prospects of tourism 観光事業の将来
DESCRIPTION
Prospects of Tourism 観光事業の将来. 2015 Tourism receipts ∗ S$30 billion Visitors number ∗ 17 million Number of Jobs ∗ 250,000. Current Tourism Status & Future goals. 2006 Tourism receipts ∗ S$12.4 billion Visitors number ∗ 9.7 million. General changes. Changing City Skyline From - PowerPoint PPT PresentationTRANSCRIPT
Prospects of Tourism観光事業の将来
Current Tourism Status & Future goals
2006• Tourism receipts
∗ S$12.4 billion • Visitors number
∗ 9.7 million
2015• Tourism receipts
∗ S$30 billion • Visitors number
∗ 17 million • Number of Jobs
∗ 250,000
• Changing City Skyline
From This
General changes
General changesTo this !
• Central Business District (around marina bay)– Skyscrapers (the tall buildings) will be lit up
with colourful neon lights– waterfront shows to be held daily during the
night
• Orchard Road– street seatings will change colours when
someone sit on it.– brightly lit trees to portray Singapore as a
“Garden City”
• Singapore River– “Jellyfish” lights floating on Boat Quay– illuminated banks and walls of river– brightly-lit river taxis
(so as to add on to the atmosphere)
General changes
Changi Airport – Terminal 3 (T3)
Opening date : 9 January 2008 Largest of the 3 airports 7 storeys (4 above grounds, 3 below grounds)
Capacity of 22 million passengers per year Directly opposite of Terminal 2 Near Crowne Plaza – 350 rooms
T3 amenities
The Green Wallo 5-storey tall and 300-
metre long vertical gardeno 4 waterfalls and layers of
tropical foliageo Sculptured sandstone art
wall at arrival hall
Shopping/Eating & Drinking• More than 100 shops, 30 restaurants
and 20 service outlets• Luxury & Specialty duty-free items• Many outlets are found in public area• Full-sized supermarket in Basement
Level 2, a food court and many other shops
EventsLate Night Shopping every Saturday- launched on 1st September 2007- extended operating hours from 9pm to midnight.- used to be a monthly basis on every last Friday of every month.- “TANGS has seen up to 20-25% increase in sales during the late hours”- Participating malls located around Orchard e.g TANGS, Wisma Atria, Paragon
Formula 1 Singapore Grand Prix - will launch on 28 September 2008- 12 race teams- Pit Building will be completed by May’08
(to house race control facilities, team garages, hospitality lounges for about 4,000 guests,a Media centre etc.
• Largest, most exciting and visually stunning musical
• Staged from 02 Nov - 18 Nov 2007 (strictly limited season)
• Past places include London’s West end, Broadway, UK
Events
Infrastructure
Double Helix Bridge
World’s first double helix bridge Resembles DNA structure
(symbolises) Life & continuity Renewal Everlasting abundance Growth
Connect existing hotel, retail & convention hub as well as upcoming Singapore Flyer & the Integrated Resort (see next slide)
Double Helix Bridge
New MRT Lines
Circle Line - Fourth MRT line - 29 stations - only have 3 cars instead of
the usual 6
Downtown Line- Fifth MRT line- 33 stations- Targeted to complete by 2018
New Mass Rapid Transit (MRT) Lines
Singapore Flyer
• To be completed around March 2008
• Design developed by Dr. Kisho Kurokawa of Japan and DP Architects, Singapore.
• 165 metres above ground• 28 Capsules of capacity : 30
people each• Duration of ride : 37 minutes
Singapore Flyer
• Estimated to be completed by the later part of 2008
• Located above Orchard MRT station• Cost of development: S$700 million• 400 retail, F&B and entertainment
stores• 8 levels of retail level• Observation Decks at top two levels –
level 55 and 56• Take up 117 metres of Orchard Road• Art exhibition space at Level 4 (5,300
sq ft)
ION Orchard
Capella– Six-star resort with 170 rooms – Will be ready by the 2nd half of
2008 – Two restaurants, a business
center, four meeting rooms and a spa and fitness center
– Occupies 1.3 million square feet of rainforest
– Development cost : US$250 million
New hotels in Sentosa
Palawan Beach Resort
- To be completed by 2nd half of 2008- Located next to the new Sentosa Express station on Palawan Beach.
- 200 rooms and variety of entertainment facilities
New hotels in Sentosa
2 Integrated Resorts
At Marina Bay…At Sentosa…
The Marina Bay Sands Integrated Resort
Completed by 2009 20.6 hectare of land - $1.2 billion Las Vegas Sands has committed
to invest S$3.85 billion in the project
Most expensive Casino Three hotel towers
2,500 rooms 200,000-square foot arts and
science museum Convention centre (1.2 million
sq ft, capacity of over 52,000 people) 10,400 jobs created
Main target : Business travellers
Resorts World at Sentosa
• To be completed by late 2009 or early 2010• Family-oriented• Resort developer : Genting/Star Cruises• Development cost : S$5.2 billion• Features
– Six world-class hotels– Universal Studios Singapore– Marine Life Park– Equarius Water Park– The Spa by ESPA– Festive Walk– Casino
• Sorry guys, that my presentation to you during the first day we met is really very brief and not very good. I was nervous!=( k緊張した!><
• Anyway, if there’s any questions on some of those things, email me too! @ [email protected]
• =D 頑張れ~~~!♡