  • 7/28/2019 production management plant location

    1/21

    PLANT LOCATION

    Module 2

  • 7/28/2019 production management plant location

    2/21

    Introduction

    Plant layout planning includes decisionsregarding the physical allocation of theeconomic activity centers in a facility.

  • 7/28/2019 production management plant location

    3/21

    Facility Layout Definition

    Afacility layoutis an arrangement of everything neededfor production of goods or delivery of services. Afacility

    is an entity that facilitates the performance of any job. It

    may be a machine tool, a work centre, a manufacturing

    cell, a machine shop, a department, a warehouse, etc.(Heragu, 1997).

    http://www.sciencedirect.com/science?_ob=ArticleURL&_udi=B6V0H-4R2GS3S-2&_user=5674735&_coverDate=11%2F05%2F2007&_alid=646172600&_rdoc=2&_fmt=full&_orig=search&_cdi=5647&_sort=d&_docanchor=&view=c&_ct=211&_acct=C000053929&_version=1&_urlVersion=0&_userid=5674735&md5=e47ccd28a13defa3d980826b6a5a91edhttp://www.sciencedirect.com/science?_ob=ArticleURL&_udi=B6V0H-4R2GS3S-2&_user=5674735&_coverDate=11%2F05%2F2007&_alid=646172600&_rdoc=2&_fmt=full&_orig=search&_cdi=5647&_sort=d&_docanchor=&view=c&_ct=211&_acct=C000053929&_version=1&_urlVersion=0&_userid=5674735&md5=e47ccd28a13defa3d980826b6a5a91ed
  • 7/28/2019 production management plant location

    4/21

    Objectives of Plant Layout The main objective consists of organizing equipment and

    working areas in the most efficient way, and at the sametime satisfactory and safe for the personnel doing thework.

    Sense of Unity

    Minimum Movement of people, material andresources.

    Safety

    Flexibility

  • 7/28/2019 production management plant location

    5/21

    Objectives of Plant Layout

    These main objectives are reached through the attainment of thefollowing facts:

    Congestion reduction.

    Better adjustment to changing conditions.

    Better utilization of the workforce, equipment andservices.

    Reduction of material handling activities and stockin process.

    Reduction on health risks and increase on workerssafety.

    Reduction on delays and manufacturing time, as

    well as increase in production capacity.

  • 7/28/2019 production management plant location

    6/21

    Factors affecting Plant Layout

    The factors affecting plant layout can be grouped into 8 categories: Materials

    Machinery

    Labor

    Material Handling

    Waiting Time Auxiliary Services

    The building

    Future Changes

  • 7/28/2019 production management plant location

    7/21

    Factors affecting Plant Layout

    Materials

    Main factors to be considered: size, shape, volume, weight, and the

    physical-chemical characteristics, since they influence the

    manufacturing methods and storage and material handling

    processes.

    Machinery

    Regarding machinery, we have to consider the type, total available

    for each type, as well as type and quantity of tools and equipment.

    Its essential as well to know about space required, shape, height,

    weight, quantity and type of workers required, risks for thepersonnel, requirements of auxiliary services, etc.

  • 7/28/2019 production management plant location

    8/21

    Factors affecting Plant Layout Labor

    Environment considerations: employees safety, light conditions,ventilation, temperature, noise, etc.

    Process considerations: personnel qualifications, flexibility, numberof workers required at a given time as well as the type of work to beperformed by them.

    Material Handling

    Material handling does not add value to the product; its just waste!

    Objective: Minimize material handling as well as combining withother operations when possible, eliminating unnecessary and costlymovements.

  • 7/28/2019 production management plant location

    9/21

    Factors affecting Plant Layout The factors affecting plant layout can be grouped into 8

    categories: Waiting time - Stock

    Objective: Continuous Material Flow through the facility, avoiding

    the cost of waiting time.

    Resting time to cool down or heating up.Auxiliary Services

    Support the main production activities at the plant:

    Related to labor: Accessibility paths, fire protection installations,

    supervision, safety, etc.

    Related to material: quality control. Related to machinery: maintenance and electrical and water lines.

    The auxiliary services represent around 30% of the space at a facility.

  • 7/28/2019 production management plant location

    10/21

    Factors affecting Plant Layout The factors affecting plant layout can be grouped into 8

    categories: The building

    If it has been already selected, its characteristics will be a constraint

    at the moment of designing the layout, which is different if the

    building has to be built.

    Future changes

    One of the main objectives of plant layout is flexibility.

    Its important to forecast the future changes to avoid having an

    inefficient plant layout in a short term.

  • 7/28/2019 production management plant location

    11/21

    Plant Location

    Criterion WeightingPossible Factory Location

    A B C D EPROXIMITYTO:

    Skilled labour 7 2 14 3 21 0 0 1 7 4 28

    A pool of unskilled labour 8 5 40 2 16 0 0 4 32 2 16

    A motorway 7 3 21 2 14 1 7 3 21 4 28

    An airport 4 1 4 3 12 4 16 2 8 2 8

    The sea / a river 0 2 0 5 0 5 0 2 0 1 0

    Housing 5 4 20 3 15 0 0 3 15 4 20

    Amenities 5 3 15 2 10 0 0 2 10 3 15

    Potential for expansion 7 2 14 1 7 5 35 3 21 2 14

    Availability of grants/incentives 8 1 8 2 16 5 40 1 8 3 24

    Safety 2 3 6 2 4 5 10 2 4 2 4

    Planning constraints 5 2 10 3 15 5 25 4 20 2 10

    Environmental impact 4 3 12 2 8 4 16 1 4 2 8

    TOTAL 164 138 149 150 175

  • 7/28/2019 production management plant location

    12/21

    Process Layouts

    General purpose & flexible resources

    Lower capital intensity & automation

    Higher labor intensity

    Resources have greater flexibility Processing rates are slower

    Material handling costs are higher

    Scheduling resources & work flow is more complex

    Space requirements are higher

  • 7/28/2019 production management plant location

    13/21

    Process layout

    Receiving Grin-

    Mills ders

    Raw matl. Large number

    of

    storage Assem- low volume

    bly products

    Drills

    Planers

    Finished

    Inspec-

    goodsLathes Automatics tion storage

    Part A

    Part B

    Facility Layout

  • 7/28/2019 production management plant location

    14/21

    Product Layouts

    Specialized equipment

    High capital intensity & wide use of

    automation

    Processing rates are faster

    Material handling costs are lower

    Less space required for inventories Less volume or design flexibility

  • 7/28/2019 production management plant location

    15/21

    Product layout

    Raw matl. Fabrication

    Rec- storage line-part B

    eiving Fabrication Planer

    line-part A

    Finished Lathe

    goods Drillstorage Mill

    Mill

    Drill

    Grinder

    Mill

    Assembly line Automatic

    Facility Layout

    Small numberofhigh volumeproducts

  • 7/28/2019 production management plant location

    16/21

    Advantages: Reduced material handling activities.

    Work In Process almost eliminated.

    Minimum manufacturing time.

    Simplification of the production planning and control systems. Tasks simplification.

    Disadvantages:

    No flexibility in the production process.

    Low flexibility in the manufacturing times.

    High capital investment.

    Every workstation is critical to the process.- The lack of personnel or

    shut down of a machine stops the whole process.

    Monotonous work.

  • 7/28/2019 production management plant location

    17/21

    Cellular Plant Layout

    L M

    D G

    M M

    D G

    L L

    L G

    ASSEMBLY

    CELL 3

    ASSEMBLY

    CELL 2

    ASSEMBLY

    CELL 1

    Group Technology

    Each cell manufactures products

    belonging to a single family.

    Cells are autonomous manufacturing

    units which can produce finished parts.

    Commonly applied to machined parts.

    Often single operators supervising

    machines in a cell, with robots for

    materials handling.

    Productivity and quality maximised.

    Throughput times and work in progresskept to a minimum.

    Flexible.

    Suited to products in batches and where

    design changes often occur.

  • 7/28/2019 production management plant location

    18/21

  • 7/28/2019 production management plant location

    19/21

    Other Plant Layouts

    PRODUCT

    MATERIAL

    MATERIAL

    LABOUR

    LABOUR

    COMPONENTS

    COMPONENTS

    Fixed Position Layout (right)

    Single large, high cost components or

    products.

    Product is static. Labour, tools andequipment come to the work rather than

    vice versa.

  • 7/28/2019 production management plant location

    20/21

    CIA 1The groups shall name themselves based on any production management concept

    (No two groups shall have the same name)

    Each member of the group shall give a write up of about 200 words on the concept

    (Members shall not repeat or copy any of their team mates content)

    Date of Submission: 10/12/2012

    In case two or more groups have the same names, by mistake or coincidence

    the group that submits first shall be final and the others have to repeat !!

  • 7/28/2019 production management plant location

    21/21

    CIA COMPONENT 2The groups shall identify an industry and product (No two groups shall work on

    the same product or industry)

    The groups to report on the following

    Plant location (Factors affecting location-To be justified)

    Plant layout (Factors affecting layout-To be justified, with suggested layout diagram)

    The report must clearly indicate the individuals contribution.

    Date of Submission: 10/12/2012

    In case two or more groups have worked on the same product or industry,by mistake or coincidence the group that submits first shall be final and the

    others have to repeat !!

    [email protected]