QC7 REPORT:

GE-1/1 WORKSHOP

Johny Jaramillo1, Milena Dyulendarova2, Brendan Regnery3

(1 Universidad de Antioquia, 2 Bulgarian Academy of Sciences, 3 University of California, Davis)

Page 2: QC7 REPORT - Indico

June 12th 2020, CERN 2/14Johny Jaramillo - QC7 report

Outline

➢ QC7 - Electronic test description➢ QC7 current setup and times➢ Typical issues and solutions➢ QC7 status

Page 3: QC7 REPORT - Indico

June 12th 2020, CERN 3/14Johny Jaramillo - QC7 report

What is QC7?

Chamber with electronics recently installed

QC7 testwithoutcooling plate

QC7 testwithcooling plate & chimney

SC - assembly Cosmic stand (QC8)

Fix & Retest Fix & Retest

Page 4: QC7 REPORT - Indico

June 12th 2020, CERN 4/14Johny Jaramillo - QC7 report

QC7 test flow

Testconnectivity

Con

fCha

mbe

r.py

100

Hz

Scurve 1 (100 ARM_DAC)

runScans.py Scurve

analUltraScan.py Scurve

Scurve 2 (100 Hz)

runScans.py Scurve

analUltraScan.py Scurve

Sbit rate

runScans.py Sbit thres

anaScan.py Sbit thres

Scurve 2 (100 Hz)

runScans.py Scurve

analUltraScan.py ScurveC

onfC

ham

ber.p

y-1

00 A

RM

_DA

C

CheckTriggerLinks

GBT & SCA communication

DacScan Analysis

DacScan

GetCalInfoFromDB

VFAT comm & sync

PROGRAM FPGA

GBT phaseScan

100 Hz THR

Page 5: QC7 REPORT - Indico

June 12th 2020, CERN 5/14Johny Jaramillo - QC7 report

QC7 approved

Normally,the bulk of channels (yellow boxes) should have ENC below this line

Low Noise

Good sbit

Page 6: QC7 REPORT - Indico

June 12th 2020, CERN 6/14Johny Jaramillo - QC7 report

Current QC7 setup

Stand 1 (Brendan) Stand 2 (Johny)

- External power supply (8 V @ 6 A)- Cooling line & external Fan- Access to QC7 machine- backend : GLIB- Full QC7 with GLIB : ~ 2,5 - 3 hours

In a typical test, QC7 is performed ~ 2 - 4 times = 5 - 12 hours

- External power supply (8 V @ 6 A)- Cooling line & external Fan- Access to QC7 machine- backend : CTP7- Full QC7 with CTP7 : ~ 1 - 1,5 hours

In a typical test, QC7 is performed ~ 2 - 4 times = 2 - 6 hours

Page 7: QC7 REPORT - Indico

June 12th 2020, CERN 7/14Johny Jaramillo - QC7 report

Typical issues : GBT phase scan

Phase 4 will be used for (OH0,VFAT0)Phase 8 will be used for (OH0,VFAT1)Phase 4 will be used for (OH0,VFAT2)Phase 4 will be used for (OH0,VFAT3)Phase 4 will be used for (OH0,VFAT4)Phase 6 will be used for (OH0,VFAT5)Phase 4 will be used for (OH0,VFAT6)Phase 4 will be used for (OH0,VFAT7)Phase 4 will be used for (OH0,VFAT8)There were more than 5 bad phases for (OH0,VFAT9)I did not find a good phase for (OH0,VFAT9)Phase 10 will be used for (OH0,VFAT10)Phase 5 will be used for (OH0,VFAT11)Phase 6 will be used for (OH0,VFAT12)Phase 6 will be used for (OH0,VFAT13)Phase 7 will be used for (OH0,VFAT14)Phase 4 will be used for (OH0,VFAT15)Phase 11 will be used for (OH0,VFAT16)Phase 8 will be used for (OH0,VFAT17)Phase 4 will be used for (OH0,VFAT18)Phase 12 will be used for (OH0,VFAT19)Phase 13 will be used for (OH0,VFAT20)Phase 4 will be used for (OH0,VFAT21)Phase 6 will be used for (OH0,VFAT22)Phase 13 will be used for (OH0,VFAT23)Writing Found Phases to frontendGBT Phase Scans Failed to Find Proper Phases

GBT phase scans fails for one or more VFATs

Most of the times this issue is solved unplugging and replugging very carefully the OH in the samtec connectors

Page 8: QC7 REPORT - Indico

June 12th 2020, CERN 8/14Johny Jaramillo - QC7 report

Typical issues : Connectors

Bad SAMTEC connector

Solution : Replace the GEB

Bad connection VFAT - readout board

Causes : ● Mechanical stress by cooling plate● Dirty 130 pin connector

Solution: Dismount cooling carefully and replugging the VFAT

Page 9: QC7 REPORT - Indico

June 12th 2020, CERN 9/14Johny Jaramillo - QC7 report

Typical issues : Broken sbits

OH SAMTEC GEB routing

100 pin Panasonic

VFATSbit lines

Typically here

Page 10: QC7 REPORT - Indico

June 12th 2020, CERN 10/14Johny Jaramillo - QC7 report

Typical issues : High noise

FEAST FQA & FQB REPLACED

ELOG: http://cmsonline.cern.ch/cms-elog/1104336

Page 11: QC7 REPORT - Indico

June 12th 2020, CERN 11/14Johny Jaramillo - QC7 report

Typical issues : High current consumption

Current consumption QC7 monitoring system

This app was developed to detect (with good temporal resolution ~ 100 mS) how some QC7 issues are related wit power consumption

Page 12: QC7 REPORT - Indico

June 12th 2020, CERN 12/14Johny Jaramillo - QC7 report

Typical issues : High current

THRESHOLDSCANScurve 2

100 Hz

SBITSCANDAC_SCAN

Scurve 1100 ARM_DACSTANDBY

RUN mode

GBT PHASE SCAN

Page 13: QC7 REPORT - Indico

June 12th 2020, CERN 13/14Johny Jaramillo - QC7 report

QC7 Status

Negative end-cap:

➢ all chambers have been tested and installed in the CMS (72/72 # chambers)

Positive end-cap:

➢ All short chambers (36/36) were validated in QC7○ Including one problematic SC pending since March○ One high current consumption chamber returning from QC8

➢ After Lab activities were restarted○ 4 short chambers were tested and validated in QC7○ 10 long chambers were tested and validated in QC7○ 2 long chambers are under test now

➢ In total 81% ( 58/72) of the GE1/1 chambers passed successfully QC7

Page 14: QC7 REPORT - Indico

June 12th 2020, CERN 14/14Johny Jaramillo - QC7 report

Thanks

QC7 team Brian, Christos, Nimantha, Ram, Balashangar, Marek,

Kalpanie, Baktash, Simone, Prashant, Mohit, Meena,

Biagio, Asar, Johny, Brendan, Milena

QC8 team Giovanni, Federica

DAQ team Laurent, Camilla, Jared, Misha

LAB team Michele B., Mohsin A., Jeremie M., Francesco F., Felipe