profile and concept of 300 hectares coron development project...
TRANSCRIPT
Profile and Concept of 300 Hectares Coron Development Project CORON, PALAWAN
CORON IN BRIEF
There are technically two Coron Philippines, one is actually the name of
the largest town on Busuanga island and another Coron is a smaller island
30-minutes offshore from Coron Town. Coron makes up the eastern half of
Busuanga Island.
Coron Town has a population of just over 40,000 but is becoming
more and more of a popular tourist destination and migration of both
local and foreigners.
Coron is often listed as one of the top tourist places in the
Philippines. Palawan has twice been named the most beautiful island in
the world .
Coron Town Proper, Busuanga Island Kayangan Lake, Coron Island
The Project location
The Project location
The location of the 300 hectares
100 Hectares (more or less)
200 Hectares (more or less)
400 Meters
distance
Clark Airport and Subic Bay : 50 min. by air
Manila Airport: 45 min. by air
Connected by Sea and Air
Boracay Island: 30 min by Air
El Nido: 25 min. by Air
Calauit Safari Park
Club Paradise
Distances from Major Tourist Destination in Coron
Busuanga Airport
Distance: 1hr. by sea from Coron Town proper
Huma Island Resort
Black Island
Coron Town Proper Distance: 30 min. by land Distance: 20
Distance: 30 min. by sea from Coron Town proper
12 SHIP WRECK DIVE SITES
Distance: 30 – 1 Hr. by sea from town proper
min. by sea fro Coron Town proper
Kayangan Lake, Coron Island
THE REDEVELOPMENT OF BUSUANGA AIRPORT TO BE AN INTERNATIONAL AIRPORT BY 2025
The Department of Transportation (DOTr) has started construction of the new P953.4 million Busuanga Airport redevelopment project phase 1.
The redevelopment project involves the relocation of the airport as well as construction of a runway embankment and re-orientation of the airport’s runway aimed at improving the airport’s facilities and allow it to handle jet aircraft.
“A runway re-orientation was deemed necessary as both the approaches of the airport’s existing runway are facing the mountains,” Civil Aviation Authority of the Philippines (CAAP) Director General Capt. Jim Sydiongco said Tuesday.
According to Sydiongco the airport upgrade is meant to bring the facility to international standards by 2025.
The airport is the main gateway to the Calamian Group of Islands that compromises the islands of Busuanga, Coron and Culion.
The first phase of the airport development project is slated to be completed on 2021.
“The Future” Wind Surfing and Kite Boarding Areas
Marina Bay/ Cove Development with Yatch/Cruise Ship Docking and Maintenance Facilities
200 Has. Hotel, Condo, Housing and other tourism facilities and amenities
100 Has. Island Resort Development With Wind and Solar Energy
Tri Beaches and Islet Development
PACKAGE PRICE (BOTH ISLAND AND MAINLAND PROPERTIES)
P 350.00 per Square Meter
CONTACT PERSON - ANTONIO P. CABRESTANTE Mobile No. – 0917-553-2211 Email – [email protected]