotiation of variations and final accounts.

Community Centre accommodation Units, London, UK

Local Authority

Undisclosed

Post contract quantity surveying services including preparation and negotiation of variations and final accounts.

Redevelopment of MAS flight kitchen, Subang, Kuala Lumpur, Malaysia

Malaysian Airlines System

6 Million

Preparation of evaluation criteria and evaluation of tenders based on financial, technical and cost criteria.

National Insemination Centre, Jerantut Pahang, Malaysia

Jabatan Perkhidmatan Haiwan

2.5 Million

Cost planning, preparation of preliminary estimates and bills of quantities.

Earthworks and substructure works for petrol stations, Malaysia

Shell Malaysia

2.5 Million

Director responsible for resource management in preparing estimates for substructure works.

Administration Building for Second Refinery, Tanjong Kling, Malacca, Malaysia

Petronas

25 Million

Preparation of preliminary estimates.

Mixed Residential Development, Desa Bakti, Selayang, Malaysia

Pandan Maju Sdn Bhd

6 Million

Full range of pre-contract quantity surveying services including preparation of preliminary estimates, cash flow projections, preparation of bills of quantities, tender documents and evaluation of tenders.

Mixed development comprising high-rise condominium, offices & shopping complex, Kuala Lumpur, Malaysia

Private Developer

Undisclosed

Preparation of feasibility studies including cash flow projections.

Factory, Malaysia

Private Client

Undisclosed

Post contract quantity surveying services including finalisation of variations and final account.

Housing Development, Batu Berendam, Malacca, Malaysia

Masa Merdeka Sdn Bhd

7.5 Million

Preparation of monthly interim valuations and financial statements.

Page 23: Naseem Ameer Ali CV

PAGE 23 OF 23

High Quality Bungalow, Ampang, Kuala Lumpur, Malaysia

Dato’ Abdullah Ahmad

Undisclosed

Post contract quantity surveying services including preparation of variation orders and negotiation of rates.

6-Storey flatted shop/office, Section 13, Petaling Jaya, Malaysia

Domar Dunia Sdn Bhd

7 Million

Preparation of cost analysis and tender price index.

Residential Development, Saujana Impian, Malaysia

Sungai Kantan Development Sdn Bhd (Associate of Negara Properties Sdn Bhd)

Undisclosed

Contracts consultancy services including preliminary review & report and arbitration support services

Residential Colleges at International Islamic University, Gombak, Malaysia

Goldbridge Engineering & Construction Berhad

12.5 Million

Preparation of variations & final accounts and claims consultancy services including preliminary assessment of extension of time claims, loss and expense claims and on-going contract administration services.

Low Cost Apartments in Tirana, Albania

Penang Shipbuilding Corporation (Sub-consultant to project consultant QS)

25 Million

Pre-contract commercial & contracts advise to appointed project consultant QS including advising on drafting of design and build contracts and cost planning

Rehabilitation of abandoned project for Tabung Projek Perumahan Terbengkalai, Taman Jayamas, Seremban, Malaysia

TPPT Sdn Bhd

Confidential

Independent review, audit and assessment of value of work including complete review of financial & contractual status of project and assessment of performance of all consultants.

Rehabilitation of abandoned project for Tabung Pusingan Perumahan Kos Rendah, Kg Ketiau, Penampang, Kota Kinabalu, Sabah, Malaysia

TPPT Sdn Bhd

Confidential

Independent opinion & assessment on variation disputes

Road Rehabilitation and Slope Stabilisation Works at Bukit Dabei Microwave Hill Station, Marudi, Sarawak, Malaysia

TM Facilities Sdn Bhd

Confidential

Independent opinion and report on contractual issues.