Table of Contents CHAPTER 1: Project Summary ................................................................ 1 1.1. Brief description of the Project ............................................................................................ 1 1.2. Management Aspects.............................................................................................................. 1 1.3. Marketing Aspects ................................................................................................................... 1 1.4. Technical Aspects ................................................................................................................... 2 1.5. Financing Aspects (total capital amount only) ................................................................ 2 CHAPTER 2: Project Timetable and Status........................................... 3 CHAPTER 3: Management Aspects ......................................................... 4 3.1. Management during the Pre-Operating Period ................................................................ 4 3.1.1. Registration of Business................................................................................................ 4 3.1.2. Obtaining of Financing ................................................................................................... 4 3.1.3. Plant Site Acquisition...................................................................................................... 5 3.1.4. Building Construction..................................................................................................... 5 3.1.5. Machinery Supplier Selection ....................................................................................... 5 3.1.6. Order and Receipt of Machinery .................................................................................. 5 3.1.7. Machinery Installation..................................................................................................... 6 3.1.8. Materials Supplier Selection ......................................................................................... 6 3.1.9. Advertising (For Open Positions) ................................................................................ 6 3.1.10. Hiring of employees .................................................................................................... 6 3.1.11. Advertising (For Products) ........................................................................................ 7 3.1.12. Trial Run ......................................................................................................................... 8 3.2. Management During the Operating Period........................................................................ 9 3.2.1. Type of Business Organization and Reason for Choice............................................ 9 3.2.2. Internal Organization........................................................................................................... 9 3.2.3. Labor ..................................................................................................................................... 12 CHAPTER 4: Marketing Aspects ............................................................ 13 4.1. Demand..................................................................................................................................... 13 4.2. Consumption for the past years. ....................................................................................... 14 4.3. Projected consumption for the next three years upon start up. ............................... 15 Tooty Sweety Corporation Page i

Upload: bulilit-p

Post on 20-Nov-2015

16 views

Category:

Documents


1 download

TRANSCRIPT

  • Table of Contents

    CHAPTER 1: Project Summary ................................................................ 1 1.1. Brief description of the Project ............................................................................................ 1 1.2. Management Aspects.............................................................................................................. 1 1.3. Marketing Aspects ................................................................................................................... 1 1.4. Technical Aspects ................................................................................................................... 2 1.5. Financing Aspects (total capital amount only) ................................................................ 2

    CHAPTER 2: Project Timetable and Status ........................................... 3 CHAPTER 3: Management Aspects ......................................................... 4

    3.1. Management during the Pre-Operating Period ................................................................ 4 3.1.1. Registration of Business ................................................................................................ 4 3.1.2. Obtaining of Financing ................................................................................................... 4 3.1.3. Plant Site Acquisition ...................................................................................................... 5 3.1.4. Building Construction ..................................................................................................... 5 3.1.5. Machinery Supplier Selection ....................................................................................... 5 3.1.6. Order and Receipt of Machinery .................................................................................. 5 3.1.7. Machinery Installation ..................................................................................................... 6 3.1.8. Materials Supplier Selection ......................................................................................... 6 3.1.9. Advertising (For Open Positions) ................................................................................ 6 3.1.10. Hiring of employees .................................................................................................... 6 3.1.11. Advertising (For Products) ........................................................................................ 7 3.1.12. Trial Run ......................................................................................................................... 8

    3.2. Management During the Operating Period ........................................................................ 9 3.2.1. Type of Business Organization and Reason for Choice ............................................ 9 3.2.2. Internal Organization ........................................................................................................... 9 3.2.3. Labor ..................................................................................................................................... 12

    CHAPTER 4: Marketing Aspects ............................................................ 13 4.1. Demand ..................................................................................................................................... 13 4.2. Consumption for the past years. ....................................................................................... 14 4.3. Projected consumption for the next three years upon start up. ............................... 15

    Tooty Sweety Corporation Page i

  • 4.4. Method of projection used and factors considered ...................................................... 15 4.5. Comparison of projection with competitor/demand ..................................................... 15 4.6. Prices......................................................................................................................................... 17 4.6.1. Cost of production ............................................................................................................. 17 4.7. Marketing program/Plan ....................................................................................................... 17

    4.7.1. Marketing Objectives .................................................................................................... 17 4.7.2. Strategic Marketing Directions ................................................................................... 18 4.7.3. Marketing Programs ...................................................................................................... 19

    4.8. Channels of Distribution ...................................................................................................... 27 4.9. Packaging................................................................................................................................. 28 4.10. Projected Sales Quantity for the Next Three Years .................................................. 28

    CHAPTER 5: Technical Aspects ............................................................ 32 5.1. Product ..................................................................................................................................... 32 5.2. Product Specifications and Principal Uses..................................................................... 32 5.3. Product Quality and Quantity ............................................................................................. 33 5.4. Manufacturing Process ........................................................................................................ 34

    5.4.1. Process Flow for Cupcake ........................................................................................... 34 5.4.2. Process Flow for Cheesecake .................................................................................... 36 5.4.3. Process Flow for Brownies ......................................................................................... 37

    5.5. Processes used in existing plants .................................................................................... 38 5.6. Plant Size and Production Schedule ................................................................................ 38 5.7. Annual and Daily capacity at a given number of shifts and the number of operating days per month ............................................................................................................... 41 5.8. Machinery ................................................................................................................................. 42 5.9. Specifications and Functions ............................................................................................. 42 5.10. Selection of Supplier ......................................................................................................... 43 5.11. Quotations from Supplier ................................................................................................ 43 5.12. Delivery, Payments, and Other Arrangements with the Suppliers ....................... 45 5.13. Plant Location ..................................................................................................................... 47 5.14. Plant Location Map ............................................................................................................ 49 5.15. Desirability of the Location ............................................................................................. 49 5.16. Alternative Locations ........................................................................................................ 50 5.17. Plant Layout ......................................................................................................................... 50

    Tooty Sweety Corporation Page ii

  • 5.18. Structures ............................................................................................................................. 50 5.19. Raw Materials ...................................................................................................................... 51 5.20. Consumption of Raw Materials ...................................................................................... 52 5.21. Specifications ..................................................................................................................... 58 5.22. Proof of Reliability of Raw Materials ............................................................................. 60 5.23. Alternative Raw Materials ................................................................................................ 61 5.24. Availability of Supply ........................................................................................................ 61 5.25. Supplier ................................................................................................................................. 62 5.26. Material Cost Table ............................................................................................................ 63 5.27. Quotations ........................................................................................................................... 66 5.28. Utilities .................................................................................................................................. 67 5.29. Waste Disposal ................................................................................................................... 67

    CHAPTER 6: Financing Aspects ............................................................ 69 6.1. Sources of Financing for the Project ................................................................................ 69

    CHAPTER 7: Financial Statement .......................................................... 70 7.1. Statement of Financial Position First Year and Three Years Forecast ................ 70 7.2. Income Statement First Year and Three Years Forecast ......................................... 71 7.3. Statement of Cash Flow First Year and Three Years Forecast ............................... 72 7.4. Financial Ratios First Year and Three Years Forecast ............................................. 78 7.5. Financial Ratios Analysis Story ......................................................................................... 79

    CHAPTER 8: Social Desirability of a Project ........................................ 81 8.1. Government Revenues ......................................................................................................... 81 8.2. Foreign Exchange Reserves ............................................................................................... 81 8.3. Related Industries .................................................................................................................. 81 8.4. Consumers ............................................................................................................................... 81 8.5. Employees ............................................................................................................................... 82

    CHAPTER 9: Acknowledgement ............................................................ 83 CHAPTER 10: Appendices ................................................................... 84

    10.1. Tooty Sweety Transactions Year 1 ................................................................................ 84 10.2. Computations For Year 1 ................................................................................................. 85

    CHAPTER 11: Bibliography .................................................................. 90

    Tooty Sweety Corporation Page iii

  • List of Figures

    Figure 5-1 Process Flow for Cupcake (1st Half) ............................................................................ 34 Figure 5-2 Process Flow for Cupcake (2nd Half) ............................................................................. 35 Figure 5-3 Process Flow for Cheesecake (1st Half) ....................................................................... 36 Figure 5-4 Process Flow for Cheesecake (2nd Half) ...................................................................... 36 Figure 5-5 Process Flow for Brownies (1st Half) ............................................................................ 37 Figure 5-6 Process Flow for Brownies (2nd Half) ........................................................................... 37 Figure 5-7 Gantt chart for the whole Production of Tooty Sweety (8 hrs) .............................. 38 Figure 5-8 Gantt chart for the Production of Cupcake of Tooty Sweety ................................. 39 Figure 5-9 Gantt chart for the Production of Cheesecake of Toory Sweety .......................... 39 Figure 5-10 Gantt Chart for the Production of Brownies of Tooty Sweety ............................. 40

    Tooty Sweety Corporation Page iv

  • List of Tables

    Table 2-1 Gantt Chart of Project Activities ........................................................................................ 3 Table 4-1 Sales of Baked Goods by Category: Volume 2008-2013 ........................................... 14 Table 5-1 Tooty Sweety's Annual and Daily capacity at a given number of shifts and the number of operating days per month ............................................................................................... 41 Table 5-2 Product Specification for Cupcake ................................................................................. 59 Table 5-3 Product Specification for Cheesecake .......................................................................... 59 Table 5-4 Product Specification for Brownies ................................................................................ 60 Table 5-5 Material Cost Table for Cupcake ..................................................................................... 63 Table 5-6 Material Cost Table for Cheesecake ............................................................................... 64 Table 5-7 Material Cost Table for Brownies .................................................................................... 65

    Tooty Sweety Corporation Page v

  • List of Images Image 4-1 Tips, Ideas and Cool Stuff for Desserts to be Featured in our Website .............. 21 Image 4-2 New and Featured Products Section in our Website ................................................ 21 Image 4-3 List of Products for Online Order ................................................................................... 22 Image 4-4 Product Display ................................................................................................................... 23 Image 4-5 Product Display ................................................................................................................... 23 Image 4-6 Movie-Themed Cookies .................................................................................................... 24 Image 4-7 Television Show Inspired Cookies................................................................................. 24 Image 4-8 Novel-Themed Dessert ...................................................................................................... 25 Image 4-9 Holiday Cookies .................................................................................................................. 25 Image 4-10 Packaging for Individual Orders .................................................................................. 28 Image 4-11 Packaging for Group Orders ......................................................................................... 28 Image 5-1 Dough Roller ........................................................................................................................ 42 Image 5-2 Bread Slicer .......................................................................................................................... 42 Image 5-3 Cake Mixer ............................................................................................................................ 43 Image 5-4 Location of Tooty Sweety ................................................................................................. 48 Image 5-6 Location Map of Tooty Sweety ........................................................................................ 49 Image 5-7 Plant Layout of Tooty Sweety ......................................................................................... 50

    Tooty Sweety Corporation Page vi

  • CHAPTER 1: Project Summary

    1.1. Brief description of the Project

    Tooty Sweety is a dessert shop located at East II Lakeside Evozone Nuvali,

    Sta. Rosa, Laguna. We can be described as a quick-service restaurant where

    customers sit around a bar and watch their desserts being made. The show, as

    well as the dessert, is our main selling point.

    Tooty Sweety sells gourmet desserts coupled with exceptional customer

    service in a comforting atmosphere. Customers can dine-in and watch the chef

    create their dessert. We also offer carry-out to prepare our desserts at home or

    have a special cake for a celebration.

    1.2. Management Aspects

    The management aspect focuses on the formation of the business including

    the type of business, the formation of the internal structure of the business, the

    owners and the labor needed. In this paper, a gantt chart on the preparation of the

    business will be presented. An organizational digaram will also be presented and

    the individuals roles and functions will be discussed.

    1.3. Marketing Aspects

    The marketing aspects objective is to establish the annual quantity of the

    product which is expected to be sold by the business in the future, the selling price

    at which the product can be sold and the marketing program which have to be

    adapted in order to sell the given quantity at the given price. The study made use

    of the geometric forecasting method based on the demand of the products in the

    Tooty Sweety Corporation Page 1

  • industry. The price was derived after subtracting the costs incurred and is

    competitive to existing businesses in the industry. The promotion of the business

    and the products will be included at the end of the study and the channels of

    distribution will also be presented.

    1.4. Technical Aspects

    The technical aspects include the product and its specifications, the quality,

    quantity and principal uses of the products, the plant size and location of the

    business. It also show the plant layout design, the raw materials and equipment

    needed in producing the products and the suppliers of the business. At the end of

    this study, a detailed process flow of the business main products including

    cupcake, cheesecake and brownies will be presented. A Gantt chart of the

    production schedule of the business in an 8-hour basis and the production process

    of each product is presented at the end of the study.

    1.5. Financing Aspects (total capital amount only)

    Tooty Sweety Corporation will have a total start-up capital of 3 500 000

    through the contributions of the owners and through loaning from Metrobank.

    The owners will give a capital of 500 000 each. And then the business will

    obtain a loan of 2 000 000.

    Tooty Sweety Corporation Page 2

  • CHAPTER 2: Project Timetable and Status

    Table 2-1 Gantt Chart of Project Activities

    Tooty Sweety Corporation Page 3

  • CHAPTER 3: Management Aspects

    3.1. Management during the Pre-Operating Period

    3.1.1. Registration of Business

    It is important to register the business to avoid any legal problems once

    the business operations start.

    It will be an opportunity for the competitors to disrupt and delay

    operations by notifying the proper authorities about the necessary

    registrations of the business.

    Steps:

    Get certificate of registration for the business name through Security

    and Exchange Commission (SEC)

    Visit Barangay Hall, Local Government Unit, and Bureau of Internal

    Revenue (BIR) for necessary permits/clearance

    Register employees to SSS, DOLE, HDMF, and PhilHealth

    3.1.2. Obtaining of Financing

    In order for a small business to get off the ground, or to keep operating,

    it must have financing.

    Amortization Schedule for Tooty Sweety business loan.

    Loan amortization simply means figuring out how much interest and

    principal you have to pay on a loan each time the loan comes due, along

    with how much the balance is reduced.

    Tooty Sweety Corporation Page 4

  • 3.1.3. Plant Site Acquisition

    Selecting of the best location for the placement of Tooty Sweety

    business facilities.

    Commercial zoning

    Right of way procurement (permits and agreements)

    3.1.4. Building Construction

    Building construction

    Preparing for and forming buildings and building systems.

    Planning for construction

    Design/layout of desired concept of the building

    Financing for the acquisition of construction materials and labor

    Execution of building construction

    3.1.5. Machinery Supplier Selection

    Review and evaluate available machine supplier product catalogs

    Obtain quotations and proposals from selected or preferred suppliers

    3.1.6. Order and Receipt of Machinery

    Upon receipt of quotations prepare formal purchase orders from the

    suppliers

    Request for machine test or trial for evaluation of machine

    specifications

    Receipt delivery of ordered machineries after suppliers order lead time

    Tooty Sweety Corporation Page 5

  • 3.1.7. Machinery Installation

    Schedule machine installation and pre-testing

    Inspect required electrical and mechanical requirements

    Commercial installation and testing of the machine/equipment ordered

    3.1.8. Materials Supplier Selection

    Searching for available supplier that will satisfy the required raw

    materials

    Obtain quotations and proposals from selected or preferred suppliers

    3.1.9. Advertising (For Open Positions)

    Social network advertisements

    Flyers

    Posters

    Tooty Sweety Website

    3.1.10. Hiring of employees

    Includes Human Resource planning to identify what the organization

    requires in terms of the numbers of employees needed and their

    attributes (knowledge, skills and abilities) in order to effectively meet

    job requirements.

    Identifying and setting of the proper salary per employee

    Job interview of potential candidates for employee

    Hiring the right people for the right job

    Tooty Sweety Corporation Page 6

  • Job description will be recorded in order to assess performance of the

    employee even after they have been hired.

    Induction to help the new staff member settle quickly

    Training and development programs

    3.1.11. Advertising (For Products)

    Online advertising

    o Posting ads on websites that receive heavy traffic is one way to

    get the word out about your business.

    Newspaper Ads

    o A daily and weekly newspaper ad allows targeting specific

    geographic neighborhoods. Attaching an incentive, such as a

    coupon, to the ad can help track the ad's effectiveness.

    o Purchasing an ad in a section of the newspaper that is relevant to

    the business

    Radio Advertisement

    o A catchy jingle

    o Quick tag line

    Television Advertisement

    o High cost but will ensure reach to customers who would not

    respond to radio

    Public Speaking

    o Offer services to organizations that could benefit from one of our

    workshops or lectures

    Tooty Sweety Corporation Page 7

  • o Bringing of promotional materials to the event to encourage

    audience to spread the word about the product

    Door Hangers and Flyers

    o Canvassing the neighborhood

    o Placing flyers in mailboxes

    o Hanging ads on doorknobs

    Event Sponsorship

    o Acknowledgement in the event program

    o On-site location for sample product

    o Appearance of company logo on event posters

    o Stamp that bears the company logo

    Word of Mouth Advertising

    o Hiring people to talk about the product of the company

    o Hired marketers can go to coffee shop by pairs and talk audibly

    about the product

    3.1.12. Trial Run

    Operates for a couple of days to learn what will be done in the shop and

    see if the business produces positive feedbacks

    o A test drive for both the employee and the owner of the business

    o It will saved money in the long run because of fewer hiring mistakes

    Tooty Sweety Corporation Page 8

  • 3.2. Management During the Operating Period

    3.2.1. Type of Business Organization and Reason for Choice

    Tooty Sweety is a corporation as Corporations have many advantages

    over partnerships and sole proprietorships.

    Advantages of Corporation Vs Sole Proprietorship and Partnerships:

    o Shareholders in a corporation are not liable for corporate debts

    o Corporations offer self-employment tax savings

    o Corporations have continuous life

    o Corporations make raising money easier

    3.2.2. Internal Organization

    Board of Directors

    President

    Accounting Manager

    Marketing Manager

    Advertising Sales Supervisor

    Sales Staff

    Operations Manager

    Head Baker

    Assistant Baker

    Supervisor

    Cashier Delivery Person Waiter

    H.R. Manager

    Tooty Sweety Corporation Page 9

  • Board of Directors (3) (Angel Lizardo) (Jamaica Lafuente) (Kurt Lazarte)

    governing the organization by establishing broad policies and objectives

    selecting, appointing, supporting and reviewing the performance of the

    President

    ensuring the availability of adequate financial resources

    approving annual/monthly budgets

    accounting to the stockholders for the organizational performance

    setting the salaries and compensation of corporation management

    President (1) (Angel Lizardo) - reports to the Board of Directors regarding the

    performance of the company. Leader, director, decision maker, manager, and

    executor.

    Accounting Manager (1) (Angel Lizardo) responsible for the

    management sales, relationship with particular customers

    Marketing Manager (2 ) (Kurt Lazarte) (Jamaica Lafuente) responsible

    for influencing the level, timing, and composition of customer demand

    and may act as the overall general manager of his/her assigned product

    1. Advertising (1) (recruit) persuade, encourage, drive consumer

    behavior with respect to a commercial offering

    2. Sales Supervisor (1) (recruit) work directly to a sales team,

    lead the team to make its quotas, motivating the team, and

    correcting any problems that come up within it.

    Tooty Sweety Corporation Page 10

  • Sales Staff (1) (recruit) assist the superior in carrying out

    an assigned task, responsible in sales

    Operations Manager (2) (Kurt Lazarte) (Angel Lizardo) ensuring that

    the business operations are efficient in terms of using as few resources

    as needed, and effective in terms of meeting the customers

    requirements.

    1. Head Baker (1) (Jamaica Lafuente) manages and coordinates

    work done by other baker. Setting the right proportions for

    ingredients, and overseeing work being done by the bakers.

    Also, involved in most steps of food preparation (mixing

    ingredients, etc.).

    Assistant Baker (5) (relatives) assist and help the head

    baker in preparation and production of products by

    customers specifications and instructions in the time

    frame.

    2. Supervisor ( Kurt Lazarte) supervise the performance of the

    personnel of the shop while operating

    Cashier (2) (recruit) keeping the record of money the

    shop had prior and after operation

    Delivery Person (2) (former drivers) helps in delivering

    products to customers location

    Waiter (2) (recruit) take orders and serve foods and

    beverages to customers at tables

    Tooty Sweety Corporation Page 11

  • Human Resource Manager (2) (Kurt Lazarte) (Jamaica Lafuente)

    overseeing department functions and managing employees

    3.2.3. Labor

    COMPENSATION:

    There will be a 2% increase in salary annually. The following are included in this

    salary increase:

    Christmas Bonus

    Overtime and Night Differential Pay

    SSS Premiums

    Retirement Fund

    Medical Insurance

    Salary: Daily Monthly Yearly

    Advertising 1 12,000.00 144,000.00 Sales Supervisor 1 15,000.00 180,000.00

    Sales Staff 1 12,000.00 144,000.00 Assistant Baker 5 75,000.00 900,000.00

    Cashier 2 681.00 17,706.00 212,472.00 Waiter 2 681.00 17,706.00 212,472.00

    Delivery Person 2 681.00 17,706.00 212,472.00 Owner 3 60,000.00 720,000.00

    17 2,725,416.00

    Tooty Sweety Corporation Page 12

  • CHAPTER 4: Marketing Aspects

    4.1. Demand

    Filipinos love to eat and food is the basis of their social life. At the same time,

    Filipinos are known to love eating sweet food and because of this, Filipinos started

    doing their own desserts depending on how they want it to be. According to AIB

    International (2013), 70% of consumers eat dessert at least once a week, with 36%

    twice or more; mid-evening snack (54%), afternoon (42%), late at night (40%), and

    mid-morning (33%).

    Moreover, the stronger performance of the Philippine economy helped to fuel the

    consumption of baked goods in 2013. As stated in Euromonitor International (2014),

    it is expected that retail current value sales will jump by 6%, as Filipinos are starting

    to consume bread, pastries and cakes more frequently. This is especially noted

    amongst busy middle-income urban consumers, who prefer to have sandwiches

    instead of rice and other dishes in order to save time on food preparation.

    Tooty Sweety Corporation Page 13

  • 4.2. Consumption for the past years.

    Table 4-1 Sales of Baked Goods by Category: Volume 2008-2013

    '000 tonnes 2008 2009 2010 2011 2012 2013 Bread 130.99 130.58 132 135.61 139.49 144.14 - Bread Substitutes - - - - - - -Packaged/Industrial Bread 51.84 52.62 53.57 56.78 60.25 64.46 - Unpackaged/Artisanal Bread 79.15 77.96 78.43 78.82 79.24 79.68 Cakes 30.18 30.09 30.36 30.63 30.9 31.21 - Packaged/Industrial Cakes 13.99 14.06 14.18 14.32 14.48 14.65 - Unpackaged/Artisanal Cakes 16.18 16.02 16.18 16.31 16.43 16.56 Pastries 43.65 43.62 44.2 44.92 45.69 46.53 - Packaged/Industrial Pastries 28.26 28.54 28.97 29.55 30.2 30.93 - Unpackaged/Artisanal Pastries 15.39 15.08 15.23 15.37 15.49 15.6

    Baked Goods 204.82 204.29 206.56 211.15 216.08 221.87

    Source: Euromonitor International from official statistics, trade associations, trade press, company research, store

    checks, trade interviews, trade sources

    Tooty Sweety Corporation Page 14

  • 4.3. Projected consumption for the next three years upon start up.

    Current Consumption Projected Annual Quantity for 2017-2019

    (pieces per year) Product 2016 2017 2018 2019 Cupcake 123,552 135,907 176,679 265,019 Cheesecake 38,376 42,214 54,878 82,317 Brownies 131,664 144,830 188,280 282,419 Total 293,592 322,951 419,837 629,755

    4.4. Method of projection used and factors considered

    By knowing the capacity of the business, the annual sales can be projected. With the

    ratio of the business annual sales with the industry sales, the target market percentage

    was determined. However, the sales of the business was obtained by setting a

    percentage of increase per year. The owners set a 10% increase, 30% increase and 50%

    increase on the sales of the business for the years 2017-2019 respectively. Through the

    use of the total annual sales, the market percentage was determined by comparing it to

    the industry sales.

    4.5. Comparison of projection with competitor/demand

    Although Tooty Sweety is offering something new in the baked goods industry, we do

    share similarities, and therefore compete with several kinds of quick-service dessert

    businesses:

    1. Bakeshop and Restaurants: any restaurant offering dessert such as Contis

    Bakeshop & Restaurant (Nuvali).

    2. Ice Cream Shops: Dairy Queen (Laguna Central).

    Tooty Sweety Corporation Page 15

  • 3. Donut and Coffee Shops: any place coffee and pastries are available for carry-

    out or dine-in consumption including Starbucks (Paseo), Figaro (Laguna

    Central), Krispy Kreme (Nuvali) and Auntie Annes (Philippines).

    4. Supermarket: in-store bakeries as well as frozen specialty desserts offer some

    competition like The French Baker (South Supermarket).

    5. Bakeries: free-standing traditional bakeries such as Wild Flour Caf + Bakery

    (Philippines), BreadTalk (Nuvali), Goldilocks Bakeshop (Paseo) and Red

    Ribbon (Paseo).

    Although Tooty Sweety is opening up a new niche in the baked goods industry,

    there is no doubt that we are competing with a variety of similar businesses. We need

    to compete against the ideas that dessert is something that only follows a special

    dinner and needn't be any better than a frozen cake. We want every day to be a

    reason to celebrate. And being able to watch your gourmet dessert be prepared by a

    chef is a treat that appeals to everyone.

    While price may be a factor when competing against Ice Cream and Coffee

    Shops, these same consumers who are willing to pay a high price for a latte or a scoop

    of ice cream are already conscious of a better quality product. We believe they will

    be equally as willing to spend a little extra for an extraordinary dessert in a warm and

    friendly setting.

    The comfort factor also plays an important role in consumer decisions about

    sweets. Both the atmosphere and staff of Tooty Sweety are warm & friendly. And the

    menu will reflect "comfort food" desserts as opposed to intimidating desserts that

    Tooty Sweety Corporation Page 16

  • resemble architectural colossi. We will use the highest quality products; sometimes

    paring the ordinary with the exotic, but we will always present our desserts in a unique

    and comforting manner.

    4.6. Prices

    4.6.1. Cost of production

    Cost of Cupcake per Piece 15.8809937 Price of Cupcake per Piece 50.00

    Material Ratio 31.76%

    Cost of Cheesecake per Piece

    37.8341635

    Price of Cupcake per Piece 70.00

    Material Ratio 54.05%

    Cost of Brownies per Piece

    15.8327462

    Price of Cupcake per Piece

    50.00

    Material Ratio 31.67%

    4.7. Marketing program/Plan

    4.7.1. Marketing Objectives

    The perishable products that will be offered should satisfy the customers

    expectations from a newly established dessert shop.

    The perishable products that will be offered should be sold at least 80% of the

    total capacity of production in the first year of the business.

    At the first year to fourth year of the business, the sold perishable product

    should increase up to 95% of total production in order to minimize cost.

    Tooty Sweety Corporation Page 17

  • The company will participate on parties or occasions in nearby locations such

    as anniversary parties, birthdays, christenings, weddings, etc. in the third year

    of the business. This will build up the credibility of our business.

    Expansion of building and further improvement of our personnel in the 5th to

    10th year of the business in order to have a quick and effective work and

    respond to customers requirements inside the shop

    Introduce new excellent quality product every month

    Allocate at least three to five percent capital expenditure on marketing efforts

    to further enhance market development

    4.7.2. Strategic Marketing Directions

    We need to set up a website for Tooty Sweety Corporation and that will be

    www.tootysweety.com.ph. In this website, we can feature our products

    themes per week, online catalogs which will feature our new products and

    recipes, and nutritional facts, our corporate vision and mission, our promos

    every occasion, our present customers and suppliers, our awards through the

    years, and our Corporate Social Responsibility activities as well as

    Environmental Objectives and Targets. This website will enable consumers to

    order our products through delivery and as a channel to give gifts to their loved

    ones. In doing this, we can set the appeal to all website surfers on the

    companys amiability and accomplishments.

    We will join the exhibits at different conventions and bazaars. We will also be

    putting stalls in the different schools activities to further expose our products.

    Tooty Sweety Corporation Page 18

    http://www.tootysweety.com.ph/

  • 4.7.3. Marketing Programs

    4.7.3.1. Action Plans

    2016

    Month/Year Plan Cost December 2015 Set up a website for Tooty Sweety 329,025.00

    1st Week of February 2016 Launch of website

    1st Week of February 2016 1st Promo of our Products (Opening Sale) 5,000.00

    Posters and Fliers will be printed whenever there are new products Posters and Fliers 200,000.00

    Once Every Four Months Taste Test in Different Locations

    5,000.00 Total: 15, 000.00

    Annually

    Total Cost 534,025.00

    Sales 14,258,880.00

    Start-up Capital 10,000,000.00

    Total Funds 24,258,880.00

    Ratio 2.20%

    2017 and 2018

    Month/Year Plan Cost

    Whole year Maintenance of website 100,000.00

    2nd Week of February 1st Promo of our

    Products (Opening Sale)

    5,000.00

    Posters and Fliers will be printed whenever there are new products Posters and Fliers 80,000.00

    Tooty Sweety Corporation Page 19

  • During Anniversaries (February starting 2017) Promos 20,000.00

    Once Every Four Months Taste Test in Different Locations 5,000.00 Total:

    15000 Annually

    Total Cost 220,000.00

    2017 2018

    Sales 14,544,057.60 14,980,379.33 Capital 4,500,000.00 3,000,000.00 Total 19,044,057.60 17,980,379.33 Ratio 1.16% 1.22%

    2019

    Month/Year Plan Cost

    Whole year Maintenance of website 100,000.00

    2nd Week of February 1st Promo of our

    Products (Opening Sale)

    5,000.00

    Will depend on the schedule of event & number of consumers (On the third year of business - 2019)

    Put up stalls for different events

    (Bazaars, Hotels and School Activities)

    5,000.00

    Posters and Fliers will be printed whenever there are new products Posters and Fliers 80,000.00

    During Anniversaries (February starting 2017) Promos 20,000.00

    Once Every Four Months Taste Test in Different Locations 5,000.00 Total:

    15000 Annually

    Total Cost 225,000.00

    Sales 20,093,185.66 Capital 600,000.00 Total 20,693,185.66 Ratio 1.09%

    Tooty Sweety Corporation Page 20

  • 4.7.3.2. Website Set-up

    The IT department of Tooty Sweety Corporation will be the one to design the

    website and register it.

    Image 4-1 Tips, Ideas and Cool Stuff for Desserts to be Featured in our Website

    Image 4-2 New and Featured Products Section in our Website

    Tooty Sweety Corporation Page 21

  • Image 4-3 List of Products for Online Order

    4.7.3.3. Product Showroom

    In our shop, we will allot a space for the display of desserts especially

    for the new products. Also, by participating in different bazaars in schools

    and in different malls, our products will be exposed to different markets and we

    will be able to know their response. If the response is slow and we cannot get

    the desired increase in orders, then an adjustment in the marketing plan should

    be done.

    Tooty Sweety Corporation Page 22

  • Image 4-4 Product Display

    Image 4-5 Product Display

    Tooty Sweety Corporation Page 23

  • 4.7.3.4. Dessert by Themes

    Movies

    Television

    Image 4-6 Movie-Themed Cookies

    Image 4-7 Television Show Inspired Cookies

    Tooty Sweety Corporation Page 24

  • Books

    Holidays and Events

    Image 4-8 Novel-Themed Dessert

    Image 4-9 Holiday Cookies

    Tooty Sweety Corporation Page 25

  • 4.7.3.5. 4Ps

    Product

    The company will be producing high quality products. The company will

    make sure that the consumers will be satisfied with the products that we will

    be producing. New and innovative products will be introduced to the market

    every month as part of the development of the company. The business will

    also produce products that are not harmful to the consumers but rather will

    improve their health. In order to do so the supplies used will be properly stored

    and the fruits and other dairy products will be fresh. The products will be

    packaged in a paper box as part of our contribution to the environment.

    Price The price of our products will be competitive to the prices of our

    competitors. From time to time, the company will be having different promos

    in order to increase sales and promote the business.

    Place Tooty Sweety will be located at the Lakeside Evozone, Nuvali, Sta. Rosa,

    Laguna. The business will also market its products using different online and

    offline approaches which include:

    Online: website, e-mail marketing campaign, web video ad, online

    catalogs, etc.

    Offline: brochures, menus, posters and flyers, business cards.

    Tooty Sweety Corporation Page 26

  • Promotion

    Our current promotional plans include but are not limited to:

    Create online and offline press releases to introduce our business

    Facebook, Twitter, Instagram, Official Website

    Ads on Google, and different sites

    Coupon offers and promos, both online and offline

    Premiums, giveaways, incentives

    Magazine and newspaper ads

    Stalls to different events in schools, bazaars and malls

    Taste test in different locations

    4.8. Channels of Distribution

    Products will be delivered via land transportation.

    o Orders

  • 4.9. Packaging

    Individual orders will be delivered in fancy boxes while group orders will be delivered

    in rectangular boxes.

    Image 4-11 Packaging for Group Orders

    4.10. Projected Sales Quantity for the Next Three Years

    Product Price per Piece Quantity (pieces)

    Annual Sales Daily Monthly Yearly

    Cupcake 50.00 396 10,296 123,552 6,177,600.00

    Cheesecake 70.00 123 3,198 38,376 2,686,320.00

    Brownies 50.00 422 10,972 131,664 6,583,200.00

    Total 15,447,120.00

    Image 4-10 Packaging for Individual Orders

    Tooty Sweety Corporation Page 28

  • Sales of Baked Goods in the Philippines 37,063,700,000.00

    Target Market 0.04%

    Current Sales Projected Sales

    2016 2017 2018 2019

    15,447,120.00 16,991,832.00 22,089,381.60 33,134,072.40

    The annual sales of Tooty Sweety are based on its own capacity based on the

    three main products. In 2016, Tooty Sweety has 0.04% market share. For the next

    three years, the target increase in sales of the company is 10%, 30% and 50% for

    2017-2019 respectively.

    Tooty Sweety Corporation Page 29

  • 2017

    Product Quantity (pieces)

    Annual Sales Daily Monthly Yearly

    Cupcake 471 11325.6 135907.2 6,795,360.00

    Cheesecake 146 3517.8 42213.6 2,954,952.00

    Brownies 502.8833 12069.2 144830.4 7,241,520.00

    Total Annual Sales 16,991,832.00

    Sales of Baked Goods in the Philippines 37,938,800,000.00

    Market Percentage 0.04%

    If the total sales for 2017 is 16,991,832.00, the above data should show how many quantity per product should be sold.

    2018

    Product Quantity (pieces)

    Annual Sales Daily Monthly Yearly

    Cupcake 613 14723.28 176679.36 8,833,968.00

    Cheesecake 190 4573.14 54877.68 3,841,437.60

    Brownies 653.7483 15689.96 188279.52 9,413,976.00

    Total Annual Sales 22,089,381.60

    Sales of Baked Goods in the Philippines 38,905,500,000.00

    Market Percentage 0.06%

    If the total sales for 2018 is 22,089,381.60, the above data should show how many quantity per product should be sold.

    Tooty Sweety Corporation Page 30

  • 2019

    Product Quantity (pieces)

    Annual Sales Daily Monthly Yearly

    Cupcake 920 22084.92 265019.04 13,250,952.00

    Cheesecake 285 6859.71 82316.52 5,762,156.40

    Brownies 980.6225 23534.94 282419.28 14,120,964.00

    Total Annual Sales 33,134,072.40

    Sales of Baked Goods in the Philippines 39,782,676,151.01

    Market Percentage 0.08%

    If the total sales for 2019 is 33,134,072.40, the above data should show how many quantity per product should be sold.

    Tooty Sweety Corporation Page 31

  • CHAPTER 5: Technical Aspects

    5.1. Product

    The business will serve pies, cakes, cheesecakes, bars and stacks, brownies,

    cupcakes, pudding, custard, smoothies and frozen desserts. Some of the companys

    best-selling products are Smores Tart, Berries and Cream, Death by Chocolate,

    Heavenly Hazelnut, Berry Delight Strawberry Cheesecake.

    5.2. Product Specifications and Principal Uses

    A dessert is a typically a sweet course that concludes a meal. It is usually a sweet

    course or dish, as of fruit, ice cream, or pastry, served at the end of a meal. The word

    dessert originated from the French word desservir "to clean the table" and the negative

    of the Latin word servire. Desserts usually include cakes, cookies, biscuits, gelatins,

    pastries, ice creams, pies, puddings, and candies. Fruit is also commonly found in

    dessert courses because of its natural sweetness. Even though desserts are known

    for its sweet taste, there are several benefits one can get in eating desserts like having

    better mood, greater nutrient intake and nourishing essential energy. Desserts can

    positively influence a persons mood. In fact according to Aveen Bannon, a consultant

    dietician and founder of The Dublin Nutrition Care, carbohydrate-rich foods cause your

    brain to produce serotonin and tryptophan -- chemicals that promote emotional well-

    being. Desserts also provide greater nutrient intake. Even though desserts are known

    for its sweet taste, thus having negative effects in health, many establishment now

    create pastry products using vegetables and fruits that provide antioxidants and

    Tooty Sweety Corporation Page 32

  • promotes strong immune function. There are also smoothies or parfaits made with

    low-fat milk or yoghurt that provide protein and calcium. Also, according to traditional

    Chinese medicine, sweet food can actually nourish Qi (essential energy), enrich

    blood, relieve tiredness, resolve toxin, and regenerate body fluid.

    5.3. Product Quality and Quantity

    The company will make sure that the equipment used will be properly maintained

    and that the raw materials needed to make our products will be fresh and properly

    stored. In terms of price and its taste, the company will make sure that it is competitive

    enough and that the products will satisfy what the consumers really want.

    Tooty Sweety Corporation Page 33

  • 5.4. Manufacturing Process

    5.4.1. Process Flow for Cupcake

    Start

    Prepare the necessary materials.

    Whisk flour, baking soda and brown sugar in electric mixer.

    Add eggs and vanilla extract.

    A

    A

    Is it properly mixed?

    Mix in flour mixture until properly mixed

    Freeze for a few minutes

    Yes

    No

    Add chocolate chips

    Mix

    Is it evenly mixed?

    No

    Put dough in baking pans then set aside.

    Yes

    B

    Figure 5-1 Process Flow for Cupcake (1st Half)

    Tooty Sweety Corporation Page 34

  • Figure 5-2 Process Flow for Cupcake (2nd Half)

    B

    Mix eggs, cake mix and canola oil

    Place mixture in cupcake liners

    Add the dough

    Preheat oven to 350 degrees F

    Bake in preheated oven for 20 minutes

    Set aside then cool

    Bake for a few minutes

    Serve Chocolate Chip Cookie Dough

    Cupcake

    Is it properly cooked?

    No

    Yes

    Tooty Sweety Corporation Page 35

  • 5.4.2. Process Flow for Cheesecake

    Figure 5-3 Process Flow for Cheesecake (1st Half)

    Figure 5-4 Process Flow for Cheesecake (2nd Half)

    Start

    Combine cookie crumbs, melted butter, brown sugar

    and cinnamon

    Mix

    Bake at 350 degrees F for 5 minutes

    A

    Set aside

    Is it properly mixed?

    Mix cream cheese, sugar, whipping cream, flour and

    vanilla

    Add egg Yes

    Add mixture to the pan

    Bake at 350 deg F for 45 minutes

    Is it properly cooked?

    Yes

    B

    A

    Remove cake from oven

    Bake for a few minutes

    No

    B

    Combine sour cream, sugar and vanilla to cheesecake

    Bake for 7 minutes

    Leave in oven for 30 minutes

    Combine whipping cream, chocolate chips in saucepan

    Remove cake from oven

    Stir until chocolate melts then add vanilla

    Pour mixture over cheesecake

    Refrigerate for at least 8 hours

    Serve Chocolate Cookie Cheesecake

    Tooty Sweety Corporation Page 36

  • 5.4.3. Process Flow for Brownies

    Figure 5-5 Process Flow for Brownies (1st Half)

    Figure 5-6 Process Flow for Brownies (2nd Half)

    Start

    Prepare necessary ingredients

    Preheat oven to 350 degrees F

    Melt butter in a saucepan

    A

    Remove from heat

    A

    Add sugar, eggs and vanilla

    Put mixture in the pan

    Mix

    Is it evenly mixed?

    No

    Bake in preheated oven for 25 to 30 minutes

    Yes

    B

    Add cocoa, flour, salt and baking powder

    Set aside

    Is it evenly mixed? Yes

    Bake for a few more minutes

    Combine softened butter, cocoa, honey, vanilla extract

    Set aside until cool

    Mix

    Is it evenly mixed?

    No

    Put mixture

    Yes

    B

    Add confectioners sugar

    Serve Brownies

    Tooty Sweety Corporation Page 37

  • 5.5. Processes used in existing plants

    The processes used by existing business in making pastries and delivering

    desserts vary. Some use the old method wherein there will be a long fermentation in

    making the breads and pastries while others dont. At the same time, they manipulate

    their formula depending on the availability of raw materials because of the different

    seasons. Krispy Kremes production and delivery method when it comes to making

    their products may be different from others. They normally start making their products

    early in the morning and starts their delivery once the products are finished and they

    do the said process every day.

    5.6. Plant Size and Production Schedule

    The location of the business will be on the EvoZone Lakeside Nuvali, Sta. Rosa,

    Laguna. The plant size is 20m by 20m and since the building will have two floors- the

    first floor will be for the restaurant while the second floor will be divided into two parts:

    an extension of the restaurant and the office of the employess and owners the total

    size of the plant is 800 m2.

    Figure 5-7 Gantt chart for the whole Production of Tooty Sweety (8 hrs)

    Tooty Sweety Corporation Page 38

  • Figure 5-8 Gantt chart for the Production of Cupcake of Tooty Sweety

    Figure 5-9 Gantt chart for the Production of Cheesecake of Toory Sweety

    Tooty Sweety Corporation Page 39

  • Figure 5-10 Gantt Chart for the Production of Brownies of Tooty Sweety

    The figure shown in Figure V-7 shows the Gantt chart for the whole production of

    Tooty Sweety for eight hours. On the other hand, Figures V-8, V-9 and V-10 shows

    the production process of making cupcakes, cheesecakes and brownies respectively.

    Tooty Sweety Corporation Page 40

  • 5.7. Annual and Daily capacity at a given number of shifts and the number of operating days per month

    Table 5-1 Tooty Sweety's Annual and Daily capacity at a given number of shifts and the number of operating days per month

    No of hours per day 8 No of minutes per hour 60 No of minutes per day 480 No of days per month 26 Breaktime 40 No of days per year 312

    No of minutes per day 440 No of minutes per year 137280 No of minutes per month 11440 No of minutes per week 2640

    Bakers Time(min) No of operators

    No of minutes per day

    Sweets produced per day

    Sweets per

    week

    Sweets per month 2014 production

    Cupcake 80 3 440 396 2,376

    10,296

    123,552

    Cheesecake 100 2 440 123 738

    3,198

    38,376

    Brownies 50 3 440 422 2,532

    10,972

    131,664 Total 293592

    The table above shows Annual and Daily capacity at a given number of shifts and the number of operating days per

    month of Tooty Sweety. The business will run 8 hours a day and 24 days per month.

    Tooty Sweety Corporation Page 41

  • 5.8. Machinery

    The equipment used in the production of the products will be coming from the

    companys main supplier, F. USABAL Enterprises. The equipment includes: 8-tray

    Oven, Dough Roller, Bread Slicer, Working Table, Fermentation Rack and Mixing Box.

    Purchasing additional units of the equipment will be considered by the business based

    on its performance.

    5.9. Specifications and Functions

    Dough Roller All heavy duty materials Cast iron rollers and parts Effective and economical Chain-driven for smoother operation Pedal brake Sizes of rollers

    1.5 HP Capacity, electric motor, 4" dia. x 16" roller

    2.0 HP Capacity, electric motor, 4" dia. x 16" roller

    2.0 HP Capacity, electric motor, 5" dia. x 20" roller

    Bread Slicer Bearing-type for silent operation 31 blades, all individually mounted under

    balanced tension Table type with stainless guide and heavy duty

    steel casing 1/4 HP electric motor 1/2" & 3/4" Thick Capacity

    Image 5-1 Dough Roller

    Image 5-2 Bread Slicer

    Tooty Sweety Corporation Page 42

  • The tables above show the equipments

    specifications and functions from the main supplier F.

    USABAL Enterprises.

    5.10. Selection of Supplier

    The equipment to be used in the production of the products will be coming from

    the companys main supplier F. USABAL Enterprises which is located at #42/29 P.

    Gomez St., San Isidro I, Concepcion, Marikina City. The said supplier make quality

    and affordable bakery equipment including commercial and industrial ovens since

    1975. The other materials to be used in the production will be coming from the

    companys other supplier including MK Kitchen Equipments & Surplus Warehouse

    located at Lot 1A-3 Pioneer St., Bgy. Highway Hills, Mandaluyong City, Philippines,

    Bakeware Sta.Cruz, Laguna and Cupcake Equipment Factory at Karuhatan,

    Valenzuela City.

    5.11. Quotations from Supplier

    The companys main supplier in equipment is F. USABAL ENTERPRISES. Their

    complete baking packages costs Php 80,000 which includes 8-tray Oven, Dough

    Roller, Bread Slicer, Working Table, Fermentation Rack and Mixing Box with 1 year

    warranty on parts and services (except on electrical parts). Since the business is just

    starting, the company will be purchasing two sets of the said package. Additional units

    of equipment will be depending on the companys performance.

    Cake Mixer Gear-driven Mixer 20 Quart & 12 Quart Capacity 3/4 HP Motor 220 Volts

    Image 5-3 Cake Mixer

    Tooty Sweety Corporation Page 43

  • The table below shows the materials and the prices of each materials from the

    companys supplier Bakeware found in Sta. Cruz, Laguna.

    Products Prices

    Silicon Bake ware

    Cake pan sets

    Square cake tins

    Round tins

    Cupcakes Trays

    Show Case

    Baking tins cupcakes

    Wooden spoon

    Large mixing bowl

    Weighing scales

    Paper cases

    Knife

    P 500.00/pc

    P 500.00/set

    P 300.00/pc.

    P300.00/pc.

    P 300.00/pc

    P 75.000/pc

    P 120.00/pc.

    P 50.00/pc.

    P 150.00/pc

    P 500.00/pc

    P 30.00/case

    P 220.00/set

    The table below shows the materials and its price from the compans supplier

    Cupcake Equipment Factory located at Karuhatan, Valenzuela City.

    Products Prices

    Measuring Cups

    Measuring Spoons

    Liquid Measuring Cup

    Electric Mixer

    Hand Mixer

    Spatula

    Sheet Pans or Cupcake

    Pans

    Oven Thermometer

    Cooling Rack

    P 50 /pc.

    P 50 /set

    P 70 /pc.

    P 1,500 /pc.

    P 200/pc.

    P 80/pc.

    P 200/pc.

    P 40,000/pc.

    P 3,000/pc.

    P 100/pc.

    P 30/dozen.

    Tooty Sweety Corporation Page 44

  • Piping Bag and Large

    Tips

    Cupcake Papers/liners

    Cloth or paper towels

    Deck oven

    Storm convection oven

    Oven rack

    Spiral mixer

    P 50/pc

    P 30,000

    P 50,000

    P 25,000

    P 45,000

    P 20,000

    5.12. Delivery, Payments, and Other Arrangements with the Suppliers

    The delivery, payments, and other arrangements with the suppliers will incude but

    not limited to: E-mail order form, call or text, and cash and check payments. Tooty

    Sweety will also coordinate on the suppliers regarding the process of acquiring the

    goods/equipment. The delivery fees vary depending on the exact location which the

    company will also consider with the supplier. At the same time, the companys main

    supplier of equipment have 1-year warranty on parts and services except on electrical

    parts. This should be recorded so that if there were problems in the machinery, the

    supplier will be the one to arrange everything and take care of it. Lastly, the company

    will have free baking seminar for buyers.

    Category Object Supplier Qty Selling Price TOTAL COST Unit

    Furniture

    Long Sofa

    JECAMS Enterprises

    6 22,500.00 135,000.00 piece 2-Seat Sofa 28 17,250.00 483,000.00 piece Single Chair 20 3,800.00 76,000.00 piece Office Sofa 1 57,000.00 57,000.00 piece

    1 53,000.00 53,000.00 piece Office desk 6 13,432.00 80,592.00 piece

    1 35,800.00 35,800.00 piece Conference Table 1 10,864.00 10,864.00 piece

    Office Chair 6 4,290.00 25,740.00 piece Cabinet 3 12,550.00 37,650.00 piece Counter 2 40,957.00 81,914.00 piece

    Tooty Sweety Corporation Page 45

  • Total 1,076,560.00 Category Object Supplier Qty Selling Price Total Cost Unit

    Equipment, Appliances and Vehicle

    Complete Baking Package:

    F. Usabal Enterprises

    3 80,000.00 240,000.00 package

    8-tray Oven

    Dough Roller

    Bread Slicer

    Working Table

    Fermentation Rack

    Mixing Box

    Cake Pan

    Bakeware

    25 500.00 12,500.00 set

    Silicon Bakeware 3 500.00 1,500.00 set

    Cupcakes Trays 25 300.00 7,500.00 piece

    Large mixing bowl 6 150.00 900.00 piece

    Weighing Scale 4 500.00 2,000.00 piece

    Knife 3 220.00 660.00 set

    Measuring Cups 6 50.00 300.00 piece

    Measuring Spoons 6 50.00 300.00 set

    Liquid Measuring Cup 6 70.00 420.00 piece

    Hand Mixer 4 200.00 800.00 piece

    Spatula 6 80.00 480.00 piece

    Sheet Pans or Cupcake Pans

    25 200.00 5,000.00 piece

    Oven Thermometer 2 40,000.00 80,000.00 piece

    Cooling Rack 2 3,000.00 6,000.00 piece

    Piping Bag and Large Tips

    4 100.00 400.00 piece

    Cupcake Papers/liners 80 30.00 2,400.00 dozen

    Cloth or paper towels 4 50.00 200.00 piece

    Tooty Sweety Corporation Page 46

  • Rolling Pin

    Gourdo's

    6 380.00 2,280.00 piece

    Fountainware Soda Glass

    50 145.00 7,250.00

    Libbey Valley Forge Lexington Beverage

    9 300.00 2,700.00 6/set

    Gourdo's Dessert Service Colonial

    3 1,125.00 3,375.00 25

    pieces

    Bar Spoon Stiletto 9 360.00 3,240.00 6 pieces

    AC unit Henrich Trading Center

    6 40,000.00 240,000.00 piece

    Refrigerator LG

    Electronics 2 123,087.00 246,174.00

    Utensils Lazada.com 6 340.00 2,040.00 12

    pieces per set

    Plates 15 455.00 6,825.00 4 pieces per set

    Cake Stand Bakecraft 4 2,300.00 9,200.00 set

    Cash Register Olympia 3 23,500.00 70,500.00 piece

    Printer Canon 6 4,995.00 29,970.00

    Computer Acer 6 23,990.00 143,940.00

    Van Hyundai 2 838,000.00 1,676,000.00

    Total 2,564,854.00

    5.13. Plant Location

    The company will be acquiring the premier plus commercial Lot at East II

    Lakeside Evozone, Nuvali, Sta. Rosa, Laguna. It is situated right of Lakeside

    Evozone East, with additional 47 commercial lots to the remaining inventory in the

    Lakeside Evozone. Similar to the East and South Districts, East II will also be mixed-

    use development, dedicating areas for open space, park systems, and road

    Tooty Sweety Corporation Page 47

  • networks.

    Image 5-4 Location of Tooty Sweety

    Tooty Sweety Corporation Page 48

  • 5.14. Plant Location Map

    As mentioned above, the company will be acquiring the premier plus commercial

    Lot at East II Lakeside Evozone, Nuvali, Sta. Rosa, Laguna.

    5.15. Desirability of the Location

    The company will acquire the premiere plus commercial lot at East II Lakeside

    Evozone, Nuvali, Sta Rosa, Laguna which is a corner lot. Corner lots provide great

    vantage points, excellent frontage and better access as it is bounded by a 25-meter

    wide road on one side, and a 15-meter wide road on the other.

    Image 5-5 Location Map of Tooty Sweety

    Tooty Sweety Corporation Page 49

  • 5.16. Alternative Locations

    If in case the desired location for Tooty Sweety is not possible, the management

    plans to have the business built in Paseo de Sta. Rosa, Laguna and Solenad I or II

    which is near the desired location.

    5.17. Plant Layout

    Image 5-6 Plant Layout of Tooty Sweety

    5.18. Structures

    Tooty Sweety will be a two-story building and is rent to own. The company will hire

    an interior designer or architect for a new and better construction of the shop. The

    buildings maximum floor area ratio (FAR) is 4 for the typical commercial lots. There

    will also be setbacks and building footprints which includes: 4 meters minimum for the

    building face fronting a street, 3 meters minimum for the building face fronting adjacent

    parcels and maximum building footprint allowed is 75% of the total area. The

    maximum height of the building shall be determined based on the floor area ratio and

    Tooty Sweety Corporation Page 50

  • other restrictions that may govern such as ATO, local government ordinances, etc.

    The building shall have a contemporary and progressive look consistent with

    NUVALIs vision. The use of innovative construction and finishing material that is, not

    only, cost efficient and aesthetically pleasing but also environmentally responsible is

    highly encouraged.

    5.19. Raw Materials

    The raw materials the company will be using in the production of its products are

    shown in the table below:

    Fruits

    Dairy Products

    Fresh Juices and Jams

    Ice Cream

    Breads

    Bread Bases

    Bread Concentrates

    Bread Improvers & Conditioners

    Bread Mixes

    Bread Preservatives

    Leavening Agents

    Specialty Bread Bases

    Cakes

    Cake Mixes and Concentrates

    Cake Preservative

    Egg Substitute

    Emulsifiers & Stabilizers

    Leavening Agents

    Chocolates

    Fats and Oils

    Emulsified Fats

    Fats

    Releasing Agents

    Fillings and Toppings

    Fruit Fillings

    Specialty Fillings

    Specialty Toppings

    Finishing

    Glazes

    Icings and Toppings

    Piping Jelly

    Flavors and Colors

    Miscellaneous

    Tooty Sweety Corporation Page 51

  • 5.20. Consumption of Raw Materials

    2016

    Annual Orders 123552 Cupcakes

    Flour 988416 grams 988.416 kgs

    Baking Soda 5148 grams 5.148 kgs

    Salt 7722 grams 7.722 kgs

    Butter 581724 grams 581.724 kgs

    Sugar 257400 grams 257.4 kgs

    Sugar 514800 grams 514.8 kgs

    Egg 20592 grams 20.592 kgs

    Vanilla Extract 1235520 pcs 1235520 pcs

    Chocolate Chips 782496 grams 782.496 kgs

    Yellow Cake Mix 2662571.34 grams 2662.571 kgs

    Canola Oil 406692 mL 406.692 L

    Annual Orders 38376 Cheesecakes

    Cookie Crumbs 1228032 grams 1228.032 kgs

    Butter 78122.57143 grams 78.12257 kgs

    Sugar 150762.8571 grams 150.7629 kgs

    Cinnamon 182925.6 grams 182.9256 kgs

    Cream Cheese 2483.475429 grams 2.483475 kgs

    Sugar 825084 grams 825.084 kgs

    Whipping Cream 216550.2857 mL 216.5503 L

    Flour 43858.28571 grams 43.85829 kgs

    Vanilla Extract 41117.14286 mL 41.11714 L

    Eggs 10964.57143 pcs 10964.57 pcs

    Sour Cream 1242943.817 grams 1242.944 kgs

    Tooty Sweety Corporation Page 52

  • Chocolate Chips 624980.5714 grams 624.9806 kgs

    Annual Orders 131664 Brownies

    Butter 929877 grams 929.877 kgs

    Sugar 1654029 grams 1654.029 kgs

    Eggs 16458 pcs 16458 pcs

    Vanilla Extract 82290 mL 82.29 L

    Cocoa Powder 351104 grams 351.104 kgs

    Flour 526656 grams 526.656 kgs

    Salt 12343.5 grams 12.3435 kgs

    Baking Powder 8229 grams 8.229 kgs

    Honey 1974960 mL 1974.96 L

    Sugar 1053312 grams 1053.312 kgs

    2017

    Annual Orders 135907 Cupcakes

    Flour 1087256 grams 1087.256 kgs

    Baking Soda 5662.792 grams 5.662792 kgs

    Salt 8494.188 grams 8.494188 kgs

    Butter 639895.5 grams 639.8955 kgs

    Sugar 283139.6 grams 283.1396 kgs

    Sugar 566279.2 grams 566.2792 kgs

    Egg 22651.17 grams 22.65117 kgs

    Vanilla Extract 1359070 pcs 1359070 pcs

    Chocolate Chips 860744.3 grams 860.7443 kgs

    Yellow Cake Mix 2928824 grams 2928.824 kgs

    Canola Oil 447360.5 mL 447.3605 L

    Tooty Sweety Corporation Page 53

  • Annual Orders 42214 Cheesecakes

    Cookie Crumbs 1350848 grams 1350.848 kgs

    Butter 85935.64 grams 85.93564 kgs

    Sugar 165840.7 grams 165.8407 kgs

    Cinnamon 201220.1 grams 201.2201 kgs

    Cream Cheese 2731.849 grams 2.731849 kgs

    Sugar 907601 grams 907.601 kgs

    Whipping Cream 238207.6 mL 238.2076 L

    Flour 48244.57 grams 48.24457 kgs

    Vanilla Extract 45229.29 mL 45.22929 L

    Eggs 12061.14 pcs 12061.14 pcs

    Sour Cream 1367251 grams 1367.251 kgs

    Chocolate Chips 687485.1 grams 687.4851 kgs

    Annual Orders 144830 Brownies

    Butter 1022862 grams 1022.862 kgs

    Sugar 1819427 grams 1819.427 kgs

    Eggs 18103.75 pcs 18103.75 pcs

    Vanilla Extract 90518.75 mL 90.51875 L

    Cocoa Powder 386213.3 grams 386.2133 kgs

    Flour 579320 grams 579.32 kgs

    Salt 13577.81 grams 13.57781 kgs

    Baking Powder 9051.875 grams 9.051875 kgs

    Honey 2172450 mL 2172.45 L

    Sugar 1158640 grams 1158.64 kgs

    Tooty Sweety Corporation Page 54

  • 2018

    Annual Orders 176679 Cupcakes

    Flour 1413432 grams 1413.432 kgs

    Baking Soda 7361.625 grams 7.361625 kgs

    Salt 11042.44 grams 11.04244 kgs

    Butter 831863.6 grams 831.8636 kgs

    Sugar 368081.3 grams 368.0813 kgs

    Sugar 736162.5 grams 736.1625 kgs

    Egg 29446.5 grams 29.4465 kgs

    Vanilla Extract 1766790 pcs 1766790 pcs

    Chocolate Chips 1118967 grams 1118.967 kgs

    Yellow Cake Mix 3807469 grams 3807.469 kgs

    Canola Oil 581568.4 mL 581.5684 L

    Annual Orders 54878 Cheesecakes

    Cookie Crumbs 1756096 grams 1756.096 kgs

    Butter 111715.9 grams 111.7159 kgs

    Sugar 215592.1 grams 215.5921 kgs

    Cinnamon 261585.1 grams 261.5851 kgs

    Cream Cheese 3551.391 grams 3.551391 kgs

    Sugar 1179877 grams 1179.877 kgs

    Whipping Cream 309668.7 mL 309.6687 L

    Flour 62717.71 grams 62.71771 kgs

    Vanilla Extract 58797.86 mL 58.79786 L

    Eggs 15679.43 pcs 15679.43 pcs

    Sour Cream 1777420 grams 1777.42 kgs

    Chocolate Chips 893727.4 grams 893.7274 kgs

    Tooty Sweety Corporation Page 55

  • Annual Orders 188280 Brownies

    Butter 1329728 grams 1329.728 kgs

    Sugar 2365268 grams 2365.268 kgs

    Eggs 23535 pcs 23535 pcs

    Vanilla Extract 117675 mL 117.675 L

    Cocoa Powder 502080 grams 502.08 kgs

    Flour 753120 grams 753.12 kgs

    Salt 17651.25 grams 17.65125 kgs

    Baking Powder 11767.5 grams 11.7675 kgs

    Honey 2824200 mL 2824.2 L

    Sugar 1506240 grams 1506.24 kgs

    2019

    Annual Orders 265019 Cupcakes

    Flour 2120152 grams 2120.152 kgs

    Baking Soda 11042.46 grams 11.04246 kgs

    Salt 16563.69 grams 16.56369 kgs

    Butter 1247798 grams 1247.798 kgs

    Sugar 552122.9 grams 552.1229 kgs

    Sugar 1104246 grams 1104.246 kgs

    Egg 44169.83 grams 44.16983 kgs

    Vanilla Extract 2650190 pcs 2650190 pcs

    Chocolate Chips 1678454 grams 1678.454 kgs

    Yellow Cake Mix 5711215 grams 5711.215 kgs

    Canola Oil 872354.2 mL 872.3542 L

    Tooty Sweety Corporation Page 56

  • Annual Orders 82317 Cheesecakes

    Cookie Crumbs 2634144 grams 2634.144 kgs

    Butter 167573.9 grams 167.5739 kgs

    Sugar 323388.2 grams 323.3882 kgs

    Cinnamon 392377.7 grams 392.3777 kgs

    Cream Cheese 5327.086 grams 5.327086 kgs

    Sugar 1769816 grams 1769.816 kgs

    Whipping Cream 464503.1 mL 464.5031 L

    Flour 94076.57 grams 94.07657 kgs

    Vanilla Extract 88196.79 mL 88.19679 L

    Eggs 23519.14 pcs 23519.14 pcs

    Sour Cream 2666130 grams 2666.13 kgs

    Chocolate Chips 1340591 grams 1340.591 kgs

    Annual Orders 282419 Brownies

    Butter 1994584 grams 1994.584 kgs

    Sugar 3547889 grams 3547.889 kgs

    Eggs 35302.38 pcs 35302.38 pcs

    Vanilla Extract 176511.9 mL 176.5119 L

    Cocoa Powder 753117.3 grams 753.1173 kgs

    Flour 1129676 grams 1129.676 kgs

    Salt 26476.78 grams 26.47678 kgs

    Baking Powder 17651.19 grams 17.65119 kgs

    Honey 4236285 mL 4236.285 L

    Sugar 2259352 grams 2259.352 kgs

    Tooty Sweety Corporation Page 57

  • 5.21. Specifications

    Overall, the business will serve pies, cakes, cheesecakes, bars and stacks,

    brownies, cupcakes, pudding, custard, smoothies and frozen desserts. As part of

    the marketing strategy of the business, every month a new product will be created

    and the company will have a different theme every week depending on what is in

    in the market.

    Cakes Cakes are usually a sweet tender bread made with sugar and

    delicate flour. The company will serve different types of cake. Since the

    theme of the business is different every week, it is expected to have different

    types of cakes depending on the theme of the said week.

    Pies Pies are crust with different fillings. The crust are either made of

    pastry or crumbs. The company will have different sets of pies depending

    on the availability of raw materials and the themes of that particular week.

    Cupcakes Cupcakes are small size cakes.

    Custards and Puddings These types of desserts usually includes a

    thickened base.

    Frozen Desserts Frozen desserts usually include ice cream and gelatos.

    Tooty Sweety will be producing different flavors of ice cream and gelatos

    that its consumers will surely want.

    Cheesecakes A sweet dish conatining one or more layers. It is composed

    of cheese and other sweeteners and can be topped with different fruits.

    Smoothies Blended sweetened beverages made out of fruits. Tooty

    Sweety will be have different types of smoothies made out of fresh fruits.

    Tooty Sweety Corporation Page 58

  • Brownies Usually, flat and baked square. It is close to being a cake and

    cookie and cookie. Tooty Sweety will be producing chocolate chip cookie

    brownies.

    Table 5-2 Product Specification for Cupcake

    Cupcake

    Flour (8g)

    Baking Soda (0.04 g)

    Salt (0.06 g)

    Butter (4.7g)

    White Sugar (2g)

    Brown Sugar (4g)

    Egg

    Vanilla Extract (10mL)

    Semisweet Chocolate Chips (6.3 g)

    Yellow Cake Mix (21.5g)

    Canola Oil (3.3L)

    Table 5-3 Product Specification for Cheesecake

    Cheesecake

    Cookie Crumbs (32g)

    Butter (2g)

    Sugar (4g)

    Cinnamon (4.8g)

    Cream Cheese (0.06g)

    Sugar (21.5g)

    Whipping Cream (5.6g)

    Flour (1 g)

    Vanilla Extract (1 mL)

    Eggs

    Sour Cream (32 g)

    Chocolate Chips (16g)

    Tooty Sweety Corporation Page 59

  • Table 5-4 Product Specification for Brownies

    Brownies

    Butter (7g)

    Sugar (13g)

    Eggs

    Vanilla Extract (0.6 mL)

    Cocoa Powder (2.7g)

    Flour (4g)

    Salt (0.09g)

    Baking Powder (0.06g)

    Honey (15mL)

    Confectioners Sugar (8g)

    The tables above show the specification needed in the production of one

    cupcake, cheesecake and brownies.

    5.22. Proof of Reliability of Raw Materials

    Holy Carabao Holistic Farms practice organic and biodynamic farming so that

    all the vegetables they produce are healthy, nutritious and abundant with live

    enzymes.

    Organic Farming

    o Ensures that both the produce and the soil that nourishes it are free

    from toxins.

    Biodynamic Farming

    o Works together with the life forces, rythms and natural cycles of the

    earth.

    o Experience the power to heal and encourage life.

    Tooty Sweety Corporation Page 60

  • o It is the this healing power that they aim to harness in everything they

    harvest.

    Holy Carabao Holistic Farms believe that all of life is interconnected. They

    treasure everything from seedlings to the wiggly worms that cultivated the soil.

    5.23. Alternative Raw Materials

    Tooty Sweety will get its raw materials from different suppliers so if one supplier

    cannot provide our orders, then we can get it from other suppliers.

    5.24. Availability of Supply

    The information below are what the company needs in order to communicate with

    the suppliers from time to time.

    Holy Carabao Farms will be open from 9am-4pm

    EMAIL|[email protected]

    CALL or TEXT | 0929 752 1076 or 0920 46 88 785 & 0916 475 3211 for the delivery

    of products

    Bakels Philippines

    Phone: (+63 2) 915 0372 to 74

    Fax: (+63 2) 915 0375

    5.25. Supplier

    The main supplier for raw materials of the busincess will be coming from the Holy

    Carabao Farms Holy Carabao Holistic Farm at Sta. Elena Properties Inc. Barrio

    Malitlit, Sta. Rosa, Laguna. Another supplier of raw materials is the Bakels Philippines

    Tooty Sweety Corporation Page 61

    mailto:[email protected]

  • locatedat Suites 601 & 602 Raffles Corporate Center Don Francisco Ortigas, Jr. Road

    Ortigas Center, 1605 Pasig City Philippines

    The table below shows the raw materials, quantity and the price of each materials

    from the companys main supplier.

    Seasonal Fruits Quantity Price

    Banana (latundan) Approx. 1kg 1.2kg Php 120/bunch

    Banana (saba) Approx. 1kg 1.2kg

    Php 100/bunch

    Banana (tagalog) Approx. 1kg 1.2kg Php 100/bunch

    Corn Php 90/medium pack

    Indian Mango Php 50/medium pack Jackfruit/Langka Approx. 1kg Php 50/cut

    Kamias Php 15/petite pack Kalamansi Php 15/petite pack

    Lemon (green) Php 40/small pack Passion Fruit Php 150/medium pack Papaya Ripe Approx. 1kg 1.2kg Php 120/head

    Buko Php 50/head Strawberries Php 147/small pack

    Tooty Sweety Corporation Page 62

  • 5.26. Material Cost Table

    Table 5-5 Material Cost Table for Cupcake

    Material Standard Quantity Unit Purchase Price Unit Price

    Flour All-Purpose 8 g 50.00 1 kg 0.4000000 Baking Soda 0.041666667 g 21.50 500 g 0.0017917

    Salt Sea 0.0625 g 20.00 1 kg 0.0012500 Butter Softened 4.708333333 g 78.50 225 g 1.6426852 Sugar White 2.083333333 g 60.00 1 kg 0.1250000 Sugar Brown 4 g 60.00 1 kg 0.2500000 Egg 0.166666667 pc 13.00 1 pc 2.1666667

    Vanilla Extract 10 mL 220.00 450 mL 4.8888889 Chocolate Chips Semisweet 6.333333333 g 152.75 340.08 g 2.8446738 Yellow Cake Mix 21.55020833 g 68.50 500 g 2.9523785

    Canola Oil 3.291666667 mL 70.15 380 mL 0.6076590 Total 15.8809937 Cost of Cupcake 50.00 Material Ratio 31.76%

    The figure above shows the material cost for the production of each cupcake. The total cost of each cupcake

    is Php 15.88, however, the company will be selling each quantity for Php 50.00, a price that is still competitive to its

    competitors.

    Tooty Sweety Corporation Page 63

  • Table 5-6 Material Cost Table for Cheesecake

    Material Standard Quantity Unit Purchase

    Price Unit Price

    Cookie Crumbs 32 g 60.00 200 g 9.6000000

    Butter Melted 2.035714286 g 78.50 225 g 0.7102381

    Sugar Brown 3.928571429 g 60.00 1 kg 0.2357143

    Cinnamon Ground 4.766666667 g 548.00 1 kg 2.6121333

    Cream Cheese Softened 0.064714286 g 137.00 226 g 0.0392295

    Sugar White 21.50000000 g 60.00 1 kg 1.2900000

    Whipping Cream Heavy 5.64285714 mL 110.00 250 mL 2.4828571

    Flour All-Purpose 1.142857143 g 50.00 1 kg 0.0571429

    Vanilla Extract 1.071428571 mL 220.00 450 mL 0.5238095

    Eggs 0.285714286 pcs 13.00 1 pc 3.7142857

    Sour Cream 32.38857143 g 100.00 350 g 9.2538776

    Chocolate Chips Semisweet 16.28571429 g 152.75 340.08 g 7.314875491

    Total 37.8341635 Cost of Cheesecake 70.00 Material Ratio 54.05%

    The production cost for each cheesecake is Php 37.83. However, the company will be selling each price for

    Php 70.00

    Tooty Sweety Corporation Page 64

  • Table 5-7 Material Cost Table for Brownies

    Material Standard Quantity Unit Purchase

    Price Unit Price

    Butter 7.0625 g 78.50 225 g 2.4640278

    Sugar White 12.5625 g 60.00 1 kg 0.7537500

    Eggs 0.125 pcs 13.00 1 pc 1.6250000

    Vanilla Extract 0.625 mL 220.00 450 mL 0.3055556

    Cocoa Powder Unsweetened 2.666667 g 170.00 1 kg 0.4533333

    Flour All-Purpose 4 g 50.00 1 kg 0.2000000

    Salt 0.09375 g 20.00 1 kg 0.0018750

    Baking Powder 0.0625 g 60.00 1 kg 0.0037500

    Honey Semisweet 15 mL 350.00 550 mL 9.5454545

    Sugar Confectioners' 8 g 60.00 1 kg 0.4800000

    Total 15.8327462 Cost of Brownies 50.00 Material Ratio 31.67%

    The table above shows the material cost for production of brownies. Each brownies costs approximately Php

    15.83. Tooty Sweety will be selling each brownies for Php 50.00.

    Tooty Sweety Corporation Page 65

  • 5.27. Quotations

    Table 5-8 Cost of Raw Materials for Cupcake

    Material Purchase Price (Php) Unit Flour 50.00 1 kg

    Baking Soda 21.50 500 g Salt 20.00 1 kg

    Butter 78.50 225 g White Sugar 60.00 1 kg Brown Sugar 60.00 1 kg

    Egg 13.00 1 pc Vanilla Extract 220.00 450 mL

    Chocolate Chips 152.75 340.08 g Yellow Cake Mix 68.50 500 g

    Canola Oil 70.15 380 mL

    Table 5-9 Cost of Raw Materials for Cheesecake

    Material Purchase Price (Php) Unit Cookie Crumbs 60.00 200 g

    Butter 78.50 225 g Brown Sugar 60.00 1 kg

    Cinnamon 548.00 1 kg Cream Cheese 137.00 226 g White Sugar 60.00 1 kg

    Flour 50.00 1 kg Vanilla Extract 220.00 450 mL

    Eggs 13.00 1 pc Sour Cream 100.00 350 g

    Chocolate Chips 152.75 340.08 g

    Tooty Sweety Corporation

    Page 66

  • Table 5-10 Cost of Raw Materials for Brownies

    Material Purchase Price (Php) Unit Butter 78.50 225 g

    White Sugar 60.00 1 kg Eggs 13.00 1 pc

    Vanilla Extract 170.00 mL 1 kg Cocoa Powder 170.00 1 kg

    Flour 50.00 1 kg Salt 20.00 1 kg

    Baking Powder 60.00 1 kg Semisweet

    Honey 350.00 550 mL

    Confectioners Sugar

    60 1 kg

    5.28. Utilities

    The Utilities the business will need are electricity and water which is dependent on the

    provider of Nuvali since the business will be built in the said area. The business will also

    be needing cable for television as a sign of entertainment for the customers in the

    restaurant and PLDT for telephone and internet services so that the business will be able

    to address the orders through online and through calls.

    5.29. Waste Disposal

    The business will be considering the process wastes, packaging wastes and other

    wastes incurred in the production of the products. The process wastes include dough flour

    dust, sugar dust, burnt biscuits, broken biscuits, burnt loaves or rejected loaves and market

    returned old bakery products. The company will sell these to suppliers who deal into cattle

    feeding. Precaution should be taken that none of these have contamination so that it can

    be used for cattle feeding. Packgaing wastes iinclude wrappers, tins, cardboard boxes,

    bags, cores, polythene, sacks and plastic trays and pallets. Most of these can be recycled

    by packaging material suppliers. Metallic scrap, wooden pallets, papers and bakery waste

    water dry sludge are also wastes to be considered. Metallic scrap can be sold to scrap

    Tooty Sweety Corporation Page 67

  • merchants, dry sludge and other can be sold to land filling contractors. Bakery waste water

    can be treated and can be used for gardening and other cleaning purposes. Other wastes

    include fat and oil contaminated and spent oil from machinery. These wastes could be sold

    to recyclers. These may be considered as wastes but the business can styill get profit

    through selling them to the right people. At the same time, bakery waste recycling is being

    adopted by various companies to save cost and implements resource conservation.

    Tooty Sweety Corporation Page 68

  • CHAPTER 6: Financing Aspects

    6.1. Sources of Financing for the Project

    The business will be funded through the contributions of the owners and through

    loaning from Metrobank. The owners will give a capital of 500 000 each. And then

    the business will obtain a loan of 2 000 000. So Tooty Sweety will now have a start-

    up capital of 3 500 000.

    Tooty Sweety Corporation Page 69

  • CHAPTER 7: Financial Statement

    7.1. Statement of Financial Position First Year and Three Years Forecast

    Assets 2016 2017 2018 2019 2016 2017 2018 2019

    Current Assets:Cash 2,746,210.12 4,485,598.14 9,179,194.98 18,950,650.02 32.02% 50.57% 65.68% 76.68%Accounts Receivable 3,089,424.00 1,699,183.20 2,208,938.16 3,313,407.24 36.02% 19.16% 15.81% 13.41%Merchandise Inventory 680,192.91 673,390.98 666,657.07 659,990.50 7.93% 7.59% 4.77% 2.67%

    Total Current Assets: 6,515,827.03 6,858,172.32 12,054,790.21 22,924,047.76 75.96% 77.32% 86.25% 92.75%

    Non-Current Assets:Furnitures and Fixtures 110,000.00 210,000.00 310,000.00 410,000.00 1.28% 2.37% 2.22% 1.66%

    Acc'd Depreciation (13,750.00) (47,500.00) (101,250.00) (175,000.00) 0.16% 0.54% 0.72% 0.71%Property, Plant and Equipment 2,162,174.00 2,262,174.00 2,362,174.00 2,462,174.00 25.21% 25.50% 16.90% 9.96%

    Acc'd Depreciation (196,612.43) (413,224.86) (649,837.29) (906,449.71) 2.29% 4.66% 4.65% 3.67%Total Non-Current Assets: 2,061,811.57 2,011,449.14 1,921,086.71 1,790,724.29 24.04% 22.68% 13.75% 7.25%

    Total Assets: 8,577,638.60 8,869,621.47 13,975,876.93 24,714,772.05 100.00% 100.00% 100.00% 100.00%103% 158% 177%

    LiabilitiesCurrent Liabilities:

    Accounts Payable 1,821,417.00 587,917.39 742,203.22 1,080,170.76 21.23% 6.63% 5.31% 4.37%Total Current Liabilities: 1,821,417.00 587,917.39 742,203.22 1,080,170.76