presented to
Wisconsin Department of Transportation
presented by
Brian Scott
SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07
ITS Sketch PlansCorridor Sketch Plan Methodology – Update
2
Agenda
Schedule/Progress
Management Update – John Corbin
Presentation – Sketch Planning Update - SRF, EK, SEH
• Threshold Updates
• Deployment Density – Spectrum Update
• Corridor Examples− Beltline
− Fox Valley
− Capital
Long Range Plan Input - Chris Hedden
Next Steps
8
Process
Raw Data Threshold Map
Develop Raw Data Corridor Map
Smooth Segments
Analyze Smoothed Segments
Apply Operations Oriented Recommendations (Mileposts)
Next Steps
• Meeting with Regions – Operations Chiefs and Planning Chiefs
• Produce final maps and recommendations for all corridors
27
Statewide – Additional Information Layers
• RWIS
• Fiber optic cable• State Patrol microwave network• State Patrol MDN
29
Input into Connections 2030 LRP
Submitted draft data set 7/23/07
• Only red and orange links
• Table Text Suggested
Sketch Planning data set Version 3.0 submitted
• Contains updated thresholds
Mid-Term (5-10 Years)
US 29 Operations deployments recommended south of Fond du Lac MPA to milepost xxx.
x X x
Operations
Implement Operations technologies as recommended by WisDOT Operations Sketch Plan
x x x
36
Next Steps (Short Term)
Complete SW and NE Region Maps
• Obtain consensus from WisDOT Regions & BHO
Complete SE Region Maps
Complete NW and NC Regions
Data collection – existing systems & infrastructure