PowerPoint Presentation

YUNG SENG CONSTRUCTION SDN.BHD1st FLOOR, LOT 2062, RICH COMMERCIAL CENTER7TH MILE, JALAN PENRISSEN93250 KUCHING SARAWAKPREPARED BY:NAME : GARVIN TEAREGISTRATION NO : 05DKA13F1060PROGRAM : DIPLOMA KEJURUTERAAN AWAMDEPARTMENT : JABATAN KEJURUTERAAN AWAMTRAINING DURATION : 01 DECEMBER 2014 15 APRIL 2015INDUSTRIAL TRAINNING PRESENTATION

COMPANY PROFILE : YUNG SENG CONSTRUCTION

CONTENTPILINGFunction as basic load transfer through the soil strata that low bearing of the strata, the rock have high bearing capacityFactor using PileThe ground not able to bear the load from the structureThe distribution of land under the land surface is not uniformFor the purpose of preventing the action of the thrust of the subsurface such as hydrostatic actionType of PileReinforcement Concrete PileSheet PileSpun PileSelection and Design Criteria PileUnderground conditionLocation of constructionType of structureDurability pile

ELEMENT AND STRUCTURE OF HOUSE BUILDINGBEAMTo support the weight of building of a buildingSupport the load with horizontalSupport the wall and jointFLOOR SLABCover the groundSupport the load item of buildingMake the level building (for multistory building)COLUMNSupport the load from floor slab and beamAs prefabricated sheeting

UPPER BEAM

COLUMN

FLOOR SLABFORMWORKUse for the concreting workMake a shape of structureThe beginning step to creating the element.

REINFORCEMENTTo make the structure more strongBefore concreting work done

Ground Beam FormworkFloor Slab FormworkColumn Formwork

DRAINAGETo remove the water from the ground surface

DRAINConstruct behind the roadIn front or rear of house building

CULVERTInstall in the road the junction or across the road

Procedure to Install the CulvertThe operator will excavate the hole like the drain by use the excavator.The hole will excavate until both of drain was connectedThe supervisor will measure the hole to know how much culvert need to installThe worker will brought culvert from the storeThe operator keep up the culvert and then put it on the hallAll the culvert need to connect with each other to prevent leaksAll the culvert will cover by conversThe soil will keep on the hole to cover the culvertLEVELINGCONCEPTThe leveling methods are used to measure the different in height (H) between the two point A and B, vertical rods are set up at each of these two point and a level somewhere between them.

Procedure of Levelling WorksPlanting the temporary on every point that you'd got readingsSetting Up the Auto-LevelSet up the TripodMake sure head Tripod are flatPut auto level on a tripodAdjust the auto-level to get into an air bubble into the circleThe auto level ready to useThe worker will put the staff near the pegThe auto-level shoot into staff to get the readingCHECKERThe give a signature to receipt, check the material that buy from sub-contracter

8SUB-BASE of ROADTo make the structure of road more struggler and the durability of road more longer.ESTIMATINGTHE FUNCTION:To make easily to the client plan and design the projectTo estimate the cost to construct the project

PROGRESSIONTHE FUNCTIONTo know how the progression of project

FINDINGS AND RECOMMENDATIONFINDING THE PROBLE"Report and Presentation must use English". It, therefore, provides a sense of panic to students who have started to write the report in the Malay language. It will burden them convert their sentences into English. Malay grammars with English grammar are quite different. This will give effect to the lecturers to evaluate the final report Industry Training students.For example, during the 20th week, the students just do the same task. This will give you a sense of bored students who undergo industrial training. This will cause fewer students get objective of the training industry. Students will have less exposure in industrial training. This will cause the students lack the knowledge to be expressed in the final report.

RECOMMENDATIONSome terms used by employees while teaching the students may not be the same in terms of the theory. Polytechnics need to give space to students that not good in English in using the English language to present experiences during training industry. Perhaps, polytechnics should facilitate students to present their experiences in the presentation. During that time, students must write a final report in English. This simplifies the lecturer know, how far students understand what he experienced in the training industry. It also helps students to appoint of understanding him in the work he is going in the training industry.Students who undergo industrial training is not the same capabilities with the ability of ordinary workers. Students who undergo industrial training, they want to experience what about his career or work they will do in the courses they take in polytechnics. UPLI should provide recommendations to the firm or company that provides industrial training to students planning activities necessary to prepare to launch student activities during the training industry. It will reduce student experiencing the same things as long as 20 weeks. This will provide many benefits to students who undergo industrial training. It will give a lot of exposure to the students during their industrial training.

ANY QUESTION????THANK FOR LISTEN