presented to

Wisconsin Department of Transportation

presented by

Brian Scott

SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07

ITS Sketch PlansCorridor Sketch Plan Methodology – Update

2

Agenda

Schedule/Progress

Management Update – John Corbin

Presentation – Sketch Planning Update - SRF, EK, SEH

• Threshold Updates

• Deployment Density – Spectrum Update

• Corridor Examples− Beltline

− Fox Valley

− Capital

Long Range Plan Input - Chris Hedden

Next Steps

Management Update

Sketch Planning Update

Thresholds Update

7

Threshold Adjustment

Original Adjusted

8

Process

Raw Data Threshold Map

Develop Raw Data Corridor Map

Smooth Segments

Analyze Smoothed Segments

Apply Operations Oriented Recommendations (Mileposts)

Next Steps

• Meeting with Regions – Operations Chiefs and Planning Chiefs

• Produce final maps and recommendations for all corridors

Deployment Density Update

10

Deployment Density – Urban Interstate/Expy

11

Deployment Density – Rural Interstate/Expy

12

Deployment Density – Urban and Rural Other

13

Beltline Corridor – Raw Threshold Data

14

Beltline Corridor – Smoothed Data

15

Beltline - Mileposts

16

Fox Valley Corridor – Raw Data

17

Fox Valley Corridor – Raw Data

18

Fox Valley Corridor

19

Fox Valley Corridor

20

Fox Valley – Milepost Adjustment Data

21

Fox Valley Corridor – Revised Mileposts

22

Fox Valley Corridor – Revised Mileposts

23

Fox Valley Corridor

Insert SEH Methodology

24

Fox Valley Corridor – DMS

25

Capitol Corridor

26

Capitol Corridor - Signals

27

Statewide – Additional Information Layers

• RWIS

• Fiber optic cable• State Patrol microwave network• State Patrol MDN

Connection 2030 Input

29

Input into Connections 2030 LRP

Submitted draft data set 7/23/07

• Only red and orange links

• Table Text Suggested

Sketch Planning data set Version 3.0 submitted

• Contains updated thresholds

Mid-Term (5-10 Years)

US 29 Operations deployments recommended south of Fond du Lac MPA to milepost xxx.

x X x

Operations

Implement Operations technologies as recommended by WisDOT Operations Sketch Plan

x x x

Next Steps

35

Statewide Map – Signals

36

Next Steps (Short Term)

Complete SW and NE Region Maps

• Obtain consensus from WisDOT Regions & BHO

Complete SE Region Maps

Complete NW and NC Regions

Data collection – existing systems & infrastructure

37

Next Steps (Mid – Term)

Technology Scan

Validate results in Regional workshops SE, NW, NC)

38

Next Steps (Finalize)

Develop Infrastructure & Operations Plan

Aggregate Plans (Freeways, Arterials, ATIS)

Prioritize Corridors

Integrate into existing WisDOT planning processes

Apply recommendations to near-term corridor projects for implementation