SRS Performance Update: Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens Advisory Board

Upload: others

Post on 29-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

SRS Performance Update:Final FY11 Results & FY12 Targets

November 14, 2011Rich Olsen

Planning AnalystDOE-SR / AMIP

Presentation to the SRS Citizens Advisory Board

Page 2: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

2

• Review the major areas of the EM Cleanup Program at SRS

and explain supporting high level performance metrics

• Provide a update of key EM performance results

for FY 2011 and targets for FY2012

Purpose

Page 3: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

3

• The Lifecycle Baseline (scope, cost & schedule) for the SRS cleanup program was originally established in the 1990’s

• Over the years, modifications to the Lifecycle Baseline have been managed through a disciplined change control process

(changes due to technology, funding, regulatory, etc.)

• Performance metrics have evolved to track progress

towards current Lifecycle Baseline targets

SRS Cleanup Program - Background

Lifecycle BaselineManagement tool for SRS

Cleanup Program

Page 4: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

4

SRS Clean Up Program - Major Areas

Liquid Waste

Nuclear Materials

Soil, Groundwater& Facilities

Solid Waste

Salt Waste

InsolubleSludge

Plutonium

UsedNuclear

Fuel

Highly Enriched Uranium

Mixed & Low Level Waste

Waste SiteRemediation

Deactivation and

Decommission

Transuranic Waste

TankClosures

Page 5: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

5

“How are we doing ?”

SRS Cleanup Program

Page 6: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

6

Progress towards EM Site Cleanup – through FY 2011

POC: Pipe Overpack Container

EM Site Cleanup- Major Areas End State Unit of FY Year

FY 09 FY10 FY11 Quantity Measure CompleteLiquid Waste

Disposition Radioactive Liquid WasteProduce Canisters 39% 40% 43% 7,557 Canisters 2028Process Salt Solution 2% 4% 5% 116,595 k Gallons 2025

Close TanksOld Style 8% 8% 8% 24 Tanks 2022Newer Style 0% 0% 0% 27 Tanks 2026

Solid WasteTransuranic (TRU) Waste Disposed

Legacy 59% 62% 71% 11,084 Cu Meters 2013Newly Generated 0% 0% 0% 3,980 Cu Meters 2031

Mixed & Low-Level Waste DisposedLegacy 100% 100% 100% 103,171 Cu Meters 2008Newly Generated 2% 8% 19% 135,017 Cu Meters 2031

Nuclear Materials

Highly Enriched Uranium: Blend Down & Ship 89% 96% 99.7% 336 Trailers 2012

Used Nuclear Fuel: Blend Down & Ship 0% 0% 0% TBD Bundles TBD

Plutonium DispositionPu Dissolved for processing at DWPF 54% 86% 100% 100 Containers: 3013 2011Pu Packaged for Shipment to WIPP 0% 0% 1% 5,833 Containers: POC 2016Pu Oxide prepared for MOX 0% 0% 0% TBD TBD TBD

Soil, Ground Water & FacilitiesComplete Remediation of Waste Sites 71% 72% 74% 515 Release Sites 2038

Facilities Deactivated & Decommissioned 23% 23% 25% 1,101 Facilities 2032

Foot Print Reduction (ARRA) 0% 48% 98% 234 Square Miles 2012

% End State Complete

Page 7: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

7

Produce Canisters

0

100

200

300

400

500

Prior

Years

1997

1999

2001

2003

2005

2007

2009

2011

2013

2015

2017

2019

2021

2023

2025

Ca

nis

ters

Actuals Targets

Salt Solution Processed

0

3000

6000

9000

12000

Prio

r Y

ears

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

K G

allo

ns

Actuals Targets

Close Newer Style Tanks - Double Wall

0

2

4

6

8

10

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

Ta

nk

s

Targets

Close Old Style Tanks - Single Wall

0

2

4

6

8

10

Prior

Years

1997

1999

2001

2003

2005

2007

2009

2011

2013

2015

2017

2019

2021

2023

2025

Ta

nk

s

Actuals Targets

Note: Targets Based on Liquid Waste System Plan Rev 16

Performance Results & Lifecycle Projections

Liquid Waste

End State: 7,557 Canisters

End State: 24 Tanks End State: 27 Tanks

End State: 116, 595 K Gallons

Page 8: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

8

TRU Disposed: Legacy

0

600

1200

1800

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

Cu

bic

Me

ters

Actuals Targets

TRU Disposed: Newly Generated

0

600

1200

1800

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

Cu

bic

Me

ters

Targets

MLL & LLW Disposed: Newly Generated (Incl ARRA)

0

4000

8000

12000

16000

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

Cu

bic

Me

ters

Actuals Targets

MLL & LLW Disposed: Legacy

0

4000

8000

12000

16000

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

Cu

bic

Me

ters

Actuals Targets

Performance Results & Lifecycle Projections

Solid Waste

End State: 11,084 Cubic MetersEnd State: 3,980 Cubic Meters

Note: Excludes LLW associated with Facility D&D

End State: 103,171 Cubic MetersEnd State: 135,017 Cubic Meters

Legacy Completed in 2008

Legacy to beCompleted in 2013

MOXOperations

Page 9: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

9

UNF Disposition

0

20

40

60

80

100

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

Bu

nd

les

Targets

HEU Disposition: Blend Down & Ship

0

20

40

60

80

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

Tra

ilers

Actuals Targets

Performance Results & Lifecycle Projections

Nuclear Materials

End State: 336 Trailers End State: Bundles

HEU: Highly Enriched Uranium UNF: Used (Spent) Nuclear Fuel

Pending DOE Decision

Page 10: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

10

Pu Disposition: Packaged for Shipment to WIPP

0

500

1000

1500

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

Co

nta

ine

rs (

PO

C's

)

Actuals Targets

Pu Disposition: Pu Oxide Prepared for MOX

0

200

400

600

800

1000

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

Co

nta

ine

rs

Targets

Pu Disposition: Dissolve in H-Canyon

0

10

20

30

40

Prior

Years

199

7

199

9

200

1

200

3

200

5

200

7

200

9

201

1

201

3

201

5

201

7

201

9

202

1

202

3

202

5

Co

nta

ine

rs

Actuals Targets

Performance Results & Lifecycle Projections

Nuclear Materials

End State: 100 Containers (3013’s)

End State: 5833 Containers (POC’s) End State: Containers (TBD)

Completed

Initial PhaseUnderway

Agreement betweenEM & NSSA is being

developed

POC: Pipe Overpack Container

Page 11: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

11

Waste Sites Remediated

0

20

40

60

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

Wa

ste

Sit

es

Actuals Targets

Facilities Deactivated & Decommissioned (D & D)

0

40

80

120

160

Pri

or

Ye

ars

19

97

19

99

20

01

20

03

20

05

20

07

20

09

20

11

20

13

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

Fa

cilit

ies

Actuals Targets

Performance Results & Lifecycle Projections

End State: 515 Waste Sites End State: 1,101 Facilities

Area Completion

Page 12: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

12

Summary and Path Forward

DOE-SR will continue to provide the Stakeholders periodic updates of performance lifecycle measures for the key operational areas of EM cleanup operations

Suggestions from for any improvements are welcomed

Page 13: Presentation to the SRS Citizens Advisory Board SRS ... · Final FY11 Results & FY12 Targets November 14, 2011 Rich Olsen Planning Analyst DOE-SR / AMIP Presentation to the SRS Citizens

13

Acronyms

ARRA American Recovery & Reinvestment Act

DRR Domestic Research Reactor

D&D Decommission & Demolition

DWPF Defense Waste Processing Facility

FFA Federal Facility Agreement

LEU Low Enriched Uranium

HEU Highly Enriched Uranium

LLW Low Level Waste

MLLW Mixed Low level Waste

NU Natural Uranium

Pu Plutonium

SCDHEC South Carolina Dept of Health & Environmental Control

UNF Used Nuclear Fuel

SWPF Salt Waste Processing Facility

TRU Transuranic Waste

TVA Tennessee Valley Authority