Outline
➢ QC7 - Electronic test description➢ QC7 current setup and times➢ Typical issues and solutions➢ QC7 status
June 12th 2020, CERN 3/14Johny Jaramillo - QC7 report
What is QC7?
Chamber with electronics recently installed
QC7 testwithoutcooling plate
QC7 testwithcooling plate & chimney
SC - assembly Cosmic stand (QC8)
Fix & Retest Fix & Retest
June 12th 2020, CERN 4/14Johny Jaramillo - QC7 report
QC7 test flow
Testconnectivity
Con
fCha
mbe
r.py
100
Hz
Scurve 1 (100 ARM_DAC)
runScans.py Scurve
analUltraScan.py Scurve
Scurve 2 (100 Hz)
runScans.py Scurve
analUltraScan.py Scurve
Sbit rate
runScans.py Sbit thres
anaScan.py Sbit thres
Scurve 2 (100 Hz)
runScans.py Scurve
analUltraScan.py ScurveC
onfC
ham
ber.p
y-1
00 A
RM
_DA
C
CheckTriggerLinks
GBT & SCA communication
DacScan Analysis
DacScan
GetCalInfoFromDB
VFAT comm & sync
PROGRAM FPGA
GBT phaseScan
100 Hz THR
June 12th 2020, CERN 5/14Johny Jaramillo - QC7 report
QC7 approved
Normally,the bulk of channels (yellow boxes) should have ENC below this line
Low Noise
Good sbit
June 12th 2020, CERN 6/14Johny Jaramillo - QC7 report
Current QC7 setup
Stand 1 (Brendan) Stand 2 (Johny)
- External power supply (8 V @ 6 A)- Cooling line & external Fan- Access to QC7 machine- backend : GLIB- Full QC7 with GLIB : ~ 2,5 - 3 hours
In a typical test, QC7 is performed ~ 2 - 4 times = 5 - 12 hours
- External power supply (8 V @ 6 A)- Cooling line & external Fan- Access to QC7 machine- backend : CTP7- Full QC7 with CTP7 : ~ 1 - 1,5 hours
In a typical test, QC7 is performed ~ 2 - 4 times = 2 - 6 hours
June 12th 2020, CERN 7/14Johny Jaramillo - QC7 report
Typical issues : GBT phase scan
Phase 4 will be used for (OH0,VFAT0)Phase 8 will be used for (OH0,VFAT1)Phase 4 will be used for (OH0,VFAT2)Phase 4 will be used for (OH0,VFAT3)Phase 4 will be used for (OH0,VFAT4)Phase 6 will be used for (OH0,VFAT5)Phase 4 will be used for (OH0,VFAT6)Phase 4 will be used for (OH0,VFAT7)Phase 4 will be used for (OH0,VFAT8)There were more than 5 bad phases for (OH0,VFAT9)I did not find a good phase for (OH0,VFAT9)Phase 10 will be used for (OH0,VFAT10)Phase 5 will be used for (OH0,VFAT11)Phase 6 will be used for (OH0,VFAT12)Phase 6 will be used for (OH0,VFAT13)Phase 7 will be used for (OH0,VFAT14)Phase 4 will be used for (OH0,VFAT15)Phase 11 will be used for (OH0,VFAT16)Phase 8 will be used for (OH0,VFAT17)Phase 4 will be used for (OH0,VFAT18)Phase 12 will be used for (OH0,VFAT19)Phase 13 will be used for (OH0,VFAT20)Phase 4 will be used for (OH0,VFAT21)Phase 6 will be used for (OH0,VFAT22)Phase 13 will be used for (OH0,VFAT23)Writing Found Phases to frontendGBT Phase Scans Failed to Find Proper Phases
GBT phase scans fails for one or more VFATs
Most of the times this issue is solved unplugging and replugging very carefully the OH in the samtec connectors
June 12th 2020, CERN 8/14Johny Jaramillo - QC7 report
Typical issues : Connectors
Bad SAMTEC connector
Solution : Replace the GEB
Bad connection VFAT - readout board
Causes : ● Mechanical stress by cooling plate● Dirty 130 pin connector
Solution: Dismount cooling carefully and replugging the VFAT
June 12th 2020, CERN 9/14Johny Jaramillo - QC7 report
Typical issues : Broken sbits
OH SAMTEC GEB routing
100 pin Panasonic
VFATSbit lines
Typically here
June 12th 2020, CERN 10/14Johny Jaramillo - QC7 report
Typical issues : High noise
FEAST FQA & FQB REPLACED
ELOG: http://cmsonline.cern.ch/cms-elog/1104336
June 12th 2020, CERN 11/14Johny Jaramillo - QC7 report
Typical issues : High current consumption
Current consumption QC7 monitoring system
This app was developed to detect (with good temporal resolution ~ 100 mS) how some QC7 issues are related wit power consumption
June 12th 2020, CERN 12/14Johny Jaramillo - QC7 report
Typical issues : High current
THRESHOLDSCANScurve 2
100 Hz
SBITSCANDAC_SCAN
Scurve 1100 ARM_DACSTANDBY
RUN mode
GBT PHASE SCAN
June 12th 2020, CERN 13/14Johny Jaramillo - QC7 report
QC7 Status
Negative end-cap:
➢ all chambers have been tested and installed in the CMS (72/72 # chambers)
Positive end-cap:
➢ All short chambers (36/36) were validated in QC7○ Including one problematic SC pending since March○ One high current consumption chamber returning from QC8
➢ After Lab activities were restarted○ 4 short chambers were tested and validated in QC7○ 10 long chambers were tested and validated in QC7○ 2 long chambers are under test now
➢ In total 81% ( 58/72) of the GE1/1 chambers passed successfully QC7
June 12th 2020, CERN 14/14Johny Jaramillo - QC7 report
Thanks
QC7 team Brian, Christos, Nimantha, Ram, Balashangar, Marek,
Kalpanie, Baktash, Simone, Prashant, Mohit, Meena,
Biagio, Asar, Johny, Brendan, Milena
QC8 team Giovanni, Federica
DAQ team Laurent, Camilla, Jared, Misha
LAB team Michele B., Mohsin A., Jeremie M., Francesco F., Felipe