From 2008
Organization ChartCEO
CTO
PM(TI)
Coordinator(TXN)
Implementation Team
Coordinator(RBS)
RBS Team
PM(D/T & OPT)
Coordinator
D/T and OPT team
PM (Civil)
Coordinator(Design)
Design Team
Coordinator(Construction)
Construction Team
PM(Testing)
Coordinator
Testing Team
Coordinator
Testing Team
PM(QA)
Coordinator(Telecom)
QA Team
Coordinator(Civil)
QA Team
CFO Head of HR and Admin Head of Marketing and Sales
Marketing and Sales Team
Our Strength
7+ Years in Telecom
100+ Highly Skilled
Resources
End to End Solution of
Telecom Services
Operation in Two Countries
Head Office: Kha-44, Bashtola Masjid Road, Shahajadpur, Gulshan, Dhaka-1212Email: [email protected] No: +880 1674567809Website: auspiciousbd.com
Yangoon Office: Room-11/A, Building: 240, Seikkanthar Street(Upper Block) Kycuktada Township, Yangoon,Myanmar Email: [email protected] No: +95 9264334023Website: auspiciousbd.com
Sister Concern of
1. Astha Constructions Ltd.2. Power Engineering, Constructions and Logistics Ltd (PECL)3. Samadhan Myanmar Ltd.
Local Partner of
Local Partner of
Services Offered
ServicesTelecommunication
Civil Engineering Services
Environmental Health and Safety
Trading
Our Services• Radio Network Planning (Macro, Micro, IBS, Small
Cells, Wi-Fi)• Drive Test, Optimization & Reporting • Site Acquisition • Civil Constructions• Sites Design and Drawing• Quality Assurance • INC Work (RBS & MW)• Survey (RBS & MW)• E1 Routing • Documentation • Frequency Scan & PIM Test (Coming)• Local Representative of Commscope and InfoVista
Telecommunication
Civil Engineering Services• Quality Assurance Supervision• Civil Constructions• Power Connection• Renovation Work• Retrofitting
Survey• Topological Survey• Hydrological Survey• Geographical Survey• Detailed Engineering Assessment
Equipped With All Modern Testing Tools
Telecom Testing Tools:1. Tems-16.1/ 15.1 and Nemo 7.62. Commscope Portable Optical PIM
Tester3. PCTEL Frequency Scanner (Coming)4. Ber Tester5. Site Master Civil Testing Tools:6. Ferro Scanner7. PET Machine 8. Hammer9. Core cutting Machine
Our Client
Project Organization Chart
Project Manager
Project Coordinator (SSV)
RF Engineer RF Engineer
Project Coordinator (Cluster Drive and Optimization)
RF Engineer
Rigger
RF Engineer
Rigger
Project Coordinator (Reporting)
Reporting Engineer
Our RF Solution
Contents
1 Introduction
2 Drive test tools3 Drive test type
4 Site Verification
5 Rigging Audit
6 Cluster Drive Test Optimization
7 Our Capability
Drive Test TypeSite Verification Individual cell verification test : To investigate detail of site performance by checking all single sectors with AMR call and Throughput test. In addition also required to perform small area dedicated test for Intra/Intercell HO.
Cluster Optimization Normal Drive To frame the potential area of the new site planned. Also to improve the important neighboring sites for which the handover to be defined. Cluster Optimization Dedicated Drive
Performed call to the test number and drive to the potential area given to determinei) call set up timeii) call set up successiii) drop calliv) SHO v) HSDPA ( Average & Maximum) Speedvi) Coverage Status ( Technology)vii) Pilot polution
When the site is completely integrated, Drive tester team will start to perform site
investigation. The detail sub-activities are outlined below:
1. Rigging Audit2. Site Verification3. Site corrective action (cross feeder, inconsistent data, functionality
problem, etc.)4. Acceptance Test
The site has been built and integrated as planned and that the planned coverage has been achieved
Site Verification:
RF Solution Department
All Tests Clear?
Corrective Actions
NoYes
New On Air Site Flow
New Site Integration
1. Consistency Check2. Rigging Audit3. Site Verification
Site Acceptance
Site Verification:
RF Solution Department
• Voice / Video calls
• Verify on per cell basis for all carriers:• RSCP• EC/No• Scrambling Code• LAC / RAC• Cell ID• Etc......
• Data / Throughput test• HSDPA and HSUPA /
Internet Browsing• Verify on per cell basis for all
carriers:• RSCP• EC/No• Scrambling Code• LAC / RAC• Cell ID• Max/Ave Speed• Etc..........
Site Verification:
RF Solution Department
Static test At the best radio location required to perform for all carriers 1. Voice call to determine if any call failure or block calls 2. Video call succesful 3. IRAT test for network reselection 4. Throughput R99/ HSDPA/HSUPA/Latency test using http / fttp and speedtest. 5. Internet browsing succesful
Mobility Test 1. Check intra cell HO in dedicated mode clockwise and anti clockwise two rounds for each direction 2. Check inter cell HO in dedicated mode for the 1st layer per cell both ways.
Site Verification:
RF Solution Department
Rigging Audit
Test Items in Rigging Audit:Antenna Installation Verification
- Azimuth- Height- Location- Cross-feeder/s
Rigging Tools :- Safety Belt- Compass- GPS
- Measurement tape- Digital Inclinometer
Site Audit required from the Rigger
1. Panoramic photos surrounding sites including antenna sectors/objective area
2. Ensure no blocking sectors from the main beam antenna3. Antenna mechanical/electrical tilt was in correct value4. Antenna was in correct orientation for the objective/target area5. Site Height6. Site Coordinates
RF Solution Department
• Cluster Definition, Site Information Data and Site Location Map• With Site/Cell ID, Site name, Primary SC, Neighbour list, RNC ID
and Cluster border highlighted• Prepare Route Map for Drive Testing• Perform drive test either Idle mode or Dedicated mode• Identify Problematic Areas• The result from the data will showing of Network performance such
as 1. Drop call rate 2. Accessibility – mobile originated/terminated call set up success rate 3. Coverage – RSCP and Ec/No
Cluster Drive test Optimization:
RF Solution Department
Cluster Drive test Optimization:
RF Solution Department
• The area which doesn't meet the criteria below is defined as "Problematic Area“
• Coverage Problem Area
• Dominance Problem Area
• Pilot Pollution
Best Server’s CPICH RSCP < - 99 dBm
Best Server’s CPICH Ec/No < -14 dB
4th Best Server’s CPICH RSCP > - 99 dBm
Cluster Drive test Optimisation:
RF Solution Department
Optimization Check needed before Starting Drive Test.
• Parameter Consistency Check(site creation & default parameter values)
• CELL/NODEB/RNC level Alarms check.
• Prx noise(Uplink Interference or RTWP check) Ranges between -102dbm to -105 dbm.
• Cell Availability Check(Site Down ).
• Cell barred.
• Proper neighbour definition.
• Drive Test Route preparation for Cluster level Drive Test.
• For cluster level Drive test 90% or above site should me On Air and Alarm Free.
RF Solution Department
Drive Test Window_TEMS
Monitored Neighbor DetectedNeighbor
Active Set
RF Solution Department
Drive Test Window_TEMS
Monitored Neighbor DetectedNeighbor
Active Set
RF Solution Department
What is the purpose of RF optimization?
RF Solution Department
Drive Test optimization Objective
A
B
C
D
RF Solution Department
Coverage and Dominance Problem
RF Solution Department
Coverage and Dominance ProblemBlock A:- The Area which is having bad RSCP <-95dbm and poor EC/no will be considered as poor coverage /problematic Area.Requirement for Analysis:- for optimizing this we require RSCP & EC/NO plot of best server. And RSCP Vs. EC/NO plot•Solution:- Antenna Tilting, change of Height of antenna•Increase CPICH power.•Antenna Type change( replace with High gain antenna)•Check any missing neighbor & Cross FeederBlock B:- Here the problematic Area is having RSCP >-95dbm but EC/NO <-10dbmRequirement for Analysis:- for optimizing this we require RSCP & EC/NO plot of best server.EC/NO plot for each Scrambling code.•Solution:- Antenna Tilting, change of Height of antenna•Increase CPICH power of serving cell, Decrease CPICH of Interfering cell•Antenna Type change( replace with Low gain antenna)•Check any missing neighbor.•Check CO scrambling Code.
RF Solution Department
Coverage and Dominance Problem
Block C:- Here the problem is the EC/NO of 4th best server is <6db as compared to best Server.Requirement for Analysis:-EC/NO plot for all serving cell in Active set and 4th and 5th best server from either monitoring /Detected set.Solution:- Antenna Tilting, change of Height of antenna•Increase CPICH power of serving cell, Decrease CPICH of Interfering cell•Antenna Type change( replace with Low gain antenna)
RF Solution Department
Missing Neighbor analysis
Here we have checked Best serving cell as per scanner which is SC 485 but UE is latched to SC 504 and the neighbor from SC 504 to SC 485 is not defined so the call drop occur due to missing neighbor.
RF Solution Department
Cross feeder analysisIn this Case in the Defined coverage area of SC 130 we are getting coverage of 128 and in the planned coverage of 128 we are getting coverage of 130.So we suspect Cross feeder between Sector 1 and sector 3.
Problems Caused by cross feeder can be:-1. High handover Failure.2. High Call Drop.3. Poor Dominance.
RF Solution Department
RF Solution Department
Pilot pollutionWhen the Number of Candidates eligible of Active set becomes greater than the active set size then Pilot pollution occurs.
RF Solution Department
Recommendation & Solution of Pilot pollution• perform scanning (via drive test)• Locate pollutant area• Do Neighbor list verification
• Remove neighbors those are not measured but are in Neighbor list• Add missing neighbor
• Check pollutant, whether it’s from overshooting site or site nearby• Check and Adjust physical configuration• Check and Adjust CPICH Power
RF Solution Department
RTWP(Received total wideband power)
• RTWP can be caused by bad weather, feeder broken, port feeder broken, or traffic fluctuation (load).
RF Solution Department
Time Propagation (TP)• TP use for checking overshoot sites• 1 unit TP equals to 234m in distance.• In NSN system we check PRACH report.
RF Solution Department
3G KPI Formulas and counters
3G KPI’s
RF Solution Department
Capability• We have well experienced, Optimization, Reporting & Drive Test Engineer
RF Solution Department
Planning & Optimization Software
Name Version Nos
Planet 5.8 1
Xeda 9 1
Xeous 1
Reporting Software
Actix 5.0.2 2
Mapinfo 11.5 3
Drive Test Software
Tems Investigation 15/16.1 5/2
Nemo Outdoor 7.6.1.12 3