    BCivil 0 0 0Electrical 9 9 0Mechanical 2 0 0

    1 SS-03 A Electrical SS-02 Pressure relative dampers to be provided NV Takreer 25

    2 SS-02 A Electrical SS-02 Downloading of Programming to be carried out after PSSR NV Takreer 25

    3 SS-02 C Mechanical SS-02 To put lock-nuts for all U-clamps NV Takreer 25

    4 SS-02 A Electrical SS-02 20% of TB to be provided for all JB's NV Takreer 25

    5 SS-02 A Electrical SS-02 Earthing to be rectified from Cable Tray to JB NV Takreer 25

    6 SS-02 A Electrical SS-02 Training to be provided for Operations Team NV Takreer 25

    7 SS-02 A Electrical SS-03 Pressure relative dampers to be provided NV Takreer 25

    8 SS-00 C Mechanical SS-03 To put lock-nuts for all U-clamps NV Takreer 25

    9 SS-00 A Electrical SS-03 20% of TB to be provided for all JB's NV Takreer 25

    10 SS-03 A Electrical SS-03 Earthing to be rectified from Cable Tray to JB NV Takreer 25

    11 SS-03 A Electrical SS-03 Training to be provided for Operations Team NV Takreer 25

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    Cat.: A (Before Mechanical Completion) - B (Before Commissi

    Replacement of CO2 Flooding System for Fire Suppression in Sub Station

    Agreement No. 12RREDR10934

    COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESI

    TYCO DOC. NO. TFS-CAMS-CA137892-441

    Open

    Sl.

    No

    Building

    No.Cat. Displin Location

    Test

    Pack/RFI No.Description

    Issued (Takreer / TPI)

    By Company D

  • 8/11/2019 PSSR Punch List

    2/4

    TotalB C

    Civil 0 0 0 0Electrical 9 9 0 0Mechanical 2 0 0 2

    Cat.: A (Before Mechanical Completion) - B (Before Commissioning)

    Replacement of CO2 Flooding System for Fire Suppression in Sub Stations at R

    Agreement No. 12RREDR10934

    COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESIGN &

    TYCO DOC. NO. TFS-CAMS-CA137892-441Open

    Sl.

    No

    Building

    No.Cat. Displin Location

    Test

    Pack/RFI No.Description

    Issued (Takreer / TPI)

    By Company Date

    25

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

  • 8/11/2019 PSSR Punch List

    3/4

    TotalB C

    Civil 0 0 0 0Electrical 9 9 0 0Mechanical 2 0 0 2

    Cat.: A (Before Mechanical Completion) - B (Before Commissioning)

    Replacement of CO2 Flooding System for Fire Suppression in Sub Stations at R

    Agreement No. 12RREDR10934

    COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESIGN &

    TYCO DOC. NO. TFS-CAMS-CA137892-441Open

    Sl.

    No

    Building

    No.Cat. Displin Location

    Test

    Pack/RFI No.Description

    Issued (Takreer / TPI)

    By Company Date

    52

    53

    54

    55

    56

    56

    57

    58

    59

    60

    61

    62

    63

    64

    65

    66

    67

    68

    69

    70

    71

    72

    73

    74

  • 8/11/2019 PSSR Punch List

    4/4

    TotalB C

    vElectrical 9 9 0 0Mechanical 2 0 0 2

    Cat.: A (Before Mechanical Completion) - B (Before Commissioning) -

    Replacement of CO2 Flooding System for Fire Suppression in Sub Stations at Ru

    Agreement No. 12RREDR10934

    COMPLETE PUNCH LIST REPORT [ELECTRICAL, MECHANICAL, DESIGN & C

    TYCO DOC. NO. TFS-CAMS-CA137892-441Open

    Sl.

    No

    Building

    No.Cat. Displin Location

    Test

    Pack/RFI No.Description

    Issued (Takreer / TPI)

    By Company Date

    75

    76

    77

    78

    79

    80

    81

    82

    83