srf activities - spallation neutron source · srf activities presented at the ... cavities fully...

19
ORNL is managed by UT-Battelle for the US Department of Energy SRF Activities Presented at the Accelerator Advisory Committee Review John Mammosser SCL Systems Group Research Accelerator Division March 24-26, 2015

Upload: ngodung

Post on 07-Sep-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

ORNL is managed by UT-Battelle

for the US Department of Energy

SRF Activities

Presented at the

Accelerator Advisory Committee Review

John MammosserSCL Systems Group Research Accelerator Division

March 24-26, 2015

Page 2: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

2 Presentation_name

Superconducting RF Activities at SNS

• SRF activities at SNS are focused in three primary areas

1. Support of Superconducting Linac (SCL) operations, maintenance and improving operational performance

2. Support of SRF and Plasma Processing R&D aimed at improving installed operational gradients

3. Operating and improving SRF facilities to carryout the above activities

Page 3: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

3 Presentation_name

SCL Support Activities - Since last Review

• Highlights of support activities for reliable LINAC operation:

– Removal of one Medium Beta (MB) and one High Beta (HB) cryomodule for replacement of a RF coupler in each module

• Standard servicing of these cryomodules was conducted

• Tested in test cave to verify performance

• Installation of these two cryomodules back into service

• No MB spare is still a concern

– Removal of a low performing HB cryomodule (now the spare HB), this CM will be serviced and part of Plasma R&D development efforts in the next few months

– Warmup of three cryomodules for warm section repair

Page 4: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

4 Presentation_name

SCL Current Support Activities

• Typical Cryomodule Servicing

– Removal of HOM probes and piezo fast tuners

– Repair of CM components (reliefs, diodes, tuners, etc.)

• In-situ thermal cycling of CM’s to recover performance

• Quality Assurance Team Activities

– Focus on development of repeatable repair procedures and capturing of critical data

– Reducing particulate contamination during repairs and R&D activities

• Particulate contamination leads to reduced gradients due to field emission effects

Page 5: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

5 Presentation_name

Quality Assurance Team Activities

• Reducing particulate generation and migration is a priority

• Topical areas visited by the QA team• Particulate control during venting and purging (example next)

• Particulate control during cryomodule beam line component removal and replacement

• Cleaning step effectiveness and improvements (just started)

Page 6: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

N2

open

N2

Closed

Fore line Closed and Roughing

Opened

Pa

rtic

ula

te

co

un

ts

9:3

9:0

0,

205

9:4

6:0

0,

625

Laser Vacuum Particle Counter

Bin1 -Red

Bin2- Blue

Bin3- Green

Bin 4- Pink

Bin 5 - Black

Time (h:mm)

Count

s300 Torr

9 Torr

Example of QA Activities

Page 7: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

7 Presentation_name

Normal Pumpdown

Bypass Pumpdown

Time = 10 min

Time = 19 min

Normal Pumpdown

Bypass Pumpdown

580 particle counts

1 particle counts

Page 8: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

8 Presentation_name

Development of in-house MB spare

• There is a strong need for a spare MB Cryomodule!!

– In-house cavity prototyping effort is underway with MB cavity, procedures developed and tooling verified

• Developing local vendor capabilities

• Shorten long lead procurements activity (Response to AAC2012 recommendation)

– Next step is to verify trimming procedure and then fabricate first MB cavity spare in niobium

– The spare MB CM effort is awaiting funding

Page 9: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

9 Presentation_name

Horizontal Test Apparatus Developed,

Integrated and Commissioned

• Qualifies Cavity in a Similar Way to Accelerator Operations

• HPRF and Diagnostics

– Using 5MW klystron in the RFTF

– 8 radiation detectors, camera system for imaging inside of cavity, 20 temperature sensors, etc

• Horizontal Testing

– Used first to support plasma processing R&D with HB cavities fully dressed

Page 10: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

10 Presentation_name

SRF Support of plasma processing R&D

• Preparation for HTA test

– High beta cavities dressed with helium vessel

– Preparation of cavities in clean room

– Installation of cavity in HTA

– Integration of HTA in the SNS test cave

– Support activities during test

Page 11: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

11 Presentation_name

Vertical Test Area

– Commissioned at 4.2K 9/2013

– Started commissioning at 2K with Kinney skid 1/2015

– Current focus is on qualifying the two HB cavities with modified end-groups

• Cavities had end groups changed to remove HOM cans and improve thermal stability

• Verify vertical performance at 2K

RF Control System

Page 12: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

12 Presentation_name

CTF System Installed and Commissioned

Liquid helium fill station

in the CTF area

Vertical Dewar Shielding Lid

Kinney Pump Skid

Cold Box

Page 13: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

13 Presentation_name

CTF Refrigeration System Specifications

Description Specification

Refrigeration 650W @ 4.4K

Liquefaction 240 L/hr

He High Header Pressure 13 atm

Helium Mass Flow 81 g/s

Oil Content < 0.1 ppmv

He Low Header Pressure 1.05 atm

Start Up Time < 6 hours

Page 14: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

14 Presentation_name

CTF Liquid Helium Fill Station

• The CTF Fill Station now commissioned and ready for use

– Needed to mitigate supply chain issues during helium shortages

– Allows for responding to emergency needs of liquid helium supply

– Supports sample environment and instrument operations

• The CTF Fill Station is also integrated with the VTA

– Supplies liquid helium to VTA

– Potentially allows operation of the VTA without running the CTF

– Liquid helium can be transferred from the VTA back to the Fill Station

• Power is conserved with this feature

Page 15: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

15 Presentation_name

Additional SRF Facilities

– Cavity Inspection Station

• Internal cavity inspection system construction complete, currently developing tooling and capture hardware

– Centrifugal Barrel Polishing

• Installed but not commissioned, procedure be developed for a cavity repair

– Niobium Heat Treatment Furnace

• Furnace installed, commissioned and R&D activities started

– Cleanroom assembly facilities continued operations and improvements

• Degreasing of cavity and new component cleaning station (on site but not installed)

• HPR commissioned and studies for performance identified

• New entry way and larger doors installed for easier installation of cryomodules for repair

Page 16: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

16 Presentation_name

Facility Plans

• There is a Need for a Chemistry Facility

– The facility will aid in the repair and maintenance activities addressing damaged cavities, and the reprocessing of cavities used in the linac

– This facility is necessary for the cleaning and processing of SRF structures for R&D to improve machine performance

– The facility is also necessary for process development for new cavities

• STS can benefit from this effort

A Small Scale Chemistry Facility Concept Was Developed The chemistry facility concept is designed as a low through put cavity

and component processing facility

Plan submitted, reviewed and awaiting funding

Page 17: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

17 Presentation_name

Small Scale Chemistry Facility Concept

Cut View

Page 18: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

18 Presentation_name

Small Scale Chemistry Facility

Capabilities:

• Electropolish Chemistry

– Full cavities (low through put)

– Small samples and cavity components

• Degreasing

– Full cavities (moved from cleanroom)

– Small samples and cavity components

HF free chemistry will be pursued to reduce risks and cost

Page 19: SRF Activities - Spallation Neutron Source · SRF Activities Presented at the ... cavities fully dressed. ... use – Needed to mitigate supply chain issues during helium shortages

19 Presentation_name

Summary of SRF Activities

1. Large part of our effort is supporting linac operations

– Developing and implementing repairs and improvements

– Preparing for a spare MB cryomodule with cavity development

2. Supporting Plasma Processing R&D for future linac performance improvements

3. Developing, operating and maintaining SRF facilities to support above activities