    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    I..4.2 Over Head Tank

    MASONRY

    1 1.5 Providing and constructing Solid Cement Concrete

    Block masonry in cement mortar 1:6 (1 Cement : 6

    Coarse sand) using factory made, load bearing,

    approved quality Cement Concrete blocks of

    specified size, Grade D (4.0), Density of blocks notless than 1800 kg/cum. Minimum average

    Compressive strength of units - 4.0 N/sqmm and

    Minimum strength of individual units 3.2 N/sqmm,

    setting in position, curing, raking out joints

    wherever required etc., complete with all leads and

    all as per specifications and directions of the

    Engineer-in-charge. IN FOUNDATION AND

    Cu.M

    For 200mm thick walls using (400 x 200 x 200) mm

    size blocks.

    PLAIN CEMENT CONCRETE

    2 Providing and laying cement concrete using 40mm

    nominal size graded hard granite stone aggregate

    obtained from approved quarry including

    compaction, finishing top surface to level, curing

    but excluding cost of formwork, etc., complete as

    per specifications. Mix ratio specified is for

    (cement: coarse sand: graded stone aggregate).

    a) 0.5 In foundations with PCC 1:3:6 Cu.M

    3 Providing and laying cement concrete using graded

    hard granite stone aggregate of 20mm nominal

    size obtained from approved quarry including

    formwork, compaction, finishing, curing, etc., IN

    BED BLOCKS, SILL BLOCKS COPING upto all

    heights complete all as per specifications. Mix ratiospecified is for (cement: coarse sand: graded stone

    aggregate). The work includes providing throating/

    drip mould wherever required as per standard

    engineering practice of size not be less than 40mm

    x 15mm. The rate is inclusive for making drip

    mould and no extra cost shall be paid for.

    1 In coping with P.C.C (1:3:6) Cu.M

    Page 1 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    2/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    REINFORCED CEMENT CONCRETE

    4 Providing & laying in position machine batched,

    machine mixed and machine vibrated design mix

    cement concrete of specified grade for reinforced

    cement concrete structural elements, using graded

    hard granite stone aggregates of maximum 20mm

    nominal (down graded) size obtained from

    approved quarry including fine aggregates

    conforming to latest IS 383 and cement all as per

    approved design mix proportions conforming to

    latest IS 10262 with minimum cement content for

    durability including supplying and providing

    concrete cover blocks etc., which shall be followed

    as per latest IS 456-2000 including mixing,

    transportation, placing, vibrating, compaction,

    finishing to required levels, curing etc., complete all

    as per specifications but excluding cost of

    formwork and steel reinforcement.

    Rate to include labour for keeping embedments if

    any wherever required while casting. Rate also to

    include lift charges and scaffolding for heights,

    depths and levels from FFL/GL. (The design mix

    proportions shall clearly indicate cement: fine

    aggregate: coarse aggregate: water cement ration

    and approval shall be obtained from Engineer-in-

    charge for initial and subsequent mixes as and

    w en ere w e c ange n quarry ma er a s or

    25 grade reinforced cement concrete, etc., all work

    above plinth level upto all heights.

    a) 84 Walls (any thickness) including attached pilasters,

    buttresses, plinth and string courses, fillets,

    columns, pillars, piers, abutments, posts and struts,

    etc.,

    Cu.M

    b) 49.5 Beams, suspended floors, roofs having slope upto

    18 degree, landings, balconies, shelves, chajja,

    lintels, bands, plain windows sills, staircases and

    spiral staircases etc.,

    Cu.M

    5 Providing and fixing M-20 grade precast Reinforced

    cement concrete using graded hard Granite stone

    aggregate of 20mm nominal size obtained from

    approved quarry including mechanical mixing,

    centering and shuttering, compaction,

    simultaneously finishing smooth with 6mm thick

    cement plaster 1:3 (1 cement: 3 find sand) on

    exposed surfaces and fixing in position with sameC.M 1:3, curing etc., complete all as per

    specifications but excluding cost of steel

    Page 2 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    3/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    0.5 For man hole covers Cu.M

    6 Extra for mixing water proofing compound of

    approved quality and brand in R.C.C items withROFFE HYPROOF manufactured by M/s. Roffe

    Construction Chemicals Pvt, Ltd. At 140ml per

    50kgs of cement or CONPLAST X 421 IC of Fosroc

    Chemicalsltd. At 130ml per 50kgs of cement or

    equivalent approved make mixed with cement as

    per manufacturer's specifications etc., complete all

    as per specifications. (Rate to include cost of water

    roofin com ound133.5 In M-25 grade concrete Cu.M

    FORM WORK

    7 Providing rigid and water tight centering and

    shuttering using best quality wood/ plywood /steelforms and centering with steel props, acro tubes

    etc., including strutting, propping, bracing, staging

    etc., complete for all RCC items fixed in position as

    required including labour for careful removal of

    form work etc., complete all as per specifications at

    .

    surfaces.a) 72 Lintels, beams, plinth beams, girders, bressumers

    and cantilevers

    Sq.M

    b) 218 Suspended floors, roofs, landings, shelves and

    their supports, balconies and chajjas.

    Sq.M

    c) 598 Walls (any thickness) including attached pilasters,

    buttresses plinth and string courses etc.

    Sq.M

    d) 598 Extra for Curved shuttering for walls Sq.M

    e) 598 Extra for form finish for walls Sq.M

    Page 3 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    4/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    8 Extra for additional height in centering, shuttering

    wherever required with adequate bracing, propping

    with steel props, acrotubes etc., including cost of

    deshuttering and decentering at all levels, for

    suspended floors, roofs, landings, beams and

    balconies, etc., for NOTE: (1) Plan area to be

    measured (2) Floor height to be taken from finished

    floor level (3) This item is applicable only for

    roof/high bay slabs & beams and not applicable to

    other items such as columns, walls, etc.

    a) 13 For all RCC items above 3.5m lvl and upto 4.5m lvl Sq.M

    b) 13 For all RCC items above 4.5m lvl and upto 5.5m lvl Sq.M

    c) 13 For all RCC items above 5.5m lvl and upto 6.5m lvl Sq.M

    d) 13 For all RCC items above 6.5m lvl and upto 7.5m lvl Sq.M

    e) 13 For all RCC items above 7.5m lvl and upto 8.5m lvl Sq.M

    f) 13 For all RCC items above 8.5m lvl and upto 9.5m lvl Sq.M

    g) 13 For all RCC items above 9.5m lvl and upto 10.5m

    lvl

    Sq.M

    h) 13 For all RCC items above 10.5m lvl and upto 11.5mlvl

    Sq.M

    i) 26 For all RCC items above 11.5m lvl and upto 12.5m

    lvl

    Sq.M

    j) 56 For all RCC items above 12.5m lvl and upto 13.5m

    lvl

    Sq.M

    k) 84 For all RCC items above 13.5m lvl and upto 14.5m

    lvl

    Sq.M

    l) 118 For all RCC items above 14.5m lvl and upto 15.5m

    lvl

    Sq.M

    Page 4 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    5/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    STEEL WORK

    9 Steel reinforcement for al l RCC items including

    decoiling, cutting, hooking, bending, cranking,

    fabricating to required shape, placing in position

    and tying the system with soft drawn annealed

    binding wire of diameter not less than 1.00mm with

    2 strands etc., complete all as per specifications at

    all hei hts bindin wire will not be measured for15 With TMT 415 bars. M.T

    10 Supplying, fabricating, assembl ing, hoisting /

    erecting and fixing in position at all heights and with

    all leads, structural steel works of welded built-up

    sections, all as per structural drawings and as per

    detailed specifications (for materials and

    workmanship) in the situations described

    hereinafter includina) Cutting of components to required lengths/

    widths and shapes/ profiles

    b) Smooth machining of edges/ facesc) Welding (electric arc welding) at joints of built-up

    sections/ single sections for required weld lengths

    and sizes andd) Painting all over with two coats of synthetic

    enamel paint of approved quality, make and colour

    primer with surfaces duly pressed to receive

    painting etc., complete all as directed by the

    Engineer-in-Charge.NOTE: The Contractor shall submit fabrication

    shop drawings for work involved based on

    construction drawings (that may be issued during

    construction period) for approval by Engineer-in-

    char e.The fabrication work shall start only after approval

    to the fabrication drawings. Any change required in

    the fabrication drawings shall be carried out at no

    extra cost over the quoted rates. Fabrication shall

    be in a perfectly workmanship like manner and as

    provided in Section V and VI of IS 800 and IS

    7215. Welding shall be carried out by qualified

    welders.

    Electrodes for welding, the procedure, selection,

    test and inspection shall conform to provisions in IS

    816. IS 818, IS 822 and IS 833. Erection / hoisting

    shall commence only after passing of fabricated

    parts by the Engineer-in-charge.

    0.3 Structural steel works with MS angles, Tees and

    other sections

    M.T

    Page 5 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    6/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    FLOORINGS

    11 Providing and laying Indian patent stone flooring

    with cement concrete 1:2:4 (1cement: 2 coarse

    sand: 4 graded stone aggregate) using graded

    granite stone aggregate obtained from approved

    quarry laid to level or slope in bays not exceeding

    3sqm per panel including providing 3mm thick

    aluminium dividing strips to the full depth of the

    flooring and finished smooth, curing, etc., complete

    all as er s ecifications.19 40mm thick (Using 20mm nominal size stone

    aggregate)

    Sq.M

    WOOD WORK & JOINERY

    12 Providing and fixing steel door system made out of

    standard rolled steel sections. The door frame,

    shutter frame and diagonal stiffeners for the

    shutters, styles and rails and for shutters shall be

    MS angles / Tees. The shutter frame shall be

    covered with MS sheet (single / double skin)

    electrically welded. The door frame shall have base

    tie made out of 12mm square MS rod embedded in

    flooring and 3nos. of 15mm x 3.15mm lugs of

    100mm long on each side embedded in cement

    concrete blocks of size 150 x 100 x 100mm of 1:3:6

    mix (1 cement : 3 coarse sand : 6 hard granite

    stone aggregate 20mm nominal size) or with

    anchor fasteners or with fixing clips with bolts and

    The work includes providing approved pivots as

    required and iron oxidized butt hinges 125mm long,

    3nos. for each shutter conforming to IS 1341-1970

    etc., including cutting the steel sections to required

    lengths, joints mitred and electrically welded,

    ground and cleaning the surface thoroughly freefrom rust scales and painted with two coats of

    synthetic enamel over a coat of red oxide zinc

    chromate primer, after pre treatment of the surface

    by pickling and phosphating etc., conforming to IS

    specifications including providing and fixing MS

    aldrops, MS tower bolts and MS handles etc.,

    complete all as per specifications, drawings and

    instructions of Engineer in charge at all heights.

    161 a) Fully openable (single / double) shutter and

    Using MS sheet covered on single or both sides

    Kgs

    Page 6 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    7/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    13 Providing and fixing MS grills of required pattern in

    wooden / steel frames of windows, ventilators,

    clerestory windows, etc; with M. S flats, square

    orround bars with round headed bolts and nuts or

    by screws, etc; complete all as per drawings and

    directions of Engineer-in-charge.

    280 Plain grill ( With vertical, horizontal members or a

    combination of both)

    Kgs

    ROOFING

    14 Providing and laying water proofing treatment over

    RCC roof in 3 courses, as specified below, after

    thoroughly cleaning surface of the roof slab with

    wire brush, cleaning of dust and foreign matters,

    raking and cleaning of construction joints if any

    etc., complete to make the surface suitable for

    receivin water roofin treatment.I Course: The existing covering on slab to be

    removed and the surface of the RCC slab exposed.Construction joints if any are to be raked and

    cleaned. A coat of cement slurry at the rate of

    4.4kg/sqm mixed with acrylic water proofing

    compound (as per manufacturers specification) is

    spread uniformly over the RCC roof area and

    ensuring that the slurry penetrates in to the RCC

    slab below and fills all micron cracks and all other

    porous areas. Over this a layer of 15mm thick

    cement mortar 1:5, mixed with acrylic water

    proofing compound as per manufacturers

    specifications shall be laid to place the II course.

    II Course: A single layer of brick on edge with

    15mm wide gaps filled with CM 1:5 mixed with

    acrylic water compound is laid (i.e. bricks placedvertically on its 75x115mm side or 75x230mm side

    as the case may be, to suit the required thickness

    of courses), when the bottom layer (I course) is still

    green and laid to slope of 1 in 60 as per roof

    drainage scheme using approved well burnt bricks

    (wear absorption not more than 20%) with

    minimum thickness of 65mm at outer edge

    including the top and bottom plastering (I&III

    course) to get required gradient, laying the bricks

    with not less than 15mm gap alround, which shall

    be properly filled completely and compacted with

    CM 1:5 mixed with acrylic water proofing compound

    as per manufacturers specification using full bricks

    or bricks cut to required size to lay the course with

    single layer with gradient said above for adequate

    drainage.

    Page 7 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    8/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    III Course: 20mm thick cement mortar 1:4 mixed

    with acrylic water proofing compound with a layer of

    Chicken mesh 12mmx26G and marked with

    300mmx300mm false squares including curing

    etc., for not less than 7 days, complete all as per

    specifications and directions of Engineer-in-charge.

    The 20mm thick layer shall be carried out in two

    layers of 10mm thick with an inter layer of chicken

    mesh of 12mmx26G laid in between the two layers

    of cement mortar.

    NOTE:

    The acrylic water proofing compound to be used

    shall be;

    a). CHEMSEAL - Manufactured by M/s. Overseas

    Water Proofing Corporation, Mumbai. The

    proportion of CHEMSEAL shall be 2% by weight of

    cement. OR CONPLAST X 421 IC - integral water

    proofing compound manufactured by M/s.

    FOSROC Chemicals (India) Ltd., Bangalore. The

    proportion of CONPLAST x 421 IC shall be 130ml

    per 50 kgs of manufactured by M/s. ROFFE

    Construction Chemicals Pvt. Ltd., liquid integral

    water proofing compound at 140ml per 50kg of

    cement or E uivalentb)The second course of the treatment shall be laid

    in single course using full bricks/cut bricks as may

    .

    c) The rate to include all labour, material and

    contingent coats for execution of work in a

    workman like manner including curing, etc.,

    complete for respective courses.d) The plane horizontal measurements of roof slab

    only shall be measured for payment.e) The theoretical cement consumption required for

    the above work will be worked out based on co-

    efficient for each layer of work as per specification.

    f) The work shall be got executed through

    specilised water proofing agency.

    130 g) The contractor should finish a guarantee bond in

    the prescribed format for satisfactory water proofing

    performance for 10 years.

    Sq.M

    15 Providing and f ixing rigid PVC SWR (soil, waste

    and rain water) drainage/ rain water pipe

    conforming to type-A of IS 13592-1992, including

    accessories like bends and fixing with pipe clips,

    adhesive at joints all as per manufacturer's

    specifications to required length etc., complete allas per specifications and directions of Engineer-in-

    char e.

    Page 8 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    9/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    50 110mm OD pipes with minimum wall thickness of

    2.20mm.

    Mtr

    16 Providing and making khurras of size specif ied

    below with 12mm thick CM 1:3 plaster finish overPCC 1:2:4 using 10mm nominal size stone

    aggregate (1 cement: 2 coarse sand: 4 stone

    aggregate) of 600mmx600mm of varying thickness

    of 40mm at WPC side to 30mm at pipe end, laid to

    slope, compacted over PVC sheet of

    1000x1000mm x 400 micron laid over top of slab

    after cleaning the surface of concrete slab. The top

    surface of CM 1:3 plaster shall be finished smooth

    with cement punning, rounding of edges etc.,

    complete all as per specifications and directions of

    - -[Note: The RWP shall be fixed during construction

    of parapet to ensure filling the joints and around

    pipe properly].

    3 600mmx600mm size Each

    FINISHING

    17 Plastering 12mm thick with cement mortar

    s ecified below finished rou h includin,

    scaffolding, curing, etc. complete for EXTERNAL

    SURFACES inclusive of sills, jambs, soffits,

    ceilings, etc., complete all as per specifications for

    IN ALL FLOORS AND AT ALL HEIGHTS. Mix

    specified is for cement : coarse sand.

    NOTE : i) CM 1 : 3 OR CM 1:4 is generally

    applicable for ceilings and RCC surfaces unless

    otherwise specified.712 With CM (1:4) to RCC surfaces Sq.M

    18 Plastering 12mm thick with cement mortar

    specified below, finished smooth with lime neeru

    including scaffolding, curing, etc., complete for

    INTERNAL SURFACES of walls, beam, ribs, sills,

    jambs, ceiling, etc., complete all as per

    specifications at ALL HEIGHTS. Mix specified is

    for cement: fine sand.a) 373 a) With CM 1:4 to RCC surfaces Sq.M

    Page 9 of 10

  • 7/29/2019 Package II Part i.4.2, Boq Oht

    10/10

    Package II PartI Civil Works

    Construction of Over Head Tank

    SL.

    NO.QUANTITY DESCRIPTION OF ITEM UNIT

    RATE (in Figures &

    In Words)AMOUNT

    19 Water proof cement plastering of thickness as

    specified below in cement mortar 1:3 (1 cement: 3

    coarse sand) mixed with approved water proofing

    compound such as CICO or ACCOPROOF or

    equivalent as per manufacturers specifications

    including scaffolding, curing, etc., complete for

    EXTERNAL SURFACES all as per specifications

    UPTO ALL FLOORS AND AT ALL HEIGHTS.

    363 12mm thick Sq.M

    20 31 Painting steel work with TWO or more coats of

    SYNTHETIC ENAMEL PAINT of Ist quality and

    approved colour to give an even shade over a coat

    of red oxide zinc chromate primer including

    cleaning the surfaces, applying a coat of approved

    putty on whole surface and rubbing the surface to

    achive desired smooth surface, scaffolding, etc.,

    complete all as per specifications. (Rate to include

    cost of zinc chromate primer, putty also).

    Sq.M

    21 712 Painting external plastered surfaces with two or

    more coats of 100% acrylic exterior emulsion paint

    of approved make and colour (weather coat of

    Sq.M

    having protection against fungal, growth, flaking,

    fading, alkali and UV degradation and to give an

    even shade with required finish including cleaning

    the surfaces, filling the crevices with approved filler,

    scaffolding, curing, etc., complete all as per

    specifications at all heights.

    22 373 Painting plastered surfaces with TWO or more

    coats of ACRYLIC WASHABLE DISTEMPER of I

    quality and approved colour to give an even shade

    over a coat of water thinnable cement primer/ oil

    based cement primer including cleaning the

    surfaces, filling the crevices with approved filler,

    applying a coat of approved putty on whole surface

    and rubbing the surface to achieve desired smooth

    surface, scaffolding, etc., complete all as per

    specifications. (Rate to include cost of primer, putty

    also

    Sq.M

    23 25 Providing and fixing DI Specials suitable for push

    on joints upto 600mm dia

    Kg

    TOTAL