Page 1: PRACTICAL MAXIMuM CAPACITY OF HKIA’S TWO-RuNWAY … · declared runway capacity from 40 in 1999 to 61 in 2011. The length of time taken is to allow sufficient time for CAD to familiarise

PRACTICAL MAXIMuM CAPACITY OF HKIA’S TWO-RuNWAY SYSTEM

Accordingtothe1992publishedNewAirportMasterPlan(NAMP),HongKongInternationalAirport(HKIA)wasdesignedtohandleanultimatecapacityof87millionpassengers,8.9milliontonnesofcargoand376,000airtrafficmovements(ATMs,alsoknownasflightmovements)perannumin2040.However,thelatestbase-casetrafficdemandforecastfromInternationalAirTransportAssociation(IATA)Consultingby2030is97millionpassengers,8.9milliontonnesofcargoand602,000ATMsperyear.Themainreasonforthediscrepancybetweenthe1992NAMPandtheIATAConsultingestimatesforannualATMsisthatmanyoftheworkingassumptionsadoptedbackinearly1990swerebasedontheoperatingenvironmentofKaiTakAirportwhichatthattimewashighlyconstrainedandfullystretched–

(a)The1992NAMPassumedtheforecastflightsatHKIAwouldcompriseaveryhighpercentageofwide-bodiedaircraft(84%),resultinginahighaveragepassengerloadforecastofover300peopleperaircraft.WhenKaiTakexhausteditsrunwaycapacity,itwasnaturalthatairlines

maximisedthevalueofeachslotbydeployingthebiggestaircraftpossible.TheopeningofHKIAwithtworunwayshasprovidedmorerunwaycapacityforairlinestoincreasefrequency,servenewsecondarydestinations(especiallyontheMainland)anddeploynarrow-bodiedaircraft(lessthan200seats)onroutesthathaveyettomature.Theaveragepassengerloadperaircraftasaresultdecreasedfromaround200atairportopeningin1998toabout190since2000.Forthesamepassengerthroughputof87millionpassengers,IATAConsultingforecaststhatitwouldentail437,000ATMs,insteadof278,000ATMsthatwereoriginallyestimatedintheNAMP.

(b)The1992NAMPalsoassumedextensiveuseofwide-bodiedfreighters(forexample,B747Fof100tonnes)andlowerthanactualcargotonnagecarriedbyfreighterat45%ofthetotalcargothroughput.Asitturnsout,theextraordinarygrowthofthecargomarketinthelastdecade(supportedbytheGovernment’sprogressiveliberalisationpoliciesonairservices)andtherapid

2222

Page 2: PRACTICAL MAXIMuM CAPACITY OF HKIA’S TWO-RuNWAY … · declared runway capacity from 40 in 1999 to 61 in 2011. The length of time taken is to allow sufficient time for CAD to familiarise

developmentofexpresscargoservicesatHKIAhasresultedinamuchgreaterpercentageofcargotrafficbeingcarriedbyfreighter(at60%)andthegreateruseofmedium-sizedfreighters(forexample,A300Fof55tonnes),thusincreasingtheoverallATMsatHKIA.Asopposedto66,000freighterATMscarrying8.9milliontonnesthatwereforecastintheNAMP,IATAConsultingestimatesthat108,000freighterATMswouldberequired.

THEORETICAL RuNWAY CAPACITY OF THE TWO-RuNWAY SYSTEMUnderacompletelyunconstrainedenvironmentandoperatingundera“MixedMode”(i.e.allowingbothlandingandtake-off),arunwaycandeliveramaximumof44ATMsperhour8,basedonInternationalCivilAviationOrganization(ICAO)

recommendedpracticesandotherrelevantfactorssuchasthetrafficmixatHKIA.Accordingly,tworunwaysoperatingcompletelyindependentlyshouldtheoreticallydeliver88ATMsperhour(44ATMsx2).However,inreality,thisisrarelythecase.Duetodifferentconstraints,noneoftherunwaycapacitycurrentlydeclaredbyairportsintheregionwithtworunwayscouldreachthistheoreticalmaximum.

PRACTICAL MAXIMuM RuNWAY CAPACITY OF HKIAHKIAstartedwithasinglerunwayoperation(SouthRunway)with34ATMsperhourattheairportopeningin1998.Sincetheopeningofthesecondrunway(NorthRunway)in1999,thedualrunwaysystemhasbeenoperatingunderaSegregatedMode(i.e.SouthRunwaydedicatedtodeparturesandNorthRunwayto

Single Runway’s Arrival/Departure Cycle under a Mixed Mode OperationFigure

�.1

Total Cycle (Landing & Take-off) = 68sec + 54sec + 45sec = 167sec

68sec 54sec 45sec

RUNWAY RUNWAY

Aircraft Landing Aircraft Take-Off

Note:Thelandingaircraftmustbeatleast3nauticalmilesfromtherunwayendwhenthedeparturebeginsandmaynottouchdownbeforethedepartingaircrafthaslefttherunway.

arrivals).TheCivilAviationDepartment(CAD)hasgraduallyincreasedthedeclaredrunwaycapacityfrom40in1999to61in2011.ThelengthoftimetakenistoallowsufficienttimeforCADtofamiliariseitsairtrafficcontrollerswithdualrunwayoperationsandgraduallybuildupitsairtrafficcontrolcapacity.

InordertoestablishthepracticalmaximumcapacityofHKIA’stwo-runwaysystem,NationalAirTrafficServices(NATS),aleadingproviderofairtrafficmanagementservicesbasedintheUnitedKingdom,wascommissionedtostudyandidentifymeasuresrequiredtofurtherraiseHKIA’srunwaycapacityagainstdifferentpossiblemodesofoperationincluding–

• Segregatedoperation–onerunwayexclusivelyfordeparturesandtheotherrunwayexclusivelyforarrivals;

8 Therecanbe3,600sec(seconds)÷167sec=21.56≈22cycles(i.e.22pairsoflandingandtake-off)perhour,thus44movementsperhour.

23HKIA MASTER PLAN 2030 23HKIA MASTER PLAN 2030

PRAC

TICA

L MA

XIMu

M 

CA

PAC

ITY OF H

KIA’S  

TWO

-RuN

WA

Y SYSTEM�

Page 3: PRACTICAL MAXIMuM CAPACITY OF HKIA’S TWO-RuNWAY … · declared runway capacity from 40 in 1999 to 61 in 2011. The length of time taken is to allow sufficient time for CAD to familiarise

wasbasedonthehistoricalflightmovementpatternofatypicalbusydayandhavingtakenintoaccount–

(a)Alternateclosureofthetworunwayseachnightforabout8hoursforroutinemaintenance;

(b)ThematchingofslotavailabilityatHKIAandthedestinationairports;

(c)Typicalhourlyfluctuationsofabusyday;and

(d)Provisionforrecoveryperiodstocaterforoperationaldelays.

Thepracticalmaximumdailymovementsof1,200canbetranslatedintothepracticalmaximumannualmovementsof420,000,takingintoaccountthehistoricalseasonaladjustmentofflightmovementsbyairlinesasreflectedintheirflightschedulepublishedtwiceayearforthesummerandwinterseasonsrespectively.Thepracticalmaximumannualmovementcapacityis

expectedtobereachedsometimebetween2019and2022asindicatedinFigure4.2.

LATEST DEVELOPMENTSTosupportHKIA’scontinuedgrowth,wehavecommittedHK$9.3billiontothefirstphaseoftheMidfieldDevelopmentwhichwillenableHKIAtooptimallyaccommodate,intermsofbothitsterminalandapronfacilities,approximately60millionpassengersand5milliontonnesofcargoperyear.Thisismainlytomeettheadditionalpassengerandfreighteraircraftstandsdemandintheinterim,whilemaintainingHKIA’shighservicestandards.Theprojectinvolves–

(a)Theconstructionof20aircraftparkingstandsincluding11airbridge-servedstands,aswellasan“I-shaped”passengerconcourseattheMidfield;

• Mixedoperation–botharrivalsanddeparturesareallowedoneachrunway.

NATSconcludedthatgivenHKIA’sspecialcircumstances(forexample,terrainconstraintsurroundingHKIAincludingtheLantauPeak,LoFuTauandSunsetPeakonLantauIslandaswellasTaiMoShanandCastlePeak,congestedandcomplicatedairspacemanagement,theaircraftmixatHKIA,etc.)andtoremainfullyincompliancewithICAO’ssafetyandminimumseparationrequirements,thepracticalmaximumrunwaycapacityofHKIAcanonlybeincreasedfrom61to68ATMsperhourby2015regardlessofthemodeofoperation.ThishasbeenverifiedandacceptedbyCAD.

Onthebasisof68ATMsperhour,NATSassessedthatthepracticalmaximumdailymovementsisabout1,200perday.Thisassessment

Forecast Air Traffic Movements to Reach the Two-Runway Capacity Between 2019 and 2022Figure

�.2

700,000ATMs/Year

200,000

300,000

500,000

400,000

600,000

2014

2015

2016

2017

2018

2019

2020

2022

2021

2023

2024

2025

2026

2027

2028

2029

2030

2012

2010

2008

2013

2011

2009

BaseLow

Capacity of Two Runways

High

2019

2022

CAGR 2008-2030

3.6%

3.2%

2.8%

Practical MaxiMuM caPacity of HKia’s two-runway systeM�

2�2�

Page 4: PRACTICAL MAXIMuM CAPACITY OF HKIA’S TWO-RuNWAY … · declared runway capacity from 40 in 1999 to 61 in 2011. The length of time taken is to allow sufficient time for CAD to familiarise

(b)Anextensionoftheexistingautomatedpeoplemover(APM)systemfromTerminal1tothepassengerconcourseattheMidfield;

(c)Minorenhancementworksonthebaggagehandlingsystem;and

(d)Thebuildingofanewcross-fieldtaxiway.

Withtheseenhancements,HKIAwillbeabletomeettheunconstraineddemandforecastofabout60millionpassengersand5milliontonnesofcargoperyearby2015.Beyondthat,wemustexploreotherdevelopmentoptions.TheMasterPlan2030hasevaluateddifferentoptionstocaterforthe“capacitycrunch”beyond2015.Theseareanalysedinthefollowingchapters.

Planned Midfield Development by 2015Figure

�.3

Anartist’simpressionofthePhase1ofMidfieldDevelopment.

2�HKIA MASTER PLAN 2030 2�HKIA MASTER PLAN 2030

PRAC

TICA

L MA

XIMu

M 

CA

PAC

ITY OF H

KIA’S  

TWO

-RuN

WA

Y SYSTEM�