AUTOMATION OF THERMAL POWER PLANT Shri Ramya Vadlamani 09R11A0251 M.S.Madhuri 09R11A0230 Batch No. 20

Upload: ramya-vadlamani

Post on 16-Jul-2015

171 views

Category:

Design


0 download

TRANSCRIPT

Page 1: Ramya project

AUTOMATION OF THERMAL POWER PLANT

Shri Ramya Vadlamani09R11A0251

M.S.Madhuri09R11A0230

Batch No. 20

Page 2: Ramya project

INTRODUCTION

The rising importance of middle-range power operations andenvironmental preservation requirements at thermal power stationshas brought the need for more sophisticated operation and control.

Meanwhile, in response to the changing circumstances of theelectric power industry, systems must be implemented, that can alsomeet requirements such as cost effectiveness and labor savings.

The technical advances such as implementation of protectivefunctions by printed circuit boards, software configure system andcommon sensor system

Page 3: Ramya project

THERMAL POWER PLANT LAYOUT

Page 4: Ramya project

TOP

MEDIUM

BOTTOM

BC1

BC2

BUNKER

COAL HANDLING PLANT

AUTOMATION LEVEL-1

Page 5: Ramya project

1 2 3 4 5 6 11 12 13 14 15 16

LCD

40393837363534333231

123

9

181920

2221

12

8

1615

9

BC1

BC2

12V

12V

5V

IR1

IR2

IR3

5V

8051AT89S52

ULN 2003A

8.2KΩ

10µF

33pF

11.0592 KHz

Page 6: Ramya project

BC547

IRT IRR

5V

1K

502

330Ω

330Ω

To MCU

Page 7: Ramya project

Coal Conveyor Belts

Page 8: Ramya project

BoilerESP

Ash Handling Plant

CHARGING

VIBRATING

BC3

BC4 BC5

AUTOMATION LEVEL-2

Page 9: Ramya project

1 2 3 4 5 6 11 12 13 14 15 16

LCD

40393837363534333231

1

9

181920

2221

12

8

1615

9

12V

12V

5V

5V

23

3 14

12V

BC3, BC4

BC5

ESP

8051AT89S52

ULN 2003A

33pF

11.0592 KHz

8.2KΩ

10µF

Page 10: Ramya project

CHARGING MODEVIBRATING MODE

AUTOMATION LEVEL-3

Page 11: Ramya project

Electro Static Precipitator(ESP)

Page 12: Ramya project

Internal Structure of ESP

Page 13: Ramya project

From Boiler Tubes

Steam to Superheater

Pressure Meter

To Deaerator

Water Level

Steam

AUTOMATION LEVEL-4

Page 14: Ramya project

STEAM INLET

CONDENSED STEAM (WATER)

GENERATOR 1 IS ONGENERATOR 1 & 2 ARE ON

CONDENSOR

AUTOMATION LEVEL-5

Page 15: Ramya project

COOLING TOWER

Page 16: Ramya project

SV 1

SV 2

T 1

T 2

G 1

G 2

ISO 1

ISO 2

LOAD 1

LOAD 2

STEAM

AUTOMATION LEVEL-6

Page 17: Ramya project

TURBINE

Page 18: Ramya project

CONVEYOR BELTS

HARDWARE COMPONENTS :

L-Shape Aluminium rod

Flat Aluminium rod

Pulley wheels

Drums

Leather belts

ELECTRICAL COMPONENTS :

Gear motors (300 & 200 RPM)

12V / 1A DC

T = 3 kg/cm2

Page 19: Ramya project

STOKERHARDWARE COMPONENTS :

Aluminium Sheet

ELECTRICAL COMPONENTS :

Gear motor ( 10 RPM)

12V / 1A DC

T = 7 kg/cm2

BUNKERHARDWARE COMPONENTS :

Aluminium Sheet

ELECTRICAL COMPONENTS :

1.7V Infrared Sensors ( Transmitter and Receiver )

Page 20: Ramya project

BOILERHARDWARE COMPONENTS :

Copper Tubes

Iron Stand

White Cement

Aluminium sheet

HARDWARE COMPONENTS :

Copper Sheets

Copper tubes

BOILER DRUM

ELECTRICAL COMPONENTS :

Pressure meter

Water level sensor

Page 21: Ramya project

ELECTROSTATIC PRESIPITATOR

HARDWARE COMPONENTS :

L-shape Aluminium rods

Meshes

Aluminium Sheets

ELECTRICAL COMPONENTS :

Transformers ( 230V / 12V , 1A)

Vibrators ( 5V / 250mA )

Bridge Rectifier ( 2A )

Page 22: Ramya project

CONDENSOR

HARDWARE COMPONENTS :

Copper sheets

Copper tubes

COOLING TOWER

HARDWARE COMPONENTS :

Plastic & Aluminium

ELECTRICAL COMPONENTS :

Brushless DC motors ( 12V / 250mA )

Submersible Pumps ( 100W )

Page 23: Ramya project

Control Boards

Page 24: Ramya project

This project has introduced the new technologies applied in labor-saving systems that as a thermal power plant supervisory andcontrol systems aim to be economical while maintaining a highdegree of reliability.

The systems discussed are the first to meet the need for a remotecentralized supervisory and control system and result from asuccessful fusion of latest digital control equipment, computertechnology and the excellent operational skills built up by theelectric power company.

CONCLUSION