PORTFOLIO Page 1 Pieter Venter PROJECT MANAGEMENT PORTFOLIO PROFILE

Upload: pieter-venter

Post on 14-Apr-2017

21 views

Category:

Documents


2 download

TRANSCRIPT

PORTFOLIO Page 1

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PROFILE

PORTFOLIO Page 2

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

CONTENTS:

Executive Summary

Mission Statement 3

About me 3

Consultancy Services

Redevelopment 4

Retrofitment 5

BUILDING AUDITS / DUE DILIGENCE REPORTS 6

Planned Maintenance 7

Small Works Projects 8

Project Portfolio

Tower House 9

Argyle Precinct 10

Dudley Heights 11

Skyways 12

YMCA 13 - 16

Skyways Restaurant and Bar 17 - 18

Residential/small works 19 - 20

Project Structure 21

Fee Structure 22

Curriculum Vitae

Pieter Venter 23 - 27

Reference Letters 28 – 34

Contact Details 35

PORTFOLIO Page 3

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

ABOUT PIETER VENTER:

MISSION STATEMENT

Pieter Venter is committed to providing professional, quality service and advice to employers

and clients alike, promoting the role of the Project Manager within the construction industry.

ABOUT

Pieter Venter following a total of 15 years within the design, maintenance, development and

construction industry.

As a Project Manager Pieter is a member of PMSA Project Management South Africa and

provide expert advice, design and detailed reports to employers or clients who wish to build,

purchase, maintain, renovate, improve or redevelop buildings.

My aim for the future is to continue the growth of my skills and services to private, commercial

and public clients, and build on my existing strength of professional, friendly and personal

services.

PORTFOLIO Page 4

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

EXPERIENCE:

REDEVELOPMENT

When re-developing a building the entire building is stripped out in its entirety and re-

developed. The changes generally range from complete internal conversions from office space

to residential units through to external façade changes. In most cases all electrical works and

wet services are completely removed and new layouts are designed and implemented.

YMCA – Braamfontein – redeveloped in 2009

PORTFOLIO Page 5

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

RETROFITMENT

Retro fitment is defined as the removal of outdated services from existing buildings and the

refitting of modernized, more efficient services. Retro fitment projects consist of the renewal of

electrical services (main distribution boards, cabling and fixtures and fittings), plumbing services

(wet service pumps, storage tanks, supply and waste pipe-work, and plumbing fixtures and

fittings), fire reticulation systems, lifts, low/zero carbon technologies, security systems and

access control systems.

Retrofitment projects are generally carried out in order to minimize maintenance and running

costs,reduce carbon footprints, upgrade existing buildings to meet current legislative

requirements, increase security, and increase the value of depreciated property.

Argylle precint – Combination of retro fitment and redevelopment

PORTFOLIO Page 6

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

CONSULTANCY SERVICES:

HOME BUYERS REPORTS / BUILDING AUDITS / DUE DILIGENCE REPORTS

Due to the nature of Pieter’s combined relative experience in the trade, building owners or

clients who wish to acquire a property/building can have the building audited and obtain a full

detailed report on the status of all services, fixtures, fittings, finishes and the super structure

including concrete slabs, pillars, brickwork, soffits, ceilings, flooring etc. Building audit reports

include a budget proposal to repair or replace any damaged areas and items noted.

PORTFOLIO Page 7

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

CONSULTANCY SERVICES:

PLANNED MAINTENANCE:

Planned Maintenance can best be described as a planned scheme of works that need to be

carried out to a building over time so as to spread out the costs of the maintenance and to

ensure the building is kept safe and in good working order over its life span. Regular minor

maintenance avoids large unexpected expenses.

Before any planning or programming of maintenance can commence it is essential that a

thorough, systematic inspection is carried out so as to determine the actual condition of the

building and of specific components. This allows the prioritization of repairs and also aids in

establishing suitable cyclical maintenance timescales.

The Project Bureau has extensive experience in the inspection of various types of buildings and

is able to provide clients with long term maintenance schedules that are prioritised and costed

in order to allow our clients to maintain their assets to a desired standard and to manage their

cash flow for building maintenance.

Maintenance programmes are based on building reports and will outline all areas and services

that are to be checked up on, re-tested, serviced, etc. Such a maintenance report is designed to

suit each building in its own respect and if adhered to will ensure that general maintenance

costs and over-all year to year expenditure on a building can be kept to a minimum and allow

for realistic budgeting forecasts.

PORTFOLIO Page 8

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

SMALL OR MINOR WORKS

Pieter classifies small works as work that is required on a site that would generally be part of a

general construction, retro fitment or re-development project. Such works can be summarized

as painting projects, landscaping projects, paving projects, tiling projects, shop fitting projects,

space planning or procurement to commercial or residential property.

PORTFOLIO Page 9

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PROJECT PORTFOLIO:

TOWER HOUSE (JR House), Johannesburg CBD:

BRIEF:

Tower House was a Retrofitment and Redevelopment Project. The works consisted of the demolition

and rebuilding of walls that were beyond repair and the renovating and upgrading of the internal

structure, i.e. renewal of all flooring, kitchens, bathrooms, fixtures and fittings, including the renewal of

the entire electrical system, and fire reticulation and wet services system, which also included the

installation of a new wet services system, which included booster pumps, circulation pump sets, cold

water storage tanks, a 10,000 litre boiler plant facility, and Pex-Al-Pex piping for all water supply

pipework from the municipal feed to each unit. In addition to this all waterproofing was replaced and

specialist concrete and facade repairs were carried out.

PROJECT TIMEFRAME TOTAL CONSTRUCTION VALUE

7 Months R8,000,000.00

DATE COMPLETED GROSS FLOOR AREA

November 2007 1668sq.m

PORTFOLIO Page 10

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PROJECT PORTFOLIO: ARGYLE PRECINCT, Braamfontein:

The Argyle Precinct consisted of the following 4 independent buildings: Argyle Centre, Baker House, Dudley

Heights and Skyways. All buildings were developed concurrently.

Argyle Centre and Baker House:

BRIEF

The Baker House and Argyle Centre project consisted of the redevelopment of an existing hospital into 138

residential units with medical facilities on the ground floor level of Argyle Centre.

95% of the internal layout was demolished and redesigned into 138 units with new kitchens, bathrooms,

built-in cupboards and flooring. All units and communal areas were painted throughout. Works included the

replacement of all electrical wiring, the installation of a new wet services booster pump and storage tanks,

the replacement of all plumbing supply and drainage pipe work, façade repairs, the upgrade of the fire

reticulation system and the renewal of all plumbing and electrical fixtures and fittings. Two new 55KvA

generators, connected to lifts and emergency lighting, was also installed.

PROJECT DURATION VALUE

6 Months R19,320,000.00

DATE COMPLETED GROSS FLOOR AREA

March 2009 4200sq.m

PORTFOLIO Page 11

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Dudley Heights:

BRIEF

The Dudley Heights project consisted of a retrofitment and an upgrade of existing residential building

containing 223 Units. All units had new kitchens, bathrooms, built-in cupboards and flooring installed

and were painted throughout. Works included the replacement of all electrical wiring, the installation of a

new wet services booster pump and storage tanks, the replacement of all plumbing supply and drainage pipe

work, structural concrete repairs, the upgrade of the fire reticulation system and the renewal of all plumbing

and electrical fixtures and fittings. Two new boilers with a capacity of 50,000 litre were installed to supply

hot water to all four buildings with the hot water being generated by a combination of electrical

element-banks in the boilers and new solar panels on the roof. A new 110KvA generator, connected to

lifts and emergency lighting, was also installed.

PROJECT DURATION TOTAL CONSTRUCTION VALUE

8 Months R 67,160,000.00

DATE COMPLETED GROSS FLOOR AREA

March 2009 14,600sq.m

PORTFOLIO Page 12

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Skyways:

BRIEF

The Skyways project consisted of a retrofitment and an upgrade of existing residential building

containing 72 Units. All units had new kitchens, bathrooms, built-in cupboards and flooring installed and

were painted throughout. Works included the replacement of all electrical wiring, the installation of a new

wet services booster pump and storage tanks, the replacement of all plumbing supply and drainage pipe

work, the upgrade of the fire reticulation system and the renewal of all plumbing and electrical fixtures and

fittings. A new 55KvA generator, connected to lifts and emergency lighting, was also installed.

PROJECT TIMEFRAME

5 Months

DATE COMPLETED

March 2009

GROSS FLOOR AREA

2,300sq.m

TOTAL CONSTRUCTION VALUE

R 10,580,000.00

PORTFOLIO Page 13

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

YMCA, Braamfontein:

The YMCA building consisted of 3 attached buildings and was split into the following 3 phases for

redevelopment:

Phase 1:

BRIEF:

YMCA Phase 1 consisted of the refurbishment of the existing internal structure from hostel accommodation

with communal facilities into 119 self-contained student residential units. Works included the upgrade of the

Main Distribution Board and replacement of all electrical wiring, the installation of a new wet services

booster pump and storage tanks, the replacement of all plumbing supply and drainage pipe work, façade

repairs, the renewal of all floor coverings, painting throughout, the upgrade of the fire reticulation system

and the renewal of all plumbing and electrical fixtures and fittings.

PROJECT DURATION

6 Months

DATE COMPLETED

Phase 1 – September 2009

GROSS FLOOR AREA

5200sq.m

CONSTRUCTION COST

R18,000,000.00

PORTFOLIO Page 14

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Phase 2:

PORTFOLIO Page 15

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

BRIEF:

YMCA Phase 2 consisted of the complete redevelopment of open communal spaces into 46 self-

contained student residential units.

Structural works included the construction of pad foundations, a new architectural slab, reinforced

concrete columns and a reinforced concrete mezzanine floor. Internally works consisted of the

installation of dry-wall partitioning, the renewal of all electrical wiring, fixtures and fittings, the

replacement of all plumbing supply and drainage pipe work, the strip out and installation of a lift, the

installation of a biometric access control system and the upgrade of the fire reticulation system.

Externally works consisted of the installation of a wet services booster pump, façade repairs and all

waterproofing was replaced.

PROJECT DURATION

7 Months

DATE COMPLETED

Phase 2 – March 2010

GROSS FLOOR AREA

2600sq.m

CONSTRUCTION COST

R10,000,000.00

PORTFOLIO Page 16

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Phase 3:

BRIEF:

YMCA Phase 3 consisted of the redevelopment of open communal spaces into self contained student

residential units. This building was initially condemned by the appointed structural engineer due works

carried out by a previous contractor that were not in compliance with the national building regulations,

and which overloaded structure and rendered the building unsafe.

In order to develop the building all construction work carried out previously had to be completely

demolished and stripped out. Redevelopment works consisted of the installation of dry-wall

partitioning, the renewal of all electrical wiring, fixtures and fittings, the replacement of all plumbing

supply and drainage pipe work, the installation of a structural steel mezzanine floor with timber decking,

the installation of a biometric access control system and the upgrade of the fire reticulation system.

Externally works consisted of the installation of façade repairs and all waterproofing was replaced.

PROJECT DURATION DATE COMPLETED

2 Months Phase 2 – February 2011

GROSS FLOOR AREA CONSTRUCTION COST

700sq.m R2,000,000.00

PORTFOLIO Page 17

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Argyll Precinct restaurant and gym project Fifa 2010:

The Argyll precinct consists of four existing buildings that are seen as a single unit. During the 2010

Soccer world cup these buildings were used to host the HBS broadcasting service and housed over 480

staff:

BRIEF: Basement conversion to new Restaurant, Bar, Gym and Tea Room for HBS hoast broadcaster for the Fifa soccer

world cup 2010.

Before After

PORTFOLIO Page 18

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Argyll Precinct restaurant and gym project Fifa 2010: Before After

Project start date: 23 March 2010

Completion date: 23 April 2010

Days to complete: 22 Working days and 4 Saturdays = 26 Days

Project budget: R 3 400 000.00

PORTFOLIO Page 19

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

RESIDENTIAL / SMALL WORKS: BRIEF: Enhance facade of existing dwelling and prevent plaster cracks in walls advancing to a worse

stage of dilapidation.

Before After

PORTFOLIO Page 20

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PROJECT DURATION DATE COMPLETED

4 Weeks 21-04-2011

GROSS FLOOR AREA PROJECT VALUE

2452sq.m of painting & 350sqM of tiling R 148 000.00

PORTFOLIO Page 21

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PROJECT STRUCTURE:

Pieter Venter will act as the single point of contact to the employer or client and will manage

the entire project employing other consultants as is required.

PORTFOLIO Page 22

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

FEE STRUCTURE:

The project fees charged by The employer at the time were in accordance with Government

Gazette No. 26422 – Recommended Cope of Services and Tariff of Fees for Persons Registered

in terms of the Project Construction Management Professions Act, 2000 (Act No. 48 of 2000):

Cost of Works

From To Primary Fee Secondary Fee For value over

R0.00 R4,000,000.00 R0.00 5.90% R0.00

R4,000,000.00 R8,000,000.00 R236,000.00 4.43% R4,000,000.00

R8,000,000.00 R16,000,000.00 R413,000.00 3.85% R8,000,000.00

R16,000,000.00 R32,000,000.00 R721,000.00 3.36% R16,000,000.00

R32,000,000.00 R64,000,000.00 R1,258,000.00 2.93% R32,000,000.00

R64,000,000.00 R128,000,000.00 R2,197,000.00 2.56% R64,000,000.00

R128,000,000.00 R256,000,000.00 R3,836,000.00 2.24% R128,000,000.00

R256,000,000.00 And above R6,699,000.00 1.95% R256,000,000.00

The following table was used for proportioning the basic fee for normal services over the

various stages of the services:

Project Stage Description % of Total Fee

1 Project Initiation and Briefing 10%

2 Concept and Viability 10%

3 Design Development 25%

4 Tender Documentation and Procurement 10%

5 Construction and administration 40%

6 Contract Close Out 5%

PORTFOLIO Page 23

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

CURRICULUM VITAE

of

PIETER VENTER

Education / Qualifications:

Secondary

Kuswag School, Amanzimtoti, Matric – 1997

Tertiary Qualification

− N4 and N5 National Certificate - Multi Disciplinary Drawing Office Practice, Durban College of

Education, 1998

− National Civil Engineering Diploma, Unisa, Current

Professional Accreditations:

SACAP – South African Council for Architectural Professionals

PMSA – Project Management South Africa

Computer Literacy:

AutoCAD

CADDIE

Floor Plan 3D

Microsoft Project

Microsoft Office (Excel, Word, Power-point and Outlook)

PORTFOLIO Page 24

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Career History:

Mafadi

March 2015 – Current

Maintenance and Project manager

Run maintenance department for property management co. with large portfolio of client buildings and

individual tenanted investment units

Identify and pursue construction projects throughout this portfolio and outside the portfolio.

Private Consultant

July 2014 – March 2015

Private project management Consultant

Manage and offer turnkey solutions to private clients

Complete Due Diligence reports for potential buyers of small, medium and large buildings

Home inspection reports for potential Buyers

Aengus Investment Properties

July 2011 – July 2014

Head of Group Construction and letting

• Oversee all construction works

• Oversee all refurbishment works

• Oversee all maintenance works

• Identify and starting of new business units and projects

• Costing and budgets for yearly expenditure and budgets

• Implementation of cost saving and energy efficiency programs within portfolio

• Fill buildings within company portfolio

PORTFOLIO Page 25

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Aengus Property Holdings

March 2009 – June 2010

Specialist Projects Manager

− Created a new maintenance department within Aengus Property Holdings

− Execute site feasibility studies and building reports which included professional reports, proposed

new design layouts, current status of buildings, project planning and costing

− Monitor maintenance staff at buildings throughout entire portfolio

− Monitor site progress of project department

− Recommendations relating to current projects reporting to MD as to where additional funds could

be saved

Aengus Property Holdings

September 2007 – March 2009

Project Manager

− Day to day management of site, including supervising and monitoring the site labour force and

monitoring the work of sub-contractors

− Scheduling and coordinating of sub-contractors

− Control of materials and wastage

− Liaising with consultants, sub-contractors, supervisors, surveyors and work force involved in the

project

− Planning, time management and programming of work

− Time keeping, daily reports and daily costing of labour

− Contract administration

− Overseeing quality control and safety matters on site, and ensuring that regulations are adhered to

− Site security and control

− Requisition of materials and plant for sites

− Checking drawings and quantities and ensuring that the calculations are correct

− Negotiate prices and fees with suppliers

Projects:

− Tower House – Re-development project

− Baker House – Re-development project

− Argyle House – Re-development project

− Dudley Heights – Retro fitment project

− Skyways – Retrofitment project

PORTFOLIO Page 26

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Virtual Buro

March 2007 – September 2007

Drawing Office Manager

Duties:

− Day to Day to day management of entire drawing office

− Ensuring all architectural drawings and Engineering drawings correlated and were issue to clients

− Check accuracy of drawings created within drawing office

Projects:

− Lanseria airport new car park extension

Sagcom7

April 2004 – February 2007

Self employed (Architectural design studio)

Duties:

- Check Office administration

- Measuring up on site

- Site planning and layouts

- Artist impressions of client requirements

- Drawing of architectural plans

- Subcontracted to other Architects

- Liasion with engineers and other trades

- Municipal liasion

- Site supervision

- Assisting clients with obtaining prices and negotiating with suppliers

- Issuing site instructions

- Obtaining occupation certificates from municipalities for clients

- Areas worked in: From Durban to Umkomaas KZN radius +- 120km

- Arranging site meetings between professional’s clients and contractors.

- Assisting clients & contractors with deviations and deviation plans.

- Submitting of all drawings & Sorting out referrals for approval with various Municipal & other

governmental departments.

Total number of projects worked on – 219

Total number of plans produced – 405

PORTFOLIO Page 27

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

Department of Works Mayville (Kwazulu Natal)

June 1999 – April 2004

Architectural technician

Duties:

− Plan site layouts for new building work

− Architectural drawings most government sectors

− Site surveying

− Liaising with client departments. (Dept health, Dept Education, etc.)

PORTFOLIO Page 28

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PORTFOLIO Page 29

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PORTFOLIO Page 30

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PORTFOLIO Page 31

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PORTFOLIO Page 32

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PORTFOLIO Page 33

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PORTFOLIO Page 34

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

PORTFOLIO Page 35

Pieter Venter

PROJECT MANAGEMENT PORTFOLIO

CONTACT:

PHYSICAL ADDRESS:

170 Aquilla, Roos Street

Fourways

2098

Johannesburg

Gauteng

South Africa

POSTAL ADDRESS:

170 Aquilla, Roos Street

Fourways

2098

Johannesburg

Gauteng

South Africa

TELEPHONE:

081-733-0432

FAX:

086-572-6048

E-MAIL:

[email protected]