PRACTICAL MAXIMuM CAPACITY OF HKIA’S TWO-RuNWAY SYSTEM
Accordingtothe1992publishedNewAirportMasterPlan(NAMP),HongKongInternationalAirport(HKIA)wasdesignedtohandleanultimatecapacityof87millionpassengers,8.9milliontonnesofcargoand376,000airtrafficmovements(ATMs,alsoknownasflightmovements)perannumin2040.However,thelatestbase-casetrafficdemandforecastfromInternationalAirTransportAssociation(IATA)Consultingby2030is97millionpassengers,8.9milliontonnesofcargoand602,000ATMsperyear.Themainreasonforthediscrepancybetweenthe1992NAMPandtheIATAConsultingestimatesforannualATMsisthatmanyoftheworkingassumptionsadoptedbackinearly1990swerebasedontheoperatingenvironmentofKaiTakAirportwhichatthattimewashighlyconstrainedandfullystretched–
(a)The1992NAMPassumedtheforecastflightsatHKIAwouldcompriseaveryhighpercentageofwide-bodiedaircraft(84%),resultinginahighaveragepassengerloadforecastofover300peopleperaircraft.WhenKaiTakexhausteditsrunwaycapacity,itwasnaturalthatairlines
maximisedthevalueofeachslotbydeployingthebiggestaircraftpossible.TheopeningofHKIAwithtworunwayshasprovidedmorerunwaycapacityforairlinestoincreasefrequency,servenewsecondarydestinations(especiallyontheMainland)anddeploynarrow-bodiedaircraft(lessthan200seats)onroutesthathaveyettomature.Theaveragepassengerloadperaircraftasaresultdecreasedfromaround200atairportopeningin1998toabout190since2000.Forthesamepassengerthroughputof87millionpassengers,IATAConsultingforecaststhatitwouldentail437,000ATMs,insteadof278,000ATMsthatwereoriginallyestimatedintheNAMP.
(b)The1992NAMPalsoassumedextensiveuseofwide-bodiedfreighters(forexample,B747Fof100tonnes)andlowerthanactualcargotonnagecarriedbyfreighterat45%ofthetotalcargothroughput.Asitturnsout,theextraordinarygrowthofthecargomarketinthelastdecade(supportedbytheGovernment’sprogressiveliberalisationpoliciesonairservices)andtherapid
2222
developmentofexpresscargoservicesatHKIAhasresultedinamuchgreaterpercentageofcargotrafficbeingcarriedbyfreighter(at60%)andthegreateruseofmedium-sizedfreighters(forexample,A300Fof55tonnes),thusincreasingtheoverallATMsatHKIA.Asopposedto66,000freighterATMscarrying8.9milliontonnesthatwereforecastintheNAMP,IATAConsultingestimatesthat108,000freighterATMswouldberequired.
THEORETICAL RuNWAY CAPACITY OF THE TWO-RuNWAY SYSTEMUnderacompletelyunconstrainedenvironmentandoperatingundera“MixedMode”(i.e.allowingbothlandingandtake-off),arunwaycandeliveramaximumof44ATMsperhour8,basedonInternationalCivilAviationOrganization(ICAO)
recommendedpracticesandotherrelevantfactorssuchasthetrafficmixatHKIA.Accordingly,tworunwaysoperatingcompletelyindependentlyshouldtheoreticallydeliver88ATMsperhour(44ATMsx2).However,inreality,thisisrarelythecase.Duetodifferentconstraints,noneoftherunwaycapacitycurrentlydeclaredbyairportsintheregionwithtworunwayscouldreachthistheoreticalmaximum.
PRACTICAL MAXIMuM RuNWAY CAPACITY OF HKIAHKIAstartedwithasinglerunwayoperation(SouthRunway)with34ATMsperhourattheairportopeningin1998.Sincetheopeningofthesecondrunway(NorthRunway)in1999,thedualrunwaysystemhasbeenoperatingunderaSegregatedMode(i.e.SouthRunwaydedicatedtodeparturesandNorthRunwayto
Single Runway’s Arrival/Departure Cycle under a Mixed Mode OperationFigure
�.1
Total Cycle (Landing & Take-off) = 68sec + 54sec + 45sec = 167sec
68sec 54sec 45sec
RUNWAY RUNWAY
Aircraft Landing Aircraft Take-Off
Note:Thelandingaircraftmustbeatleast3nauticalmilesfromtherunwayendwhenthedeparturebeginsandmaynottouchdownbeforethedepartingaircrafthaslefttherunway.
arrivals).TheCivilAviationDepartment(CAD)hasgraduallyincreasedthedeclaredrunwaycapacityfrom40in1999to61in2011.ThelengthoftimetakenistoallowsufficienttimeforCADtofamiliariseitsairtrafficcontrollerswithdualrunwayoperationsandgraduallybuildupitsairtrafficcontrolcapacity.
InordertoestablishthepracticalmaximumcapacityofHKIA’stwo-runwaysystem,NationalAirTrafficServices(NATS),aleadingproviderofairtrafficmanagementservicesbasedintheUnitedKingdom,wascommissionedtostudyandidentifymeasuresrequiredtofurtherraiseHKIA’srunwaycapacityagainstdifferentpossiblemodesofoperationincluding–
• Segregatedoperation–onerunwayexclusivelyfordeparturesandtheotherrunwayexclusivelyforarrivals;
8 Therecanbe3,600sec(seconds)÷167sec=21.56≈22cycles(i.e.22pairsoflandingandtake-off)perhour,thus44movementsperhour.
23HKIA MASTER PLAN 2030 23HKIA MASTER PLAN 2030
PRAC
TICA
L MA
XIMu
M
CA
PAC
ITY OF H
KIA’S
TWO
-RuN
WA
Y SYSTEM�
wasbasedonthehistoricalflightmovementpatternofatypicalbusydayandhavingtakenintoaccount–
(a)Alternateclosureofthetworunwayseachnightforabout8hoursforroutinemaintenance;
(b)ThematchingofslotavailabilityatHKIAandthedestinationairports;
(c)Typicalhourlyfluctuationsofabusyday;and
(d)Provisionforrecoveryperiodstocaterforoperationaldelays.
Thepracticalmaximumdailymovementsof1,200canbetranslatedintothepracticalmaximumannualmovementsof420,000,takingintoaccountthehistoricalseasonaladjustmentofflightmovementsbyairlinesasreflectedintheirflightschedulepublishedtwiceayearforthesummerandwinterseasonsrespectively.Thepracticalmaximumannualmovementcapacityis
expectedtobereachedsometimebetween2019and2022asindicatedinFigure4.2.
LATEST DEVELOPMENTSTosupportHKIA’scontinuedgrowth,wehavecommittedHK$9.3billiontothefirstphaseoftheMidfieldDevelopmentwhichwillenableHKIAtooptimallyaccommodate,intermsofbothitsterminalandapronfacilities,approximately60millionpassengersand5milliontonnesofcargoperyear.Thisismainlytomeettheadditionalpassengerandfreighteraircraftstandsdemandintheinterim,whilemaintainingHKIA’shighservicestandards.Theprojectinvolves–
(a)Theconstructionof20aircraftparkingstandsincluding11airbridge-servedstands,aswellasan“I-shaped”passengerconcourseattheMidfield;
• Mixedoperation–botharrivalsanddeparturesareallowedoneachrunway.
NATSconcludedthatgivenHKIA’sspecialcircumstances(forexample,terrainconstraintsurroundingHKIAincludingtheLantauPeak,LoFuTauandSunsetPeakonLantauIslandaswellasTaiMoShanandCastlePeak,congestedandcomplicatedairspacemanagement,theaircraftmixatHKIA,etc.)andtoremainfullyincompliancewithICAO’ssafetyandminimumseparationrequirements,thepracticalmaximumrunwaycapacityofHKIAcanonlybeincreasedfrom61to68ATMsperhourby2015regardlessofthemodeofoperation.ThishasbeenverifiedandacceptedbyCAD.
Onthebasisof68ATMsperhour,NATSassessedthatthepracticalmaximumdailymovementsisabout1,200perday.Thisassessment
Forecast Air Traffic Movements to Reach the Two-Runway Capacity Between 2019 and 2022Figure
�.2
700,000ATMs/Year
200,000
300,000
500,000
400,000
600,000
2014
2015
2016
2017
2018
2019
2020
2022
2021
2023
2024
2025
2026
2027
2028
2029
2030
2012
2010
2008
2013
2011
2009
BaseLow
Capacity of Two Runways
High
2019
2022
CAGR 2008-2030
3.6%
3.2%
2.8%
Practical MaxiMuM caPacity of HKia’s two-runway systeM�
2�2�
(b)Anextensionoftheexistingautomatedpeoplemover(APM)systemfromTerminal1tothepassengerconcourseattheMidfield;
(c)Minorenhancementworksonthebaggagehandlingsystem;and
(d)Thebuildingofanewcross-fieldtaxiway.
Withtheseenhancements,HKIAwillbeabletomeettheunconstraineddemandforecastofabout60millionpassengersand5milliontonnesofcargoperyearby2015.Beyondthat,wemustexploreotherdevelopmentoptions.TheMasterPlan2030hasevaluateddifferentoptionstocaterforthe“capacitycrunch”beyond2015.Theseareanalysedinthefollowingchapters.
Planned Midfield Development by 2015Figure
�.3
Anartist’simpressionofthePhase1ofMidfieldDevelopment.
2�HKIA MASTER PLAN 2030 2�HKIA MASTER PLAN 2030