presented to wisconsin department of transportation presented by brian scott srf, seh, ek and...
TRANSCRIPT
presented to
Wisconsin Department of Transportation
presented by
Brian Scott
SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07
ITS Sketch PlansCorridor Sketch Plan Methodology – Update
2
Agenda
Schedule/Progress
Management Update – John Corbin
Presentation – Sketch Planning Update - SRF, EK, SEH
• Threshold Updates
• Deployment Density – Spectrum Update
• Corridor Examples− Beltline
− Fox Valley
− Capital
Long Range Plan Input - Chris Hedden
Next Steps
8
Process
Raw Data Threshold Map
Develop Raw Data Corridor Map
Smooth Segments
Analyze Smoothed Segments
Apply Operations Oriented Recommendations (Mileposts)
Next Steps
• Meeting with Regions – Operations Chiefs and Planning Chiefs
• Produce final maps and recommendations for all corridors
27
Statewide – Additional Information Layers
• RWIS
• Fiber optic cable• State Patrol microwave network• State Patrol MDN
29
Input into Connections 2030 LRP
Submitted draft data set 7/23/07
• Only red and orange links
• Table Text Suggested
Sketch Planning data set Version 3.0 submitted
• Contains updated thresholds
Mid-Term (5-10 Years)
US 29 Operations deployments recommended south of Fond du Lac MPA to milepost xxx.
x X x
Operations
Implement Operations technologies as recommended by WisDOT Operations Sketch Plan
x x x
36
Next Steps (Short Term)
Complete SW and NE Region Maps
• Obtain consensus from WisDOT Regions & BHO
Complete SE Region Maps
Complete NW and NC Regions
Data collection – existing systems & infrastructure