INTRODUCTION
The rising importance of middle-range power operations andenvironmental preservation requirements at thermal power stationshas brought the need for more sophisticated operation and control.
Meanwhile, in response to the changing circumstances of theelectric power industry, systems must be implemented, that can alsomeet requirements such as cost effectiveness and labor savings.
The technical advances such as implementation of protectivefunctions by printed circuit boards, software configure system andcommon sensor system
THERMAL POWER PLANT LAYOUT
TOP
MEDIUM
BOTTOM
BC1
BC2
BUNKER
COAL HANDLING PLANT
AUTOMATION LEVEL-1
1 2 3 4 5 6 11 12 13 14 15 16
LCD
40393837363534333231
123
9
181920
2221
12
8
1615
9
BC1
BC2
12V
12V
5V
IR1
IR2
IR3
5V
8051AT89S52
ULN 2003A
8.2KΩ
10µF
33pF
11.0592 KHz
BC547
IRT IRR
5V
1K
502
330Ω
330Ω
To MCU
Coal Conveyor Belts
BoilerESP
Ash Handling Plant
CHARGING
VIBRATING
BC3
BC4 BC5
AUTOMATION LEVEL-2
1 2 3 4 5 6 11 12 13 14 15 16
LCD
40393837363534333231
1
9
181920
2221
12
8
1615
9
12V
12V
5V
5V
23
3 14
12V
BC3, BC4
BC5
ESP
8051AT89S52
ULN 2003A
33pF
11.0592 KHz
8.2KΩ
10µF
CHARGING MODEVIBRATING MODE
AUTOMATION LEVEL-3
Electro Static Precipitator(ESP)
Internal Structure of ESP
From Boiler Tubes
Steam to Superheater
Pressure Meter
To Deaerator
Water Level
Steam
AUTOMATION LEVEL-4
STEAM INLET
CONDENSED STEAM (WATER)
GENERATOR 1 IS ONGENERATOR 1 & 2 ARE ON
CONDENSOR
AUTOMATION LEVEL-5
COOLING TOWER
SV 1
SV 2
T 1
T 2
G 1
G 2
ISO 1
ISO 2
LOAD 1
LOAD 2
STEAM
AUTOMATION LEVEL-6
TURBINE
CONVEYOR BELTS
HARDWARE COMPONENTS :
L-Shape Aluminium rod
Flat Aluminium rod
Pulley wheels
Drums
Leather belts
ELECTRICAL COMPONENTS :
Gear motors (300 & 200 RPM)
12V / 1A DC
T = 3 kg/cm2
STOKERHARDWARE COMPONENTS :
Aluminium Sheet
ELECTRICAL COMPONENTS :
Gear motor ( 10 RPM)
12V / 1A DC
T = 7 kg/cm2
BUNKERHARDWARE COMPONENTS :
Aluminium Sheet
ELECTRICAL COMPONENTS :
1.7V Infrared Sensors ( Transmitter and Receiver )
BOILERHARDWARE COMPONENTS :
Copper Tubes
Iron Stand
White Cement
Aluminium sheet
HARDWARE COMPONENTS :
Copper Sheets
Copper tubes
BOILER DRUM
ELECTRICAL COMPONENTS :
Pressure meter
Water level sensor
ELECTROSTATIC PRESIPITATOR
HARDWARE COMPONENTS :
L-shape Aluminium rods
Meshes
Aluminium Sheets
ELECTRICAL COMPONENTS :
Transformers ( 230V / 12V , 1A)
Vibrators ( 5V / 250mA )
Bridge Rectifier ( 2A )
CONDENSOR
HARDWARE COMPONENTS :
Copper sheets
Copper tubes
COOLING TOWER
HARDWARE COMPONENTS :
Plastic & Aluminium
ELECTRICAL COMPONENTS :
Brushless DC motors ( 12V / 250mA )
Submersible Pumps ( 100W )
Control Boards
This project has introduced the new technologies applied in labor-saving systems that as a thermal power plant supervisory andcontrol systems aim to be economical while maintaining a highdegree of reliability.
The systems discussed are the first to meet the need for a remotecentralized supervisory and control system and result from asuccessful fusion of latest digital control equipment, computertechnology and the excellent operational skills built up by theelectric power company.
CONCLUSION