FORSA was born in Colombia in 1995, and since then we

have offered to the construction sector an Industrialized

Construction System, based on a highly versatile and

adaptable formwork. This enable users to minimize costs and

construction times achieving high quality finishes, always with

our support, backup and continued advice.

Today we are leaders in the Colombian and Latin American

market, with three production facilities located in Colombia,

Mexico and Brazil as well as maintenance workshops in other

countries.

Page 3: Presentation Forsa Alum ENG - Building Progress

• FORSA is a modular, fast

and profitable construction

system.

• It achieves the construction

of a house a day using

poured slabs (walls and

floors simultaneously)

• The Forsa System adapts

to all types of design, in any

geometric form or

construction height

• The FORSA System is

complete: in addition to the

pieces and accessories the

system has, we supply all

the guard rails and specials

platforms allowing job

performance while fulfilling

all the client’s demands to

guarantee the safety of the

workers.

Page 4: Presentation Forsa Alum ENG - Building Progress

According to design,

architectural features the

amount of units to be built

and the required project

execution times; we offer two different products.

Aluminum formworks for big projects. This represents

lower costs, more savings and speed than traditional construction methods.

Plastic formworks made of engineering plastic for smaller

projects (housing and civil works) offering the builder excellent

concrete finishes.

Page 5: Presentation Forsa Alum ENG - Building Progress

MINIMUM WASTE OF CONCRETE

3.5% IN CONCRETE SAVING

VS.

Independent

pouring of walls and slab

With FORSA formworks construction of a

housing unit per day can be achieved

through monolithic pours (walls and slab at

the same time).

MONOLITHIC SYSTEM

Page 6: Presentation Forsa Alum ENG - Building Progress

MONOLITHIC POUR

90% SAVINGS IN RENDERING OF DETAILS

VS.

INDEPENDENT POURING OF WALLS

AND SLAB

• 90 degrees angle in wall-slab union • Maximum strength – minimal drifts • Slab bottoms properly leveled, completely

horizontal without bumps.

Page 7: Presentation Forsa Alum ENG - Building Progress

With FORSA System lightweight forms, fewer personnel is necessary to reach daily performance (steel forms 38 Kg/m2 vs. Forsa Alum 23 Kg/m2).

18% SAVINGS IN LABOR

VS. STEEL FORMS OR

TRADITIONAL METHODS.

CONSTRUCTION PERFORMANCE: HIGH RISE AND LOW RISE

Page 8: Presentation Forsa Alum ENG - Building Progress

FORSAalum: 1500 uses. FORSAplast : 400 uses. Daily preventive maintenance suggested by FORSA’s technical department is required in order to achieve offered lifecycle.

REUSABLE SYSTEM

4.0% OF THE STRUCTURE COST IS THE FORSA

SYSTEM

Page 9: Presentation Forsa Alum ENG - Building Progress

The size of each panel and contact surface quality of FORSA System, achieves excellent finishes on concrete surfaces. Reduces: rendering/plastering/ filling to achieve a flat surface before painting

FLAT AND HOMOGENEOUS CONTACT SURFACE

70% SAVING IN CORRECTIONS OR

FINISHINGS VS.

TRADITIONAL SYSTEM

Page 10: Presentation Forsa Alum ENG - Building Progress

Floor-to-Floor Connections: expansion joints helps hiding floor- to- floor dents.

The FORSA system integrates expansion joints to the forms and façade support angles to get them casted in the concrete slab edges.

FLOOR -TO- FLOOR TRANSITION

• Homogeneous façades: Dimensional precision, excellent vertical alignment and nice plumbs in corners and surface.

Page 11: Presentation Forsa Alum ENG - Building Progress

With FORSA Systems, dimensions of architectural design are maintained, this allows other construction activities to be industrialized (for example: door and window manufacturing, MEP installations and others).

INDUSTRIALIZATION OF THE PROCESSES

Page 12: Presentation Forsa Alum ENG - Building Progress

FORSA exceeds the demands of International Norm ACI 117

QUALITY STRUCTURE

Concrete warping

MAXIMUM FORSA 3mm

< NORM: 6 mm

Page 13: Presentation Forsa Alum ENG - Building Progress

FORSA INTEGRATES SPECIAL FEATURES TO CONCRETE SHAPES: The architectural and structural design is maintained and integrated into the mold. Some of these features include: curved elements on façades and roofs (vaults and others); diagonal walls, special ledges, etc.

VERSATILE SYSTEM

Page 14: Presentation Forsa Alum ENG - Building Progress

HIGH RISE AND LOW RISE PERFORMANCE

• Only one team of workers to pour walls and floors.

• Fast learning curve.

18% SAVING IN LABOR

VS. TRADITIONAL SYSTEM

Area: 80 m2 Cycle: 6 hours Average manpower performance: 1 m2/hour # Workers= 80/6/1 = 14

Page 15: Presentation Forsa Alum ENG - Building Progress

HIGH RISE AND LOW RISE PERFORMANCE

• For High Rise buildings you need a couple of workers for every 30 m. of perimeter to install walkways.

• Steel installation: 5 workers for 80 m2

• Hydraulic and sewage system: 2 workers for 80 m2

• Electricians: 2 workers for 80 m2

• 3 additional workers for patching and refilling holes left by ties. • 3 workers for supervision, axis plotting and other tasks.

Page 16: Presentation Forsa Alum ENG - Building Progress

CONSTRUCTION TIME REDUCTION

POSSIBILITY OF SIMULTANEOUS JOBS As the structure moves along, finishing work can be started on previously poured structures.

42% SAVING IN INDIRECT AND

ADMINISTRATIVE EXPENSES

VS. TRADITIONAL SYSTEM

Page 17: Presentation Forsa Alum ENG - Building Progress

• Different stages of the project in the same site, reducing the construction time. • Savings in Indirect and Administrative Expenses.

SIMULTANEOUS WORK

Page 18: Presentation Forsa Alum ENG - Building Progress

• Minimum Waste of Concrete • Less waste of Construction materials • Decrease of the use of wood.

CLEAN AND NEAT WORK SITES MEANS LESS COST

Page 19: Presentation Forsa Alum ENG - Building Progress

The FORSA System is compatible with any thermal insulation system.

WEATHER ADAPTED STRUCTURES

Page 20: Presentation Forsa Alum ENG - Building Progress

CONCRETE SPECIFICATIONS

Use concrete according to structural design specs and plasticizer / accelerator additives. For walls: Use gravel from 3/8» to ½ » depending on the thickness of the wall. For slabs: Use ½» to ¾» gravel

Page 21: Presentation Forsa Alum ENG - Building Progress

“Since I started using Forsa, I can control all my projects processes, represented in quality of works and major savings to get bigger profits. Eng. Andres Santamaria Apiros Constructors Bogotá, Colombia

BUILDERS ALWAYS COUNT ON OUR

COMPANIONSHIP

Page 22: Presentation Forsa Alum ENG - Building Progress

• Staff training on-site providing a

systematic method to ensure the optimum performance and consequent workforce reduction .

• Thanks to our Technical Monitoring

Plan, you’ll have on-site technical support at least twice a year until the end of the project. We look forward to improve your experience with Forsa systems and to guarantee formworks life cycle.

BUILDERS ALWAYS COUNT ON OUR

COMPANIONSHIP

• Permanent presence of our agents to meet any requirements.

• We have a very experienced

team to validate each stage of your formwork modulation in order to complete all project requirements and submit the most efficient solution.

Page 23: Presentation Forsa Alum ENG - Building Progress

FORSA Alum industrialized system compared to traditional systems is approximately 22% less of

direct cost.

CUSTO DE CONSTRUCAO - AREA TOTAL CONSTRUIDA

$ 0

$ 500,000

$ 1,000,000

$ 1,500,000

$ 2,000,000

$ 2,500,000

Alvenaria Estrutural Sistema FORSA

Administraçao da Obra

Retirada de Entulho

M.O Revestimento

Mat. Revestimento

M.O Regularizaçoes

Mat. Regularizaçoes

M.O Cobertura

Mat. Cobertura

M.O Alvenaria e Estrutura

Mat. Alvenaria e Estrutura

Vr Forma Forsa + Manutençao

OPTIMAL TECHNICAL -ECONOMIC RESULTS

Page 24: Presentation Forsa Alum ENG - Building Progress

ASSEMBLY PROCESS

Page 25: Presentation Forsa Alum ENG - Building Progress

ASSEMBLY PROCESS

Page 26: Presentation Forsa Alum ENG - Building Progress

DISMANTLING PROCESS

Page 27: Presentation Forsa Alum ENG - Building Progress

DISMANTLING PROCESS

Page 28: Presentation Forsa Alum ENG - Building Progress

For second floor formwork assembly, exterior walkways should be installed at entire housing’s perimeter. Grooved angles are inserted on walkways slots to support façade panels and keep building verticality. Platforms over walkways provide a safe exterior surface for workers safe movement.

ADDING MORE FLOORS

Page 29: Presentation Forsa Alum ENG - Building Progress

Forsa system produce the best concrete finishes due to the precision of the manufactured parts and smooth contact surface.

A minimum amount of finishing compound must be applied before painting.

QUALITY FINISHES

Page 30: Presentation Forsa Alum ENG - Building Progress

QUALITY FINISHES

Page 31: Presentation Forsa Alum ENG - Building Progress

SINGLE STORY HOUSES

Page 32: Presentation Forsa Alum ENG - Building Progress

TOWN HOUSES

Page 33: Presentation Forsa Alum ENG - Building Progress

CONDOS

Page 34: Presentation Forsa Alum ENG - Building Progress

HIGH RISES

Page 35: Presentation Forsa Alum ENG - Building Progress

HOTELS

Page 36: Presentation Forsa Alum ENG - Building Progress

CORRECTIONAL FACILITIES (JAILS)

Page 37: Presentation Forsa Alum ENG - Building Progress

STAIR CASE

Page 38: Presentation Forsa Alum ENG - Building Progress

SAFETY FEATURES

Pasarelas – Plataformas - Guardacuerpos

Alineadores con guardacuerpos

Page 39: Presentation Forsa Alum ENG - Building Progress

SAFETY FEATURES

Page 40: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 41: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 42: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 43: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 44: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 45: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 46: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 47: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 48: Presentation Forsa Alum ENG - Building Progress

BUILDINGS

Page 49: Presentation Forsa Alum ENG - Building Progress

INFRASTRUCTURE PROJECTS

Page 50: Presentation Forsa Alum ENG - Building Progress

We have commercial agents in: Mexico.

Brazil.

Guatemala.

Nicaragua.

Honduras

Costa Rica.

El Salvador.

Panama.

Ecuador.

Peru.

Venezuela.

Bolivia.

Uruguay.

Argentina.

Jamaica.

Chile.

Dominican Republic.

Trinidad and Tobago.

Spain.

Cuba.

Colombia. Cali

Bogota.

Medellin.

Barranquilla.

Our Presence…

Page 51: Presentation Forsa Alum ENG - Building Progress

Some of our projects…

APIROS Altamira Bogotá

Cantapiedra

Medellín Los Maderos

Cali

DEMET San Francisco - Tepojaco

SARE Cancún

GRUPO ROMA Coatzacoalcos

Page 52: Presentation Forsa Alum ENG - Building Progress

PECSA - Serramonte MACROINVERSIONES Villas de Buenaventura

NABLA RESIDENCIAL Fuentes del Valle

CONSTRUCTTORI Villa Liberación

CONSTRUCTORA BISCONO Arroyo Hondo

CONSTRUCTORA M.H.P Residencias Melian

Projects with our System

Page 53: Presentation Forsa Alum ENG - Building Progress

CONSTRUCTORA COAMCO Proyecto San José

PROMOTORA SU CASA S.A. Versalles

COVIGON Torre Nautica

Projects with our System

Page 54: Presentation Forsa Alum ENG - Building Progress

JAMAICA

ELEGANT ESTATES • PORT MORE. Maurice Meadows – 60 UNITS

• SPANISH TOWN. Wedgewood Gardens (Phase I)– 81 UNITS

• SPANISH TOWN. Wedgewood Gardens (Phase II)– 35 UNITS

• St. ELIZABETH. South Lamar – 28 UNITS

Page 55: Presentation Forsa Alum ENG - Building Progress

JAMAICA

M&M JAMAICA LTD. • PORT MORE. Union Estates – 700 UNITS

• CLARENDON. Longville Park – 129 UNITS

Page 56: Presentation Forsa Alum ENG - Building Progress

JAMAICA

PHILIP SMITH. • LIGUANEA AVENUE – 12 UNITS

• UPPER WATERLOO – 30 UNITS

• FAIRWAY– 30 UNITS

Page 57: Presentation Forsa Alum ENG - Building Progress

JAMAICA

WIHCON • JACARANDA. Union Estates – 540 UNITS

Page 58: Presentation Forsa Alum ENG - Building Progress

JAMAICA

YOUR PROJECT

HERE

Page 59: Presentation Forsa Alum ENG - Building Progress

QUESTIONS & ANSWERS

Thank you !!!

MR. VICTOR SALAZAR

+1 (876) 8182547

[email protected]