Nu Flow recently expanded its position in the United Kingdom market with a distribution and licensingpartner in Totton, Southampton, providing commercial, industrial, municipal and residential customers with
proven technologies to rehabilitate pipes without destruction. Nu Flow UK completed their rst job at a
school while Nu Flow technicians were there to train.
Project: Rehabilitate the failing water pipes throughout a
secondary school using Nu Flow’s epoxy coating system.
Site: King Harold Business and Enterprise Academy
(formerly King Harold School), a secondary school
located in Waltham Abbey, Essex.
System: The system consists of galvanized hot water
feed pipes, hot water return pipes and cold water supplypipes ranging in diameter of ½” to 3”. The problematic
pipe lines run horizontally and vertically throughout the
school.
Problem: The pipes suffered from low pressure, low ow
and discolored water. In addition, the majority of the hot
water taps were not functioning correctly. Prior to nding
Nu Flow, the customer had to take up all of the oors,
ceilings and some walls in approximately half of the
school to replace the pipes. The school had to be closed
to staff and pupils for over 9 months.
Solution: Nu Flow UK created a full site investigationto determine the location, diameters, direction of ow
and area of connections. With this, work began by using
compressed air to shoot a garnet through the pipes to
remove deposits. Once cleaned, hot air was blown
through the pipe to remove any nal deposits or garnet.
The system required multiple access points, high-
pressure air lines and segregated work areas. Starting
with the main run, the air valve was opened and the resin
was blown into the pipes, followed by any lateral lines.
After thirty minutes of air ow, the resin was cured and
thickness consistency was checked at each end of thepipe. The system stood for another 20 to 24 hours before
being used.
Where pipes were lined, both the ow and pressure were restored and color returned to normal. The hot
pipes that previously rancold water returned to proper temperature.
Nu Flow UK Completes First Pipe Rehabilitation Project